Noise and Blast Management Plan

Size: px
Start display at page:

Download "Noise and Blast Management Plan"

Transcription

1 Strength. Performance. Passion. Noise and Blast Management Plan Jandra Quarry Holcim Australia Pty. Ltd Holcim Country Company Name 1

2 CONTENTS INTRODUCTION 1 Context 1 Background 1 Environmental Management Document System 1 NBMP approval 1 PURPOSE AND OBJECTIVES 3 Purpose 3 Objectives 3 Targets 3 ENVIRONMENTAL REQUIREMENTS 4 Relevant legislation and guidelines Legislation Guidelines and standards 4 Minister s Conditions of Approval 4 EXISTING ENVIRONMENT 8 Identified Sensitive Receivers 8 Existing Acoustical Environment Continuous Unattended Noise Monitoring 9 Operator Attended Noise Surveys NOISE & BLASTING CRITERIA 12 Noise Criteria 12 Blasting Criteria Airblast Criteria Vibration Criteria 14 ENVIRONMENTAL ASPECTS & IMPACTS 15 Development Activities 15 Influences 15 Impacts Operational Noise Sleep Disturbance ENVIRONMENTAL CONTROL MEASURES 17 COMPLIANCE MANAGEMENT 19 Inspections & Monitoring Noise monitoring Blast monitoring 19 Training 20 Licenses and permits 20 Complaints and enquiries procedure 20 Auditing and reporting 20 Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan i

3 REVIEW AND IMPROVEMENT 21 Continuous improvement 21 NBMP update and amendment 21 Figures Figure 1 Surrounding land use, residences and environmental monitoring locations 11 Tables Table 1 Conditions of Approval relevant to the NBMP 4 Table 2 Noise sensitive receptor locations 8 Table 3 Summary of existing Rating Background Levels and existing Ambient Noise Levels 9 Table 4 Existing road traffic noise 9 Table 5 Operator attended survey results Table 6 Noise criteria - quarrying operations only db(a) Table 7 Noise criteria quarrying operations & asphalt plant production combined db(a) Table 8 Acceptable MIC (kg) to meet ANZEC Guidelines for human comfort Table 9 Airblast overpressure criteria Table 10 Peak particle velocity criteria Table 11 Stage 1 without asphalt plant operating (exceedances shown in bold) Table 12 Stage 1 without asphalt plant operating and early morning shoulder restrictions (exceedances shown in bold) Table 13 Stage 1 with asphalt plant operating (exceedances shown in bold) Table 14 Stage 2 without asphalt plant (exceedances shown in bold) Table 15 Stage 2 without asphalt plant operating and early morning shoulder restrictions (exceedances shown in bold) Table 16 Stage 2 with asphalt plant operating (exceedances shown in bold Table 17 Stage 3 without asphalt plant operating (exceedances shown in bold) Table 18 Stage 3 without asphalt plant operating, early morning shoulder restrictions and no works at or above RL50 during the day/evening (exceedances shown in bold) Table 19 Stage 3 with asphalt plant operating (exceedances shown in bold) Table 20 Sleep disturbance assessment (exceedances shown in bold) Table 21 Environmental Controls & Mitigation Measures Appendices Appendix A Jandra Quarry Blast Management Procedure Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan ii

4 GLOSSARY / ABBREVIATIONS ANZEC BoM Compliance audit CoA dba Department, the DP&E The Australian and New Zealand Environment Council Australian Bureau of Meteorology Verification of how implementation is proceeding with respect to a construction environmental management plan (EMS) (which incorporates the relevant approval conditions). Conditions of Approval for Modification Application No. DA MOD 5. Decibels using the A-weighted scale measured according to the frequency of the human ear. NSW Department of Planning and Environment. NSW Department of Planning and Environment EA Environmental Assessment Ecological sustainable Using, conserving and enhancing the community s resources so that development the ecological processes on which life depends are maintained and the total quality of life now and in the future, can be increased (Council of Australian Governments, 1992). ECP Environmental Compliance Planner (Guideline 4.1 Permits, Licences and Approvals, Attachment 4.1E, Issue Date: February 2014). EPA NSW Environment Protection Authority EMS Environmental management strategy Environmental aspect Defined by AS/NZS ISO 14001:2004 as an element of an organisation s activities, products or services that can interact with the environment. Environmental impact Defined by AS/NZS ISO 14001:2004 as any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organisation s environmental aspects. Environmental incident A set of circumstances that causes, or threatens to cause, material harm to the environment; and/or breaches or exceeds the limits or performance measures/criteria in the Conditions of Approval. Environmental objective Defined by AS/NZS ISO 14001:2004 as an overall environmental goal, consistent with the environmental policy, that an organisation sets itself to achieve. Environmental policy Statement by an organisation of its intention and principles for environmental performance. Environmental target Defined by AS/NZS ISO 14001:2004 as a detailed performance requirement, applicable to the organisation or parts thereof, that arises from the environmental objectives and that needs to be set and met in order to achieve those objectives. EP&A Act Environmental Planning and Assessment Act 1979 EPL Environment Protection Licence Feasible Feasible relates to engineering considerations and what is practical to build or carry out. INP NSW Industrial Noise Policy (as updated from time-to-time) LEP Local Environmental Plan Equivalent continuous sound level - the constant sound level which, L eq Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan iii

5 when occurring over the same period of time, would result in the receiver experiencing the same amount of sound energy. L Aeq (15min) The A-weighted equivalent continuous (energy average) A-weighted sound pressure level of the activity under consideration over a 15- minute period and excludes other noise sources such as from industry, road, rail and the community. L A (max) The A-weighted maximum noise level only from the activity under consideration, measured using the fast time weighting on a sound level meter. L 90 The sound pressure level exceeded for 90% of the measurement period. For 90% of the measurement period it was louder than the L 90. MIC Maximum Instantaneous Charge Minister, the Minister for Planning and Environment, or delegate. MOD 5 Modification Application No. DA MOD 5. Non-compliance Failure to comply with the requirements of the Project approval or any applicable license, permit or legal requirements. Non-conformance Failure to conform to the requirements of Project system documentation or supporting documentation. NOW NSW Office of Water OEH NSW Office of Environment and Heritage PIN Penalty Infringement Notice POEO Act Protection of the Environment Operations Act 1997 Quarrying operations The extraction, processing and transportation of extractive materials on the site and the associated removal of vegetation, topsoil and overburden. Quarry products Includes all saleable quarry products, but excludes tailings and other wastes RBL The Rating Background Level for each period is the medium value of the assessment background level for the period over all of the days measured. There is therefore an RBL value for each period (day, evening and night). Reasonable Reasonable relates to the application of judgement in arriving at a decision, taking into account: mitigation benefits, cost of mitigation versus benefits provided, community views and the nature and extent of potential improvements Rehabilitation The restoration of land disturbed by the development to a good condition, ensuring it is safe, stable, non-polluting environment and appropriately vegetated. RL Reduced level RMS Roads and Maritime Services RNP NSW Road Noise Policy Secretary, the Secretary of the NSW Department of Planning and Environment (or delegate). SPL Sound Pressure Level, the amount of sound at a specified point. SWL Sound Power Level, the total sound emitted by a source. Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan iv

6 DOCUMENT CONTROL Revision Date Description By Review Approved A Draft report D. Green 9/08/15 26/08/15 B Draft report with Holcim review D. Lidbetter & I. Shenton 27/08/15 30/08/15 Final draft Final draft report D. Green 31/08/15 31/08/15 Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan v

7 1 1.1 INTRODUCTION Context A Noise and Blast Management Plan was developed for Jandra Quarry following the Environmental Impact Statement (EIS) and subsequent development consent issued on 30 March 2000 (DA ). This Noise and Blast Management Plan (NBMP or Plan) forms part of the Environmental Management Strategy (EMS) for the Jandra Quarry. This NBMP has been prepared to meet the requirements of the Minister s Conditions of Approval (CoA) for the Jandra Quarry Intensification in Production Modification (DA MOD 5) and supersedes all previous versions. This NBMP has been prepared to address the CoA, the mitigation measures listed in the Jandra Quarry Intensification in Production Environmental Assessment (EA) and all applicable legislation. 1.2 Background Hard rock extraction involves blasting and the use of large bulk earthwork machinery, which combined with processing equipment such as crushers, generate noise and vibration. Consequently a noise and blasting assessment was undertaken during the EA and considered the potential impacts of the modification on nearby sensitive residential receivers. The noise and blasting assessment in the EA utilised a computer noise model developed for each of the three stages of the quarry s life, with the quarry stages modelled to reflect worst case operations and associated noise impacts at residential receptor locations. The model inputs included local topography and existing ground contour information, sound power levels of quarry plant and equipment, ground contour information based upon future stages of the quarry s life and meteorological information. 1.3 Environmental Management Document System The environmental management document system is described in Section 5.1 of the EMS. The NBMP is part of Holcim s environmental management strategy for Jandra Quarry and is a requirement of CoA 4 of Schedule 3. Management measures identified in this NBMP will be incorporated into relevant Work Method Statements (WMS) and the Blast Management Procedure. Work Method Statements are approved by the Quarry Manager. Operational personnel are required to undertake works in accordance with the safeguards identified in WMS. The review, auditing and document control processes for this NBMP are described in Sections 9, 10 & 11 of the EMS. 1.4 NBMP approval This NBMP must be endorsed by the Quarry Manager prior to submission to the Secretary of the Department of Planning & Environment (DP&E). Submission of the NBMP for the approval of the Secretary is required no later than 31 August 2015 or as otherwise agreed by the Secretary. Intensification activities approved by Holcim Jandra Quarry Environmental Management Strategy 1 Noise & Blast Management Plan

8 the CoA will not commence until written approval of the EMS and this Plan has been received from the Secretary. Holcim Jandra Quarry Environmental Management Strategy 2 Noise & Blast Management Plan

9 2 2.1 PURPOSE AND OBJECTIVES Purpose The purpose of this NBMP is to describe how Holcim proposes to manage noise and blast impacts during the operational lifetime of Jandra Quarry. 2.2 Objectives The key objective of the NBMP is to ensure that impacts to the local community and the built environment from noise and vibration are minimised. To achieve this objective, Holcim will undertake the following: identifying sensitive receivers and ensuring appropriate environmental controls and procedures are implemented during operational activities; minimising potential adverse noise and vibration impacts to the environment and community; managing impacts if they occur through a systematic analysis of mitigation strategies; ensure appropriate measures are implemented to address the relevant CoA outlined in Table 1 and the EA mitigation measures detailed in Table 10; and ensure appropriate measures are implemented to comply with all relevant legislation and other requirements as described in Section of this NBMP. 2.3 Targets The following targets have been established for the management of noise and blasting impacts during the operational lifetime of Jandra Quarry: ensure full compliance with the relevant legislative requirements and CoA; feasible and reasonable noise mitigation measures are implemented with the aim of achieving the noise management levels detailed in the NSW Industrial Noise Policy (EPA, 2000); blasting activities are only undertaken during approved operating times and compliant with blasting criteria; and complaints from the community and stakeholders are minimised. Holcim Jandra Quarry Environmental Management Strategy 3 Noise & Blast Management Plan

10 ENVIRONMENTAL REQUIREMENTS Relevant legislation and guidelines Legislation Legislation relevant to noise and vibration management includes: Protection of the Environment Operations Act 1997 (POEO Act); and Protection of the Environment Operations (Noise Control) Regulation Relevant provisions of the above legislation are explained in the register of legal and other requirements included in Appendix A1 of the EMS Guidelines and standards The main guidelines, specifications and policy documents relevant to this NBMP include: NSW Industrial Noise Policy (INP) (EPA 2000); NSW Road Noise Policy (RNP) (EPA 2011); Interim Construction Noise Guideline (ICNG) (DECC 2009); Assessing Vibration: A Technical Guideline (DEC 2006); Technical Basis for Guidelines to Minimise Annoyance due to Blasting Overpressure and Ground Vibration (ANZEC) (Australian and New Zealand Environment and Council, 1990); Australian Standard AS Explosives Storage and use Part 2: Use of explosives; Holcim Guideline 4.7 Community Engagement (Aggregates) (May, 2014); Holcim Guideline 4.12 Noise Emissions (Aggregates) (May, 2014); Holcim Guideline 4.19 Quarry Development (Aggregates) (May, 2013); and Holcim Environmental Standards for Aggregate Operations (May, 2014). 3.2 Minister s Conditions of Approval The CoA relevant to this NBMP are listed Table 1 below. A cross reference is also included to indicate where the condition is addressed in this NBMP or other environmental management documents. Table 1 Conditions of Approval relevant to the NBMP CoA No. Sch 2, 10 Requirement The Applicant shall comply with the operating hours in Table 1 (below). Table 1 Operating Hours Day Extraction Transportation Asphalt Plant and and processing operations associated transport (on a campaign basis) operations Monday 6 am to 10 pm 6 am to hours a day Friday pm Saturday 6 am to 6 pm 6 am to 10 pm 24 hours a day Reference Section 5.1 Holcim Jandra Quarry Environmental Management Strategy 4 Noise & Blast Management Plan

11 Sch 2, 14 Sch 3, 1 Sundays None None 24 hours a day and Public Holidays The following activities may be carried out on the site outside the hours specified in Table 1: (a) return of trucks to the site prior to 12 midnight Monday to Saturday; (b) delivery or dispatch of materials as requested by Police, Fire Brigade or other similar authorities; and (c) emergency work to avoid the loss of lives, property and/or to prevent environmental harm. In circumstances outlined in (b) and (c), the Applicant shall notify the Secretary and affected residents prior to undertaking the activities, or as soon as is practical thereafter. The Applicant shall ensure that all the plant and equipment used at the site is maintained and operated in a proper and efficient manner. The Applicant shall ensure that the noise generated by the development does not exceed the criteria in Table 2 or Table 3 at any residence on privately-owned land. Table 2 Noise criteria quarrying operations only db(a) Section 6.3 Location 6 am 10 pm (L Aeq(15 min)) Sch 3, 2 R1 46 R5 40 R2, R4, R6 36 R7 35 Table 3 Noise criteria quarrying operations & asphalt plant production combined db(a) 6 am 10 pm 10 pm 6 am Location (L Aeq(15 min)) (L Aeq(15 min)) (L A1(1 min)) R R R R2, R R Notes: (a) Receiver locations are shown on the figure in Appendix 2 of CoA. (b) Condition 10 of Schedule 2 prohibits quarrying operations during the hours 10 pm 6 am. Noise generated by the development is to be measured in accordance with the relevant requirements of the NSW Industrial Noise Policy (as may be updated from time-to-time). Appendix 3 of CoA details the meteorological conditions under which these criteria apply and the requirements for evaluating compliance with these criteria. However, these criteria do not apply if the Applicant has a negotiated agreement with the owner/s of the relevant residence or land to generate higher noise levels, and the Applicant has advised the Department in writing of the terms of this agreement. Upon receiving a written request from the owner of any residence on property R1 the Applicant shall implement additional noise mitigation measures (such as double glazing, insulation, or air conditioning) at the residence in consultation with the owner. These measures must be reasonable and feasible and directed towards reducing the noise impacts of the project on the residence. If within 3 months of receiving this request from the owner, the Applicant Section 4.1 Section 5.1 Section 4.1 Holcim Jandra Quarry Environmental Management Strategy 5 Noise & Blast Management Plan

12 Sch 3, 3 Sch 3, 4 Sch 3, 5 and the owner cannot agree on the measures to be implemented, or there is a dispute about the implementation of these measures, then either party may refer the matter to the Secretary for resolution. However, the obligation to implement noise mitigation measures does not apply if the Applicant has a negotiated agreement with the owner/s of the relevant residence or land that sets aside noise mitigation measures under the terms of this consent, and the Applicant has advised the Department in writing of the terms of this agreement. The Applicant shall: (a) implement best practice management to minimise the construction, operational and transportation noise of the development; (b) minimise the noise impacts of the development during meteorological conditions when the noise limits in this consent do not apply (see Appendix 3); (c) carry out regular monitoring to determine whether the development is complying with the relevant conditions of this consent; and (d) regularly assess noise monitoring data and modify and/or stop operations on site to ensure compliance with the relevant conditions of this consent, to the satisfaction of the Secretary. The Applicant shall prepare and implement a Noise Management Plan for the development to the satisfaction of the Secretary. This plan must: (a) be submitted to the Secretary for approval by 31 August 2015; (b) describe the measures that would be implemented to ensure: compliance with the noise criteria in this consent; best management noise minimisation practice is employed on site; noise emissions from trucks on the site after 10 pm do not annoy neighbouring residents; and the noise impacts of the development are minimised during any meteorological conditions when the noise limits in this consent do not apply; and (c) detail a monitoring program that will be put in place to measure noise from the development against the noise criteria in Table 2 and 3 [of Condition 1 of Schedule 3], and which: includes quarterly attended monitoring for the first two years of each of the three Stages of the development, as shown in the three figures in Appendix 1 (this monitoring must take place within a 24 hour asphalt campaign, if any such campaign is conducted during the quarter), and thereafter annually unless the Secretary agrees otherwise; and evaluates and reports on the effectiveness of the noise management system on site. The Applicant shall ensure that blasting on site does not cause any exceedance of the criteria in Table 4. Table 4 Blasting criteria Airblast Ground Location overpressure vibration Allowable exceedance (db(lin Peak)) (mm/s) Any residence on % privately owned land, or any 5% of the total number of public blasts over a period of 12 infrastructure months However, these criteria do not apply if the Applicant has a written agreement with the relevant owner to exceed the limits in Table 4, and the Applicant has advised the Department in writing of the terms of this agreement. Section 6.3 Section 8.1 This Plan Section 5.2 Holcim Jandra Quarry Environmental Management Strategy 6 Noise & Blast Management Plan

13 Sch 3, 6 Sch 3, 7 Sch 3, 8 Sch 3, 9 The Applicant shall only carry out blasting on site between 9 am and 5 pm Monday to Friday and 9 am to 3 pm Saturday. No blasting is allowed on Sundays or public holidays, or at any other time without the written approval of the Secretary. The Applicant may carry out a maximum of 2 blasts per month on site. This condition does not apply to blasts required to ensure the safety of the quarry or workers on site. Note: For the purposes of this condition a blast refers to a single blast event, which may involve a number of individual blasts fired in quick succession in a discrete area of the quarry. The Applicant shall: (a) implement best management practice to: protect the safety of people and livestock in the areas surrounding blasting operations; protect public or private infrastructure/property in the surrounding area from damage from blasting operations; protect the Pacific Highway from flyrock from blasting operations; and minimise the dust and fume emissions of any blasting; (b) operate a suitable system to enable the public to get up-to-date information on the proposed blasting schedule on site; and (c) carry out regular monitoring to determine whether the development is complying with the relevant conditions of this consent, to the satisfaction of the Secretary. The Applicant shall prepare and implement a Blast Management Plan for the development to the satisfaction of the Secretary. This plan must: (a) be submitted to the Secretary for approval by 31 August 2015; (b) describe the measures that would be implemented to ensure compliance with the blast criteria and operating conditions of this consent; (c) include a monitoring program for evaluating and reporting on compliance with the blasting criteria in this consent; (d) include a blast fume management protocol to demonstrate how emissions will be minimised including risk management strategies if blast fumes are generated; (e) include public notification procedures on the blasting schedule; and (f) include a protocol for investigating and responding to complaints. Section 5.2 Section 5.2 Section 6.3 Section 8 Section 9 This Plan Holcim Jandra Quarry Environmental Management Strategy 7 Noise & Blast Management Plan

14 4 EXISTING ENVIRONMENT The following sections summarise the factors influencing noise and vibration associated with the development site, based upon the information provided in Section of the EA. It was noted during the EA that there have been no environmental complaints relating to noise or blasting emissions at the Jandra Quarry during the period 1999 to Identified Sensitive Receivers Jandra Quarry is a hard rock quarry located approximately 17 kilometres (km) south of Taree in the Greater Taree Local Government Area (LGA). The surrounding land use is generally rural in nature and is generally characterised by low background noise levels and scattered residences. The closest sensitive receivers surrounding the quarry are residences, located to the northeast (approximately 350 metres), east (approximately 850 metres), southeast (approximately 1.45 kilometres) and southwest (approximately 800 metres) of the operational areas of the site (refer to Figure 1). Most of the residences to the southwest are located adjacent or in proximity to the Pacific Highway, which is a dominant noise source, at least during the day time. Receivers R1 to R10 (refer Table 2) are the closest receivers to the approved quarry operations. These receivers were therefore selected to assess noise and blasting impacts associated with the intensification in production. Table 2 Noise sensitive receptor locations Receptor ID R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 Address Location Distance (m) / Elevation Easting (m) Northing (m) Direction from Consent Boundary (mahd) Pacific , N 45 Highway, Possum Brush 112 Spicers Road, , E 74 Rainbow Flat Pacific , SW 18 Highway, Possum Brush Lot 6 Pacific Highway, , W 44 Possum Brush Pacific , W 55 Highway, Possum Brush 1677 The Lakes Way, , E 72 Rainbow Flat 136 Spicers Road, , ESE 42 Rainbow Flat Holcim owned , S 12 residence Holcim owned , S 30 residence Holcim owned Within boundary 79 residence With regards to the noise sensitive receptors listed above, Holcim has executed a negotiated agreement with the property owner of R1 which excludes this receptor from the approved noise criteria stipulated in Section 5.1. R3 is not included in the approved noise criteria stipulated in Section 5.1 as this receiver represented road noise and the EA concluded that road noise impacts as a consequence of the development were below guideline thresholds and didn t warrant further assessment. Receivers R8, R9 and R10 are Holcim owned residences and the approved noise criteria stipulated in Section 5.1 only Holcim Jandra Quarry Environmental Management Strategy 8 Noise & Blast Management Plan

15 apply to private-owned land. Prior to the extraction area reaching the proximity of R10, the resident s lease agreement is to be terminated and the residence demolished Existing Acoustical Environment Continuous Unattended Noise Monitoring During the EA, ambient noise monitoring surveys were undertaken at three residential locations (R1, R2 and R3) to assist in the determination of project specific criteria / noise limits and potential impacts associated with the development (refer to Table 3). Ambient noise was not monitored at receptor locations R4 to R10. For assessment purposes, the existing acoustic environment at monitoring location R1 was assumed to be representative of receiver locations R4, R5, R8 and R9 as these receivers are located within 600m of the Pacific Highway. R2 was assumed to be representative of receiver locations R6, R7 and R10 as these receivers are remote from the Pacific Highway. Table 3 Summary of existing Rating Background Levels and existing Ambient Noise Levels Monitoring Location L A90 (15minute) Rating Background Noise Level (dba) 1 Daytime Evening Night Hours Hours Hours L Aeq (period) Existing Ambient Noise Level (dba) 1 Daytime Hours Evening Hours Night Hours R1 (R1, R4, R5, R8 & R9) R2 (R6, R7 & R10) R Note 1: The L A90 represents the level exceeded for 90% of the interval period and is referred to as the average minimum or background noise level. The L Aeq is the equivalent continuous noise level defined as the level of noise equivalent to the energy average of noise levels occurring over a measurement period. Off-site Road Traffic The noise logging data collected at R3, approximately 40 metres west of the Pacific Highway, has been used to quantify the existing ambient road traffic noise levels (refer to Table 4). Table 4 Existing road traffic noise Receptor Road Traffic Noise (dba free field ) L Aeq(15 hour) L Aeq(1 hour) Day L Aeq(9 hour) L Aeq(1hour) Night R Road traffic criteria are provided in the NSW Road Noise Policy (RNP), which was released in March The policy sets out noise criteria applicable to particular types of projects, road category and land use for the purpose of defining traffic noise impacts. It is noted that the existing road traffic noise levels of 60 LAeq(15 hour) and 55 LAeq(9 hour) at R3 exceed the RNP assessment levels for Existing residences affected by additional traffic on existing freeways/arterial/sub-arterial road generated by land use development. In situations where exceedances of the road traffic noise assessment criteria are predicted, the RNP states, Holcim Jandra Quarry Environmental Management Strategy 9 Noise & Blast Management Plan

16 Where existing traffic noise levels are above the noise assessment criteria, the primary objective is to reduce these through feasible and reasonable measures to meet the assessment criteria. A secondary objective is to protect against excessive decreases in amenity as the result of a project by applying the relative increase criteria. In assessing feasible and reasonable mitigation measures, an increase of up to 2 db represents a minor impact that is considered barely perceptible to the average person. For existing residences and other sensitive land uses affected by additional traffic on existing roads generated by land use developments, any increase in the total traffic noise level should be limited to 2 db above that of the corresponding no build option. The future change in road traffic noise attributable to the development was calculated using a prediction algorithm which took the following into consideration: The existing traffic movements on the Pacific Highway as provided in the Traffic Impact Assessment ( TUP Report, June 2014); 186 heavy vehicle movements (93 inbound and 93 outbound) on any single day. This figure corresponds to the 85 percentile of the day movements as provided in the TUP Report; 100 heavy vehicle movements during the night period (after 10 pm and before 7:00 am). This figure corresponds to the predicted level of heavy vehicle movements at night during asphalt production campaigns; and A 50% north south split of truck movements from the site. On the basis of the above information, the predicted changes in road traffic noise levels resulted in an increase of 0.3 db during the day period and 1.9 db during the night period. The predicted changes are below the threshold of +2 dba and therefore no further investigations or controls are warranted. Holcim Jandra Quarry Environmental Management Strategy 10 Noise & Blast Management Plan

17 Figure 1 Surrounding land use, residences and environmental monitoring locations Holcim Jandra Quarry Environmental Management Strategy 11 Noise & Blast Management Plan

18

19 5 NOISE & BLASTING CRITERIA The following section identifies the development s noise and blasting criteria approved in the CoA. 5.1 Noise Criteria CoA 1 of Schedule 3 stipulates the development s approved noise criteria and categorises them according to two scenarios: Noise criteria when quarrying only operations are being undertaken (refer Table 5); and, Noise criteria when quarrying and asphalt plant production are both being undertaken (refer Table 6). Condition 10 of Schedule 2 prohibits quarrying operations during the hours 10pm 6am. The approved noise criteria do not apply to R1, R3, R8, R9 and R10. Holcim has executed a negotiated agreement with the property owner of R1 which excludes this receptor from the approved noise criteria. R3 is not included in the approved noise criteria as this receiver represented road noise and the EA concluded that road noise impacts as a consequence of the development were below guideline thresholds and didn t warrant further assessment. Receivers R8, R9 and R10 are Holcim owned residences and the approved noise criteria only apply to private-owned land. Table 5 Noise criteria - quarrying operations only db(a) Location 6 am 10 pm (L Aeq(15 min) ) R1 46 R5 40 R2, R4, R6 36 R7 35 Table 6 Noise criteria quarrying operations & asphalt plant production combined db(a) Location 6 am 10 pm 10 pm 6 am (no quarry operations) (L Aeq(15 min) ) (L Aeq(15 min) ) (L A1(1 min) ) R R R R2, R R Noise generated by the development is to be measured in accordance with the relevant requirements of the NSW Industrial Noise Policy (INP). Appendix 3 of the CoA details the meteorological conditions under which these criteria apply and the requirements for evaluating compliance with these criteria. 5.2 Blasting Criteria Airblast and ground vibration criteria specific to blasting activities are stipulated below: Holcim shall only carry out blasting on site between 9 am to 5 pm Monday to Friday, and 9 am to 3 pm Saturday; No blasting will be undertaken on Sundays or public holidays, or at any other time without the written approval of the Secretary of the DP&E; Holcim Jandra Quarry Environmental Management Strategy 12 Noise & Blast Management Plan

20 Holcim will carry out a maximum of two blasts per month on site. However this does not apply to blasts which may be required to ensure the safety of the quarry or workers on site; and A blast refers to a single blast event, which may involve a number of individual blasts fired in quick succession in a discrete area of the quarry. The ANZEC Guidelines (1990) are the prevailing guideline for human comfort related to blasting overpressure and ground vibration. In accordance with this guideline, the calculated MIC that ensures the criteria for human comfort are not exceeded at the closest private receivers are outlined in Table 7. Table 7 Acceptable MIC (kg) to meet ANZEC Guidelines for human comfort Stage Bench Closest receiver Distance from blast (m) Highest Acceptable MIC (kg) determined from: Ground Vibration Ground Vibration Maximum acceptable MIC (kg) 1 North R South R East R North R South R East R North R South R East R Holcim do not anticipate using MICs greater than 137 kg at Jandra Quarry, with the exception of R1 during Stage 3 where the MIC will be reduced to 125kg on the northern benches. Compliance with the guidelines is predicted at all receptor locations, for all blasts and at all stages of the quarry life Airblast Criteria CoA 5 of Schedule 3 stipulates that airblast overpressure generated by blasting associated with the development is not to exceed the criteria specified in Table 8 when measured at the most affected residence or other sensitive receiver. Table 8 Airblast overpressure criteria Airblast overpressure (db(lin Peak)) 115 Allowable exceedance 5% of total number of blasts over a 12 month period 120 0% Holcim Jandra Quarry Environmental Management Strategy 13 Noise & Blast Management Plan

21 5.2.2 Vibration Criteria CoA 5 of Schedule 3 stipulates that ground vibration generated by blasting associated with the development is not to exceed the criteria specified in Table 9 when measured at the most affected residence. Table 9 Peak particle velocity criteria Receiver Any residence on privately owned land, or any public infrastructure Peak particle velocity Allowable exceedance (mm/s) 5 5% of total number of blasts over a 12 month period 10 0% In accordance with clause L3.3 of Environment Protection Licence (EPL) No. 2796, airblast overpressure and ground vibration levels must be measured at any point within one metre of any affected residential boundary or other noise sensitive location such as a school or hospital. Holcim Jandra Quarry Environmental Management Strategy 14 Noise & Blast Management Plan

22 6 6.1 ENVIRONMENTAL ASPECTS & IMPACTS Development Activities A range of activities are undertaken at Jandra Quarry utilising various heavy machinery, plant and equipment. Key activities likely to generate noise or vibration are identified below. clearing and grubbing; demolition; earthworks and drainage; drilling and blasting; crushing and screening; load and haul; plant operation; and product dispatch and transportation. 6.2 Influences The potential for noise and blast impacts on sensitive receivers will depend on several factors, notably: the type of equipment in use; the number of equipment simultaneously in use; ground condition; topography and other physical barriers; proximity to sensitive receivers; the existing structural condition of sensitive receptors; hours/duration of activities; time of day; and proximity to the highway. Holcim Jandra Quarry Environmental Management Strategy 15 Noise & Blast Management Plan

23 6.3 Impacts The EA assessed and predicted noise levels based upon a set of nominated noise criteria referred to as Project Criteria. Subsequent to DP&E s review of the EA and determination, a set of slightly varied noise criteria were approved. The section below updates the EA noise assessment, taking into consideration the noise criteria approved in the CoA, in order to understand the potential impact of the development. Section 6.3 provides mitigation measures that will be implemented to avoid or minimise these impacts on the receiving community Operational Noise During the EA, operational noise from the development was assessed in accordance with INP criteria for the three quarry development stages. Overall noise levels were calculated with and without asphalt production in progress, as asphalt production will not be a regular part of routine operations at Jandra Quarry. Summary During normal operations and no asphalt production, compliance with the approved noise criteria stipulated in Section 5.1 is predicted at all privately owned residences, provided operations are restricted during the early morning shoulder period. During normal operations and asphalt production, compliance with the approved noise criteria stipulated in Section 5.1 is predicted at all privately owned residences, provided operations are restricted during the early morning shoulder period and quarry operations are not undertaken during the night period (10pm to 6am). Restrictions during the early morning shoulder period for the two scenarios include: No works in the approved overburden emplacement area; No works above RL50; and No operation of the mobile processing plant. In addition to this meteorological conditions will be monitored using the weather station installed on the Jandra Quarry site to ensure that operations are carried out in accordance with the criteria scheduled in Appendix 3 of the consent. Where meteorological conditions are found to exceed the criteria in Appendix 3 of the consent the site will assess the operations being conducted using the site Noise Control Plan to ensure that all operational noise is minimised. Holcim Jandra Quarry Environmental Management Strategy 16 Noise & Blast Management Plan

24 7 ENVIRONMENTAL CONTROL MEASURES A range of environmental requirements and control measures are identified in the EA, Conditions of Approval and Holcim Environmental Guidelines. Specific measures and requirements to address impacts on noise and blasting are outlined in Table 10. Table 10 Environmental Controls & Mitigation Measures ID Measure / Requirement Reference When to implement Responsibility Where addressed ENVIRONMENTAL ASSESSMENT MITIGATION MEASURES NBMM1 Prompt response to any community issues of concern. Section of EA All stages Quarry Manager Section 8.4 Section 7.3 of EMS; Guideline 4.7 Community Engagement NBMM2 NBMM3 NBMM4 NBMM5 NBMM6 NBMM7 NBMM8 Management to restrict the operations to the approved operating hours (noise and blasting) and ensure staff are made aware of these hours as part of their training. Consideration of negotiated agreements with property holders. No works in the quarry pit above RL50 during the period 6am to 7am. No spoiling or redistribution of overburden in the approved overburden emplacement area during the period 6am to 7am No operation of the mobile processing plant during the period 6am to 7am. Maintain compliance with the terms of the agreement obtained with the property holder of R1. Prior to the extraction area reaching the proximity of R10, the resident s lease agreement is to be terminated and the residence demolished. Occupants of Holcim owned residences would be temporarily evacuated prior to blasts. Section of EA All stages Quarry Manager Section 3.2; Section 8.1 Section 2.1 of EMS Section of EA All stages Quarry Manager Section 3.2; Section 4.1 Section of EA All stages Quarry Manager Section 6.3.1: Section 8.1 Section of EA All stages Quarry Manager Section Section of EA All stages Quarry Manager Section Section of EA Stage 1 Quarry Manager Section 4.1 Section of EA Stage 3 Quarry Manager Section 4.1 NBMM9 Section of EA Prior to blasting Quarry Manager Appendix A: Jandra Quarry Blast Management Procedure NBMM10 The MIC used on the northern benches during Stage 3 would Section of EA Stage 3 Quarry Manager Section 5.2 Holcim Jandra Quarry Environmental Management Strategy 17 Noise & Blast Management Plan

25 ID Measure / Requirement Reference When to implement Responsibility Where addressed be no greater than 125 kg. NBMM11 Broadband reversing beepers to be used in all vehicles operating in the approved overburden emplacement area, the Section of EA Stage 2 Quarry Manager Guideline 4.16 Plant & Vehicle Maintenance upper southern and eastern benches from the commencement of Stage 2. NBMM12 Blasts to be monitored at the closest non-holcim residence in Section of EA All stages Quarry Manager Section 5.2; Section 8.1.2; order to establish compliance with the blasting criteria and to Blast Management progressively update the blast emissions site laws. Procedure NBMM13 The levels of noise emitted from the quarry operations would Section of EA All stages Quarry Manager Section 5.1; Section 8.1.1; continue to be monitored in order to establish compliance Attachment 4.1H - with the noise criteria. Environmental Monitoring Worksheet HOLCIM ENVIRONMENTAL STANDARDS GUIDELINE 4.12 NOISE EMISSIONS NBMM14 Where noise requirements are contained within licence and Guideline 4.12 All stages Quarry Manager Attachment 4.1H - approval conditions, monitoring data shall be available to Environmental Monitoring confirm that the site complies with specified limits. Worksheet NBMM15 Plant and equipment shall be free from unusual or excessive noise that is likely to generate a noise nuisance. Guideline 4.12 All stages Quarry Manager Guideline 4.16 Plant & Vehicle Maintenance NBMM16 Upon receipt of a verified noise related complaint, emissions Guideline 4.12 All stages Quarry Manager Attachment 4.12A - Model at the boundary subject to complaint shall be assessed and Noise Control Plan an improvement plan prepared and implemented. The Aggregates Sites improvement plan must include specific actions, responsibilities and timeframes. NBMM 17 NBMM 18 Staff will ensure that trucks that are operating onsite after 10pm do not cause annoyance to neighbouring residents. Where noise criteria does not apply due to the meteorological conditions specified in Appendix 3 of the Development Consent, Holcim will assess operations using the Holcim 4.12A Noise Control Plan to ensure impacts are minimised. Guideline 4.12 All stages After 10pm Quarry Manager Attachment 4.12A - Model Noise Control Plan Aggregates Sites Guideline 4.12 All stages Quarry Manager Attachment 4.12A - Model Noise Control Plan Aggregates Sites Holcim Jandra Quarry Environmental Management Strategy 18 Noise & Blast Management Plan

26 8 8.1 COMPLIANCE MANAGEMENT Inspections & Monitoring Routine inspections by the Quarry Manager (or delegate) will occur throughout the operational lifetime of the development. Detail on the nature and frequency of these inspections are documented in Section 9 of the EMS. Noise and blast compliance monitoring will also occur throughout the operational lifetime of the development and will be undertaken by a suitably trained professional Noise monitoring Attended noise monitoring is to be undertaken quarterly for the first two years of each of the three stages of the development. This monitoring must take place within a 24 hour asphalt campaign, if any such campaign is conducted during the quarter. After the first two years of each stage, attended noise monitoring is to be undertaken annually unless the Secretary agrees otherwise. Noise monitoring will be assessed against the criteria outlined in Section 5.1. All monitoring will be undertaken at the locations specified in Figure 1. In the event of a non-compliance discovered during noise monitoring will be met with the following actions: 1. Details of the non-compliance will be entered into the INX to log the breach and track corrective actions. 2. Details of the non-compliance including corrective actions will be provided in a report to DP&E at the completion of noise monitoring. 3. The actions implemented following a non-conformance will be reviewed through a risk assessment and during fortnightly environmental inspections Blast monitoring Monitoring of airblast overpressure and ground vibration is to be undertaken for all blast events. Vibration monitoring equipment shall be positioned adjacent to the closest affected privately owned premises to the quarry. In the event a blast monitoring result is recorded that is outside the criteria of the approval the site will implement the following protocol: 1. Record the result and report as soon as becoming aware of the incident to the Holcim NSW Planning and Environment Manager. 2. If Environmental Harm is believed to have been caused the Quarry Manager will contact the Department of Planning and Environment and the EPA hotline (as soon as becoming aware) to report the details of the incident. 3. Quarry Manager will initiate an investigation to determine the cause or causes of non-conformances. 4. Develop and implement a plan of corrective and preventative action to address any non-conformances identified. Holcim Jandra Quarry Environmental Management Strategy 19 Noise & Blast Management Plan

27 5. Provide a report the DP&E and EPA on the findings of the investigation and corrective actions to rectify the incident and prevention measures for future blasts. 8.2 Training All employees and contractors working on site will undergo site induction training, which will cover issues relating to noise and blast management, including: existence and requirements of this Plan; relevant legislation; Jandra Quarry s operational hours; location of noise sensitive receivers; restricted activities during the early morning shoulder; and complaints reporting. Further details regarding staff induction and training are outlined in the EMS. 8.3 Licenses and permits EPL No is currently in force for the scheduled activities of Crushing, grinding or separating and Extractive activities. EPL No prescribes blasting criteria and monitoring requirements which are consistent with those stipulated in Section 5.2 and Section Complaints and enquiries procedure Wherever possible, a proactive approach will be adopted to engage the community in discussing activities which may affect them. Any complaints that are received relating to the Quarry s operations will be recorded and responded to according to Section 7.3 of the EMS. Information to be recorded will include location of complainant, time of occurrence of alleged noise or vibration impacts (including nature of impact particularly with respect to vibration), perceived source, prevailing weather conditions and similar details that could be utilised to assist in the investigation of the complaint. 8.5 Auditing and reporting Audits (both internal and external) and reporting will be undertaken to assess the effectiveness of environmental controls, compliance with this NBMP, CoA and other relevant approvals, licenses and guidelines. Audit requirements are detailed in Section 9.3 of the EMS. Holcim Jandra Quarry Environmental Management Strategy 20 Noise & Blast Management Plan

28 9 9.1 REVIEW AND IMPROVEMENT Continuous improvement Continuous improvement of this NBMP will be achieved in accordance with Section 10 of the EMS, through the ongoing evaluation of environmental management performance against environmental policies, objectives and targets for the purpose of identifying opportunities for improvement. The continuous improvement process is designed to: identify areas of opportunity for improvement of environmental management and performance; determine the cause or causes of non-conformances and deficiencies; develop and implement a plan of corrective and preventative action to address any nonconformances and deficiencies; verify the effectiveness of the corrective and preventative actions; document any changes in procedures resulting from process improvement; and make comparisons with objectives and targets. 9.2 NBMP update and amendment The processes described in Section 9 and Section 10 of the EMS may result in the need to update or revise this NBMP. The approval of updates or revisions to the NBMP will need to be considered in accordance with Section 11.2 of the EMS. Holcim Jandra Quarry Environmental Management Strategy 21 Noise & Blast Management Plan

29 APPENDIX A: JANDRA QUARRY BLAST MANAGEMENT PROCEDURE Holcim Jandra Quarry Environmental Management Strategy Noise & Blast Management Plan

30 JANDRA QUARRY DRILL & BLAST Page 1

31 CONTENTS AMENDMENT REGISTER. 3 DEFINITIONS..4 REFERENCES RESPONSIBILITIES SAFETY BLAST DESIGN DRILLING PROCESS DRILL MAINTENANCE LOADING THE BLAST PREPARATION FOR BLASTING MISFIRES ENVIRONMENTAL and BLAST MONITORING..18 APPENDIX 1. DRILLING PLAN APPENDIX 2. BLAST COMMUNICATION PLAN 20 APPENDIX 3. MISFIRES SHE GUIDELINE ATTACHMENT 3.18C...24 APPENDIX 4. NEIGHBOUR CONTACT DETAILS..27 APPENDIX 5. DISPOSAL OF EXPLOSIVES APPENDIX 6. SHOTS LEFT LOADED OVERNIGHT APPENDIX 7. SHOT LOADING PROCEDURES APPENDIX 8. THEFT or LOSS OF EXPLOSIVES APPENDIX 9. VEHICLES USED TRANSPORT EXPLOSIVES ON A HOLCIM SITE 35 APPENDIX 10. BLASTING CHECKLIST.. 36 Page 2

32 AMMENDMENT REGISTER Issue No. Amendment No. Date Page No. Procedure No. Brief details and reason for amendment The above listed instructions have been read and understood by the undersigned and a copy of the procedures has been received. Copy No. Date Name Position Signature 1 Scott Stacey Operations Manager 2 Matthew Neil Quarry Manager 3 David Saville Quarry Supervisor 4 Precission Drill and Blast Contract Driller 5 Maxam Explosives Explosives Supplier PURPOSE: The purpose of this procedure is to describe the procedures of the drilling and blasting process at Petrie Quarry. SCOPE The scope of this procedure is from the responsibilities for the design and implementation of drilling and blasting practices at the quarry to the keeping of drill and blast records. Page 3

33 DEFINITIONS Shot: Shot Firer: Stemming: Detonator: Blast Hole: Bulk Explosives: Cup Density: Tie Up: Control Line: Misfire: Burden: Spacing: Free Rock Face (face): Undercut Oversized Rock: A quantity of solid rock, which has been drilled in a regular pattern, which allows explosives to be loaded and fired within the rockmass in order that the rock can be fragmented so that it can be loaded by front-end loaders into dump trucks and transported to the primary crusher. A person who, through training and experience, is authorised by the Department of Mines to handle, charge and fire explosives. An aggregate based material (drill cuttings are not recommended) which is loaded onto the top of the explosive column in the drilled blast holes in order that explosive forces are safely contained within the rockmass by interlocking action. A device containing high explosive, specifically designed to initiate an explosive column in a blast hole. A hole drilled into solid rock specifically to accept explosives. Explosive that is loaded into the blasthole from a bulk supply truckmounted through a hose. The density relative to water of the bulk explosive before it is loaded into the blasthole. A process where by all the detonators are connected in sequence as per the Blast Initiation Plan in preparation to fire. This is the initiation point from which the shot is fired. An occurrence where, after the shot has been detonated in the approved method, one or more detonators failed to initiate leaving unexploded explosives in a muck pile. It is usually caused by an anomaly in the initiating system or explosive column in the blasthole. The distance measured in metres from one row of blastholes to the free rock face or adjacent row of blastholes. The distance measured in metres between adjacent blastholes perpendicular to the burden measurement. The near vertical naturally occurring front face of the rockmass, which forms the shot. A condition where by a section of the Free Rock Face has fallen away leaving a cavity within the free rock face. Blasted rock, which is too large to be fed into the primary crusher. Page 4

34 REFERENCES Australian Standard AS : Explosive - Storage, Transport and Use - Terminology Australian Standard AS : Explosives - Storage, Transport and Use - Storage Australian Standard AS : Explosives - Storage, Transport and Use - Use of Explosives Explosives Act 1999 Explosives Regulation 2003 Australian Code for the Transport of Explosives by road and Rail Second Edition March 2000 Page 5

35 PROCEDURE 1. RESPONSIBILITIES 1.1. The Quarry Manager appointed by HOLCIM is the Statutory Production Manager under the relevant Mines Act who is responsible for the design of the shot and the implementation of this Drill and Blast Procedure at the Jandra Quarry The Shot Firer authorised under the relevant Mines Act is in control of the handling, charging and firing of explosives at the quarry. It is the shot firer s responsibility to fill in all documentation accurately and refer any shot loading anomalies to the Quarry Manager immediately upon occurrence. The shotfirer may be an employee of HOLCIM or the Explosives services provider The Drill Rig Operator is responsible for operating the drill rig in a safe manner, complying to Section 4 of this procedure and reporting any drilling anomaly to the Quarry Manager The bulk explosives supplier is responsible for carrying out all blasting activities in a safe, professional manner ensuring strict compliance to their company safety procedures as a minimum standard. They shall also be responsible for the safe delivery of the specified explosives at the correct cup density and weight in order that no overcharging occurs in any blasthole. They shall be responsible for the removal from the site to storage of any unused explosives. Page 6

36 2. SAFETY 2.1 All persons involved in Drilling & Blasting shall have been adequately trained, qualified and have been fully inducted to the Site & the job prior to commencing any work complying with SHE Guideline 3.18 Blasting and Explosives, Jandra site procedures and risk assessments. Documented evidence of all relevant training and risk assessments shall be filed on site. 2.2 The Blasting contractor shall complete their own company Blasting Risk assessment. 2.3 All drilling and blasting operations are to be carried out strictly in accordance with HOLCIM and MAXAM approved, Jandra site, the explosives act 1999, the explosive regulation 2003 and AS , and AS Vehicle access and / or movement directly over the top of charged blastholes at the shot is strictly forbidden. 2.5 Good communication between the Quarry Manager, Shot Firer, the Drill rig operator and explosive supplier is of paramount importance in order to ensure the blast designs are implemented correctly and any anomalies in any part of the drill and blast process are highlighted and dealt with in a safe and timely manner. 2.6 The transport of explosives within the mine site in particular is to be carried out strictly in accordance SHE Guideline attachment 3.18G (refer appendix 9) and the Australian Code for Transport of explosives by Road and Rail, second Edition, March Detonators and boosters shall be separated and protected from each other and other explosives in a Day Box in a separate vehicle, so that the explosion of detonators cannot initiate other explosives. 2.7 The blasting warning lights in the vicinity of the site office shall note the intention of a blast and all employees will be notified approximate time of blast. A sign will be placed at the entrance to the Quarry. The time of the blasting shall be restricted to between 0900 and Prior to loading a shot, verbal notification shall be given to the neighbours advising them of the approximate time of blast. Refer to Appendix 4, contact details. 2.9 There shall be no unauthorised access into the location of the shot area Mobile Equipment Lock Out shall apply to equipment associated with drilling & blasting The procedures contained within this document shall be carried out in conjunction with the following Job Safety Assessments and Work Instructions. JSA Drilling JSA 009 House Keeping JSA Shot Firing JSA Working With Hardened Steel Components JSA 042 Changing High Pressure hoses in general WI : 2 - Drilling WI : 3 - Blasting Page 7

37 3. BLAST DESIGN 3.1 The blast design is the responsibility of the Quarry Manager. The blast design must take into account any risk associated from face stability which may cause rock or face subsidence, especially in terminal faces. This is to be done in conjunction with the Quarry Development plan, Geotechnical information plus that of previous shot results and site history. Document any trials done and their technical approach used in design (egg pre splitting and face angle of terminal faces). The design must be agreed with the Shotfirer and the pattern recorded on the Drilling Plan, refer to Appendix The face must be profiled using a laser profile technique and bore tracking method, and once every three months or at random times a spot check of holes throughout the shot are to bore tracked to check the accuracy of drilling. In most cases, this is considered the only accurate method of establishing undercut situations. Shots shall only be initiated where by any undercuts have been identified and over pressure is therefore controlled. 3.3 Drilling Plans shall be accurately set out on a clean bench that it is free from obstacles and a surface that is considered safe to work on. The face holes are positioned first to accommodate any undercutting of the face, and possible additional stab holes for any excessive burden. Stab holes should be used with extreme care, and where possible be avoided. The front holes, where undercutting has occurred shall be plotted during the bore tracking process and loaded accordingly. This will reduce face blow out and fly rock and reduce overpressure. 3.4 Drill holes should not be located so close to the face as to create a fall hazard where the blast crew could slip or fall over the edge. Should the pre-drilling survey indicate that a hole should be located so close to the face that it presents an unacceptable fall risk to operator then toe holes, drilled from the bench below should be considered. If the operator is required to be within 1.5 metres of the face, then the front guard must be fitted to drill or fall arrest equipment must be provided. 3.5 Once the front holes have been positioned, the remainder of the blast holes should be laid out using marker paint and a legible tape measure. The burdens and spacings must be measured accurately with holes marked using a small rock and fluorescent paint. The drill site should be demarcated by flagging or barricades to prevent the hole positions being interfered with. 3.6 Blast hole depths shall be determined during the Laser Profiling technique and a plan produced that clearly shows: Blast hole location Blast hole diameter Drill hole depth including the required Sub grade and Page 8

38 Inclination angle Blast hole Spacing & Burden 3.7 Any changes made to the Drilling plan shall be recorded on the plan and communicated to the Quarry Manager. 4. DRILLING PROCESS 4.1 Before any drilling commences a barrier is to be erected along the front of the marked bench as a safety barrier. 4.2 The Drill is to be setup in a position to ensure adequate airflow and to prevent as far as possible dust being blown onto the drill by the prevailing winds. Ensuring adequate clearance on both sides for fuelling, maintenance and adequate clearance from the face in front to the bench at the rear. Ensure the operator s door is not facing towards the open face. Check that the Drill Rig can be trammed out afterwards without disturbing the blast holes 4.3 It is not intended to drill on slopes. Drilling shall not take place on slopes unless a Risk Assessment for the operation has been completed on every occasion 4.3 Place the drill mast at the first hole and check the drill angle is correct to the desired drilling position by using the inclinometer. It is important to maintain the correct drill angle throughout the hole The drill rig should drill by line, starting from the front (face) holes and moving backwards, this avoids too much movement of the drill rig, which could result in the misplacement of hole markers. Do not work yourself into a corner. It is of utmost importance that the angle of the hole is maintained. A deviation of the angle will result in a poor result. The drill rig operators should only drill the holes as marked and not change any hole positions without notifying the Quarry Manager or shot firer. 4.5 Starting the drill hole water is used to collar the top of the hole. The amount of water used varies from hole to hole depending on the ground and the amount of broken ground on the bench. If drilling clean ground imported material, preferably Cement (or a material that has clay properties) may help stem the hole. It is also possible to use fine dust or drill cuttings from a previous drill hole. Once the hole is collared proceed to drill the hole ensuring that the rod is drilling straight. This should be checked periodically by opening the centralisers and ensuring that the rod is not leaning to one side or the other. 4.6 On completion of drilling the hole the drill rig operator shall use a tape measure to confirm the required depth has been achieved. If correct, then plug the hole using Page 9

39 plastic cones and note any relevant details on the Drilling Plan, refer Appendix 1. Then proceed to the next hole. 4.7 If the hole is blocked or not at the required depth then drill until the required depth is achieved. 4.8 When the drilling is completed and prior to loading, the shot firer must check all holes, ensuring that they are to the correct depth. If there is any variation from the designed Drilling Plan then it must be noted and redrawn on the Drilling Plan that clearly shows the actual: Blast hole location; Drill hole depth; Drill hole angle and Noticeable ground conditions, such as surface water, and soft or hard rock conditions encountered while drilling. Page 10

40 4. DRILLING PROCESS (Cont d) 4.9 Should there be variations from the Drilling Plan the quarry manager must be notified The drilled site must remain cordoned off, preventing access to the future blast area. Page 11

41 5. DRILL MAINTENANCE Drill rod removal: 5.1 After every 1500 drilled meters or 50 engine hours, there is a requirement to end for end and rotate the drill rods and couplings. This procedure is to be carried out with a minimum of two people. One person involved must be the operator. The operator is to operate the controls to discharge the rods from the drill and the assistant is to follow instructions from the operator. The operator will have the drill mast in an angle position so that when the rod is discharged from the drifter the non-coupling end will be 150mm from the ground. The coupling end will be clamped in the centraliser. The drifter shank will then be unscrewed from the rod. Once the shank is unscrewed from the coupling the operator will release the centraliser clamps as to let the non-coupling end of the rod fall to the ground. The assistant is not to handle the rod until after the drifter shank is unscrewed from the rod. His assistant will then lay the rod on the ground in an order that they know which rod is first and which rod is last. This procedure is repeated until all the rods are laid out on the ground. 5.2 An inspection will follow to decide which rods and couplings have the most wear. The consumables with the most wear will be replaced first. All rods to be end for ended. Drill rod replacement: 5.3 To replace the rods the assistant will lift the first rod to be replaced and place the coupling end in the open centralisers. The assistant will stand away allowing the operator to clamp the centralisers over the coupling. The drifter is then brought down to screw the shank into the coupling. The operator will then proceed to place the rods into the carrousel. The procedure is repeated until all the rods are replaced in their proper order. 5.4 In both cases the operator must not leave the Drill Cabin until the operation is complete. Dust Suction Hose Maintenance: 5.5 Once every week the dust suction hose shall be inspected & if necessary shall be rotated 90 degrees as to even the wear inside the hose. This will lengthen the life of the suction hose. 5.6 Loosen the clamps and rotate the hose. Check for splits and holes in the hose. Once this is done, tighten the clamps for drilling. Page 12

42 6. LOADING THE BLAST Site specific requirements for Loading of blasts. 6.1 Prior to loading any shot, an appropriate stemming material must be placed in strategic positions on the shot, this is to be coordinated by the Quarry Manager 6.2 Before loading the blast the climatic conditions must be considered, overcast weather and strong winds are not ideal for blasting. If possible postpone the blast until weather conditions are more suitable. High ground temperatures, radiation, lightning and extraneous electricity must also be considered 6.3 The risk of sympathetic detonation and unstable ground conditions must also be considered. And No Hard Hats to be worn while loading shots. 6.4 All holes must be primed prior to loading Bulk Explosives. All holes must have two primers a top and bottom to eliminate any chance of misfires 6.5 The bulk explosives truck operator shall prior to arriving at the quarry or blast location ensure that the water tank is full when weighing off the offsider is out of the truck. The readings from the weighbridge must be recorded on the Cart Note. 6.6 The Bulk explosives truck will return to the weighbridge with the water tank full & weight off the offsider is out of the truck. The readings from the weighbridge must be recorded on the Cart note. This will be the basis on calculated bulk explosives used. All other loading the blast will be in accordance with MAXAM company procedures These procedures include the following. Blast design including Responsibilities of Maxam Business manager, Drill /Blast superintendent, Shotfirer and Technical services staff. Drill and blast designs and plans Blast scheduling Blast set up including Responsibilities of Shotfires and Field operators Risk assessment Site preparation Boundary protection and security of the blast area Rules of entry into the blast area Blast hole preparation prior to loading Loading and stemming the blast including Responsibilities of Shotfirer, Authorised employee and Supervisor Field operators Organisational and planning issues Backfilling of holes Distribution of primers and detonators Priming holes before loading Handling Package primers Loading holes Waste management Page 13

43 Decking holes Stemming holes Detecting and managing slumping holes Surface tie up connections including Method of tie up Non electric shock tube detonation Detonating cord system Firing of Blasts including Duties of Blast controller and Blast guards Preparation for blasting Firing shot Electrically or Non electrically Pre shot countdown and sirens Post shot procedures Destruction of accessory packaging post shot Page 14

44 7. PREPARATION FOR BLASTING 7.1 The Quarry Manager must ensure adjoining neighbours are advised of the intent to blast. Refer to Appendix The shot firer will advise the Quarry Manager or Supervisor to clear the quarry workforce to a safe place for blasting, i.e.; behind the road barricades. 7.3 Vibration monitoring equipment shall be positioned adjacent to the closest effected premises to the quarry. 7.4 Video equipment shall be set up. Refer to section 9 of these procedures. 7.5 The Quarry manager/supervisor will then check with the Site sentries to ensure the quarry area has been blocked off. All personnel onsite, employees, contractors, downers employees and visitor s shall meet at the holding point at the front gate to be part of a roll call. 7.7 The Quarry manager/supervisor will then confirm by radio contact that all blast sentries are in position & position area clear. Positive radio contact must be maintained between the Quarry manager/supervisor, Shotfirer and the sentries. 7.8 The firing position shall be a blast shelter (i.e. old loader bucket) or under the cab of Dump Truck at a safe area as follows: Not in the designed blast direction. The rear of the machine toward the blast. At a safe distance as determined by the Shot firer from the blast. 7.9 The blasting sequence shall be sounded as follows: Once area has been cleared by drive around the direction is given to start sequence. Once the all clear has been given from quarry manager or supervisor that the front gate is shut. The quarry manager or supervisor will notify the shotfirer that he is clear to commence the blasting countdown The shot firer shall then call Attention all personell Maxam will being firing a shot in one minute please maintain radio silence until shot is fired. Shot firer will then sound blasting siren over the 2 way radio for 10 seconds. Shotfirer will call firing in 30 seconds. Firing in 15 seconds. Firing in 5 seconds. Page 15

45 Firing shot signal firing (signal shall be given over the radio). At which time the shot may be initiated by the shotfirer if it is safe to do so, Providing the shot has gone of the clear roads will be given. If the all clear has not been given to the Quarry Manager or Supervisor 10 minutes after detonation the Quarry Manager/ Supervisor will try to contact by radio. If no response Quarry Manager/Supervisor will proceed to the destination point to inspect. Page 16

46 7. PREPARATION FOR BLASTING (Cont d) 7.11 The shot firer shall wait for a suitable time period after the shot has been fired before checking the shot The shot firer will then examine the blast checking for any tell tail signs indicating a misfire. If inspection of the blast is satisfactory, the ALL CLEAR signal shall be given over the radio 7.13 The Drilling and Blasting Report and post shot inspection shall be completed after firing the blast If during the course of loading the shot any breakdown or other instance occurs which will delay the shot to a point that it is not practical to initiate during that day, the Shotfirer in conjunction with the Quarry Manager shall ensure the following actions occur: The tie up does not occur. All down lines shall be secured to prevent slumping and then covered. All explosives are returned to the appropriate magazine overnight. Evacuate the blast area ensuring signs and barricades remain in place to prevent vehicular access to the blast area. The Quarry Manager will organise a security guard who shall remain with the shot overnight to ensure the shot is not interfered with. At the commencement of the second day the whole shot is to be inspected by the Shotfirer for completeness of the previous days charging. This process will occur in conjunction with Maxam procedure Sleeping Shots will apply which includes Barricades and signage Liscensed and competent security guards Name and contact number of MAXAM representative Safety procedure for security guard 7.15 In the event of a pending electrical storm that may develop during loading the shot Maxam procedure will apply. This procedure includes Responsibilities of Business unit manger and Shotfirer Method / procedure for detection and action on lightening activity Action required when lightening activity is detected Other activity Page 17

47 7.16 In the event of an explosive vehicle breakdown MAXAM procedure will apply 8. MISFIRES 8.1 If there has been a misfire, the Shotfirer shall inform the Quarry Manager and take all necessary steps to ensure that all personnel are prevented from entering the blast danger area. Only those personnel approved by the Quarry Manager to deal with the misfire shall be allowed to enter the blast area. 8.2 It is the responsibility of the Shotfirer to deal with misfires strictly in accordance with Section 8 of Australian Standard including advising the NSW I&I Department of mines rep, John Norcott and energy explosives inspectorate. Refer to Misfire in Appendix In the event of a misfire MAXAM PROCEDURE will apply in conjunction with HOLCIM site and business SHE requirements. This procedure includes Significant safety issues Classification of misfires Method Legislative requirements and standards for dealing with misfires Responsibilities of shotfirer and Business manager Misfire handling procedures Misfire or suspected misfire discovered at time of post shot inspection Explosives uncovered during excavation Dealing with misfired explosive charge 8.4 If there is no chance of the holes being recovered, the suspected area will be marked out and photographed to clearly define the unsafe area from fixed marker points. All personal in the Quarry will be made aware of the danger area.. 9. ENVIRONMENTAL and BLAST MONITORING Blasting Limits, Video Taping, Monitoring and Observation of Blast 9.1 All Drilling and Blasting shall be designed to limit the impact on the environment & on surrounding property owners. To this end blasting limits are set and shall not exceed the following at the nearest effected residence, Ground vibration 10mm/sec Overpressure 115dB 9.2 During the firing of a blast no person shall be allowed to be located directly in front of any shot face. Page 18

48 9.2 Videotaping and/or monitoring which is conducted directly in front of any shot face will be carried out using a tripod mount for the camera. No employee may remain with the video camera during the firing of the blast. 9.3 Observation of any blast may only be conducted from a location authorised by the Quarry Manager or Shot firer, these locations will be outside the shot demarcation zones. Page 19

49 APPENDIX 1 DRILLING PLAN Submitted by Maxam Page 20

50 APPENDIX 2 BLASTING COMMUNICATION PLAN Page 21

51 BLASTING COMMUNICATION PLAN A risk assessment ( refer to Appendix 5) shall be completed prior to loading a shot. A brief toolbox talk with the Quarry Manager/Supervisor, shot firer, & sentries will take place. This is also to involve any other personnel within the cordon or responsible for establishing the safety cordon established for the shot. The toolbox meeting will outline clearly what steps to take place to fire shot & all personnel to repeat back instructions to shot firer. Radio contact will be maintained via UHF radio channel 20 throughout the shot firing sequence. Responsibilities Shot firer The shot firer will be responsible for initiating the blast and determining the status of the shot after initiation. The shot firer will assume full control of the shot and blast area and all decisions made within consultation with the Quarry Manager/ Supervisor. The shot firer shall then call Attention all personell Maxam will being firing a shot in one minute please maintain radio silence until shot is fired. Shot firer will then sound blasting siren over the 2 way radio for 10 seconds. Shotfirer will call firing in 30 seconds. Firing in 15 seconds. Firing in 5 seconds. Firing shot signal firing (signal shall be given over the radio). At which time the shot may be initiated by the shotfirer if it is safe to do so, Providing the shot has gone of the clear roads will be given. The shot firer shall wait until dust & fumes has sufficiently cleared or up to 5mins after the shot has been fired before checking the shot. The shot firer shall inspect the shot checking for any misfires, when the shot has been inspected confirming complete initiation the All Clear shall be given to the Quarry Manager/Supervisor via UHF radio 20, so as to allow people & equipment back into the area. Page 22

52 Quarry Manager/Supervisor The Quarry Manager/ Supervisor shall ensure that the security cordon around the shot and blast area is secure and that no encroachment of this area occurs. Procedure The Quarry Manager/Supervisor shall ensure that the quarry/pit is cleared & all staff and contractors are at the front gate muster point. The Quarry Manager/Supervisor shall be in a position giving them a clear vision of the shot, shot firer & roads leading into the quarry whilst being situated so as to be at a safe distance from the front of the shot. The Quarry Manager/Supervisor shall make UHF radio 20 contact with all sentries to confirm it is safe to fire shot. The Quarry Manager/Supervisor shall make UHF radio 20 contact with the shot firer instructing the shot can be fired. APPENDIX 3 MISFIRES PROCEDURES SHE Guideline Attachment 3.18C Page 23

53 Attachment 3.18C SHE Guideline 3.18 HOLCIM Australia Pty Limited July 2008 TREATMENT OF MISFIRES All identified misfires shall be made safe. The manner in which a particular misfire is to be treated will vary. Waiting intervals Where explosive hazards are the only hazards present, and other hazards, such as lingering dust and fumes, are not present, the following minimum waiting shall be observed (Note: Where other hazards are present, for example, lingering dust and fumes, a longer waiting time may be needed). a) With the exception of safety fuse initiation, the minimum waiting interval is 5 minutes. b) Where a charge or detonator that is intended to be directly initiated by safety fuse is identified as having failed to have been initiated, no person is to approach the misfire until an interval of 30 minutes has elapsed. Sentries and warning signs Appropriate sentries and warning signs shall be used to ensure that personnel are kept clear of misfires. If a misfire needs to be left overnight then it must be watched over by a competent person. Treatment Options for the treatment of misfire(s) include, but are not limited to, the following: a) Refiring. NOTES: 1) If lead wires are protruding from a blasthole, they should be shortcircuited and coiled into the blasthole collar until refiring procedures are implemented. 2) It may be necessary to increase the size of the exclusion zone. 3) Refiring should only be done after taking into account remaining protection systems to minimize environmental and safety impacts. b) Removal of the stemming (see section below) followed by repriming, restemming and in itiation. c) Removal of the explosive from the blasthole(s) by flushing the blasthole with water, or water and air, after any stemming material has been removed. NOTE: Environmental impacts should be considered and addressed before explosive products are flushed. d) Mechanical or manual removal of the explosive. e) Drilling, charging and initiating a new blasthole in the vicinity of the misfire(s) (see section below). After treating the misfire(s), work shall not resume at that location until the shotfirer or other competent person has made a thorough search for any explosive from the misfired charge. Recovered explosive shall be disposed of in a suitable and safe manner by a competent person. No person shall leave unguarded, abandon, discard or otherwise neglect to safely dispose of, or ensure the security of, any explosive recovered in the treatment of misfires. NOTE: Some regulatory authorities require that misfires be reported to them. Removal of stemming. Stemming may be removed by applying water under pressure, or a mixture of water and compressed air, through a non-ferrous blowpipe or hose. Other methods may be available and these may be used once a risk assessment has been made. Page 24

54 NOTES: 1) The use of compressed air alone is discouraged. Where it is used, special precautions should be taken to minimize the dangers from static electricity and impact. 2) Where water under pressure or compressed air is not available, the stemming may be sludged out by the use of water and a tamping rod. 3) During stemming removal, detonator and explosive are susceptible to detonation. 4) Consideration should be given to the diameter of the blowpipe in relation to the blasthole to allow free-flow of the materials being removed. This is to ensure that there is no excessive pressure build -up in the blasthole. Firing of a new hole in vicinity The technique of firing a new hole in the vicinity of a misfire shall not occur without the authority of the relevant legislative authority and the National Safety Manager. Before any action, photographs should be taken of the area. Where a hole has been previously bulled, the relieving hole method shall not be used. If it is not possible or practicable to treat the misfire(s) by other methods, then a relieving blasthole may be drilled as parallel as possible to the original blasthole, then charged and fired. Before any relieving hole is drilled it shall be established that the drill will not contact explosives. To complete this operation the following can be effective, but is subject to other controls determined by risk analysis: a) Refer to the blast plan to identify details of the misfired blasthole(s), (e.g., depth, deviation, orientation). b) To prevent drilling into a misfire, clearly mark the hole and effectively block the collar of the misfired blasthole (e.g., by the insertion of a wooden plug). c) Drill the relieving blasthole at a distance which is sufficient to prevent any part of the drill string from entering any part of the misfired blasthole. NOTE: Where practicable, a remote operated drill rig should be used to minimize the risk of injury to persons. With larger and longer holes, the distance between the misfired hole and the relieving hole shall be increased as circumstances warrant. References This document was prepared from Australian Standard AS Explosives Storage and use, Part 2: Use of explosives. Page 25

55 APPENDIX 4 NEIGHBOURS CONTACT Jandra Neighbouring Properties/Residents Name Lot DP Address Phone Comments Helen Barnes & 136 Spicers Rd, Lynda Pykett Rainbow Flat Chris Lowe Ken & Valerie Taylor Caroline Begg David Loveday Jim Smith Mark & Marina Mowbray Mikaza Pty Ltd Robert & Sharon Kim Jeffers Kimberly Rigney Leslie Neville Henderson St, Gloucestor 152 Spicers Rd, Rainbow Flat 155 Spicers Rd, Rainbow Flat Pacific H way, Possum Brush Pacific H way Possum Brush 117 Winmurra Dr, Rainbow Flat Pacific H way, Possum Brush Pacific H Way Possum Brush 1677 The Lakes Way, Rainbow Flat 112 Spicers Rd, Rainbow Flat Page Previous concerns were blasting/vibration. Original objector Also Lot DP Previous concerns were visual & blasting/ vibration. Previous concerns were visual & blasting/ vibration.

56 Graham Dubos 7& Mark & Marina Mowbray Pacific H way, Failford 117 Winmurra Dr, Rainbow Flat Previous concerns were visual & blasting/ vibration. Page 27

57 APPENDIX 5 Disposal of Explosives SHE GUIDELINE ATTACHMENT 3.18D Attachment 3.18D SHE Guideline 3.18D HOLCIM Australia Pty Limited July 2008 Disposal of Explosives Explosives which are surplus or are considered unsafe for transport, storage or use shall be destroyed or removed by the supplier. Persons intending to dispose of defective explosives shall seek advice from the manufacturer where it is available. Where such advice is not available, destruction of these explosives shall be in accordance with this document. Wherever practical the supplier should remove the explosives for destruction. Records Records shall be kept of quantities and types of explosive destroyed, and the destruction methods employed. Residues The residue from explosives destroyed by burning may be poisonous to livestock and wildlife. It shall be buried or otherwise disposed of in accordance with applicable environmental legislation. Method of disposal Explosives shall not be abandoned, thrown away, buried, discarded or placed with garbage. Before commencing to destroy explosives, an exclusion zone shall be established and made secure. Destruction of explosives shall be carried out under the control of a competent person. NOTES: 1) For guidance on whether to destroy explosives not mentioned in this section, the manufacturer, supplier or the regulatory authority should be consulted. 2) Explosives that show evidence of serious exudation are likely to be unstable. 3) When serious exudation is a problem or if large quantities of explosives are to be destroyed, the appropriate regulatory authority and the supplier of the explosives should be contacted. Explosives other than detonators Page 28

58 Explosives other than detonators shall be disposed of by one of the following methods either burning, detonation or dissolving in water. Burning Explosives may be disposed of by burning under the control of a person competent in the destruction of explosives and who holds a license to use the products being destroyed. The following shall not be destroyed by burning: i. ANFO. ii. Ammonium nitrate. iii. Bulk emulsions. iv. Bulk watergels. v. Explosives contained in rigid containers other than cardboard. WARNING: BURNING EXPLOSIVES MAY CAUSE THEM TO EXPLODE, THE FUMES PRODUCED BY THE BURNING OF AMMONIUM NITRATE OR EXPLOSIVES ARE TOXIC, SERIOUS EXUDATION OF NITROGLYCERINE IS APPARENT, ATED EXPLOSIVES SHOULD NOT BE ATTEMPTED PRIOR TO BURNING. Procedure for cartridged explosives and cast boosters The following steps are suggested as a procedure for burning cartridged explosives and/or cast boosters: (a) Determine the size of the exclusion zone and at what point of time it needs to be established (see Notes 1 and 2). (b) Select and clear an area that will minimize the spread of fire. Additional precautions may be necessary. (c) Lay out the required number of trails of sawdust or wood shavings adequate to create a bed for the quantity of explosives to be burned, approximately 200 mm wider than the length of the longest cartridge, and 25 mm deep, upon which the explosive will be laid. The trails should be aligned with the wind direction (see Notes 3 and 4). A maximum of four individual trails may be laid side-by-side (not end to end). They should be a minimum of 600 mm apart. (d) Thoroughly check that all cartridges are free of detonators (see Note 5). (e) Place the cartridges on the trail making sure i. there is at least 1 m of the trail left without any explosives at the downwind end; ii. the cartridges are parallel to each other (not end to end in a line) along the middle of the trail; iii. the cartridges are not touching (a good rule of thumb is to leave a minimum of one cartridge diameter between each cartridge); iv. the cartridges are not piled on top of each other; and v. the maximum quantity of explosives in each individual trail is not more than 12 kg. (f) Remove any explosive that is not to be burnt and return it to the magazine so that it cannot be hit by any fly or flyrock that might occur during the burning. (g) Use slow igniter cord as a wick or, if it is not available, make a wick out of sheets of paper loosely rolled together. Lay out and attach the wick to the downwind end of each trail. The wick should be an extension of the trail. (h) If igniter cord is used as a wick, one end should be coiled within the trail. If a Page 29

59 paper wick is used, ensure that at least 1 m of it is in contact with the trail. The wick should be secured so that it cannot be accidentally dislodged by the wind after lighting. (i) The length of the wick should be sufficient to allow the person(s) lighting it to retire to the predetermined safe place after it has been lit. (j) Thoroughly wet the trail and the explosives (and the paper wick) with kerosene or diesel (never petrol or other highly flammable liquid) (see Note 6). (k) Implement the exclusion zone if not already established. (l) Implement the predetermined safety procedures, light the wick and retire to the predetermined safe place (see Note 7). (m)do not return to the site for at least 15 minutes after the burning has apparently finished. (n) If the fire goes out before any trail has finished burning, do not approach for at least 15 minutes after all trace of fire has apparently gone. (o) Do not add more kerosene or diesel while there is any potential for re-ignition during application. NOTES: 1) This may need to be during the delivery or preparation stage of the work. The condition of the explosives and the quantity to be burned can influence the decision making process. 2) The size of the exclusion zone should be large enough to allow for the possibility of an explosion occurring during the burn. 3) The trail(s) should be aligned such that the flame from the trail and the burning explosives will blow away from the unburned explosives as detonation is more likely to occur if the explosives are preheated by the flame. 4) Some emulsion and water-gel explosives are difficult to burn and may require additional fuel. The manufacturer or supplier should be contacted if large quantities of these explosives are to be destroyed. 5) Puncture marks in the side or the end of a cartridge can indicate the possible presence of a detonator. 6) The use of excess fuel will only soak into the ground and unnecessarily prolong burning that might not include explosives. 7) If more than one wick is to be lit, it is recommended that either the wicks are joined or a multiple fuse lighter is used. Procedure for Detonating cord Detonating cord should not be burnt on a reel or spool but cut into lengths, or loosely coiled, and placed on top of the trail(s) as for cartridged explosives. It should be burnt in lots not greater than the equivalent of two 10 g/m reels at a time or a maximum of 1000 m, whichever is the lesser. Extreme care should be taken to ensure that there are no detonators or detonating delay devices attached to any part of the detonating cord. Procedure for Safety fuse Other than a possible fire or pollution hazard, there is little danger with safety fuse, provided that care is taken to ensure that it is free of detonators. It may be destroyed by burning on an open fire. Procedure for Ignitor cord When burning igniter cord it should be completely uncoiled from its spool. It will not need fuel to assist in the burning process and an area well cleared of flammable material is necessary as it can whip violently during burning. A length of safety fuse is recommended as a wick as it will allow the person lighting it to be well clear prior to the igniter cord commencing to burn. Page 30

60 Detonation Explosives may be disposed of by detonation, provided that a fresh priming charge is used and no detonators are inserted into deteriorated or previously charged explosives. Explosives shall not be detonated on stony ground, in a shallow hole in such ground, or on an area where debris is likely to become missiles (Note: missile damage can be expected over an extensive distance). The extent of the spread of such fly or flyrock will be proportional to the quantity of explosives being destroyed and the nature of the ground and debris. These factors should be considered when determining the exclusion zone. For this reason, explosives should be detonated in sand or earth free from stones. Dig a hole of at least 600mm depth. Place items to be destroyed in a group in the hole. Place a primer on top of them in contact with all items. Cover with paper and back fill the hole with fine material (e.g. crusher dust, sand, soil, etc). Fire the primer, and then search for unexploded products. Dissolving in water Small quantities of water-soluble explosives (e.g. ANFO) may be destroyed by immersion in buckets or drums of water. Alternatively, water-soluble explosives may be spread on the ground and watered in. The resulting fluids will not be allowed to enter a drain or watercourse. Detonators Small quantities of detonators may be disposed of by detonation. Where there is serious deterioration of detonators or large quantities of detonators need to be destroyed, the regulatory authority and the supplier shall be consulted. Detonators maybe inserted into a primer cartridge and disposed of in a blast hole. They will never be dropped into blast holes as single items. An alternative is to dig a hole 600mm deep in fine soil or crusher dust. Secure the detonators together around a primer cartridge and back fill. Fire the primer, and then search for unexploded products. Other explosives For methods of destroying explosives not mentioned above, the manufacturer shall be consulted. References This document was prepared from Australian Standard AS Explosives Storage and use, Part 2: Use of explosives. Page 31

61 APPENDIX 6 SHOTS LEFT LOADED OVER NIGHT SECURITY PROCEDURES For Shots That are To Be Left Loaded Overnight When a shot has been designed to large to be loaded in one day, or if during the course of a shot there is a mechanical breakdown with the pump truck, which in turn delays the shot to a point that it is not practical to initiate, the following will occur. 1. Blasting operations to be carried out in accordance to the Metalliferous Mining Regulations. 2. The appointed Shotfirer and / or the Quarry Manager (if a licensed Shotfirer) will be in charge to check the area and ensure that all safety measures are carried out. 3. Blasting agents and Initiation systems are to be of types that provide significant security to the effects from ground waters for many days beyond the anticipated charging process. 4. No electric detonators are to be used; the tie up will be Non-ell system, with the exception of the primary initiation point during the final connection for firing. 5. All down lines will be secured so as to prevent slumping, and then covered. 6. All surplus explosive agents will be returned to their appropriate magazines overnight 7. Signs and barricades to be placed to prevent vehicle access to the blast area. 8. The security of the shot will also be protected by either of two methods. The first being personal from the Quarry either the Quarry Manager or Foreman to stay with the shot overnight. The second is to be a security guard from the company contracted to do the security at the Quarry to be on site at the entrance to the shot all night. As there is only one entrance to the Quarry, the normal site security and the shot security is considered to be adequate. 9. At the commencement of the second day the whole shot will be inspected by the Shotfirer for completeness of previous days charging Page 32

62 APPENDIX 7 SHOT LOADING PROCEDURES Shot Loading Steps: For Jandra Quarry 1. A licensed Shotfirer must be present on all shots being loaded. 2. Area to be sign posted to identify loading in progress and access to authorised personnel only. 3. Shot design is to be set out by the Quarry Manager or his Appointee, or in conjunction with an external technical service agent, ensuring proper alert device for face edge hazard. (Eg. Bunding flagging tape). A minimum of one metre set back from edge is required unless impractical, in this case a physical restraint will be required. Always work facing the edge; never turn your back to face. 4. Should weather conditions give the risk of lightning strikes the shot will be postponed and access to the shot restricted with signage & barriers. No one will return to the shot until the site Manager & Shot Fire deem it safe to do so. 5. When handling Dets on the shot it is of this Quarry s safety Team opinion that Hard Hats will not be worn unless immediately under a face, this is to eliminate the chance of a hat falling onto a Det and causing initiation. Potential extraneous electrical currents eg, mobile phones and radios shall be turned of and eliminated before any electrical det is brought onto the shot. Electric dets shall be tested off the shot prior to connection. 6. Collect required amount of Accessaries as per design from Magazine s in blast truck, with Dets Separated to HE Explosives by insulated Containers, or carried separately and proceed to shot. 7. Remove all bags or cones from holes and place bottom primer s, 400 Gram with required length down lines ready for bulk loading. 8. Leave required rows free of primers to allow for Bulk Tanker to travel down for charging with using a spotter for guidance. Only rows with no products to be driven over. 9. Shot designer to work in conjunction with truck to control charging depths. 10.Check and follow for priming holes, and other risks connected with both loading and firing shots. 11.Shot Firer or his appointee will top prime the holes with 150 Gram boosters were possible and verify loading height. Page 33

63 12.Once holes have been topped primed, 14mm aggregate is used to stem holes, should any hole not take the required stemming amount, a loader bucket of dust is to be placed over that hole to eliminate the chance of ejection. 13.Tying in of shot with Non Electric Dets as per the Shot Firer s designed sequence can begin as soon as rows are clear, but only by a qualified Shot Firer or the Managers Authorised appointee. 14.Shot area will then be cleared of all rubbish ( eg: empty boxes, drill bits broken rods etc) ready for firing. Then Blasting will follow 15.Non- electric lead line detonator will be connected to the initiation point when area is completely cleared and safe for firing it will be joined to the initiation point by the Shotfirer only. APPENDIX 8 THEFT or LOSS of EXPLOSIVES Theft of explosive or any unaccountable stock shortages shall be reported appropriately. Explosives shall be regarded as accountable items and any evidence of attempted forced entry to, or theft of explosives from, a magazine or an unaccountable stock discrepancy shall be immediately reported in accordance with the relevant legislation, to the regulatory authority and the police. The records shall be readily available to permit the determination of the type and quantity of missing explosive. Page 34

64 Appendix 9 Vehicles Used To Transport Explosives on a HOLCIM Site SHE GUIDELINE ATTACHMENT 3.18G Attachment 3.18G SHE Guideline 3.18 HOLCIMr Australia Pty Limited October 2006 Vehicle used to transport explosives on a Holcim site This document was prepared with reference to the Australian Code for the Transport of Explosives by Road and Rail, second edition, March The requirements in this document satisfy the requirements of Category 2 (moderate risk) as defined in the code. This allows the transport of up to 250kg of Division 1.1 (except 1.1A) explosives and up to 5,000 Detonators of Division 1.1B. Sites with requirements in excess of this should refer to the code for the requirements. Any vehicle used to transport explosives in a quarry shall comply with the following: The vehicle shall be in sound mechanical condition and roadworthy. Every vehicle used to transport explosives shall be marked; Page 35

65 At the front, rear and on both sides with the words EXPLOSIVES in red capital letters not less than 150mm high on a white background. At the front and rear with the class label for explosives. These labels shall be a minimum 250mm square and comply with Australian Standard AS1216 Class labels for dangerous goods. All markings shall be removed or concealed whenever the vehicle does not have explosives on board. The appropriate Emergency Procedure Guide shall be carried in a pocket attached to the drivers door. Explosives shall be in a locked receptacle (complying to Attachment 3.18F Explosives receptacle) securely fixed to the vehicle. No other dangerous goods shall be transported on the vehicle. Shall have at least one fire extinguisher with a rating of at least 30B as per Australian Standard AS1850 Portable fire extinguishers Classification, rating and performance testing mounted in a readily accessible position using a quick release bracket. Appendix 10 Blasting Checklist SHE GUIDELINE ATTACHEMENT 3.18H Page 36

Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin

Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin NOISE IMPACT STUDY - Project: 16099 Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin Prepared for: MHBC Planning c/o

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

Proposed Goulbourn Pit and Quarry Noise Impact Study Geographic Township of Goulbourn City of Ottawa

Proposed Goulbourn Pit and Quarry Noise Impact Study Geographic Township of Goulbourn City of Ottawa NOISE IMPACT STUDY - Project: 10351 Proposed Goulbourn Pit and Quarry Noise Impact Study Geographic Township of Goulbourn City of Ottawa Prepared for: 1394706 Ontario Inc. c/o McIntosh Perry Consulting

More information

Canaan Quarry Noise Impact Study Geographic Township of Cumberland City of Ottawa, Ontario

Canaan Quarry Noise Impact Study Geographic Township of Cumberland City of Ottawa, Ontario NOISE IMPACT STUDY - Project: 13209 Canaan Quarry Noise Impact Study Geographic Township of Cumberland City of Ottawa, Ontario Prepared for: Cornwall Gravel Co. Ltd. 390 Eleventh Street West Cornwall,

More information

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident Response Management Plan (PIRMP) Pollution Incident Response Management Plan (PIRMP) Honeycomb Drive, Eastern Creek NSW EPA Licence No. 494 Crushing, Screening or Separating Plan approved by: Name Title Approved Katie McElhone Regional

More information

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised 2016 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description & likelihood

More information

Nutts Corner Circuit Ltd

Nutts Corner Circuit Ltd Ltd Noise Management Plan Date: March 2016 Page 1 of 16 Table of Contents INTRODUCTION... 3 NOISE MANAGEMENT PROCEDURES 1. PURPOSE... 4 2. SCOPE... 4 3. RESPONSIBILITY & AUTHORITY... 4 4. EVENT ORGANISATION

More information

Newtown Neighbourhood Centre

Newtown Neighbourhood Centre Policy Name Policy Number 1.10.1.1 Relevant procedures Work Health and Safety All procedures relating to the health, safety and well being of individuals in the workplace are relevant to this policy. Author

More information

14 NOISE AND VIBRATION

14 NOISE AND VIBRATION 14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas

More information

1.0 PURPOSE 2.0 REFERENCES

1.0 PURPOSE 2.0 REFERENCES Page 1 1.0 PURPOSE 1.1 This Advisory Circular provides Aerodrome Operators with guidance for the development of corrective action plans to be implemented in order to address findings generated during safety

More information

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH ITEM 8.3 REPORTING MANAGER TRIM FILE REF 2014/110936 ATTACHMENTS PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH GROUP MANAGER NATURAL ENVIRONMENT 1

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk

More information

Vermin, Insects and Scavenging Birds Management Plan

Vermin, Insects and Scavenging Birds Management Plan VIRIDOR WASTE MANAGEMENT LIMITED Lostock Waste Treatment Plant Vermin, Insects and Scavenging Birds Management Plan CONTENTS 1 Introduction... 2 2 Sources, Releases and Impacts... 3 3 Vermin, Insects and

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Harwood Slipway Pty Ltd 162 (Lot 1 DP128593 and Lot 2 DP536378) River Road, Harwood Island NSW Coffey Geotechnics Pty Ltd ABN 93 056 929 483 1/18 Hurley Drive

More information

Boherkill gravel pit restoration project

Boherkill gravel pit restoration project NOISE IMPACT ASSESSMENT Boherkill gravel pit restoration project FITZSIMONS WALSH ENVIRONMENTAL LIMITED Noise Impact Assessment Report prepared by Oliver Fitzsimons MSc. BSc. Noise Impact Assessment 2

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

APPENDIX R-2 VIBRATION AND OVERPRESSURE SOUND ASSESSMENT. RAINY RIVER PROJECT Final Environmental Assessment Report

APPENDIX R-2 VIBRATION AND OVERPRESSURE SOUND ASSESSMENT. RAINY RIVER PROJECT Final Environmental Assessment Report APPENDIX R-2 VIBRATION AND OVERPRESSURE SOUND ASSESSMENT RAINY RIVER PROJECT Final Environmental Assessment Report BLASTING VIBRATION AND OVERPRESSURE SOUND ASSESSMENT REPORT Submitted by: AMEC Environment

More information

National Standard for Commercial Vessels

National Standard for Commercial Vessels National Standard for Commercial Vessels Part E Operations Published 17 May 2013 Endorsed by the Standing Council on Transport and Infrastructure 10 May 2013 Commonwealth of Australia This work is copyright.

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE. Peter Karantonis 1 and David Gonzaga 2

COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE. Peter Karantonis 1 and David Gonzaga 2 ICSV14 Cairns Australia 9-12 July, 2007 COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE Peter Karantonis 1 and David Gonzaga 2 1 Renzo Tonin & Associates (Qld) Pty Ltd L20,

More information

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager

More information

Status: Rev: Comments Date: Author: Reviewer:

Status: Rev: Comments Date: Author: Reviewer: MT EMERALD WIND FARM REVISED A-WEIGHTED NOISE ASSESSMENT Rp 002 R01 2015545ML 30 January 2017 6 Gipps Street Collingwood VIC 3066 Australia T: +613 9416 1855 ABN: 53 470 077 191 www.marshallday.com Project:

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised JULY 2018 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Work Health and Safety Policy Responsible Officer Chief Operating Officer Approved by Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Relevant Legislation, University

More information

MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS

MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS Abstract Jon Cooper 1 and Tom Evans 2 1 Resonate Acoustics, Level 1/23 Peel St, Adelaide SA 5000, Australia Email: jon.cooper@resonateacoustics.com

More information

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 ELECTRICITY INDUSTRY (NETWORK QUALITY AND RELIABILITY OF SUPPLY) CODE 2005 ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 SEPTEMBER 2017 Page 1 of 81 Contents 1 Purpose...

More information

Prism Mining Prism Mining Pty Ltd ABN

Prism Mining Prism Mining Pty Ltd ABN Prism Mining Prism Mining Pty Ltd ABN 43 144 650 126 16 Rosewood St Bardon QLD 4065 Tel: 0405 407919 Fax: 07 3054 7274 TO: FROM: LEANNE WADDELL, TECHNICAL SERVICES SUPERINTENDANT, RASP MINE MIKE HUMPHREYS,

More information

Netball Australia Bench Officials Accreditation Framework. Updated 2015

Netball Australia Bench Officials Accreditation Framework. Updated 2015 Netball Australia Bench Officials Accreditation Framework Updated 2015 Contents 1.1 Introduction... 3 1.2 Licensing/Franchise Arrangements... 3 1.3 Insurance... 3 1.4 Bench Officials Code of Behaviour...

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

Braemar Power Project Pty Ltd. B1 Pipeline. User Access Guide. Updated May 2018

Braemar Power Project Pty Ltd. B1 Pipeline. User Access Guide. Updated May 2018 Braemar Power Project Pty Ltd B1 Pipeline User Access Guide Updated May 2018 Alinta Energy Level 13, Grosvenor Place, 225 George Street, Sydney NSW 2000 User Access Guide 1. INTRODUCTION 1.1 Part 23 of

More information

High seas: conservation and management measures to prevent significant adverse impacts on vulnerable marine ecosystems

High seas: conservation and management measures to prevent significant adverse impacts on vulnerable marine ecosystems High seas: conservation and management measures to prevent significant adverse impacts on vulnerable marine ecosystems ABSTRACT Australia has consented to implement the interim measures adopted in 2007

More information

Work Health Safety Record Management Guidelines. October, 2014

Work Health Safety Record Management Guidelines. October, 2014 Work Health Safety Record Management Guidelines October, 2014 Contents 1 Executive Summary... 2 2 More information... 2 3 University Records Management... 2 4 WHS Legislative Requirements... 2 5 Other

More information

Netball Australia Bench Officials Accreditation Framework. Updated 2018

Netball Australia Bench Officials Accreditation Framework. Updated 2018 Netball Australia Bench Officials Accreditation Framework Updated 2018 Contents 1.1 Introduction... 3 1.2 Licensing/Franchise Arrangements... 3 1.3 Insurance... 3 1.4 Bench Officials Code of Behaviour...

More information

BLASTING REPORT APPENDIX ENVIRONMENTAL IMPACT STATEMENT

BLASTING REPORT APPENDIX ENVIRONMENTAL IMPACT STATEMENT BLASTING REPORT APPENDIX JJ ENVIRONMENTAL IMPACT STATEMENT Report Prepared for Boral Resources (Qld) Pty Ltd Blasting Impact Gold Coast Quarry 0 500 m April, 2013. Reference #121307 April, 2013. Boral

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Pollution Incident Response Management Plan Austrak Wagga Wagga

Pollution Incident Response Management Plan Austrak Wagga Wagga - 1/16 Workplace Name: Location: Dampier St, Bomen NSW Document Ref. PIRMP Wagga Wagga Effective Date : Nov 2012 Revision Revision Date Description Reviewed Approved 01 Nov. 2012 Development for License

More information

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different incidents, injuries, loss of lives, and property damages. Dimension

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Health & Safety Policy HSP 17 Vibration Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 17 Vibration Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 17 Vibration Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 10.01.2017 David Maine 1 st

More information

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1779 Assessing the risks from high pressure Natural

More information

GUIDANCE NOTE FOR NOISE MEASUREMENT OF EQUIPMENT TO ENSURE COMPLIANCE WITH MHSC MILESTONES

GUIDANCE NOTE FOR NOISE MEASUREMENT OF EQUIPMENT TO ENSURE COMPLIANCE WITH MHSC MILESTONES MINING INDUSTRY OCCUPATIONAL SAFETY & HEALTH GUIDANCE NOTE FOR NOISE MEASUREMENT OF EQUIPMENT TO ENSURE COMPLIANCE WITH MHSC MILESTONES FACT SHEET 2016 BACKGROUND The Mine Health and Safety Council (MHSC)

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

MINE SAFETY MANAGEMENT SYSTEM Pollution Incident Response Management Plan

MINE SAFETY MANAGEMENT SYSTEM Pollution Incident Response Management Plan BERRIMA COLLIERY MINE SAFETY MANAGEMENT SYSTEM Document No: Revision No: Authorised: Berrima Colliery V7 Public Version Regional Environment Manager NSW/ACT Table of Contents 1 Objectives... 3 2 Document

More information

Research Involving Human Subjects: AA 110.7

Research Involving Human Subjects: AA 110.7 Research Involving Human Subjects: AA 110.7 Purpose To set forth certain human subjects rights and protections, and to establish a review process intended to ensure compliance with federal regulations

More information

DRIVER FATIGUE MANAGEMENT PLAN

DRIVER FATIGUE MANAGEMENT PLAN DRIVER FATIGUE MANAGEMENT PLAN Basic principles to include in a driver fatigue management plan A number of basic principles apply when developing a Driver Fatigue Management Plan. The following are detailed

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Football Lighting Policy & Requirements Season 2016

Football Lighting Policy & Requirements Season 2016 Football Lighting Policy & Requirements Season 2016 The Football Lighting Policy & Requirements (the Policy) sets out the mandatory requirements for competition lighting at football (soccer) venues used

More information

Northern Territory. Code of Practice For Responsible Gambling

Northern Territory. Code of Practice For Responsible Gambling Northern Territory Code of Practice For Responsible Gambling 2 Statement This Code of Practice reflects a partnership between Northern Territory gambling providers, Government, regulators and counseling

More information

TRAFF IC CALMING POLICY

TRAFF IC CALMING POLICY TRAFF IC CALMING POLICY Policy No: 45396 Approved by Council 28 May 2008 C11/05/08 Further amendment by Council 22 June 2011 vide c08/06/11 Contents 1 Problem Statement 1 2 Desired Outcomes 2 3 Strategic

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Issue date: July 2013 Page 1 of 9 Contents 1. PREVENTATIVE MECHANISMS: 1(a) Hazards to health and the environment Page 3 1(b) Pollutant Inventory Page 4 1(c)

More information

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

Two phases have been established for the classification of incidents to help in determining the appropriate course of action; 1.0 CLASSIFICATION OF AN EMERGENCY SITUATION Two phases have been established for the classification of incidents to help in determining the appropriate course of action; Alert phase, and Emergency phase.

More information

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet Safe Use of Explosives in Construction Safe to Blast Information Sheet This guide has been developed to provide general information to site management on issues dealing with safe use of explosives on construction

More information

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station. Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision

More information

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Preamble to the AFF Selection Policy

Preamble to the AFF Selection Policy Preamble to the AFF Selection Policy This preamble to the AFF Selection Policy outlines the philosophy on which the Selection Policy is based. This preamble is provided by way of background only, does

More information

DUBLIN CITY COUNCIL AMBIENT SOUND MONITORING NETWORK Annual Report For 2010

DUBLIN CITY COUNCIL AMBIENT SOUND MONITORING NETWORK Annual Report For 2010 DUBLIN CITY COUNCIL AMBIENT SOUND MONITORING NETWORK Annual Report For 2010 Produced by Traffic Noise & Air Quality Unit Roads and Traffic Department, Dublin City Council Page 2 of 92 Table of Contents

More information

Work Health and Safety Risk Management Procedures

Work Health and Safety Risk Management Procedures Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016

# Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016 # Post Consultation and Submissions Resource Consent Conditions for Surfing Impact Mitigation August 2016 Surf Mitigation Management Plan 1 1 Not less than 6 months prior to the commencement of the construction

More information

MOBILE SHOPS, STALLS AND HAWKERS. Ashburton District Council Mobile Shops, Stalls and Hawkers Bylaw 2016 Environmental Services

MOBILE SHOPS, STALLS AND HAWKERS. Ashburton District Council Mobile Shops, Stalls and Hawkers Bylaw 2016 Environmental Services 1 Bylaw MOBILE SHOPS, STALLS AND HAWKERS TITLE: TEAM: RESPONSIBILITY: Ashburton District Council Mobile Shops, Stalls and Hawkers Bylaw 2016 Environmental Services Environmental Monitoring Manager DATE

More information

USE OF SPEED AND RED LIGHT CAMERAS FOR TRAFFIC ENFORCEMENT: GUIDANCE ON DEPLOYMENT, VISIBILITY AND SIGNING

USE OF SPEED AND RED LIGHT CAMERAS FOR TRAFFIC ENFORCEMENT: GUIDANCE ON DEPLOYMENT, VISIBILITY AND SIGNING USE OF SPEED AND RED LIGHT CAMERAS FOR TRAFFIC ENFORCEMENT: GUIDANCE ON DEPLOYMENT, VISIBILITY AND SIGNING INTRODUCTION 1. Safety cameras provide a valuable and cost-effective method of preventing, detecting

More information

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY

PASSENGER SHIP SAFETY. Review of Operational Safety Measures to Enhance the Safety of Passenger Ships. Submitted by ICS SUMMARY MARITIME SAFETY COMMITTEE 92 nd session Agenda item 6 MSC 92/6/XX 2013 Original: ENGLISH PASSENGER SHIP SAFETY Review of Operational Safety Measures to Enhance the Safety of Passenger Ships Submitted by

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

4 COMPETITIONS 4 COMPETITIONS COMPETITON PROTOCOLS: GENERAL 4.1 VENUES 2016 MANUAL OF MOTORCYCLE SPORT

4 COMPETITIONS 4 COMPETITIONS COMPETITON PROTOCOLS: GENERAL 4.1 VENUES 2016 MANUAL OF MOTORCYCLE SPORT 4 COMPETITIONS 2016 MANUAL OF MOTORCYCLE SPORT 4 COMPETITIONS COMPETITON PROTOCOLS: GENERAL 4.1 VENUES 4.1.1 Register of Venues 4.1.1.1 Each State Controlling Body must, for its area of responsibility,

More information

Pedestrian Level Crossings Design and Installation

Pedestrian Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Pedestrian Level Crossings Design and Installation ETD-16-03 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS

More information

Explosive gas migration monitoring for a sanitary landfill facility.

Explosive gas migration monitoring for a sanitary landfill facility. 3745-27-12 Explosive gas migration monitoring for a sanitary landfill facility. (A) Applicability and implementation. This rule applies to the following: (1) The owner or operator of a sanitary landfill

More information

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL

NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL DUCHY OF CORNWALL. ST MARY S HARBOUR AUTHORITY NAVIGATIONAL SAFETY MANAGEMENT SYSTEM MANUAL WORKING DRAFT Page 1 of 25 CONTENTS 1 1. NAVIGATIONAL SAFETY MANAGEMENT SYSTEMS PRINCIPLES 3 2. INTRODUCTION

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

in Australian Workplaces

in Australian Workplaces Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 in Australian Workplaces Introduction Part 2 Part 3 Part 4 Part 5 SafeWork SA Introduction Hazard identification is the process used to identify

More information

Procedure: Work health and safety hazard management

Procedure: Work health and safety hazard management Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation

More information

Removal of Lead-Based Paint

Removal of Lead-Based Paint Safety Management System SP24-61 Process Authority: HS Manager Removal of Lead-Based Paint Approval: Chief Operating Officer Version Date:30/03/2015 Revision: B 1 Purpose To define the requirements for

More information

Environmental Management Strategy

Environmental Management Strategy Appin Surface Gas Management Project Appin Mine Surface Gas Management Project Environmental Management Strategy Page 1 Appin Surface Gas Management Project Review History Revision Description of Changes

More information

A review of Australian wind farm noise assessment procedures

A review of Australian wind farm noise assessment procedures Proceedings of ACOUSTICS 2016 9-11 November 2016, Brisbane, Australia A review of Australian wind farm noise assessment procedures Tom Evans 1 and Jon Cooper 2 1 Resonate Acoustics, Level 4, 10 Yarra Street,

More information

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13

DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13 DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1 CONTENTS Para Page 1. Introduction 3 2. Safety Management System 3 3 Reduce Risks 4 4. Identification of the Hazards and Risks... 4 5. Conformance with the

More information

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai

Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Determination 2018/047 Regarding the code compliance of barriers to a pool at 32 St Andrews Drive, Hikuai Summary This determination considers whether the barriers to a small heated pool comply with Clause

More information

EventLambeth - Post Event Report

EventLambeth - Post Event Report EventLambeth - Post Event Report Date: 23.09.16 Report title: SW4 / House of Common Post Event Report Wards: Clapham Common, Clapham Town Contact for enquiries: Lee Fiorentino. EventLambeth, London Borough

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY THE PROJECT INTRODUCTION SITE DESCRIPTION NOISE SENSITIVE RECEPTORS...

TABLE OF CONTENTS EXECUTIVE SUMMARY THE PROJECT INTRODUCTION SITE DESCRIPTION NOISE SENSITIVE RECEPTORS... VALCOUSTICS CANADA LTD. File: 115-0395 2025 Guelph Line/Burlington Noise TABLE OF CONTENTS EXECUTIVE SUMMARY...1 1.0 THE PROJECT...1 1.1 INTRODUCTION...1 1.2 SITE DESCRIPTION...2 2.0 NOISE SENSITIVE RECEPTORS...2

More information

Victorian Desalination Project

Victorian Desalination Project Victorian Desalination Project D&C Marine Area Environmental Management Plan Attachment I5 - Helicopter Management Sub Plan DOCUMENT NUMBER TDV 0 EV SB 0013.I5 02 Attachment I5 - Helicopter Management

More information

PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Prepared for: Quarry Solutions Pty Ltd Date: September 2016 File Ref: documents / 1837_610_004r2 Page i Document Control Job Details Ref no.:

More information

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

University of Iowa External/Central IRB Reliance Process Standard Operating Procedure (SOP)

University of Iowa External/Central IRB Reliance Process Standard Operating Procedure (SOP) University of Iowa External/Central IRB Reliance Process Standard Operating Procedure (SOP) I. OVERVIEW The purpose of this Standard Operating Procedure is to define a process for all University of Iowa

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

International Standard for Athlete Evaluation. September 2016

International Standard for Athlete Evaluation. September 2016 International Standard for Athlete Evaluation September 2016 International Paralympic Committee Adenauerallee 212-214 Tel. +49 228 2097-200 www.paralympic.org 53113 Bonn, Germany Fax +49 228 2097-209 info@paralympic.org

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN SITE: INGLEBURN CONTENTS 1 INTRODUCTION 4 1.1 Background... 4 1.2 Aim of the Emergency Response Plan... 4 1.3 Definition of a Pollution Incident... 4 2 OBJECTIVES

More information