NORSOK STANDARD DRILLING & WELL OPERATIONS

Size: px
Start display at page:

Download "NORSOK STANDARD DRILLING & WELL OPERATIONS"

Transcription

1 NORSOK STANDARD DRILLING & WELL OPERATIONS D-010

2 This NORSOK standard is developed by NTS with broad industry participation. Please note that whilst every effort has been made to ensure the accuracy of this standard, neither OLF nor TBL or any of their members will assume liability for any use thereof. NTS is responsible for the administration and publication of this standard. Norwegian Technology Standards Institution Oscarsgt. 20, Postboks 7072 Majorstua N-0306 Oslo, NORWAY Telephone: Fax: norsok@nts.no Website: Copyrights reserved

3 CONTENTS FOREWORD INTRODUCTION 1 SCOPE 4 2 NORMATIVE REFERENCES 4 3 DEFINITIONS AND ABBREVIATIONS Definitions Abbreviations 8 4 GENERAL REQUIREMENT Well Classification Well Design Well Data Acquisition Blow-out Contingencies or Relief Well Drilling Barrier Philosophy Operations Preparation of Programme Risk Analyses Emergency Preparedness Analysis Application of Consents, Permits, Approvals Simultaneous Operations Personnel Qualification & Training HSE Management System Safety Drills Reporting to the NPD Experience Transfer Documentation 25 5 OPERATION Drilling Completion or workover Testing Well Intervention Pressure Controlled Drilling 45 NORSOK standard Page 1 of 55

4 ATTACHMENT 5.2 BARRIER TESTING, STATUS AND AVAILABILITY FOR WELL COMPLETION OPERATIONS (INFORMATIVE) 51 ATTACHMENT 5.3 BARRIER TESTING, STATUS AND AVAILABILITY FOR WELL TESTING OPERATIONS (INFORMATIVE) 52 ATTACHMENT BARRIER TESTING, STATUS AND AVAILABILITY FOR SNUBBING OPERATIONS (INFORMATIVE) 53 ATTACHMENT BARRIER TESTING, STATUS AND AVAILABILITY FOR COILED TUBING OPERATIONS (INFORMATIVE) 54 ATTACHMENT BARRIER TESTING, STATUS AND AVAILABILITY FOR WIRELINE OR TRACTOR OPERATIONS (INFORMATIVE) 55 NORSOK standard Page 2 of 55

5 FOREWORD NORSOK (The competitive standing of the Norwegian offshore sector) is the industry initiative to add value, reduce cost and lead time and eliminate unnecessary activities in offshore field developments and operations. The NORSOK standards are developed by the Norwegian petroleum industry as a part of the NORSOK initiative and supported by OLF (The Norwegian Oil Industry Association) and TBL (Federation of Norwegian Engineering Industries). NORSOK standards are administered and issued by NTS (Norwegian Technology Standards Institution). The purpose of NORSOK standards is to contribute to meet the NORSOK goals, e.g. by replacing individual oil company specifications and other industry guidelines and documents for use in existing and future petroleum industry developments. The NORSOK standards make extensive references to international standards. Where relevant, the contents of a NORSOK standard will be used to provide input to the international standardisation process. Subject to implementation into international standards, the NORSOK standard will be withdrawn. INTRODUCTION The main objective of this NORSOK Standard is to contribute to an optimisation of the drilling & well operations with respect to gaining operational efficiency and to stipulate an acceptable safety level. Revision 2 of this Standard is an overall improvement and expansion of the former D-010, especially on well intervention and pressure control drilling. NORSOK standard Page 3 of 55

6 1 SCOPE This NORSOK standard defines functional and performance oriented requirements for well design and planning and execution of safe and efficient drilling and well operations in Norwegian waters. 2 NORMATIVE REFERENCES The following standards include provisions which, though reference in this text, constitute provisions of this NORSOK standard. Latest issue of the references shall be used unless otherwise agreed. Other recognised standards may be used provided it can be shown that they meet or exceed the requirements of the standards referenced below. NORSOK M-702 Drill string components NORSOK S-002 Working Environment NORSOK S-003 Environmental Care NORSOK Z 015 Temporary Equipment NORSOK D-001 Drilling Facilities NORSOK D-CR-003 Surface Christmas Tree, Rev. 1 Jan NORSOK D-SR-005 Coiled tubing equipment, Rev 1, Jan NORSOK D-SR-006 Snubbing equipment, Rev. 1, Jan NORSOK D-SR-007 Well testing system, Rev. 1, Jan NORSOK D-SR-008 Wireline equipment Rev. 1, Oct BS 6755: Part 1: 1986 (1991) = ISO 5208 Specification for production pressure testing requirements NACE MR0175 NPD Sulphide Stress Cracking Resistant Metallic Materials for Oilfield Equipment, 1997 Acts, Regulations and Provisions for the Petroleum Activity ANIS/ASME B31.3 Process Piping, 1996 ISO ISO ISO ISO Petroleum and Natural Gas Industries Drilling and Production Equipment Drill Storm Design and Operating Limits First Edition, 1993 Petroleum and Natural Gas Industries Subsurface Safety Valve Systems Design Installation, Operation and Repair First Edition, 1993 Petroleum and Natural Gas Industries Drilling and Production Equipment Specification for Valves, Wellhead and Christmas Tree Equipment First Edition, 1994 Petroleum and Natural Gas Industries Subsurface Safety Equipment Specification First Edition, 1993 NORSOK standard Page 4 of 55

7 ISO Petroleum and Natural Gas Industries Drilling and Production Equipment Specification for Wellhead Surface Safety Valves and Underwater Safety Valves for Offshore Service First Edition, 1994 API Bull 6AR Recommended Practice for Repair and Remanufacture of Wellhead and Christmas Tree Equipment, 1994 API Spec 6FA Specification for Fire Test for Valves, 1994 API Bull 6FI Bulletin on Performance of API and ANSI End Connections in a Fire Test According to API Specification 6FA, 1994 API Bull 6F2 Bulletin on Fire Resistance Improvements for API Flangas, 1994 API RP2K Bruk av stigerør API Bull 2J Stigerørsanalyse API Spec 10 Specification for Materials and Testing for Well Cements, 1990 API Spec 10D Specification for Bow-Spring Casing Centralises, 1995 API RP 10E Recommended Practice for Application of Cement Lining to Steel Tubular Goods, Handling, Installation and Joining Third Edition; ISO 10409, 1994 API Spec 13A Specification for Drilling Fluid Materials, 1993 API RP Recommended Practice Standard Procedure for Field Testing Water-Based Drilling Fluids, 1990 API RP Recommended Practice Standard Procedure for Field Testing Oil-Based Drilling Fluids, 1991 API RP 13C Recommended Practice for Drilling Fluid Processing Systems Evaluation, 1996 API RP 13D Recommended Practice on the Rheology and Hydraulics of Oil-Well Drilling Fluids, 1995 API RP 13E Recommended Practice for Shale Shaker Screen Cloth Designation, 1993 API RP 13G Recommended Practice Standard Procedure for Drilling Mud Report Form, 1991 API RP 13I Recommended Practice Standard Procedure for Laboratory Testing Drilling Fluids, 1995 API RP 13J Testing of Heavy Brines, 1996 API RP 14B API Spec 14D API RP 14H API RP 17A API RP 53 Design, Installation, Repair and Operation of Subsurface Safety Valve Systems Fourth Edition; ISO 10417; Errata 1996, 1994 Specification for Wellhead Surface Safety Valves and Underwater Safety Valves for Offshore Service, 1994 Recommended Practice for Installation, Maintenance and Repair of Surface Safety Valves and Underwater Safety Valves Offshore Fourth Edition; ISO 10419, 1994 Recommended Practice for Design and Operation of Subsea Production Systems, 1996 Blow-out Prevention Equipment Systems for Drilling Wells Third Edition, 1997 NORSOK standard Page 5 of 55

8 API Spec 5CT Specification for Casing and Tubing (Metric Units) Fifth Edition, 1995 API Spec 5D Specification for Drill Pipe, 1992 API Spec 5B Specification for Threading, Gauging and Thread Inspection of Casing, Tubing and Line Pipe Threads (U.S. Customary Units), 1996 API Spec 5L Specification for Line Pipe, 1995 API Spec 5LC Specification for CRA Line Pipe, 1995 API Bull 5A2 Bulletin on Thread Compounds for Casing, Tubing and Line Pipe Sixth Edition; Superseded by RP5A3, 1988 API Bull 5C2 Bulletin on Performance Properties of Casing, Tubing and Drill Pipe, 1987 API Bull 5C3 Bulletin on Formulas and Calculations for Casing, Tubing, Drill Pipe and Line Pipe Properties, 1994 API Bull 5C4 Bulletin on Round Thread Casing Joint Pressure and Bending, 1987 API RP 5A5 Recommended Practice for Field Inspection of New Casing, Tubing and Plain-End Drill Pipe, 1993 API RP 5B1 Gauging and Inspection of Casing, Tubing and Line Pipe Treads Fourth Edition, 1996 API RP 5C1 Recommended Practice for Care and Use of Casing and Tubing, 1994 API RP 5C5 Evaluation Procedures for Casing and Tubing Connections API Spec 6D Specification for Pipeline Valves (Gate, Plug, Ball and Check Valves), 1994 API Spec 6FB API Specification for Fire Test for End Connections, 1992 API Spec 6FC Specification for Fire Test for Valves with Automatic Backseats, 1994 API Spec 16A Specification for Drill Through Equipment, 1986 (replace with ISO when issued) API Spec 14A Specification for Wellhead Surface Safety Valves and Underwater Safety Valves for Offshore Service First Edition, 1994 API RP 14B Design, Installation, Operation and Repair First Edition, 1993 API RP 14E Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems, 1991 API STD 607 Fire Test for Soft-Seated Quarter Turn Valves, 1993 API Spec 16D Specification for Control Systems for Drilling Well Control Equipment, 1993 API Spec 7 Specification for Rotary Drill Stem Elements Thirty Eight Edition; Errata 1994 (replace with ISO when issued) API Spec 7F Specification for Oil-Field Chain and Sprockets, 1993 API RP 7G Drill Stern Design and Operating Limits First Edition, 1993 API Spec 8C Specification for Drilling and Production Hoisting Equipment (PSL 1 and PSL 2), 1992 (replace with ISO when issued) NORSOK standard Page 6 of 55

9 API RP 8B Recommended Practice for Procedures for Inspection, Maintenance, Repair and Remanufacture of Hoisting Equipment, 1992 API Spec 9A Specification for Wire Rope, 1995 API RP 9B Recommended Practice on Application, Care and Use of Wire Rope for Oil Field Service, 1986 API RP 10E Recommended Practice for Application of Cement Lining to Steel Tubular Goods, Handling, Installation and Joining Third Edition; ISO 10409, 1994 API RP 5C7 Coiled Tubing Operations in Oil and Gas Well Service First Edition, DEFINITIONS AND ABBREVIATIONS 3.1 Definitions Barrier: One or several dependent barrier elements, which are designed to prevent unintentional flow of formation fluid. A barrier is an envelope preventing hydrocarbons from flowing unintentionally from the formation, into another formation or, to surface. Barrier elements that make up the Primary barrier are those elements, which are or might be in direct contact with well pressure during normal operation. These elements provide the initial and inner envelope preventing unintentional flow of reservoir fluid to surface, or another zone. Barrier elements that make up the Secondary barrier are those, which are or might be exposed to contact with well pressure should any of the elements described as a Primary barrier element fail. These elements provide an envelope outside the Primary barrier envelope providing a second barrier preventing unintentional flow of reservoir fluid to surface, or another zone. HPHT well: Well drilled in a formation with expected shut-in wellhead pressure greater than 690 bar and/or bottom hole temperature in excess of 150 C. NORSOK: Norsk Sokkels Konkurranseposisjon, the Competitive standing of the Norwegian Offshore Sector, the Norwegian initiative to reduce cost on offshore projects. Shall: Verbal form used to indicate requirements strictly to be followed in order to conform to the standard and from which no deviation is permitted, unless accepted by the Operator. Should: Verbal form used to indicate that among several possibilities one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required. Simultaneous operations: Two or more major activities being in process parallel in time. Tested barrier: Barrier tested and qualified to withstand maximum expected pressure. NORSOK standard Page 7 of 55

10 Pressure controlled drilling: A well drilled under the conditions that the effective pore pressure in the formation is greater than the static/effective circulating downhole pressure, of a drilling fluid (flow drilling). 3.2 Abbreviations AFE Approval for Expenditure BHA Bottom Hole Assembly BOP Blow Out Preventer BPV Back Pressure Valve CDRS Common Drilling Reporting System CT Coiled Tubing CTD Coiled Tubing Drilling DSHA Defined Situations of Hazard and Accidents ECD Equivalent Circulating Density ESD Emergency Shut Down HMV Hand Manual Valve HPHT High Pressure High Temperature HSE Health, Safety and Environment HXT Horizontal x-mas tree IADC format International Association of Drilling Contractors IBOP Internal Blow Out Preventer IT Information Technology IWCF International Well Control Forum JPD Jointed Pipe Drilling LCC Life Cycle Cost LMRP Lower Marine Riser Package LRP Lower Riser Package LWD Logging while Drilling MSL Mean Sea Level MUT Make up Torque MWD Measurement while Drilling NMCE & R Norwegian Ministry of Church, Education and Research NMD Norwegian Maritime Directorate NPD Norwegian Petroleum Directorate OD Outer Diameter PCD Pressure Control Drilling? PL Production Licensee PSD Production Shut Down QRA Quantitative Risk Assessment RKB Rotary Kelly Bushing ROV Remote Operated Vehicle SAM Regulation relating to systematic follow-up of the working environment (Deleted!) SCSSV Surface Controlled Subsurface Safety Valve SEPREA Specific Emergency Preparedness Requirements for the Activity SFT Surface Flow Tree SJA Safe Job Analysis SPCA State Pollution Control Agency (Statens Forurensingstilsyn) NORSOK standard Page 8 of 55

11 SSTT TKV TLP WHP WL X-mas tree Sub Sea Test Tree Tubing Kill Valve Tension Leg Platform Well Head Pressure? Wire Line Production Control and Safety Valve Arrangement 4 GENERAL REQUIREMENT 4.1 Well Classification Registration number, well identification and classification or reclassification shall be obtained from the NPD for each well before any operations commence. 4.2 Well Design Formation Data The well design shall be based on the following: Geological prognosis * Expected stratigraphy and lithology * At least two interpreted deep seismic cross section views through the field or planned well path * Geological description of all prospects * Geological uncertainties * Site survey Fluid contact prognosis Requirements to zonal isolation Temperature, pore pressure and formation strength prognosis Well path and target requirements Potential well collosion risks Hole cleaning and hole stability requirements Production or injection requirements Design life requirements Well Design Process Prior to commencing the detailed well design process, the following considerations should be part of a conceptual plan: Outline Well * Define well type * Define total lifecycle of well * Policies, procedures, standards and controls in place and adequate Rig suitability Review offset data * Obtain and analyse offset data, identify areas requiring more detailed follow up Evaluate risk for shallow gas and hydrates Wellpath design NORSOK standard Page 9 of 55

12 Casing design * Review formations, pore pressures, formation strengths and temperature gradients * Prepare preliminary design * Check design for shallow hazard implications Completion * Review completion equipment with respect to artificial lift requirements, packers, plugs etc. * Testing pressure Formation Evaluation HPHT Evaluation Cold Climate Evaluation Tubing design * Test pressure * Materials selection * Packer envelope Well test requirements Manning or training Logistics and materials HSE * Identify environmental sensitivities * Hazard or risk identification and handling Review design Approve design Drilling Location A site survey including an assessment of sea bed conditions, water depths, boulders, subsidence, seabed features, possible obstructions, cables, pipelines, anchor holding demands, sea traffic, etc. of concern shall be performed and thoroughly interpreted. The survey shall also cover possible surface locations for relief wells. The seismic lines shall have a penetration covering the geological sequence to the setting depth for casings for the blowout preventer. Connecting seismic lines to neighbouring wells shall be established if practically possible Site Specific Considerations Orientation and protection of the facilities should be optimised with regard to prevailing meteorological and oceanographic conditions and with due regard to emergency preparedness. Efforts should be made to eliminate the need to place anchors closer than 500 m off other platforms or subsea installations, and 200 m off pipelines and cables, assuming direction of pull is away from these facilities. Any deployment of anchor or anchorline closer than these distances requires special safety considerations and clarifications to be undertaken if the other Owners or Operators and NPD has consented to the precautions being taken. Increased distances or clearances and additional safety precautions are required where direction of pull is towards other installations or pipelines or cables. Prior to start planning of these operations, operators of exposed platforms, sub sea installations or pipelines and cables shall be notified. NORSOK standard Page 10 of 55

13 When drilling a well close to a lease line, the position uncertainties for well path or surface location should be taken into account in order not to compromise the lease line. When drilling adjacent to boarder lines to neighbouring countries, international agreements must be observed. For floating units the station keeping capabilities must be verified to be within set criteria (with due consideration to possible anchoring or positioning failure), and it is mandatory to be able to immediately move off location in a shallow gas emergency. For other DSHA the SEPREA's and procedures defined by the operator will apply. 4.3 Well Data Acquisition General During operations data related to geology, reservoir and drilling shall be collected or recorded in order to facilitate evaluation of geology and prospects, operational control or optimisation and experience transfer. An evaluation of the data acquisition programme shall be done prior to every specific drilling operation in order to comply with the purpose of and requirements for the well. In order to optimise the value and use of data, quality assurance, storage, media, availability etc. should be focused. For a drilling operation the following minimum requirements shall apply: Geological and reservoir technical Data Requirements Drill Cuttings Unwashed (1 kg) and washed and dried (10-20 g). Min. 10 m intervals, 3 m intervals in expl wells in HC bearing zones. Cores Exploration wells: Min. 1 core in all HC bearing zones and cores from potential source rocks and reservoir rocks. Appraisal wells: Complete reservoir section in selected wells Production wells: A representative selection of wells from the reservoir and source rocks. Side wall cores Optional Fluid, gas and res. formation water samples From individual test intervals. Surface sampling: Pressure, temperature and flow rate to be recorded. Bottom hole sampling: 2 corresponding samples. Pressure, temperature and flow rate to be recorded. Surface samples may be sufficient if recombination gives correct fluid composition Logs/LWD Drilling: Min. to facilitate evaluation of lithology, porosity, water saturation, Formation test: Min. to establish pressure gradient, type of fluids, productivity and temperature. NORSOK standard Page 11 of 55

14 4.3.3 Drilling Data Requirements Well integrity Data for verification of integrity of well barriers i.e. BOP s, wellhead, casings, cement jobs etc. Directional Continuous (for every stand drilled) registration of inclination and azimuth. Formation pressure All necessary data to be recorded after installation of conductor or surface casing. Formation strength LOT/FIT after casings have been drilled out. Operational Rig data aq. system, Mud data, Mud Logs, MWD logs etc. Ref. also NORSOK Standard D-001, Drilling. An evaluation of the data acquisition requirements shall be identified for each individual well. 4.4 Blow-out Contingencies or Relief Well Drilling General The blowout contingency plan shall be developed to meet the NPD legislation as well as Operator internal requirements. The document shall be regularly updated to assure that relevant information is available in case of well control. It shall contain the following: Mobilisation of necessary emergency equipment, personnel, services Kill methods in the case of a blowout occurrence. Description of suitable locations for drilling a relief well Measures for limiting the amount of the damage from the hazard or accident Guidelines for normalisation of the operation Relief Well If a surface intervention cannot be performed on the blowing well the blowing shall be killed or plugged via a relief well. The objective of a relief well is to enter or get communication to dynamically kill and stabilise a blowing well. The following items shall as a minimum be covered for a relief well design: Mapping of suitable drilling locations if appropriate including shallow seismic interpretation of the top section Evaluation of blow-out scenarios and kill methods Requirements to facilities for relief drilling and well killing Evaluation of relevant well profiles and casing programme Estimation of necessary pumping capacity Updated list of available equipment and time critical activities, including possible rigs or facilities for well intervention options as appropriate. Initiation of relief drilling at a relevant location shall commence no later than 12 days after the option is declared. NORSOK standard Page 12 of 55

15 4.5 Barrier Philosophy Primary Requirements All Operators shall establish and implement a barrier philosophy to meet the NPD legislation s, which shall be adapted also by companies or personnel working for or on behalf of the Operator. The operator should take the necessary steps to assure that the barrier philosophy is adapted, understood and used during operations. During drilling or workover operations the fluid column or a plug is normally providing the primary barrier, with a secondary barrier available to be activated (typically BOP pipe ram or shear or blind ram) No single failure of barrier or barrier element, whether caused by operational error or equipment failure, shall lead to loss of well control. Two independent and tested barriers shall be available. The two defined barriers shall to the extent possible be independent of each other without common barrier elements. If common elements exist procedures shall be established to govern operations and/or failure scenarios. If one barrier fails, immediate measure shall be taken in order to monitor an adequate safety level, until at best two independent and tested barriers have been restored. No other activity than reestablishment of the barrier shall be carried out in the well. The barrier element shall be designed such that: Re-establishment of a lost barrier can be done quickly, The position or location and status can be known, It can be pressure tested, or verified by other means, e.g. observation, It is independent of other barriers in conjunction with the same source of influx, It can operate competently in the environment (pressure, temperature, and fluids) that may be encountered during the period it was intended for. The barrier shall be positioned as close as possible to a potential influx. As part of the planning of the operation there shall be prepared graphical barrier diagrams for the main operational stages clearly identifying primary and secondary barriers Testing of Barriers Barriers shall as far as possible be tested in the direction of the potential flow. The barrier shall be tested to the maximum anticipated differential pressure. If high-pressure components, such as BOP rams, valves, seals and gaskets are replaced, these components shall be tested to working pressure. NORSOK standard Page 13 of 55

16 Test pressures shall be specified in the Operations Programme. Fluids acting as a barrier may be qualified as tested barriers when justified on the basis of the fluid specification, observation and stability testing of the fluid. Inflow as tested barrier elements can be qualified as tested barriers. Criteria shall be established to define the acceptance level for the leak rate while pressure or leak testing barrier elements Barrier Status The position or status of the barrier or barrier element shall to the extent possible be known at all times. If not achievable, compensating measures shall be established. Identification of the barriers shall be established prior to commencement of the activity by describing the barrier elements, planned location and method of monitoring. All parameters relevant for maintaining the control of the well shall be monitored continuously. Position or status of the barrier or barrier element shall be available through test record, lights or data printout presented to the driller and/or the principal operator of the equipment representing the barrier Barrier Availability The availability of barrier elements shall be defined and documented. When planning an activity, situations where barrier elements are not available (i.e. when running drill collars past a shear ram, which is not qualified for cutting) shall be identified. Passive barrier elements that are dependent on energy to be activated shall be equipped with redundant supply, (accumulators, second electrical power source etc.) Failure Criteria (Well Control Actions) Prior to commencement of an activity, there shall be a plan of corrective action to be taken in case of failure of barrier elements. A description of possible failure that can affect the barrier shall be described together with a contingency plan to re-establish the barrier. Well control actions should regulate the use of shear ram or other cutting tools by identifying various options and use of barrier elements before the work string or wireline or coiled tubing is sheared. Failure criteria for the barriers and barrier elements shall be described through presentation of contingency action flow diagrams representing those scenarios that are considered to potentially occur as a result of equipment or human failure during the activity. NORSOK standard Page 14 of 55

17 4.6 Operations Operations Planning In due time before starting on operation, an approved project definition shall be available in writing. All projects or operations shall be planned in accordance with the relevant Regulatory Bodies' rules and regulations and Company s relevant governing documents. Solutions or methods shall be based on specifications given in the project definition, qualified experiences, available technology and cost or benefit analyses. Life cycle cost (LCC) evaluations shall be reflected in the cost or benefit calculations. Information made available for the operational environment shall give operational personnel a basis to make the decisions required for an optimal cost-effective operation, within the framework established by the HSE. This is particularly important during assignments where deviations from the programme or procedures could lead to a critical situation. The information shall provide the basis for selecting the most optimal solutions during normal operations. The planning and approval process shall be documented Back-up Equipment Critical spare parts or back-up equipment with long lead-time should be identified and possibly planned to be located offshore or at the shore base Equipment Rig-up Proper, formal interface with the rig systems for the offshore facilities must be established. Norsok Standard Z 015 is considered as recognised standard in this context Contingency procedures Approved contingency procedures shall have been reviewed prior to the operations phase. Both Company and contractor shall have these procedures available offshore. Specific contingency procedures related to special applications, operations or equipment not covered in the contractors operational manual, shall be described in the work programme. 4.7 Preparation of Programme Operation premises and a detailed description of the planned tasks to be executed shall be included in specific operations programmes for the operation in question. Typical programmes to be developed are: Drilling programme Completion programme Testing programme Plugging programme Work-over programme Well intervention programme NORSOK standard Page 15 of 55

18 Emphasis should be made on the use of explanatory formats and schematics flowcharts. The programme shall have been subject to an inter-discipline check involving the Operator and the main Contractor(s) prior to implementation. The programme may be supplemented by more detailed guidelines and risk analyses. As the operations proceeds, significant deviations from the programme shall be formally identified and recorded, and approved and the NPD informed where applicable. NORSOK standard Page 16 of 55

19 Programmes Content General Purpose of activity and time schedule x x x x x x Installation/vessel's name, PL number, block, field x x x x x x Well identification, classification x x x x x x Position (geolgraphical and seismic) x Waterdepth (MSL) and depth reference (RKB elevation) x Organisation Organization plan x x x x x x Resp. and com. during normal operation and emengencies x x x x x x List of contractors x x x x x x Geology Geological prognosis/information x Pressure prognosis/information x Plan for geological sampling/logging x Reservoir Reservoir data prognosis/information x x x x Plan for reservoir technical sampling/logging x x x x Perforation intervals, flow/shut-in periods x x x x x Estimated rates, discharges, env. consequences x x Plan for stimulation x x Technical Casing/tubing programme/information x x x x Cementing programme/information x x x x Fluids programme/information x x x x Directional programme/information x x x x Operational Operational constraints and shutdown criterias x x x x x x References to operational procedures and instructions x x x x x x Detailed operational sequence x x x x x x Safety Detailed description of barriers/well contr. eq. for all phases x x x x x x Safety and operational hazards and planned measures x x x x x x Drills related to well safety x x x x x x Deviations from governmental and internal requirements x x x x x x Drilling Programme Formation Test Programme Completion Programme Perforation-/Isolation Programme Intervention programme Plugging Programme NORSOK standard Page 17 of 55

20 4.8 Risk Analyses General Prior to every operation and when evaluating the risk situation, a separate risk analysis shall be considered carried out. Risk Analyses shall be carried out to expose the probability and consequence of single failures or sequential failures that may occur during operation. Risk analyses are normally split in two main categories: Installation specific Quantitative Risk Assessment (QRA), and Operational Risk Analyses The risk analysis shall be performed before the operation is started. The risk analysis shall as far as possible incorporate previous experience with similar operations. The analyses shall be carried out with the co-operation of personnel possessing sufficient operational experience as well as personnel possessing documented risk analysis experience to ensure that all relevant factors are taken into account. Relevant factors may include design of installation, available equipment (including barriers), organisational limitations, environment, geology, etc QRA The QRA is performed as part of the design. The operator shall review the QRA to ensure that it is in line with all relevant standards and regulations, and that all significant modifications has been incorporated. The QRA shall reflect the conditions expected at the specific location Operational Risk Analyses An operational risk analysis shall, when applicable, be performed: for new or non-standard operations for operations in new areas for operations to be performed by new or modified rig or installation for operations using new or modified equipment for operations including contractor(s) not familiar with the rig, area or operation if the operation are considered hazardous (e.g. HPHT or simultaneous operations, dynamic positioning, deep water, cold climate or reduced riser margin) Task Analysis Regular task analysis (SJA) shall be carried out to review hazards and consequences of operations and failures that may occur so that risk-reducing measures may be taken. Prior to every operation, introduction of new equipment and when evaluating change in premises, a separate analysis shall be considered carried out. A safety meeting should be held to ensure all personnel are aware of the operational limitations applicable in connection with the operation. Specific meetings to be held as often as required for reviewing risk in the activities (SJA). NORSOK standard Page 18 of 55

21 4.8.5 Methods The assessment shall as a minimum include the following steps: 4. Consequence Analysis 1. Planning of study 2. Breakdown of the activities 3. Hazard I dentification 6. Risk Evaluation 7. Evaluation of Compensating measures 5. Frequency Analysis The planning shall as a minimum include type of method to be used, boundaries of study, and inclusion of relevant personnel. Risk Acceptance criteria shall be established at this stage. In order to ensure an efficient and structured analysis, the various steps of the operation should be broken down and assumptions recorded. The hazard identification shall systematically identify all potential technical, operational and organisational hazards. The consequences of the identified hazards to personnel, environment and economy shall be identified. The frequency of occurrence of each identified hazard shall be determined based on previous experience, standard methods or expert judgements. Based on the estimated consequences and frequency of the identified hazards, the risk can be estimated and compared to the acceptance criteria. Measures to control, reduce or remove the identified risk shall be evaluated. Probability reducing measures shall be given priority over consequence reducing measures. Results from the risk analysis shall be communicated to the employees and shall be used actively in preventive safety efforts. 4.9 Emergency Preparedness Analysis The emergency preparedness analysis shall ensure a systematic evaluation of all technical, operational and organisational measures which prevent a dangerous situation that has occurred from developing into an accidental event, or prevent or reduce the harmful effects of accidental events that have occurred. Based on information obtained from the risk analysis, a set of defined situations of hazard and accident (DSHA) shall be identified, serving as a basis for establishing the emergency preparedness. For each of the DSHA, a set of Emergency Preparedness requirements shall be identified for each phase of the emergency preparedness. This is illustrated below. The analysis shall result in a set of requirements related to the effectiveness of the emergency preparedness measures employed to meet the defined situations of hazard and accident. NORSOK standard Page 19 of 55

22 Alert Danger Limitation Rescue Evacuation Normalisation Specific Emergency Preparedness Requirements for the Activity (SEPREA) Alert shall be carried out to ensure totally effective mobilisation of all relevant emergency preparedness resources. Measures for danger limitations shall be implemented when a hazardous situation occurs in order to avoid it developing into an accident situation. Rescue measures shall ensure that missing persons are found and that injured persons are given necessary first aid and brought to safe area for treatment. Evacuation on and from the installation shall be carried out in a safe and organised manner in order that all personnel are brought to a safe area. Normalisation measures shall ensure that personnel are brought ashore for treatment and care, the environment is restored to its normal condition and that damage to the installation is stabilised and the reservoir secured. Verification of the emergency preparedness shall be performed to ensure that the Emergency preparedness requirements are met. Requirements to emergency preparedness competence shall be defined for all personnel taking part in the activity concerned Application of Consents, Permits, Approvals The consents necessary shall be obtained from NPD by the Operator, they are activity specific, and are typically related to the use of a particular installation at a certain area over a defined period. The assessments required to support and document the Application for Consent need to be a wellorganised approach, with multi-discipline involvement from the Operator and Contractors. The Operator is responsible towards the authorities, but the process assumes commitments from all parties involved. Any regulatory exemptions, for which the authority concurrence is requested, are typically detailed in the Application for Consent. NORSOK standard Page 20 of 55

23 Details regarding the subsequent Permits, Approvals and submittal of programmes for specific drilling and well operations are outlined in the NPD s «Regulations for Drilling and Well Activities and Geological Data Collection, etc.». Activity plans, possible regulatory discrepancies and extraordinary HSE aspects should be highlighted by submission of these documents. A Discharge Permit shall be obtained from the SPCA for exploration and field development operations Simultaneous Operations Simultaneous operations shall be thoroughly planned, analysed and performed with the objective of limiting excessive risk imposed by multiple operations at the same time, as opposed to the risk associated with the execution of these operations individually. Relevant procedures for the control of simultaneous or parallel operations shall be developed and validated or assessed prior to commencement of operations Definition of Operations and Basic Safety Criteria The following operations are defined as simultaneous operations if two or more of these operations are executed at the same time within the defined area for such activity: Production or Injection Live well operations Pigging operations exposing drilling and well area Running or pulling riser or heavy lifting or heavy construction Skidding rig Hot Work Drilling operations and workover Conductor driving and installation Injection to annulus Repair of change-out of X-mas tree or annulus valves Pumping and flowing through temporary lines A prerequisite for executing simultaneous operations in a safe and prudent manner is emphasising administrative and operational procedures to ensure a systematic and controlled execution of the activities Operational Considerations Operational measures to ensure that simultaneous activities are carried out in a safe manner should at least include the following considerations: Ensure that the day-to-day follow-up of simultaneous activities during the operational phase takes place in a co-ordinated and systematic way, and possible deviations are identified and corrected. If during drilling a well deviates within defined minimum distances to completed and perforated wells, correlated for the uncertainty of the position indication, barriers (plugs) shall be introduced below a possible point of contact in the said production or injection wells. If a possible point of contact is located above the SCSSV, closing and testing the SCSSV will be sufficient. The annular space of wells that may be exposed to collision with a well where drilling is in progress, should be brought into an overpressure condition in relation to the well being drilled, and the annular pressure of the wells should be closely monitored. NORSOK standard Page 21 of 55

24 Restriction in simultaneous operations during heavy lifts if a sudden loss of suspended loads endanger the safety of other concurrently ongoing operations like such heavy lifts can be, but are not limited to: Handling, running and pulling of BOP, X-mas tree etc. above wellhead areas Running and pulling of risers, drill strings, casings and wellhead components in open water Transfer of heavy equipment between supply boats and rig, etc. Activities shall be halted if the gas level in the drilling area exceeds a certain limit set by the operator. Special precautions shall be taken when welding, grinding, cutting and other high-energy work in the wellhead, BOP or drillfloor area in parallel with simultaneous activities are performed. During simultaneous drilling and production, special restrictions shall be implemented for activities that could lead to a reduction of the safety level during drilling through layers containing hydrocarbons Personnel Qualification & Training In accordance with Statutory regulations and operator procedures, requirements to qualifications or training shall have been set out for all job categories with great impact on safety through the various phases of drilling and well operations. Special training should be provided in the case that new equipment or technology is planned to be used Qualifications and Training for Offshore Operations The following specific qualifications requirements for drilling and well operations personnel are supplemental to the common requirements for offshore personnel regarding such as health certification, basic safety and contingency training with refreshers. Supervisory personnel shall have training or experience in Norwegian Acts, Regulations and Provisions. Training with respect to work environment factors shall be in accordance with the NPD Regulations relating to systematic follow-up of the working environment. Personnel involved shall have the education and experience required in compliance with Norwegian Regulations, and shall be able to show proven track records for the same. The OLF/NR s Recommendations for Training of Drilling Personnel is considered to represent the industry norm. Documented experiences for the specific offshore positions can be provided through an on-the-jobtraining system compatible with that system recommended or issued by the NR. Requirements to personnel qualifications should also comprise theoretical and practical training when new equipment is introduced. As supplementary standard for personnel qualifications in the area of well service, reference is made to the Education Plan approved by the Norwegian Ministry of Church, Education and Research in respect of Well Service Techniques, detailed within the areas of Wireline Operations and Cementing. Well Control Training and Refreshers are required for the following offshore positions: Drilling Drilling Supervisor, Toolpusher, Tourpusher, Driller, and Assistant Driller. NORSOK standard Page 22 of 55

25 Well Intervention Wireline and Coils Tubing personnel are missing under well control training and refreshers requirements. The following wording is suggested: The Operator Company s Leader for Well Operations and Intervention. All supervisory personnel for wireline, coiled tubing and snubbing operations, such as: Superintendent, Supervisor and relevant 3 rd part equipment suppliers. Equipment operators that operate the unit, such as: Wireline winch operator, Coiled tubing cabin operator, Snubbing jack operator and Choke operator. Basic well control training and subsequent refresher courses shall be completed in accordance with US-MMS, UK-HSE or International Well Control Forum (IWCF) certification standards. The Operator can carry out mandatory control by requesting the Contractors to confirm there is consistence in personnel qualifications requirements by detailed references to existing regulations and standards, and to present any discrepancies and the existing training schedule for personnel involved HSE Management System Health, safety and environmental protection (HSE) shall receive particular attention through operations planning. An HSE Management system shall be implemented to meet regulatory requirements, and should be compatible with the E&P Forum s «Guidelines for the Development and Application of Health, Safety and Environmental Management Systems». Evidence on shortcomings in HSE performance should result in special measures or support or monitoring as agreed between the Operator and Contractor concerned Working Environment & Occupational Health Work areas should be subject to regular evaluation or charting against the NPD s «Regulations relating to systematic follow-up of the working environment, etc.», NORSOK standard S-002 Working Environment and/or against OLF/NR s «Recommended Guidelines for systematic followup of the working environment on Mobile Units, etc.». For operations with mobile units designated for drilling and well operations, the Drilling Contractor can be assigned the role as Principal Enterprise according to the OLF/NR s «Standard Agreement concerning Principal Enterprise responsibilities» for co-ordination and follow-up of the working environment onboard. On fixed installations, this role will typically rests with the Operator or Owner. Working environment and occupational health factors with high potential for changes between various wells should receive extra focus, like the changes imposed by the use of chemicals, drilling and completion fluids and additives. Before start of the operations the workforce shall receive relevant information concerning health hazards related to their work and measures to prevent harmful exposure. Including possible training in correct use of personnel protective equipment and with emphasis on risk and preventative measures associated with non-routine operations, tasks, methods, materials and chemicals. Systems should be properly implemented for the reporting of accidents, work related diseases, unsafe acts and conditions. A safety delegate system shall be implemented for the drilling and well NORSOK standard Page 23 of 55

26 operations area, and the system shall also include representatives to serve the interests of the Well Service Contractors Environmental Protection Appropriate systems for protection of the environment should be in accordance with the operative parts of the NORSOK S-003 standard for «Environmental Care». Chemicals, which are discharged to the water or emitted to the air, shall cause as little harm as possible to the environment. Selection of chemicals should be based on an overall evaluation of efficiency, environmental data, safety data and economic criteria. The total evaluation of the product should also address the quantity and concentration of emissions. All fluids and chemicals (also for emergencies, detergent and thread dope) shall have been tested in accordance with SPCA s guidelines. Chemicals on SPCA s list A and B should be as clean as possible. Chemicals which are included in the Paris Convention s Annex A part I or contain alkylfenol or alkylfenol-connections shall not be discharged. An assessment of measures for reduced fuel or energy demands and steps to reduce the consumption of chemicals and use of chemicals with better environmental characteristics shall be part of the continuous improvement process. The technology available for reducing discharges to the sea and emissions to the air shall be continuously evaluated. There shall be systems in place for handling waste and keeping track of chemicals or substances onboard and discharges. All chemicals used during the course of the work shall have Material Safety Data Sheets conforming to quality requirements issued by the OLF. Data sheets with details about composition, personnel safety data, toxicity, bioaccumulation and biodegradability shall be available for all products. An inventory of explosives and radioactive materials onboard shall be kept up to date at all times. The use of thread dope with heavy metal content should be avoided for tubular. The use of heavy metal containing dope should only be used if demanded by technical or safety reasons. Concerning well testing, other methods than burning shall be considered, including collecting oil. Use of special vessels for collecting oil should be considered, and this evaluation shall be documented. Effective burning must be provided for, both technically and operationally. Wellbore fluid in the transition between the water or diesel column and the perforations shall not be routed directly over the burners, but may be routed to production or be produced to a storage tank system onboard for subsequent handling. All discharges shall be recorded and reported via the Operator to the SPCA according to mandatory provisions. NORSOK standard Page 24 of 55

27 The need for documenting an environmental risk assessment is much dependent of the area or activity in question, and to what extent previous or existing environmental risk analyses can be used. Surface flow tree should be consulted early, if uncertainties exist Safety Drills Safety drills shall be planned and regularly executed to accomplish for the highest possible awareness. Drills involving use of blow-out preventers or other well control equipment to handle and unintentional influx of fluid or gas into the well shall be carried out prior to start of operation and further at regular intervals. Special wells or operations or analyses may result in specific input to type and scope of training and drills. (E.g. for deep water drilling and HPHT wells) Reporting to the NPD In the event of significant alterations of the activity programme, operational interruptions, dangerous incidents and accidents, the operator shall immediately notify the NPD. The Operator shall outline and communicate criteria for such reporting to personnel with dedicated responsibilities for such operation. During the time that drilling and well activities are in progress, the operator shall on a daily basis keep the NPD informed with regard to the progress of the operations. The NPD and CDRS define the extent of the reporting and reporting routines Experience Transfer Performance shall be evaluated against the goals set up before commencement of the operations. Besides the Operators own assessment of performance, and for the purpose of the continuous improvement and transfer of experience, the Contractor is encouraged to advise the Operator of such matters as: Challenges in performance versus set goals for the activity. Contractor's suggestions for improvements or simplifications in work processes and methods that might contribute to more efficient or cost effective performance by the Operator and his other contractors for future work. Information and feedback from circumstances arising during operations, that have reinforced or changed contractors perception of specific subjects, or could lead to a change in contractors relevant documentation, methods or work process. Contractor's assessment of deviations from this standard and mandatory requirements, including future recommendations Documentation Communication or Documentation In order to ensure proper communication and documentation of planned work performed or to be performed, a structured system for ensuring continuity shall be in place. The system shall include: Hand-over reports or meetings at all work levels at crew change and between shifts NORSOK standard Page 25 of 55

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

NORSOK Standard D-010 Rev 4, August 2012

NORSOK Standard D-010 Rev 4, August 2012 Foreword 2 Introduction 2 1 Scope 4 2 Normative and informative references 4 2.1 Normative references 4 2.2 Informative references 5 3 Terms, definitions and abbreviations 5 3.1 Terms and definitions 6

More information

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Success Paths: A Risk Informed Approach to Oil & Gas Well Control API Winter E&P Standards Conference, Austin January 18, 2017 Success Paths: A Risk Informed Approach to Oil & Gas Well Control Dr. Dan Fraser Director, Strategic Alliances for Global Energy Solutions,

More information

The report gives a summary of the background and motivation for the audit activity and summarizes the observations made at the meetings.

The report gives a summary of the background and motivation for the audit activity and summarizes the observations made at the meetings. Audit Report AUDIT REPORT (UNOFFICIAL TRANSLATION) AUDIT OF USE OF ANNULAR SAFETY VALVES IN GAS LIFT COMPLETIONS SUMMARY During the period from June 2003 to September 2004, the Petroleum Safety Authority

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DOCUMENT NUMBER: 800-0810-003 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Guidelines for Development

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

AWHEM RECOMMENDED PRACTICE

AWHEM RECOMMENDED PRACTICE AWHEM RECOMMENDED PRACTICE COMMON SERVICES PRACTICE RECOMMENDED PRACTICE RP 0201 AWHEM publications may be used by anyone desiring to do so. Every effort has been made by the Association to assure the

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management DOCUMENT NUMBER: 800-0810-003 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Guidelines for Development

More information

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability Talisman energy COIN Virtual Meeting # 17 26 th January 2011 Darren Bewick Graeme Douglas Martin Forbes David McGuckien Matt Morrison Martin Mosley Talisman Energy UK Ltd (TLMUK), Aberdeen 1 Presentations

More information

NORSOK Standard D-010 Rev 4. August 2012

NORSOK Standard D-010 Rev 4. August 2012 NORSOK Standard D-010 Rev 4. August 2012 Changes to the section: The content of the section is by and large the same as the rev. 3 version, but we have improved the text, made some new statements and removed

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0 International Well Control Forum IWCF Drilling Well Control Syllabus and 4 March 2017 Version 7.0 IWCF Drilling Well Control Syllabus and 4 Contents Guidance Notes... 5 1.1. Introduction... 5 1.2. Who

More information

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content Contents 1. Abbreviations 2. Background 3. Definition 4. Well Conditions 5. HPHT Safety Case

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

How HSE regulates onshore oil and gas

How HSE regulates onshore oil and gas Health and Safety Executive How HSE regulates onshore oil and gas Paul Bradley (Operations Manager Wells and Mines) Craig Norman (Well Engineering and Operations Inspector) Health & Safety Executive Health

More information

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011 AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF SEMS HAZARD ANALYSIS TRAINING September 29, 2011 Purpose The purpose of this meeting is to provide guidelines for determination of hazard

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Industry Code: Alberta Small Employer OHS Legislated Requirements

Industry Code: Alberta Small Employer OHS Legislated Requirements This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Services in this industry can

More information

Reclassification and Recompletion

Reclassification and Recompletion Reclassification and Recompletion Guideline PNG024 September 2015 Revision 1.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Record

More information

Is my well safe? Terje Løkke-Sørensen, CTO, add energy

Is my well safe? Terje Løkke-Sørensen, CTO, add energy Is my well safe? Terje Løkke-Sørensen, CTO, add energy Introduction What is? a Safe Well?.. an Unsafe Well? A well with 2 well barriers both fully intact? A well with known issues risks can be managed?

More information

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER INNOVATIVE ANALYSIS IMPROVED BLOWOUT PREVENTER 1. BRIEF DESCRIPTION OF THE SITUATION The blowout preventer (BOP) is a valve assembly usually mounted on the sea floor at the mouth of an oil well to control

More information

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production? PLEASE NOTE THAT ALL USES OF THE WORD OPERATOR IN THIS DOCUMENT REFER TO THE ACT 13 DEFINITION OF WELL OPERATOR AND THUS, REFERENCE THE PERMIT HOLDER (PERMITEE) FOR THE WELL. ANY ENFORCEMENT ACTIONS UNDER

More information

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk Completion Workover Riser System Enabling efficient operations by reducing interface complexities and minimizes operational risk Well integrity with fatigue management were key drivers for our system design

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

Texas Administrative Code

Texas Administrative Code TITLE 16 PART 1 CHAPTER 3 RULE 3.13 Texas Administrative Code ECONOMIC REGULATION RAILROAD COMMISSION OF TEXAS OIL AND GAS DIVISION Casing, Cementing, Drilling, Well Control, and Completion Requirements

More information

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

CHE Well Testing Package/Service:

CHE Well Testing Package/Service: CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40) NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40) Rev.1, Dec. 1994 CONTENTS 1 FOREWORD 2 2 SCOPE 2 3 NORMATIVE REFERENCES 2 4 DEFINITIONS AND ABBREVIATIONS

More information

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES DOCUMENT CONTROL: Created Date: May 06, 2013 Last Updated Date: September 15, 2015 Last Updated By: Stuart Ellsworth

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

Final Program. Sunday, June 10, General

Final Program. Sunday, June 10, General 2018 Exploration & Production Standards Conference on Oilfield Equipment and Materials June 11-15, 2018 Sheraton Denver Downtown Denver, Colorado www.api.org Current as of June 12, 2018 Subject to change

More information

SEMS II: BSEE should focus on eliminating human error

SEMS II: BSEE should focus on eliminating human error SEMS II: BSEE should focus on eliminating human error How US companies can prevent accidents on start-ups and shut-downs by using valve interlocks The proposed changes to BSEE s SEMS (Safety and Environmental

More information

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0 International Well Control Forum Well Intervention Pressure Control Level Syllabus July 01 Version 7.0 Well Intervention Pressure Control Syllabus - Level Contents Guidance Notes... 1. OVERVIEW... 1.1.

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants the pressure equipment safety authority Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants AB-528 Edition 2, Revision 1 Issued 2016-09-12 Table of

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

DRILLING HOSE SOLUTIONS

DRILLING HOSE SOLUTIONS DRILLING HOSE SOLUTIONS HIGH PRESSURE FLEXIBLE LINES FOR A WIDE RANGE OF DRILLING APPLICATIONS HIGH QUALITY - HIGH STANDARD WE DELIVER ACCORDING TO THE HIGHEST LEVELS OF SPECIFICATIONS AND STANDARDS WITH

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

NORSOK standard D-010 Rev. 3, August 2004

NORSOK standard D-010 Rev. 3, August 2004 7 COMPLETION ACTIVITIES... 3 7.1 GENERAL... 3 7.2 WELL BARRIER SCHEMATICS... 3 7.3 WELL BARRIER ACCEPTANCE CRITERIA... 3 7.4 WELL BARRIER ELEMENTS ACCEPTANCE CRITERIA... 5 7.5 WELL CONTROL ACTION PROCEDURES

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) WAC Page 296-307-320 Control of hazardous energy (lockout-tagout). 1 296-307-32001 What does this section cover? 1 296-307-32003 When does this section

More information

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents Owner: HSE Performance Assurance ALL HSE PRC 172 Approved By: Manager, HSE Performance Assurance Retention Code: CG01 CA Revised: March 2015 Review Frequency: Five years or less Table of Contents 1.0 Purpose...

More information

Entry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel

Entry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel AB Entry Level Requirements and Basic Introductory Course Outline for New Remotely Operated Vehicle (ROV) Personnel International Marine Contractors Association www.imca-int.com IMCA R 002 Rev. 2 May 2009

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Learn more at

Learn more at IBP1833_06 COST EFFICIENT ARTIFICIAL BUOYANT SEABED DRILLING SOLUTION Dan Moutrey 1, Frank Lim 2 Copyright 2006, Instituto Brasileiro de Petróleo e Gás - IBP This Technical Paper was prepared for presentation

More information

in Australian Workplaces

in Australian Workplaces Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 in Australian Workplaces Introduction Part 2 Part 3 Part 4 Part 5 SafeWork SA Introduction Hazard identification is the process used to identify

More information

Every things under control High-Integrity Pressure Protection System (HIPPS)

Every things under control High-Integrity Pressure Protection System (HIPPS) Every things under control www.adico.co info@adico.co Table Of Contents 1. Introduction... 2 2. Standards... 3 3. HIPPS vs Emergency Shut Down... 4 4. Safety Requirement Specification... 4 5. Device Integrity

More information

Control of Hazardous Energy. Environmental Health and Safety

Control of Hazardous Energy. Environmental Health and Safety Control of Hazardous Energy Environmental Health and Safety 11/01/2014 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) OSHA CFR 1910.147 Revised Date: November 2014 STATEMENT OF POLICY Ball State University

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Construction & Utilities Division Planning Tools The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Guidelines for Creation of

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course

More information

PV4 and PV6 Piston Valves

PV4 and PV6 Piston Valves 1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

DE149. Wireline Servicing, Fishing Job for Completion and Workover

DE149. Wireline Servicing, Fishing Job for Completion and Workover DE149 Wireline Servicing, Fishing Job for Completion and Workover H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This five-day course is

More information

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion PTRT 1471: Exploration and Production I Chapter 6: Drilling and Well Completion Well Planning Drilling is a major investment (over $100m for offshore) Planning is aimed at maximizing investment Wells are

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

Safe Work Practices and Permit-to-Work System

Safe Work Practices and Permit-to-Work System CHAPTER 24 Safe Work Practices and Permit-to-Work System 24.1 INTRODUCTION OSHA s Process Safety Management (PSM) Standard (OSHA, 1992) requires employers to develop and implement safe work practices (SWPs)

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

RULE 36 & H 2 S SAFETY

RULE 36 & H 2 S SAFETY OUTLINE OF RULE 36 RULE 36 & H 2 S SAFETY RULE 36 IS A SAFETY RULE DESIGNED TO PROTECT THE GENERAL PUBLIC FROM THE HAZARDS OF H 2 S RESULTING FROM INTENTIONAL AND ACCIDENTAL RELEASES. PROPERTIES OF H 2

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

5k Slickline Lightweight Pressure Control Equipment 4 ID

5k Slickline Lightweight Pressure Control Equipment 4 ID 5k Slickline Lightweight Pressure Control Equipment 4 ID Table of Contents 5k Slickline Lightweight Pressure Control Equipment 4 ID... 1 Hydraulic Slickline Stuffing Box... 3 Wireline Lubricators... 4

More information

SPE MS Well Collision Avoidance Management and Principles

SPE MS Well Collision Avoidance Management and Principles SPE 184730-MS Well Collision Avoidance Management and Principles S.J. Sawaryn, Consultant On behalf of the SPE Wellbore Positioning Technical Section (WPTS) Collision Avoidance Sub-Committee also referred

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

Surface Supplied Mixed Gas Diving Operations

Surface Supplied Mixed Gas Diving Operations AB The International Marine Contractors Association Surface Supplied Mixed Gas Diving Operations www.imca-int.com IMCA D 030 Rev. 1 August 2005 AB The International Marine Contractors Association (IMCA)

More information

Guide for Evaluating Your Hose Assembly Supplier

Guide for Evaluating Your Hose Assembly Supplier Guide for Evaluating Your Hose Assembly Supplier Supplier Evaluation Checklist, and How to Clearly Define Application Requirements Safe, reliable hose assemblies require appropriate specification work

More information

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157 1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and

More information

2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas

2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas 2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas www.api.org Current as of November 29, 2017 Subject to change Final program distributed

More information

PETROLEUM: Well operations and well examination schemes

PETROLEUM: Well operations and well examination schemes H E A LT H & S A F E T Y AT WO R K HSWA AC T INTERPRETIVE GUIDELINES PETROLEUM: Well operations and well examination schemes These guidelines cover part 6 of the Health and Safety at Work (Petroleum Exploration

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement Committee Input No. 35-NFPA 1670-2015 [ Chapter 1 ] Chapter 1 Administration 1.1 Scope. 1.1.1* This standard shall identify and establish levels of functional capability for conducting operations at technical

More information

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS sudden appearance of permeable sequences abnormally pressured to higher than anticipated levels in an already narrow margin. 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0 () 30.0 The purpose of the Energy Control Policy (Lockout/Tagout) is to ensure that before any employee performs any servicing and/or maintenance on machinery or equipment, where the unexpected energizing,

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

The key to connectivity

The key to connectivity The key to connectivity Kerry Daly, Global BD Manager, Tubing Conveyed Perforating (TCP) First published by Oilfield Technology, November 2015 Connecting oil or gas-bearing formations with the wellbore

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. #

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control

Table of Contents. Chapter 1: Health, Safety and Environment Programs. Chapter 2: General Guidelines and Health Control IADC Health, Safety and Environmental Reference Guide Table of Contents Chapter 1: Health, Safety and Environment Programs Safety Policy Statement... 1 HSE Meetings... 1 Safety Inspections and Logbooks...

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Kicks & blowouts A kick is an unexpected influx into a well of a formation fluid. Should this influx be uncontrolled... -- during its way from the bottom of the hole up in the

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information