1 Caring for Our Shipwreck Heritage On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding all our documents. Although this document refers to English Heritage, it is still the Commission's current advice and guidance and will in due course be re-branded as Historic England. Please see our website for up to date contact information, and further advice. We welcome feedback to help improve this document, which will be periodically revised. Please comments to We are the government's expert advisory service for England's historic environment. We give constructive advice to local authorities, owners and the public. We champion historic places helping people to understand, value and care for them, now and for the future. HistoricEngland.org.uk/advice

2 2012 Caring for Our Shipwreck Heritage Guidelines on the First Aid Treatment and Conservation Management of Finds Recovered from Designated Wreck Sites Resulting from Licensed Investigations 1

3 1 Background These guidelines provide a framework for planning and managing artefact conservation on designated wrecks for licensees and their diving teams in English waters, as well as giving advice on best practice for the first aid treatment of marine finds in accordance with English Heritage s Accessing England s Protected Wreck Sites: Guidance Notes for Divers and Archaeologists Project planning guidance is based on English Heritage s document Management of Research Projects in the Historic Environment (Lee 2006) (MoRPHE). A simplified version of the MoRPHE project management scheme, as it relates to conservation management, is shown in Table 1. This covers the main elements relating to the planning and management of any artefacts and materials retrieved to be included in your project design. These guidelines also contain first aid and other practical advice relating to artefact recovery and conservation, based principally on the publication First Aid for Underwater Finds (Robinson 1998). Initial conservation advice may also be sought from the EH Maritime Archaeology Team (maritime@ english-heritage.org.uk). Other important information relating to your responsibilities towards reporting artefacts recovered is available from the Receiver of Wreck on or row@mcga.gov.uk. These Guidelines are underpinned by the principle, enshrined in law, that the protection of certain wreck sites is for the common good. In this context English Heritage strongly encourages legal owners to arrange for artefacts in their possession, which have come from protected wreck sites, to be acquired for the public benefit, as recommended in Our Portable Past (English Heritage 2006). 2 Introduction Shipwrecks are among the most interesting, exciting and evocative evidence from the past. They are an invaluable resource for research and for furthering our understanding of the history of our maritime nation. Wrecks are often remarkably well preserved owing to the special qualities of the marine environment, but they can also be at risk from various natural causes of disturbance, and from direct and indirect drivers PROJECT STAGE project documents project brief research agenda aims and objectives potential resources SELECTION AND RETENTION CONSERVATION STRATEGY FIRST AID CONSERVATION CONSERVATION ASSESSMENT ANALYSIS ARCHIVE Table 1 How conservation fits into the MoRPHE project management scheme (Lee 2006) human activity. These shipwrecks, along with their contents and associated materials, are a non-renewable resource each is unique and irreplaceable. We all have a duty to see that wreck sites are protected from damage and loss, however it is being caused. 3 Wreck protection A number of shipwreck sites in UK waters are designated under section 1 of the Protection of Wrecks Act 1973 (the 1973 Act) by virtue of their archaeological, historical or artistic importance. The 1973 Act effectively protects these sites against disturbance and damage from uncontrolled activities, but provides for managed access to the sites for suitably trained and experienced divers and others who wish to investigate these wrecks in a pre-planned, controlled and responsible way. Visits to these sites are to be encouraged as a way of fostering an interest in and appreciation of the marine historic environment. Visits to wreck sites are particularly to be welcomed from archaeologically trained divers as a way of monitoring their conservation strategy, document including first aid conservation plan conservation records assessment report selection/retention policy updated project design report for publication/archive DISSEMINATION condition so that preventive action can be taken if damage is being caused. 4 The purposes of the licensing system The licensing system exists to ensure that any person planning any activity on a protected wreck site is both competent and properly equipped to carry out operations appropriate to its historical and archaeological importance. This activity must be compatible with any Conservation Management Plan for the site (if available), and must be with the full knowledge and approval of the English Heritage Designation HPR Team. It is an offence for any other person to obstruct, or cause to be obstructed, any activity being undertaken by a licensee allowed by their licence. English Heritage may defray or contribute towards the cost of any work undertaken on a Protected Wreck Site by a licensee, including survey, excavation or other investigation. This may also include the preservation and maintenance of a Protected Wreck, or the removal of all or any part of it to another place for the purpose of preserving it. 2

4 5 Your licence to operate Four types of licence are available for archaeological investigation under the 1973 Act. Of these, only two allow removal of material: one permitting surface recovery of artefacts, and a second allowing for excavation. Before being granted a licence to recover materials from a Protected Wreck Site, you will be expected to provide a justification for why you intend to retrieve material from the seabed and how this will meet the aims and objectives of your project design. You must also be able to demonstrate in your project design that you have a firm grasp of the principles of first aid conservation, and that you have appropriate plans and preparations in place for the safe recovery of finds and arrangements for the long-term care of finds and the associated archive. 6 Planning a recovery Any material brought up from the seabed is immediately divorced from its context, from which it derives much of its meaning and value. The wreck site itself is reduced in archaeological value every time material of any kind is removed or displaced from it, by whatever cause. For these reasons, every action involving finds must be carefully planned and meticulously carried out both during and after the dive, in accordance with the Site Management Plan. Everything recovered forms an integral part of the site archive and the long-term curation and custodianship of the archive must be agreed and assured in advance of any intrusive investigative or remedial work taking place on a designated wreck site. 7 Project design The initial project design must include the following components: 7.1 Conservation strategy You will be required to provide a statement explaining clearly the rationale behind your intention to raise finds from the designated wreck site, how this fits with the Site Management Plan and exactly who you have consulted with in relation to this decision. As well as consulting with your Nominated Archaeologist, you will also have contacted all local heritage bodies with an interest in the wreck, the Receiver of Wreck and with the receiving museum where you have an agreement to deposit the archive. You will also be expected to have made contact with a suitably qualified conservator, who must be named in the project design and who has agreed to provide you with conservation advice and services during the project. It is a condition of your licence that your finds are cared for properly. Until ownership of the wreck material is established by the Receiver of Wreck, any interventional conservation is done at the risk of the finder and with the permission of the Receiver. While ownership is being determined, the finds should normally be kept under passive conservation (ie receive first aid conservation) to prevent deterioration. Useful information: Contacting a conservator As part of the surface recovery or excavation licence, you will be expected to have a suitably qualified conservator as part of the project team. The conservator can provide advice during the dive project, and can undertake the conservation assessment of the artefacts during and, especially, at the end of the fieldwork. If you do not already have a suitable contact, then you will find accredited conservators who undertake marine conservation work through the on-line Conservation Register at In compiling your Conservation Strategy you should: identify by name the Project Manager, who will be responsible for seeing all phases of the project work through to completion and closure. list the objects and materials that you anticipate recovering, by predicted type and approximate number provide a timetable showing how you plan the work of recording, conserving and researching your finds outline your plans for publishing or otherwise making accessible the information you recover nominate one member of your team responsible for overseeing the welfare of the artefacts until they are deposited with a museum review your security and insurance arrangements and say how you will minimise risk of loss or damage during storage and transport give the name and contact details of the conservator or laboratory you have engaged to advise on and conserve your finds state your policy for backfilling or otherwise making good any disturbance you have caused to the site detail how you are intending to compare the current state of the site with previous records in other words how you will be monitoring the rate of change ensure that the museum prepared to receive your archive is accredited with the Museums Libraries and Archives Council (MLA) (for further information about archive deposition see Institute for Archaeologists 2001). 7.2 Fieldwork, first aid conservation and finds management plan The principal aim of first aid conservation is to protect your finds Useful information All finds and exposed ship s structure visible on the seabed are vulnerable to erosion, corrosion, displacement and loss. Except in special and unusual cases, it is impractical and undesirable to raise major elements of the ship s structure, anchors, cannon, bulk cargo and ballast. But personal effects and small items of equipment might be considered for raising, depending on the level of risk of loss if left on the seabed unprotected. It is currently recommended to preserve archaeological shipwreck sites in situ (English Heritage 2002, 12). This is further reinforced by the Valletta Convention (Council of Europe 1992), to which the UK is a signatory. Preferred methods to be used for reburial of features and deposits on the wreck site should be included in the site s Management and Conservation Plan and, at the conclusion of the licensed investigation, should be discussed in the project design. These might include special measures, such as the use of sacrificial anodes for the protection of cannon, anchors and other large exposed metallic items, including hulls, or remedial stabilisation of small areas with geotextiles and sandbags might be necessary. All such proposals should be included in the project design. 3

5 from physical and chemical damage once they are brought to the surface in other words, to maintain your finds as far as possible in the same condition as they were when first uncovered. The purpose of first aid conservation plan is to demonstrate that you are properly prepared for the recovery of finds and materials and for their best possible care in the short term. You will be required to state what preparations and arrangements you intend to make, with all relevant practical details, including the budget that is earmarked for this work. You should nominate one member of your team to be responsible for the finds and samples. This person should preferably be someone with previous experience and training in finds processing and recording, and someone who clearly understands their responsibilities and duties. He or she should have read First Aid for Underwater Finds (Robinson 1998) before the start of the project. 7.3 First aid conservation Some important things to do and not to do: Check that objects really are loose and free from their surroundings before attempting to lift them from seabed. Much damage can be caused by attempting to pull up partly buried artefacts they could easily be attached to something else below. If still firmly attached, it is normally best that they are left in place. Use padded strops and adequate support during lifting. Objects are often more fragile than they look, especially when they break surface. Make sure that the larger heavier items are adequately supported in several places and use foam rubber pads to stop strops digging into fragile wood surfaces, for example. Have the right materials, and containers with you in advance of the dive. Make careful preparations for the objects and materials you are planning to lift. Make sure that you have the right size of containers, with tight-fitting lids, packing and labelling materials to ensure safe transport of your finds from site to shore base. Use appropriate labelling and marking materials and see that they cannot be separated from the objects. Plastic Dymo -style printed tape and Tyvek labels with good-quality black spiritbased marker pens are recommended. Also use zip-lock clear polythene bags with write-on panels and black ballpoint or spirit-based marker pens. For attaching labels to larger objects, use polypropylene (plastic) string, not natural fibre. Keep a basic register of objects as they are recovered, giving each object a unique number. This can be a written record or a computer database or table. A digital photograph of the object (with label and scale) is also useful; and make sure the find-spot is marked on a site plan. Use the log to note what happens to each object as decisions are made. This way, a history for each object can be built up. Keep objects submerged in fresh water at all times until they can be assessed by a conservator and further action planned. This is to reduce salinity, as salt will damage most finds as they dry out. Glazed ceramics should, however, be kept in sea water until assessed by a conservator. Store containers in a cool, dark place at your on-shore base, and change the water every few days, especially if it becomes murky or a scum develops on the surface. Minimise exposure to air and heat for example during photography and recording. It is surprising how fast organic materials will crack or iron objects start to corrode, even after just a few minutes exposure to air and heat. Keep handling to a minimum. Every time you remove an object from its container, it is put under stress and can become damaged. Always carry objects in their containers, not in your hands. When it is necessary to handle objects, make sure they are adequately supported and handled over a padded surface. Separate objects of different materials into different containers to avoid the risk of cross contamination and effects of corrosion products during storage. Transport your finds properly supported and in water-filled containers suitably padded to stop them moving about. Do not let objects jostle against each other in the same container. Concretions and assemblages of objects that are concreted together should be kept as they are and not broken open or otherwise separated until they reach the conservation laboratory and have been X-rayed. X-radiography of the metal objects, concretions and composite artefacts should be undertaken as soon as possible after recovery. Arrange this through your nominated conservator. This will also tell you a lot about your finds and, especially, what is really inside those concretions. It can also act as a security measure against possible damage and loss. Further information on the uses of X-radiography can be found in Fell et al Human remains Human remains must receive the due attention and care that their special status and importance merits. Bone will often be very fragile, should be handled well supported and stored immersed in water with absorbent foam rubber padding. If you discover skeletal remains that you suspect might be human, leave them in situ and contact the Ministry of Justice ( or in the case of a Useful information The degree of survival, and the appearance and condition of marine materials, will depend on the nature of the wreck site. Wrecks may be in deep, medium or shallow waters or even in the intertidal zone; they may be incorporated into the seabed either in gravel, mud or between rocks. Materials from these various locations will have been exposed to different energy levels and burial environments during their time on the seabed and so become degraded to varying extents until reaching some level of chemical and physical equilibrium with their surroundings. If the conditions change, materials will begin to degrade again until a new equilibrium is reached. Ship structure and objects well covered with marine sediment and in deep water will generally be well preserved owing to low oxygen levels, whereas exposed materials in shallow, warm water will be in an advanced state of decay where the oxygen levels are greater. However well preserved objects appear to be, they will have suffered some degree of alteration while buried in marine sediment. Their exposure through excavation will bring them into a higher energy environment, and their state will become dynamic again, leading to further and possibly very rapid deterioration. 4

6 war grave contact the Navy Command Headquarters (Heritage and Museums, Navy Command Headquarters, Third Sector Organisation, MP1.3, Leach Building, Whale Island, Portsmouth, PO2 8BY; tel ). 7.4 Conservation assessment As part of the project design required by the conditions of your licence, you will be expected to make arrangements with a registered conservation laboratory for further conservation work. You will also be responsible for sourcing the funds for this work to take place. At the conclusion of the dive season, you should arrange for your nominated conservator to carry out a conservation assessment of the assemblage (as defined in MoRPHE Lee 2006) as soon as practicable. This will result in an assessment report, which will include a description of each object, its state of preservation, condition and identification, as far as this can be determined at this stage. Please note that radiography is included in the Fieldwork phase, as defined in MoRPHE, and should therefore be undertaken before conservation assessment. Options for different types and levels of conservation treatment will be set out, with costs, and suggestions for further analysis and other research will be made. The conservator will also check that the find is adequately packaged and stored and may undertake any urgent remedial work that he or she judges to be necessary to enable the find to be stored safely until further conservation work can take place. Priorities for conservation may also be suggested where further prolonged wet storage could cause damage. Also in line with MoRPHE, you will be required to commission assessment reports from appropriate finds researchers and other specialists, who will be able to judge the potential significance of the artefacts and other recovered materials. The conservation assessment must be undertaken in collaboration with the other specialists. If applicable, it will be relevant to look at the archives relating to the conservation history of finds previously raised from the same site. 8 Updated project design (UPD) The UPD must include the following components: 8.1 Analysis phase The conservation assessment, together with the other assessments, will lead to the production by the licensee, with advice from the appropriate authorities, of an updated project design (UPD), which will drive the analysis phase. The UPD will detail all further investigative and remedial conservation, sampling and analysis, dating and other research work that is to take place as part of the project. The requirement for further conservation and investigation must be justified and the costs stated. The type and level of work to be undertaken on the finds will be driven by the agreed aims and objectives as outlined either in the original project design or by new aims and objects identified during the assessment phase. The requirements of archive deposition with the designated receiving museum will also need to be considered. The analysis phase is the stage at which the information potential of the finds will be realised, and remedial conservation applied to stabilise the objects. This can be a long process, particularly if organic materials are involved, but the conservator should be able to provide a timetable for completion of the agreed work. Once completed, the stabilised finds will be appropriately boxed or packaged in archival materials ready for transport for research or storage. The conservator and other specialists will provide a report on the work undertaken during the analysis phase, which will include technical information of value to the finds researchers. This report forms part of the analysis phase reports, which should be compiled by the licensee/s of the designated wreck site, with input from the nominated archaeologist, other specialist researchers, and also with possible input from the legal owners (decided by the Receiver of Wreck) and the designated receiving museum. These reports form part of the archive and are to be deposited with the receiving museum. 8.2 Selection, retention and disposal It is neither practical nor often necessary to conserve and archive everything that has been collected, so this is also the time to implement a selection and Useful information Conservators often divide up the types of work they do under various headings, which are useful to think about when drafting the conservation assessment and conservation plan. Here are the main categories: first aid conservation any action that ensures the safety of an artefact from the moment of discovery until it undergoes some further conservation process preventive conservation any noninvasive (ie passive) conservation process that slows down or halts the process of deterioration, for example appropriate packaging and storage in a controlled environment, proper controls on access, display and other uses. This is an ongoing process. investigative conservation any process whereby the true nature of an artefact is revealed and recorded, either by indirect means, such as X-radiography, or by direct means, for example removing concretion and corrosion, elemental analysis, species identification or other such procedure. remedial conservation any treatment that aims to stabilise the object so that it can be brought safely to a dry state, or to provide enough extra strength to enable it to be handled and stored normally, or to inhibit corrosion depending on the materials involved. display conservation any further work beyond that included under investigative and remedial conservation that is deemed necessary to fit the object for the purpose of display. This could include re-fixing broken elements, further cleaning and surface enhancement and protection, or the provision of a suitable display mount. retention programme. The assessment reports (described above) should aim both to identify the research potential and significance of the material, and also to flag up which parts of the collection might be disposed of. The views of EH, the designated receiving museum and other stakeholders must be sought before a decision is made as to what should be saved for further conservation and archiving, and what might be disposed of. Options 5

7 for disposal that could be considered might include offering the material to another museum, heritage or educational organisation. Before any material is dispersed, it must be adequately recorded to current standards (as defined by Brown 2007 and the Institute for Archaeologists 2008 and its fate recorded in the finds register or database. 8.3 Dissemination It is the responsibility of the project manager to make available the results of the project by means of academic and popular publications, media and any other appropriate means within a reasonable period of time. Signposting your project intentions and results, using a web-based archaeological sites index, such as OASIS, may be a requirement of your licence. The discovery, conservation and research work on artefacts will, of course, be of particular interest to the public. Your anticipated dissemination methods should be included in your project design and updated project design, along with how the information gained can be used for educational and other public or publicity-focused purposes. These requirements are in line with the Institute for Archaeologists Code of Conduct (IfA 2008) and any conflict between these and the needs of confidentiality, for example for the purposes of security, should be discussed with English Heritage. 8.4 The archive creation, curation and deposition Every well planned and properly executed archaeological project will result in an archive, which is the primary evidence (notes, plans, photos, artefacts, samples and other records) that have been produced during the course of project. These materials, along with any previously gathered data and materials, constitute the sum of our knowledge of that shipwreck and its environment, in space, time and historical context. It is essential that the archive is put together in a planned and organised manner in line with recommended methodology; that the component parts are formed of longlasting ( archival ) materials; and that the whole collection is deposited with a suitable MLA (Museums. Libraries and Archives Council) accredited museum. Each museum will issue its own guidelines for how an archive is to be presented, and it is a requirement of your licence that you make arrangements for depositing your archive, in advance of a diving season taking place. Useful information: Materials and equipment suppliers Some suitable containers and some packaging materials are available from hardware stores or supermarkets. For more specialised labelling materials and equipment, request an up-todate list of suppliers from your nominated conservator or other local archaeological contacts. Also refer to useful listings at the back of Watkinson and Neale 2001 and in Portable Antiquities Scheme and York Archaeological Trust Other important contacts: Conservation Register: www. conservationregister.com English Heritage Designation Department: maritime@englishheritage.org.uk English Heritage Regional Science Advisors: advice/advice-by-topic/heritagescience/regional-science-advisors/ Marine and Coastguard Agency Receiver of Wreck: row@mcga.gov. uk; tel References and useful links Bowens, A (ed) 2008 Underwater Archaeology: The NAS Guide to Principles and Practice (2nd edn). Portsmouth: Nautical Archaeology Society Brown, D H 2007 Archaeological Archives A guide to best practice in creation, compilation, transfer and curation. Archaeological Archives Forum; archaeological_archives_2011.pdf Council of Europe 1992 European Convention on the Protection of the Archaeological Heritage (Revised) [usually referred to as The Valetta Convention ]. int/treaty/en/treaties/html/143.htm English Heritage 2002 Taking to the Water: English Heritage s Initial Policy for the Management of Maritime Archaeology in England. org.uk/publications/taking-to-the-water/ English Heritage 2006 Our Portable Past. publications/our-portable-past/ English Heritage 2010 Accessing England s Protected Wreck Sites: Guidance Notes for Divers and Archaeologists. Jones, M D (ed) English Heritage publications/guidance-for-divers/ English Heritage 2008 Conservation Principles, Policies and Guidance for the Sustainable Management of the Historic Environment. english-heritage.org.uk/publications/ conservation-principles-sustainablemanagement-historic-environment/ Fell, V, Mould, Q, and White, R 2006 Guidelines on the X-radiography of Archaeological Metalwork. Swindon: English Heritage, english-heritage.org.uk/publications/xradiography-of-archaeological-metalwork/ Institute for Archaeologists 2001 Standard and Guidance for the Collection, Documentation, Conservation and Research of Archaeological Materials. Institute for Archaeologists 2008 Code of Conduct. By-laws of the Institute of Field Archaeologists (rev edn November 2008). codes/ifa Institute for Archaeologists 2008 Standard and Guidance for the Collection, Documentation, Conservation and Research of Archaeological Materials. default/files/node-files/ifa_standards_ materials.pdf Lee, E 2006 Management of Research Projects in the Historic Environment: The MoRPHE Project Managers Guide. Swindon: English Heritage, english-heritage.org.uk/publications/ morphe-project-managers-guide/ OASIS Online AccesS to Index of archaeological investigations. Portable Antiquities Scheme and York Archaeological Trust 2005 Conservation Advice Notes (1 6). org.uk/conservation Robinson, W 1998 First Aid for Underwater Finds. London: Archetype 6

8 Publications and Nautical Archaeology Society in association with the National Maritime Museum [out of print] Watkinson, D and Neale, V 2001 First Aid for Finds. London: Rescue and UKIC Archaeology Section 10 Other useful sources Brunning, Richard, and Watson, Jacqui 2010 Waterlogged Wood: Guidelines on the Recording, Sampling, Conservation and Curation of Waterlogged Wood. Swindon: English Heritage, english-heritage.org.uk/publications/ waterlogged-wood Karsten A, Graham K, Jones J, Mould Q, Walton Rogers P 2012 Waterlogged Organic Artefacts, Guidelines on their Recovery, Analysis and Conservation Swindon: English Heritage; english-heritage.org.uk/publications/ waterlogged-organic-artefacts/ The Swash Channel Wreck ( Dave Parham). 7

9 Authors These guidelines were written and compiled by Jim Spriggs and Ian Panter, York Archaeological Trust. Acknowledgements We would like to thank the following for providing the images: Todd Stevens (front cover) One of the HMS Colossus cannons Todd Stevens and Dave Parham (inside back cover) The Swash Channel Wreck Dave Parham. English Heritage is the Government s statutory advisor on the historic environment. English Heritage provides expert advice to the Government on all matters relating to the historic environment and its conservation. For further information and copies of this leaflet, quoting the Product Code, please contact: English Heritage Customer Services Department PO Box 569 Swindon SN2 2YP telephone customers@english-heritage.org.uk Published August 2012 English Heritage 2012 Edited and brought to press by David M Jones, English Heritage Publishing Designed by Vincent Griffin, English Heritage Imaging and Visualisation Product Code:

10 If you require an alternative accessible version of this document (for instance in audio, Braille or large print) please contact our Customer Services Department: Telephone: Fax: Textphone:

MARINE ANTIQUITIES SCHEME

MARINE ANTIQUITIES SCHEME For more information on the Marine Antiquities Scheme visit www.marinefinds.org.uk The MAS support team Wessex Archaeology Portway House Old Sarum Park Salisbury SP4 6EB T: 01722 326867 E: mas@wessexarch.co.uk

More information

Streets for All : 9 Use of white lines

Streets for All : 9 Use of white lines Streets for All : 9 Use of white lines On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding

More information

Byelaws: Questions and answers

Byelaws: Questions and answers Byelaws: Questions and answers Marine Management Organisation (MMO) byelaws (under Part 5, Chapter 1 of the Marine and Coastal Access Act 2009) for European marine sites (EMS) and marine conservation zones

More information

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG) Summary. The Berwick-upon-Tweed Conservation Area Advisory Group (CAAG) is a Forum that comprises a number of organisations and representatives

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Ratified by the Finance and Buildings Committee: July 2018 ASBESTOS MANAGEMENT PLAN CONTENTS Policy Statement 4 Introduction 5 Purpose 5 Scope 5 Definitions 6 Abbreviations 6

More information

Between East and West The Phoenician Shipwreck off Gozo

Between East and West The Phoenician Shipwreck off Gozo Between East and West The Phoenician Shipwreck off Gozo Season Report Dr Timmy Gambin Department of Classics & Archaeology University of Malta October 2017 Preamble Research on the Phoenician shipwreck

More information

Keele University Institute for Science and Technology in Medicine. Standard Operating Procedure. Title: Transportation of Human Tissue

Keele University Institute for Science and Technology in Medicine. Standard Operating Procedure. Title: Transportation of Human Tissue Keele University Institute for Science and Technology in Medicine Standard Operating Procedure SOP Number: HTA-36 Version: 1.0 Title: Transportation of Human Tissue Purpose: To provide a standardised approach

More information

The Scottish Open Water Swimming Association

The Scottish Open Water Swimming Association Introducing The Scottish Open Water Swimming Association We are pleased to present draft documents for general consultation of the proposed new charity, the Scottish Open Water Swimming Society. We invite

More information

Section 1 Preparation

Section 1 Preparation IOC Toolkit for safeguarding athletes from harassment and abuse in sport Section 1 Preparation In the introduction we considered why it is important for sports organisations to develop policies and procedures

More information

UNESCO UNITWIN Network on Underwater Archaeology. Workshop on Underwater Archaeology for the African Countries

UNESCO UNITWIN Network on Underwater Archaeology. Workshop on Underwater Archaeology for the African Countries UNITWIN Network on Underwater Archaeology Workshop on Underwater Archaeology for the African Countries (13-23 May 2015 Kemer / Antalya Turkey) INTRODUCTION Training Ship "Selçuk 1" from Selçuk University

More information

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING Revised August 2017 CONTENTS PAGE 2017 Updated Code of Practice 3 UKA Health & Safety Policy 4 Definitions 5 Hazard identification

More information

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement SHEPD Section ID 154 Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement Contents Definitions and Abbreviations...

More information

Work Health Safety Record Management Guidelines. October, 2014

Work Health Safety Record Management Guidelines. October, 2014 Work Health Safety Record Management Guidelines October, 2014 Contents 1 Executive Summary... 2 2 More information... 2 3 University Records Management... 2 4 WHS Legislative Requirements... 2 5 Other

More information

National Standard for Cycle Training - NSI

National Standard for Cycle Training - NSI National Standard for Cycle Training - NSI The National Standard for cycle training was reviewed and updated in 2012. This introduction sets the revised National Standard into context and presents the

More information

Version: 1.0 Last amendment: 16/01/2012. Contact Officer: Animal Welfare Officer

Version: 1.0 Last amendment: 16/01/2012. Contact Officer: Animal Welfare Officer CDU AEC Policy on the Collection of Voucher Specimens : 1.0 Last amendment: 16/01/2012 Contact Officer: Animal Welfare Officer Approved By: CDU AEC Date: January 2012 Next Review: January 2014 INTRODUCTION

More information

NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION

NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION Protocol concerning Fatalities and Difficult to Reach Crime Scenes. INTRODUCTION The geographical nature of North Wales and its prominence

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

Training Advice for Coasteering Guides

Training Advice for Coasteering Guides Beach Advisory Group Training Advice for Coasteering Guides 1.0 Background The information contained within this document is based on a competence- based training framework, designed to assist coasteering

More information

Exploring the Prinz Eugen Indiana Jones Goes Underwater Lesson Plan

Exploring the Prinz Eugen Indiana Jones Goes Underwater Lesson Plan Exploring the Prinz Eugen Indiana Jones Goes Underwater Lesson Plan Jonathan Bird travels to Kwajalein Atoll in the South Pacific to explore the sunken German Nazi heavy cruiser Prinz Eugen. The Eugen

More information

HEALTH AND SAFETY GUIDANCE NOTE FIRST AID

HEALTH AND SAFETY GUIDANCE NOTE FIRST AID HEALTH AND SAFETY GUIDANCE NOTE FIRST AID INTRODUCTION The duty to provide adequate first aid is dealt with by the Health and Safety (First Aid) Regulations 1981 [Health and Safety (First Aid) Regulations

More information

MVF Sanu Mitigation Survey and Timber Recovery

MVF Sanu Mitigation Survey and Timber Recovery 1 MVF Sanu Mitigation Survey and Timber Recovery 2 MVF Sanu Mitigation Survey and Timber Recovery Acknowledgements MAST would like to thank the Ian Kemp, National Trust General Manager for North Cornwall

More information

Umpires in Polocrosse Information for Administrators and Players

Umpires in Polocrosse Information for Administrators and Players Umpires in Polocrosse Information for Administrators and Players Introduction All sports need a cadre of Umpires to facilitate and manage their sport. In Australian Polocrosse the game largely relies on

More information

University Safety Policy Supplement

University Safety Policy Supplement Occupational Health and Safety Service, Kings Gate Newcastle upon Tyne NE1 7RU Tel 0191 208 6274 Document History University Safety Policy Supplement Lone working Approved October 2006 Re-ratified October

More information

July Ballast Water Management FAQ

July Ballast Water Management FAQ July 2018 Ballast Water Management FAQ Contents Contents... i Forward... iii 1. Has the UK ratified the BWM Convention?... 5 2. To what ships does the Convention apply?... 5 2.1 Internationally operating

More information

Briefing on the IWC s Conservation Committee

Briefing on the IWC s Conservation Committee Briefing on the IWC s Conservation Committee 1 June 2005 Taking the IWC Conservation Committee forward At its 55 th Annual Meeting in 2003, the International Whaling Commission voted to establish a Conservation

More information

Strategic Plan for Sevens Rugby. September 2006

Strategic Plan for Sevens Rugby. September 2006 Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve

More information

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13 DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1 CONTENTS Para Page 1. Introduction 3 2. Safety Management System 3 3 Reduce Risks 4 4. Identification of the Hazards and Risks... 4 5. Conformance with the

More information

PROCEDURE First Aid. Number: C 2001 Date Published: 13 September 2013

PROCEDURE First Aid. Number: C 2001 Date Published: 13 September 2013 1.0 Summary of Changes This procedure has been re-drafted from the General Policy Guidelines enabling inclusion within the Policy and Procedure Document Library. It has been amended to incorporate changes

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 Severn Trent Water Forum DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016 The Water Forum is a multi-stakeholder panel created in 2012 to challenge Severn Trent as it developed its business

More information

CSTMC Asbestos Management Policy and Procedures

CSTMC Asbestos Management Policy and Procedures ASBESTOS MANAGEMENT PLAN FOR COLLECTIONS at the CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION October 2010 1. FOREWORD 1.1. This document specifies the Canada Science and Technology Museum Corporation

More information

County Donegal Public Participation Network Work Plan

County Donegal Public Participation Network Work Plan County Donegal Public Participation Network Work Plan Introduction The purpose of this document is to present a (DRAFT) Work Plan for County Donegal Public Participation Network which will enable member

More information

Bass Nursery Areas 21 April 2015 UK Measures Forum Guidelines and Proposals

Bass Nursery Areas 21 April 2015 UK Measures Forum Guidelines and Proposals Bass Nursery Areas 21 April 2015 UK Measures Forum Guidelines and Proposals Introduction George Eustice MP recently announced a high level review of UK measures to protect the Sea Bass. This paper focuses

More information

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH ITEM 8.3 REPORTING MANAGER TRIM FILE REF 2014/110936 ATTACHMENTS PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH GROUP MANAGER NATURAL ENVIRONMENT 1

More information

Astrolabe Reef Access Plan Stakeholder Presentation

Astrolabe Reef Access Plan Stakeholder Presentation Astrolabe Reef Access Plan Stakeholder Presentation *Rena s bow thruster approx 18m Agenda Overview Access Plan Introduction State of the Reef & Wreck Site What to Expect Timetable & Activity Questions

More information

Consolidated Guidance to Intelligence Officers and Service Personnel on the Detention and Interviewing of Detainees Overseas, and on the Passing and

Consolidated Guidance to Intelligence Officers and Service Personnel on the Detention and Interviewing of Detainees Overseas, and on the Passing and Consolidated Guidance to Intelligence Officers and Service Personnel on the Detention and Interviewing of Detainees Overseas, and on the Passing and Receipt of Intelligence Relating to Detainees July 2010

More information

Scottish Hyperbaric Medical Service Strategic Context and Overview

Scottish Hyperbaric Medical Service Strategic Context and Overview Meeting: NoSPG Date: 19 th June 2013 Item: 16/13 (ii) Scottish Hyperbaric Medical Service Strategic Context and Overview Background & Aim of the paper The provision of hyperbaric medicine has been discussed

More information

LONE WORKING HEALTH AND SAFETY GUIDANCE

LONE WORKING HEALTH AND SAFETY GUIDANCE LONE WORKING HEALTH AND SAFETY GUIDANCE Revised March 2017: Version 3.1 Name of Policy: Purpose of the Policy: Policy Applies to: Approved by: Responsible for its Updating: Final Approval by: Lone Working

More information

Heritage Partnership Agreements

Heritage Partnership Agreements Heritage Partnership Agreements for Undesignated Marine Sites in England HMS Impregnable (1799) Heritage Partnership Agreement for the site of HMS Impregnable (1799), eastern Solent. This Heritage Partnership

More information

GUIDELINES ON ACCESS AND CONSERVATION ON CRAGS AND CLIFFS

GUIDELINES ON ACCESS AND CONSERVATION ON CRAGS AND CLIFFS GUIDELINES ON ACCESS AND CONSERVATION ON CRAGS AND CLIFFS Outputs from the UIAA/IUCN workshop on Climbers, Mountains, and the Environment Barcelona, 1-3 May 1998 These guidelines are intended for the use

More information

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels

Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels MARINE GUIDANCE NOTE MGN 422 (M) Use of Equipment to Undertake Work Over the Side on Yachts and Other Vessels Notice to all Shipowners, Masters and Crew This notice should be read with the Code of Safe

More information

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT AGGREGATE DREDGING AND THE MARINE ENVIRONMENT The marine Aggregate Levy Sustainability Fund ( marine ALSF ) programme represents one of the most substantial investments in UK marine research. The research

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

Standards and guidance for forensic archaeologists

Standards and guidance for forensic archaeologists Standards and guidance for forensic archaeologists The standard and guidance for the forensic archaeologists was formally adopted as IfA approved practice at the Annual General Meeting of the Institute

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

A GUIDE TO BUYING FALL ARREST EQUIPMENT. uk.rs-online.com (UK customers) (International customers)

A GUIDE TO BUYING FALL ARREST EQUIPMENT. uk.rs-online.com (UK customers)  (International customers) A GUIDE TO BUYING FALL ARREST EQUIPMENT (UK customers) www.rs-components.com (International customers) INTRODUCTION In a world of evolving legislation employers in the EU have had a legal responsibility

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

Outline of the Position Duties and Responsibilities

Outline of the Position Duties and Responsibilities Vacancy Number: 04/018 Category: Project staff Type of Appointment: Fixed-term Location: Sarajevo, Bosnia and Herzegovina Vacancy issued: 1 February 2018 Deadline for application: 21 February2018 Terms

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

Fisheries Unit Welsh Government Rhodfa Padarn Llanbadarn Fawr Aberystwyth SY23 3UR 15 November 2013

Fisheries Unit Welsh Government Rhodfa Padarn Llanbadarn Fawr Aberystwyth SY23 3UR 15 November 2013 Fisheries Unit Welsh Government Rhodfa Padarn Llanbadarn Fawr Aberystwyth SY23 3UR 15 November 2013 Re: Natural Resources Wales response to Welsh Government s consultation Further Review of the Exceptions

More information

Amendments to the International Convention on Maritime Search and Rescue of 27 April 1979

Amendments to the International Convention on Maritime Search and Rescue of 27 April 1979 Downloaded on July 27, 2018 Amendments to the International Convention on Maritime Search and Rescue of 27 April 1979 Region United Nations (UN) Subject Maritime Sub Subject Type Amendments Reference Number

More information

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010 London Organising Committee of the Olympic Games and Paralympic Games 14 June 2010 London 2012 Olympic and Paralympic Games Volunteer Protocol Title This document shall be known as the London 2012 Olympic

More information

Chapter 2.7 Bylaw sport governance and management

Chapter 2.7 Bylaw sport governance and management Chapter 2.7 Bylaw sport governance and management 2010 International Paralympic Committee Adenauerallee 212-214 Tel. +49 228 2097-200 www.paralympic.org 53113 Bonn, Germany Fax +49 228 2097-209 info@paralympic.org

More information

Organising the National Technology Needs Assessment (TNA) Process: An Explanatory Note

Organising the National Technology Needs Assessment (TNA) Process: An Explanatory Note Appendix II Organising the National Technology Needs Assessment (TNA) Process: An Explanatory Note Subash Dhar, Jyoti Painuly, Ivan Nygaard and Jorge Rogat UNEP DTU Partnership (UDP) Denmark Revised (November,

More information

Portable Appliance Testing

Portable Appliance Testing The University of Edinburgh E Brief description of the paper University Health and Safety Committee Tuesday 18 th November 2014 Portable Appliance Testing This Paper presents the review of the University

More information

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and LOCOG: taking action to ensure respect for workers rights in global supply chains Agreement between The London Organising Committee of the Olympic Games and Paralympic Games and Trades Union Congress on

More information

Proposal for cooperation between GRASP and the CMS Gorilla Agreement

Proposal for cooperation between GRASP and the CMS Gorilla Agreement Proposal for cooperation between GRASP and the CMS Gorilla Agreement Background Great Apes Survival Partnership The Great Apes Survival Partnership (GRASP) was founded in 2001 at the World Summit on Sustainable

More information

Plot the Path into the Harbor

Plot the Path into the Harbor Plot the Path into the Harbor By Mary Anne Otten, Rudyard Area Schools and Joan Chadde, Michigan Technological University Subject/Grade: Grade 3 6, Math, Social Studies, Science Duration: 35 minutes Lesson

More information

Protection Group Providing Solutions. Developing Your Emergency Preparedness

Protection Group Providing Solutions. Developing Your Emergency Preparedness Protection Group Providing Solutions Developing Your Emergency Preparedness Emergency Preparedness and the Efficient, Effective Management of Incidents Introduction Based on the Wilton International site

More information

Mountain Caribou Recovery Implementation Plan. Predator/Prey Component. Terms of Reference

Mountain Caribou Recovery Implementation Plan. Predator/Prey Component. Terms of Reference Mountain Caribou Recovery Implementation Plan Predator/Prey Component Terms of Reference These Terms of Reference (ToR) support the October 2007 BC Mountain Caribou Recovery Implementation Plan. They are

More information

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by:

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by: T e n a n t F a r m i n g F o r u m S u b m i s s i o n o f E v i d e n c e t o t h e L a n d R e f o r m R e v i e w G r o u p I N T R O D U C T I O N The Tenant Farming Forum (TFF) is a membership organisation

More information

Underwater excavation of a shipwreck. Bougianen Project (Menorca, Spain)

Underwater excavation of a shipwreck. Bougianen Project (Menorca, Spain) Course 049 Underwater excavation of a shipwreck. Bougianen Project (Menorca, Spain) 1. General Information The Sanisera Archaeology Institute for International Field Schools offers annual programs in archaeology.

More information

TYPE F. Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15

TYPE F. Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15 0 TYPE F Home Pools GUIDELINES FOR SAFE POOL OPERATION DOMESTIC POOLS SLSQ ANNUAL REPORT 14 15 Royal Life Saving Bahrain Royal Life Saving Bahrain (RLSB) is a charity registered under the Ministry of Social

More information

Heritage Partnership Agreements

Heritage Partnership Agreements Heritage Partnership Agreements for Undesignated Marine Sites in England HMS Velox (1915) Heritage Partnership Agreement for the site of HMS Velox (1915), eastern Solent. This Heritage Partnership Agreement

More information

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL DUCHY OF CORNWALL. ST MARY S HARBOUR AUTHORITY NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL WORKING DRAFT Page 1 of 25 CONTENTS 1 1. NAVIGATIONAL SAFETY MANAGEMENT SYSTEMS PRINCIPLES 3 2. INTRODUCTION

More information

OCTOBER 2018 EXECUTIVE SUMMARY

OCTOBER 2018 EXECUTIVE SUMMARY IOC Sustainability Report Sharing progress on our 2020 objectives OCTOBER 2018 EXECUTIVE SUMMARY IOC Sustainability Report: We are pleased to present this executive summary of the first Sustainability

More information

Unit 3: Fire Service Operations and Incident Command International

Unit 3: Fire Service Operations and Incident Command International Unit 3: Fire Service Operations and Incident Command International Introduction This unit focuses on the activities required to resolve fire and rescue. It covers incident command as well as fire and rescue

More information

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions

Control of Work. Introduction This procedure describes the management of Asbestos. Definitions Home Knowledge Control of Work Search Asbestos Introduction This procedure describes the management of Asbestos. The management approach shall be in accordance with the requirements of the Control of Asbestos

More information

CORONATION OFFSHORE, PENLEE POINT PLYMOUTH

CORONATION OFFSHORE, PENLEE POINT PLYMOUTH ARCHAEOLOGICAL SERVICES IN RELATION TO THE PROTECTION OF WRECKS ACT (1973) CORONATION OFFSHORE, PENLEE POINT PLYMOUTH DESIGNATED SITE ASSESSMENT: FULL REPORT Prepared by: Wessex Archaeology Portway House

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

Abseiling (Natural Surfaces) REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

Abseiling (Natural Surfaces) REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS Abseiling (Natural Surfaces) REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS NOLRS VERSION 2.2 October 2009 Outdoor Council of Australia Ph: (08) 9248 6677 1800 660 540 Fax: (08) 9248 5799 Email: nolrs@outdoorcouncil.asn.au

More information

Minimal Impact Rescue Code ASF Australian Cave Rescue Commission

Minimal Impact Rescue Code ASF Australian Cave Rescue Commission Minimal Impact Rescue Code ASF Australian Cave Rescue Commission To help protect Australia's caves the Australian Cave Rescue Commission, in conjunction with the NSW Cave Rescue Squad, has produced the

More information

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass? Guidance Note Hydropower Guidance Note: This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments and EU obligations.

More information

HOW TO DIG A TEST PIT

HOW TO DIG A TEST PIT HOW TO DIG A TEST PIT An archaeological test pit is a small 1m by 1m trench dug in a series of layers, or spits, to a depth of approximately 1m. The archaeological materials collected from these layers

More information

Proposed fisheries management measures for English offshore MPAs in the Channel, the Southwest Approaches and the Irish Sea

Proposed fisheries management measures for English offshore MPAs in the Channel, the Southwest Approaches and the Irish Sea Proposed fisheries management measures for English offshore MPAs in the Channel, the Southwest Approaches and the Irish Sea Date: 28 February 2017 Paris Designation and Management of Marine Protected Areas

More information

An Introduction from Tom Harrison. ECB Chief Executive Officer

An Introduction from Tom Harrison. ECB Chief Executive Officer An Introduction from Tom Harrison ECB Chief Executive Officer Children are the future of our sport so it s vital they experience cricket in a safe, friendly and enjoyable environment. That s why we first

More information

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS NOLRS VERSION 2.2 October 2009 Outdoor Council of Australia Ph: (08) 9248 6677 1800 660 540 Fax: (08) 9248 5799 Email: nolrs@outdoorcouncil.asn.au

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Ackworth Road Runners. Risk Assessment and Health & Safety Policy (September 2016)

Ackworth Road Runners. Risk Assessment and Health & Safety Policy (September 2016) Ackworth Road Runners Risk Assessment and Health & Safety Policy (September 2016) Introduction To ensure that the Club minimises risk to its members and to the general public, it is necessary to ensure

More information

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) 1.0 INTRODUCTION The purpose of this procedure is to give direction on the responsibilities and requirements related to UK legislation covering

More information

Hollow Spike Tyre Deflation System

Hollow Spike Tyre Deflation System Hollow Spike Tyre Deflation System Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

Salmon Five Point Approach restoring salmon in England

Salmon Five Point Approach restoring salmon in England Salmon Five Point Approach restoring salmon in England Our Mission To restore the abundance, diversity and resilience of salmon stocks throughout England We will do this by:- a) Maximising the production

More information

DRAFT INTERIM ADVICE NOTE 150/17

DRAFT INTERIM ADVICE NOTE 150/17 DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the

More information

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE 39th Session, Paris, 2017 39 C 39 C/52 19 October 2017 Original: English Item 4.13 of the provisional agenda INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT (2021-2030) OUTLINE Source:

More information

The Concept of the Louisbourg Underwater Museum 1

The Concept of the Louisbourg Underwater Museum 1 The Concept of the Louisbourg Underwater Museum 1 Robert Grenier Introduction Parks Canada, part of the federal Department of Canadian Heritage, has been involved in managing the country's submerged marine

More information

REVISED SILT CURTAIN DEPLOYMENT PLAN

REVISED SILT CURTAIN DEPLOYMENT PLAN Contract No.: HY/2009/11 Central Wanchai Bypass, North Point Reclamation REVISED SILT CURTAIN DEPLOYMENT PLAN Name Prepared by: China Harbour Engineering Co., Ltd. China Road and Bridge Corporation Joint

More information

LIFT MAINTENANCE POLICY

LIFT MAINTENANCE POLICY LIFT MAINTENANCE POLICY Originator: Policy and Strategy Team Approval date: August 2018 Review date: August 2019 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health and safety

More information

An Introduction From David Collier. ECB Chief Executive

An Introduction From David Collier. ECB Chief Executive An Introduction From David Collier ECB Chief Executive The England and Wales Cricket Board (ECB) produced the original version of Safe Hands in the autumn of 2003. That document was prefaced by the ECB

More information

Mrs Omotayo Odubade Defra Area 4C Nobel House London SW1P 3JR. Defra

Mrs Omotayo Odubade Defra Area 4C Nobel House London SW1P 3JR. Defra PROJECT SPECIFICATION Competition Code: CTE 1201 Date for return of tenders: 4:00pm on 30 April 2012 Address for tender submission: (the Competition Code must be shown on the envelope and the tender submitted

More information

ROLE DESCRIPTIONS BY COMPETENCY LEVEL

ROLE DESCRIPTIONS BY COMPETENCY LEVEL UNIVERSITY OF NORTH CAROLINA WILMINGTON Scientific Diving Specialist DESCRIPTION OF WORK: These positions execute research protocols in accordance with input from scientists or members of the mission team.

More information

Introduction to the NRA Design Manual for Roads and Bridges

Introduction to the NRA Design Manual for Roads and Bridges Volume 0 Section 0 Part A 0.0.A Introduction to the NRA Design Manual for Roads and Bridges July 2011 St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660 2511 Fax +353 1 668 0009 Email : info@nra.ie

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS SUMMARY TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS In recent articles supplied by the Council of Gas Detection and Environmental Monitoring (CoGDEM) for inclusion in International

More information

INTERNATIONAL LIFE SAVING FEDERATION LIFESAVING POSITION STATEMENT - LPS 19 USE OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

INTERNATIONAL LIFE SAVING FEDERATION LIFESAVING POSITION STATEMENT - LPS 19 USE OF PERSONAL PROTECTIVE EQUIPMENT (PPE) World Water Safety INTERNATIONAL LIFE SAVING FEDERATION Gemeenteplein 26 3010 Leuven Belgium Tel: +32 16 89 60 60 E-mail: ils.hq@telenet.be - Web: www.ilsf.org LIFESAVING POSITION STATEMENT - LPS 19 USE

More information

Plot the Path. Mary Anne Otten. lesson three

Plot the Path. Mary Anne Otten. lesson three Plot the Path Mary Anne Otten lesson three Subject/Grade: Grade 2, Math, Social Studies, Science Duration: one class period Materials needed: Per class: Day the Great Lakes Drained Away by Charles Ferguson

More information