1 CH-MG Illustrated Start-Up Procedure, Rev 2A Pre-Start-Up Checks Is there any visible damage to the machine? If yes, describe damage: Is the machine installed outdoors? If outdoors, is the machine on the roof? Is the cooling tower at a different level from the chiller? If yes, what is the height difference? Tower: Above or Below Are all minimum clearances maintained around the chiller per Yazaki specifications? If no, which side(s) does not conform to specified clearances? [40 front and back, 28 sides, 114 front or back for tube pull] Is the machine level both in longitudinal and transverse directions, using the reference bar indicated in Figure 1? Figure 1 Water Side Pre-Start Checks Have all fluid circuits to the machine been flushed, refilled, and stabilized with pumps running and air removed? Is the water piping to the chiller in accordance to Yazaki specifications and connections correct per the installation manual? Are balance valves present? Are isolation valves present? Are drain valves present? Are all appropriate check valves present? Are provisions made for chemical treatment as is considered appropriate for all water loops? Have the pressure drops through all water loops been adjusted and finalized? Is the pressure in any water loop in excess of 114 PSI? If Yes, which loop(s)?: Record pressures on the Data Sheet. Figure 2

2 Gas Side Pre-Start Checks Was it necessary to use a flue stack rather than the factory-supplied cap? If yes, is the flue stack sized and assembled correctly in accordance to NFGC and manufacturer s recommendations? Are there any barometric dampers in the flue assembly? If multiple units use a common flue, is the flue sized and assembled correctly, and are all appropriate barometric bypass dampers installed correctly? Figure 3 Examples of Barometric Bypass Damper and Common Flue Venting Is there sufficient supply air for all appliances in the area including the Yazaki machine(s) in accordance with NFGC requirements? [Recommendations are for one square inch of free air opening per 1,000 BTU of total of all burner inputs of all gas-fired appliances in the space.] Figure 4 Is an appliance regulator installed at the gas supply inlet of the Yazaki machine(s)? Has a leak check been completed on all gas lines? Is the supply gas pressure proper when measured after the gas meter and any applicable appliance regulators? [ wc] Record Gas Supply Pressure in the appropriate area on the Data Sheet. Electrical Pre-Start Checks Have all electrical terminal connections in the Yazaki unit been checked to be tight? This includes terminal blocks, motor contactors, relay sub-bases, and junction boxes. Also includes all wiring connections in the Burner itself.

3 Are all Molex plugs in the Yazaki unit properly seated? Locations illustrated below. Front Back Left Side Right Side

4 Are all field wiring connections made properly in the Junction Box (Figure 5)? Figure 5 Is an electrical disconnect within sight of the unit and readily accessible per section of the National Electrical Code? Is the voltage appropriate for the machine? Is the high leg (or wild leg) of 3-phase power connected to L2 (if applicable)? Is the over-current protection sized properly? Record Breaker/Fuse Size in the appropriate area on the Data Sheet. Is the electrical wire size correct? Record Wire Size in the appropriate area on the Data Sheet. Are there any aluminum conductors used? Tools Required for Chiller-Heater Start-Up ACT-5 Diagnostic Tool {Shipped with Chiller} Combustion Analyzer {Bacharach shown as example} Gas Pressure Manometer {Dwyer and UEI shown as examples}

5 Draft Pressure Manometer {Dwyer and UEI shown as examples} Meter capable of reading DC volts {Extech meter shown as example} Phase Meter {Yazaki P/N Hioki 3126} Torque Wrench {Yazaki P/N N7510} [10mm, 200 kgf-cm or 14.4 ft-lb] Vacuum Gauge (Digital only) {Yazaki P/N VG64, P/N 69086} Vacuum Hose Fitting Adapter {Yazaki P/N N7512} [M14x1.5 metric flare fitting] {Yazaki P/N 30682B} Vacuum Pump, 5+ CFM {Welch 1402B shown as example} Water Pressure Test Manifold {Yazaki P/N N7559} [M12 metric flare fittings, gauge included]

6 Other Recommended Tools 10 Latex Vacuum Tubing (3/8 ID) {Yazaki P/N N7544} Calculator Permanent Marker Spirit Level {Yazaki P/N N7519} Standard Hand Tools [Screw Drivers, Pliers, Wire-Cutters, Pipe Wrenches, etc.] Tape Measure Digital or Infra-red Thermometer Yazaki Literature Required CH-MG Start-Up & Maintenance Data Sheet CH-MG Start-Up Procedure [this document] CH-MG150 & MG200 Installation Instructions [shipped with the chiller] Yazaki Warranty Registration Card [shipped with the chiller] Other Yazaki Support Literature CH-MG150 & MG200 Operating Instructions [shipped with the chiller] CH-MG Service Manual Illustrated Start-Up Procedures for CH-MG Series with Riello Burners Before beginning the Start-Up Procedure, please read this complete procedure, including Burner Setup and Completing Setup sections. The steps outlined here are intended to help provide the shortest possible time investment in a proper startup of a Yazaki CH-MG Chiller/Heater. There are other methods and procedures for start-up that may be equally valid, but do not mix procedures. If a different valid start-up procedure is chosen, follow only the steps of that procedure. Some steps below are listed as Optional. While this data is neither critical nor required for a proper startup, more complete data often assists with future inquiries in regard to maintenance and troubleshooting. IMPORTANT: On power up, the unit goes through several self-test functions and can take several minutes before it begins to respond to commands. Patience is key while setting up a CH-MG unit. 1. Record Project, ASP information, and machine data into the proper spaces at the top of the Data Sheet. Indicate this work as a Start-Up by checking the box under Type of Service on the Data Sheet. 2. Make certain the Main Gas Stop Valve, Leak Check Stop Valve, and Pilot Stop Valve are all closed. Press the manual reset button on the Gas Pressure Switch(es). 3. Perform initial evacuation. a. Refer to the Service Manual for proper procedures of evacuation. A general description of the evacuation setup is provided in Figure 6. i. Record final vacuum level achieved on the Data Sheet. b. Record amount of non-condensable gases removed on the Data Sheet (optional). c. Check for presence of hydrogen gas (optional). i. Record whether or not hydrogen gas was present on the Data Sheet.

7 Figure 6 NOTE: Irreparable damage can occur if oil from a vacuum pump gets into the machine. Do not leave a vacuum pump unattended. NOTE: Service valves should never be open if the vacuum pump is not running. NOTE: If machine is found to be at atmospheric pressure on initial startup, contact Yazaki Energy Systems at (469) for further instructions. 4. Set up Flow Switch, located in the rear area of the unit as indicated below on Figure 7. a. Using the chilled water flow balancing valve, adjust the chilled water pressure drop to 50% of the value listed on the Pressure Drop in Unit tag. (Tag location indicated by the dashed line in Figure 7.) b. Adjust the flow switch until it opens at the 50% flow rate (Figure 8, Item 1). c. Adjust the chilled water flow pressure drop to 100% of the value listed on the Pressure Drop in Unit tag (Allowable range on the chilled water circuit is +/- 20%) d. Check the box on the Data Sheet indicating the Flow Switch was set. Figure 7 Figure 8 5. Verify that flow rates through all water circuits are appropriate using data from the Pressure Drop in Unit tag on the machine as indicated in Figure 7. a. The pressure drop value indicated on the Pressure Drop in Unit tag supersedes all other values, including the value on the unit nomenclature tag. b. Record all requested data from the water circuits on the Data Sheet.

8 6. Calculate water flow and record the information on the Data Sheet (optional). 7. Check the draft pressure in the vent assembly, unless using the factory-supplied cap. a. Attach adapter for the Draft Gauge to vent discharge. b. Adjust the barometric bypass damper to bring the draft pressure into the allowable range of 0.00 to wc. c. Record the Stack Draft in the appropriate area of the Data Sheet. 8. Prepare test tools and instruments. a. Plug the ACT-5 tool into the control board. b. Attach Combustion Analyzer to the flue stack (or have it ready). c. Gas pressures will be tested at several test ports on the gas train during the Start-Up procedure. Have tools ready and access clear to each test port. 9. Check main gas supply pressure to verify it is wc. 10. Record whether or not a connection has been made in the Junction Box (Figure 9) at the terminals indicated in the appropriate section on the Data Sheet. Figure 9 Optional connections indicated with dashed line. 11. Turn power on to the Yazaki machine (no power should have been on to this machine until this point). a. It may also be necessary to turn on the disconnect switch, located in the lower left corner of the unit s main control panel. 12. Measure voltage to ground for each power leg. This should be done at the Junction Box (figure 9). Record voltage readings on the Data Sheet. 13. Verify correct phase rotation using a phase rotation meter. If rotation is incorrect, turn off power to the unit. Swap L1 and L3 wires at Junction Box (Figure 9). Restore power and verify correct phase rotation. Without a phase rotation meter, there is no simple alternative method of checking proper phase rotation on an MG unit. 14. Take the unit out of Long Term Storage mode. There is a Mode Select slide switch in the upper-middle of the CPU board (Figure 10). The unit ships with that switch in the middle position. Slide it to the right to enter Adjustment mode.

9 Figure Attach the ACT5 (Figure 11) to the CPU board (Figure 10). It may take as long as 30 seconds for the ACT5 to begin reporting properly. Do not be alarmed at any delay less than 30 seconds. a. The ACT5 connection jack is located beneath the Mode Select switch. Figure 11 b. To navigate through the menus (Covered in detail in the Service Manual): i. and at the top will move up and down in menu layers. ii. Pressing and holding the button for more than 3 seconds will back up one level in the menu ladder. iii. The circular pad of <, >, ^, and v will move the cursor position in the current menu being displayed. c. To view data without being able to change it, thus being protected from accidentally changing it, select the option [1. Monitoring]. d. Changes can only be made when using the submenus offered by selecting the option [2. Unit Data Set]. i. To make changes, move the cursor to the desired field, then use the + and - buttons to scroll through the available options for that data point. ii. Once the data point displays the desired value, press ENTER to select that value as current value for the data point. 1. Failure to press ENTER will result in the new value not being retained. 2. Some values may be displayed as O or _. O means either OK or This signal is active. _ means either Not OK or This signal is NOT active. 3. Any data point listed as No Use should not be altered at any time.

10 16. Set the unit into Cool Mode by pressing the Cooling button on the control panel (Figure 12). Also press the Direct Operation On button to enable the machine. a. Note that the LED for INT SAFETY DEVICE will be lit when all internal safeties report OK. It should be lit at all times when the unit is powered up. Figure 12 Burner Setup 1. Remove and set aside the red protective cover from the burner. 2. Verify the air and gas adjustment settings (optional). Using a flashlight, look through the inspection window indicated in Figure 13. a. The Central Air adjustment, indicated by the solid line in Figure 14, should be set to a value of 0 for MG150 machines and 6 on MG200 machines. b. The Gas adjustment, indicated by the dashed line in Figure 14, should be set to a value of 0 for MG150 machines and 2 for MG200 machines. c. Record settings on the Data Sheet. Figure 13 Figure Verify the setting of the Outside Air adjustment. a. If adjustments are required, it will be necessary to loosen the keeper plate before adjusting the screw. The proper position is when the keeper plate slips into the desired slot in the screw shaft as indicated by the solid line in Figure 15. i. This screw should be set to a value of 0 for MG150 machines and 6 for MG200 machines. ii. The first notch down the shaft is the 0 notch, then 1, then 2, etc. b. Record settings on the Data Sheet.

11 Figure Verify the settings of the Mod Motor (optional). The Red Cam should be set to 90, the Blue Cam should be set to 0, and the Orange Cam should be set to 15. Figure Adjust pressure switches. There will be an Air Pressure Switch (Figure 16 right) as well as a High Gas Pressure Switch (Figure 16 left). Some models may also have an optional Low Gas Pressure Switch (Figure 16 left). The Air Pressure Switch is located on the burner at the top left. The Gas Pressure Switches are mounted directly to the gas valve. a. Set all pressure switches to their lowest possible value. i. The Low and High Gas Pressure Switches are identical and have the same switch part number. b. Final setting values will be determined later in the process. 6. Prepare the machine for burner ignition. Make certain that both the chilled water and cooling water pumps are running and that the cooling tower is functioning properly. The machine will begin to produce cooling capacity very quickly, even during startup. 7. Prepare the gas manifold test point for use. Loosen the screw inside the brass fitting at the top of the burner head ½ turn (Indicated by the dashed line in Figure 15). Attach a gas manometer to this fitting. Burner input capacity is determined by the pressure at this test port (see Figure 17). Figure 17

12 Figure Leaving all gas valves closed, set the switch on the burner to Manual (Indicated by the solid line in Figure 18). This should start the burner in its ignition sequence. Our intention is that this sequence fails so that we can test the safety logic. Also at this step, verify the correct rotation of the combustion blower. 9. Once the ignition sequence has failed, open the Pilot Gas Valve and reset the burner control by pressing on the clear plastic window covering the indicator dial (Indicated by the dashed line in Figure 18). a. It is not necessary to press very hard to for the reset to take hold. b. Once reset, the ignition sequence should begin again after a slight delay, only this time it should fail at the main ignition point of the sequence. c. It may take several cycles to purge the air in the pilot gas train. 10. Open the Main Gas Stop, but leave the Leak Check Valve closed. Reset the burner control. Attach a manometer to the pressure tap in the downstream gas valve (Figure 19). Adjust this gas pressure to approximately 6 wc. a. Total accuracy at this step is not required. b. It may take several cycles of failure and reset to do this. c. Also during this step, check the manifold for potential gas leaks. Figure Once the manifold gas pressure has been set, and the burner is locked out one last time, open the Leak Check Valve. Now all gas valves should be open. Move the gas manometer to the Gas Manifold Test Point on the burner head (Indicated by the dashed line in Figure 15). Reset the burner control. The burner should ignite smoothly.

13 12. The burner will now operate at a capacity determined by manually adjusting the Mod Motor position with the +/- Jog Switch, located to the right of the Auto/Manual Switch (Indicated by the solid line in Figure 18). Intuitively, pressing + will increase the fire rate, and - will decrease it. The first objective is to have flame stable enough to advance to the 90, full fire position. a. Use the ACT5 to display the temperature of the GP sensor. i. The menu path is 1.Monitoring A1 Analog I/O A11 Temperature Data Point 7 GP. b. Using the Jog Switch, open the valve until the burner sounds like it is pulsating slightly, a sound similar to a train engine. Stop the burner at this point and monitor the GP sensor reading. Once the GP sensor indicates a temperature above 160 F, open the valve again until either the pulsating sound returns or the 90 open position is reached. If the pulsating sound returns, hold the burner there until the GP sensor reading indicates greater than 175 F. Once the GP sensor indicates above 175 F, open the valve to the 90, full fire position. The pulsating sound should have diminished or disappeared entirely. 13. Adjust the gas pressure using the main gas pressure regulator (indicated by the dashed line in Figure 19) so that the Gas Manifold Pressure Port (indicated by the dashed line in Figure 15) reads 4.2 wc for the MG150 machines and 5.2 wc for the MG 200 machines. This should be 100% fire rate. Record readings on the Data Sheet. 14. Attach the Combustion Analyzer to the stack using the access port in the chimney (Figure 20). Figure Adjust the Air Delivery Cam adjustment screws to set proper combustion (Figure 21). a. The air delivery rate is determined by the cam position at the 6 o clock position, or the very bottom of the assembly as seen through the adjustment window indicated by the arrows in Figure 21. i. When the burner is at full firing rate, the last air adjustment screw (Circled in Figure 21) should be at the 6 o clock position. b. Screwing in will increase the air delivery and out will decrease it. c. Only very slight adjustments typically need to be made to these settings. d. Target Values for combustion analysis: i. O2 2 to 6% ii. CO Less than 50 ppm desired, up to 200 ppm allowable. iii. NOx Less than 30 ppm, depending upon air quality rules for the area. iv. CO2 8.5 to 11.5% e. Record readings on the Data Sheet.

14 Figure Next, use the Jog Switch to move the next screw back into the 6 o clock position. Let the burner have a minute for the GP and EXH temperature readings to adjust to the lower fuel input. Then adjust the screw to trim the combustion analyzer readings into the proper ranges as indicated in step 15d. 17. Repeat step 16 for 2 more screw positions. This will make a total of four (4) air adjustment screws that will be used to set proper combustion. The remaining three (3) lower firing rate screws (indicated by the box in Figure 21) will not be set using a combustion analyzer. a. The full range of unit capacity, 30% to 100% cooling capacity, is covered by the four adjustment screws that are set by using the combustion analyzer. These four screws govern burner capacity from 43% to 100% firing rate, which is all that is needed for normal operation of the burner. b. In regard to the other three screws, the first one won t be used at all. The second one is simply pilot/ignition position, and the third one just acts as a transition position to advance from pilot into normal firing ranges.

15 i. Since the burner never spends more than 10 seconds burning the main flame in pilot position before beginning transition, and transition to the range controlled by the four screws that were adjusted by combustion analysis only takes about 5 seconds, the actual combustion analysis readings for the first three screws are not needed and trying to adjust these screws only wastes time during the startup. ii. The goal for these three screws is to get reliable ignition and combustion with little regard toward CO or NOx readings. A slightly fuel-rich mixture for the first three screws is preferable. 1. Whatever adjustments are made in order to get a stable ignition on the second screw will need to be made to screws 3-7 as well in order for the burner flame to be able to remain stable enough to advance the burner firing rate using the Jog Switch. 18. Set your Air Pressure Switch (Figure 22). Using the Jog Switch, set the burner to the pilot position (Second screw at the 6 o clock position). a. Turn the dial on the switch clockwise until the action opens and the burner locks out. b. Turn the dial to a value of 80% of the action point value. For example, if the action opened at 0.8 wc, set the dial for 0.8 x.80 =.64 wc. c. Reset the burner control and ensure correct ignition with the Air Pressure Switch set. i. Should the burner be unable to fire, reduce the setting by 0.05 wc, and repeat the ignition test. d. Record settings on the Data Sheet. Figure Set your High and Low Gas Pressure Switches (Figure 23). Using the Jog Switch, set the burner to maximum fire rate, or the last air screw at the 6 o clock position. a. Set the High Gas Pressure Switch, mounted directly on the first gas valve body: i. Turn the dial on the switch counter-clockwise until the action opens and the burner locks out. ii. Turn the dial clockwise to a value equal to the action point value plus 0.8 wc. For example, if the switch acted at 7 wc, set the switch to approximately 7.8 wc. b. Set the Low Gas Pressure Switch (if applicable. Most units do not have this optional switch.): i. Turn the dial clockwise until the switch action opens and the burner locks out. ii. Turn the dial counter-clockwise to a value equal to the action point value minus 0.8 wc. For example, if the switch acted at 7 wc, set the switch to approximately 6.2 wc. c. Reset the burner and test ignition with the pressure switches set.

16 i. Should the burner be unable to fire or locks out again, adjust whichever switch opened by an additional 0.4 wc. Clockwise for the High Gas Pressure Switch, counter-clockwise for the Low Gas Pressure Switch. d. Record settings on the Data Sheet. Figure Define the ratio of unit capacity to burner firing rate for the CPU Board. a. The burner comes from the factory with very low combustion setting values. Unless these are set up properly during this process, the unit may never give more than 35% of its available capacity. b. The menu path to reach the burner setup screen is: 2. Unit Data Set B4 Burner Adjust B42 M Burner i. This menu is only visible if the CPU Board Mode Select Switch is set towards the right in the Adjustment position. Otherwise, menus B3 and B4 are not displayed at all. c. Set the menu to Test Mode by selecting the _ in the upper right corner of this screen and changing the symbol to O (indicated by the oval in Figure 24). i. To change between _ and O values, move the cursor to the field with the _, press the ENTER button, then press the + button to change the value to O, the press the ENTER button again to accept the new value. Figure 24 d. Change all the _ symbols in each line to O as well. Do this for all three pages of menus (indicated by the square in Figure 24). e. Move cursor to the Data column. Use the +/- keys to adjust the value of these fields to the desired value as required by the fire rate.

17 f. Set the Data fields for each line to the values indicated in Figure 25. i. New values in descending order: 100%, 95%, 84%, 76%, 58%, 48%, 44%. ii. No matter what, the order MUST be descending or else the unit will simply stop the burner at the value that is out of order and not move it again while there is a demand for burner operation. Figure 25 g. Once the data values have been set as required, change all the O symbols in the % rows back to _, but do NOT change the O field in the upper right corner yet. h. Review the data was retained properly by paging through these three menu pages to verify that the data did not revert to previous. i. Once the data has been verified to be properly retained, change the O in the upper right corner to _. j. Press and hold the to back out of this menu. Then select menu B42 M Burner once again to re-enter the same menu. Verify one last time that all data was retained and that all O fields were indeed changed back to _ values. k. Once verified, page back on the ACT5 to the root menu. 21. Slide the Mode Switch on the CPU board to the left-most position, translated by the Japanese as the Standard or Usually position. This switch MUST be to the left in order for the machine to be allowed to operate in a normal manner. 22. Set the switch on the burner from Manual to Auto. If the burner is currently operating, the mod motor should immediately adjust its position to what the CPU Board is requesting. 23. Burner setup now complete. If there are multiple machines or the installation is in an area where there is competition for combustion air supply, it will be necessary to fire each machine at full fire rate and repeat the maximum fire rate combustion analysis on each machine. If the readings go out of range, address the lack of combustion supply air. If no more air can be brought in, other steps must be taken. Completing Start-Up 1. Set the unit for desired operation. Refer to Figure 26 for a layout of the control panel. b. If the unit is not to be left operating, then press the Off button in the Direct Operation area of the control panel. The LED on the Off button should light up, indicating the unit is currently Disabled. On the left side, the CH OFF should light up with a green LED as well.

18 i. If the unit should not operate and should be completely dormant for a long period of time with all fluid loops drained, switch the slider switch on the CPU board back to center position for Long Term Storage. ii. If the unit will have fluid in the loops while dormant, using the Long Term Storage position is NOT recommended. c. If the unit is to be operated by remote signals from building management, etc., press the Remote button. The LED on the Remote button should light up, indicating that local control is no longer in force. i. Under Remote control, a lit LED on CH OFF in the left column indicates the remote control signals have Disabled the machine while a lit LED on the CH ON button indicates the remote control signals have Enabled the machine. d. If the unit is to operate under its own logic, without remote instructions, press the On button in the Direct Operation area of the control panel. The LED on the On button should light up, indicating that the unit is now Enabled under local control. Make certain the LED on the Remote button is NOT lit. e. Choose the desired mode by pressing either the Cooling or Heating button on the control panel. An LED in the left column on the control panel will light up to confirm the selected mode. Figure Record all data points from the ACT5 as requested by the Data Sheet. 3. Fill in all remaining blanks as is possible with the tools and data you have at hand. Please send a copy of all paperwork to: Yazaki Energy Systems, Inc. 701 E. Plano Pkwy, Suite 305 Plano, TX, or FAX it to (469) or it to yazaki@yazakienergy.com

Is there any visible damage to the machine? If yes, describe damage:

Is there any visible damage to the machine? If yes, describe damage: CH-K Illustrated Start-Up Procedure, Rev 1C1 Pre-Start-Up Checks Is there any visible damage to the machine? If yes, describe damage: Is the machine installed outdoors? If outdoors, is the machine on the

More information

ACCESSORY KIT INSTALLATION MANUAL

ACCESSORY KIT INSTALLATION MANUAL ACCESSORY KIT INSTALLATION MANUAL LP (PROPANE) CONVERSION KIT 1NP0366 FOR USE WITH MODELS: G8C & GF8 This conversion kit shall be installed by a qualified service agency in accordance with these instructions

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS 1NP0680 - PROPANE CONVERSION FOR USE WITH MODELS: PM8, PC8, PM9, PC9, FL9M, FL9C, FC9M, FC9C This conversion kit is to be installed by a qualified service agency

More information

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302 SL 40-399 G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302 If converting from Propane to Natural Gas, order the Natural Gas Conversion Parts Kit (IBC Part # P-303) from your authorized IBC Distributor.

More information

ACV-10 Automatic Control Valve

ACV-10 Automatic Control Valve ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,

More information

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet) Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet) INSTALLATION INSTRUCTIONS For R7 Series Light Commercial Packaged Gas Electric Units IIMPORTANT: Please

More information

Installation Instructions

Installation Instructions Page 5750-S-1 Installation Instructions General These mounting instructions for Circular INCINO- PAK Burners are in addition to the specific instructions offered for other Maxon component items: Shut-Off

More information

Installation Instructions

Installation Instructions LP and High Altitude LP Gas Conversion Kit For United States Installations Installation Instructions For Model Series *G6/PGF1 Furnaces, *L1/PGC1 Furnaces, and *R4/PPG1 Gas/Electric Appliances using Honeywell

More information

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY Form CP-UD-GC Obsoletes I-UD-GC (Version E) Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters General and Warnings All gas conversion must be done by a qualified

More information

Model 130M Pneumatic Controller

Model 130M Pneumatic Controller Instruction MI 017-450 May 1978 Model 130M Pneumatic Controller Installation and Operation Manual Control Unit Controller Model 130M Controller is a pneumatic, shelf-mounted instrument with a separate

More information

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only Natural Gas High Altitude Conversion Kit United States Installations Only Installation Instructions Light Commercial Packaged Gas Electric Units R7TQ Series 6, - 7 1/2, & 10 Ton (2,001 FT - 10,000 FT)

More information

Natural Gas to L.P. Gas Conversion Kit

Natural Gas to L.P. Gas Conversion Kit Natural Gas to L.P. Gas Conversion Kit For Bosch 80% AFUE Gas Furnace, BGS80 Model Installation Instructions 3124627 2 Natural Gas to L.P. Gas Conversion Kit Installation Instructions Data subject to change

More information

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED VULCAN 36RB 36IRB WOLF C36RB C36IRB This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used by those not

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! INLET PRESS TAP WHITE-RODGERS 36E93-304 Delay-Opening Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY

More information

36H SERIES Combination Gas Valve

36H SERIES Combination Gas Valve FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL INJURY AND/OR PROPERTY DAMAGE. DESCRIPTION The 36H series combination gas valve is

More information

SL G3. Warning

SL G3. Warning Important: If converting from Propane to Natural Gas - order the Natural Gas Conversion Parts Kit (IBC Part # P-307) from your authorized IBC Distributor. Use the Propane Gas conversion parts kit if the

More information

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve Installation Instructions Issue Date August 19, 2008 G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve Application The G196 valves are suitable for use with natural gas, Liquefied

More information

Installation Instructions For Natural Gas Conversion

Installation Instructions For Natural Gas Conversion Installation Instructions For Natural Gas Conversion (Kit Part No. 1175405) This kit is designed to convert PGX4 and PX4 Two -Stage Gas units for use with Natural Gas. Table 1 Heating Value at Altitude

More information

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve Installation Instructions Issue Date March 13, 2013 G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve Application The G196 valves are suitable for use with natural gas, Liquefied

More information

Installation Instructions

Installation Instructions 48011HW NATURAL GAS TO PROPANE CONVERSION KIT 58HDX, 359AAV, PG9YAB, PG9YAA Installation Instructions SAFETY REQUIREMENTS Installing and servicing heating equipment can be hazardous due to gas and electrical

More information

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* THIS KIT CONTAINS: AOPS7741 (NATURAL TO PROPANE CONVERSION PARTS FOR MODEL SIZE, 50) AOPS7742(NATURAL

More information

Natural Gas to L.P. Gas Conversion Kit

Natural Gas to L.P. Gas Conversion Kit Natural Gas to L.P. Gas Conversion Kit For Bosch 96% AFUE Gas Furnace, BGH96 Model Installation Instructions 3124627 2 Natural Gas to L.P. Gas Conversion Kit Installation Instructions Data subject to change

More information

SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301

SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301 SL 26-260 G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301 Note If converting from Natural Gas to Propane, order the Natural Gas Conversion Parts Kit (IBC Part # P-300) from your authorized IBC

More information

OPTIMA 7 - BIOGAS Calibrating the gas sensors SENSOR ADJUSTMENT. Diamond Scientific 625 Peachtree St., Cocoa, Florida /Tel:

OPTIMA 7 - BIOGAS Calibrating the gas sensors SENSOR ADJUSTMENT. Diamond Scientific 625 Peachtree St., Cocoa, Florida /Tel: SENSOR ADJUSTMENT The calibration of your OPTIMA 7 should be performed by experienced service personal only! MRU will not be responsible for any misuse or wrong interpretation of this calibration instruction.

More information

GAS FRYER Instruction Manual Model #5099NS

GAS FRYER Instruction Manual Model #5099NS Part No. 89932 Revised: March 2004 GAS FRYER Instruction Manual Model #5099NS Cincinnati, OH 45241-4807 USA GAS SAFETY PRECAUTIONS GAS FUNNEL CAKE FRYER 2 MODEL #5099NS GAS FUNNEL CAKE FRYER SAFETY PRECAUTIONS

More information

DANGER WARNING IMPORTANT

DANGER WARNING IMPORTANT BWC Series Instructions for Field Conversion From: Natural Gas to LP LP to Natural Gas D E S I G N E D T O L E A D DANGER These instructions include a procedure for adjusting the air-fuel mixture on this

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS Type 36C04, 36C14 Step-Opening Combination Gas Control (24 Volt, 120 Volt & 750 mv Models) INSTALLATI INSTRUCTIS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW

More information

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL INJURY AND/OR PROPERTY DAMAGE. DESCRIPTION

More information

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WTE-RODGERS 36E96-314 DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0501 FOR USE WITH 95% MODELS: TG9S, GG9S (130,000 BTU ONLY) FOR USE WITH 80% MODELS: TG(8,L)S, GG(8,L)S (130,000

More information

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS Installation Instructions For Model Series *G7/*GC2 Furnaces and Appliances Using Honeywell Gas Valves. BEFORE THE CONVERSION

More information

LENNOX SLP98UHV DIAGNOSTIC CODES

LENNOX SLP98UHV DIAGNOSTIC CODES Code Status of Equipment Action required to clear and recover - Idle mode (Decimal blinks at 1 Hertz -- 0.5 second ON, 0.5 second OFF) A Cubic feet per minute (cfm) setting for indoor blower (1 second

More information

Instruction Manual VCG-6

Instruction Manual VCG-6 Specifications Amps / Volts requirements 400 ma @ 24 VDC Propane pressure (VCG-6LP) 11 WC / 2.8 kpa Natural Gas pressure (VCG-6NG) 4.5 WC / 1.15 kpa Cu ft per hour / CO2 3-6 SCFH BTU Rating (Variable)

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS

INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS INSTALLER! PLEASE LEAVE WITH HOMEOWNER INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS by Please Note: It is important that you read instructions before installing or operating gas logs

More information

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A 2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A PROJECT ADDRESS TESTING AUTHORITY TELEPHONE Checked by/date Enforcement Agency Use GENERAL INFORMATION OF BLDG. PERMIT PERMIT # BLDG. CONDITIONED FLOOR

More information

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves

More information

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WTE-RODGERS 36E54-214 DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS

More information

G96 Series BASOTROL Dual Operator Valve

G96 Series BASOTROL Dual Operator Valve Installation Instructions 9. Issue Date February 22, 2013 G96 Series BASOTROL Dual Operator Valve Applications The G96 valves are combination, dual operator, automatic valves available with or without

More information

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141 0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and

More information

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS 36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING

More information

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii Operator s Manual Table of Contents Operator Safety... 1 Introduction... 2 Unpacking and Setup... 3 Unpacking... 3 Setup... 4 FLYER Overview... 5 FLYER Diagram... 5 Capabilities... 5 Control Panel... 6

More information

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WHITE-RODGERS 36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS

More information

UL Listed GM-20/25 and GM-40/45 Series Dual-block Multi-function Gas Control Valves

UL Listed GM-20/25 and GM-40/45 Series Dual-block Multi-function Gas Control Valves Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin GM-20/25 GM-40/45 Issue Date 1298 UL Listed GM-20/25 and GM-40/45 Series Dual-block Multi-function

More information

Types 749B and R130 Changeover Manifolds

Types 749B and R130 Changeover Manifolds Instruction Manual MCK-1179 Types 749B and R130 June 2012 Types 749B and R130 Changeover Manifolds TYPE HSRL-749B TYPE 64SR/122 TYPE R130/21 TYPE 749B/21 Figure 1. Changeover Manifolds and Regulator Assemblies

More information

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y

INSTALLATION. and INSTRUCTION MANUAL. for QUALITY AIR BREATHING SYSTEMS. Model 50 Systems Outfitted with ABM-725 Monitor C O M P A N Y INSTALLATION and INSTRUCTION MANUAL for QUALITY AIR BREATHING SYSTEMS Model 50 Systems Outfitted with ABM-725 Monitor M A R T E C H S E R V I C E S C O M P A N Y OFFICE: (507) 843-4700 P.O. BOX 7079 Toll

More information

Gas Countertop Griddle

Gas Countertop Griddle Gas Countertop Griddle This manual contains important information regarding your purchased equipment. Please read the manual thoroughly prior to equipment set-up, operation and maintenance. Failure to

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 6C8-5 Combination Gas Control INSTALLATI INSTRUCTIS Operator: Save these instructions for future use FAILURE TO READ AND FOLLOW ALL INSTRUCTIS CAREFULLY BEFORE INSTALLING OR OPERATING THIS

More information

SPECIFICATIONS ATTENTION

SPECIFICATIONS ATTENTION VPS 504 S06 Installation Manual - P/N 80122 - Ed. 01/09 VPS 504 S06 and S05 Valve Proving System Installation Instructions VPS 1 6 Gases Natural gas, air and other inert gases. NOT suitable for butane

More information

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction.

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction. ACCESSORY KIT INSTALLATION INSTRUCTIONS HIGH ALTITUDE APPLICATION CONVERSION MID-EFFICIENCY SINGLE-STAGE INDUCED COMBUSTION FURNACES MODELS: P*HU/G8T-UH/L8T-UH/FL8 UPFLOW / HORIZONTAL P*DN/G8T-DN/L8T-DN

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation. Quality Products at Competitive Prices Gas Check Automatic testing of the down-stream installation to check that all valves are closed and that pipework and fittings are gas tight before each system start-up.

More information

Universal Valve Company Inc

Universal Valve Company Inc Universal Valve Company Inc 800-223-0741 www.universalvalve.com 1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Free Air Universal

More information

GAS SUPPLY DESIGN GUIDE

GAS SUPPLY DESIGN GUIDE GAS SUPPLY DESIGN GUIDE Natural Gas, Propane Gas, or Dual Fuel Fired Modulating, Condensing Boilers BENCHMARK Series Gas-Fired Boilers For models: BMK750 to BMK6000 Last Update: 06/20/2014 PR1 06/20/14

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! Pilot Gas Outlet: Located at outlet end of the valve Type of Gas Suitable for all domestic heating gases Pressure Rating: 1/2 lb. per sq. in. Pressure Regulator Adjust Range (Typical, See Control Label):

More information

INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles

INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles MODELS MLS TYG48C ML-769368-Z1 TYG60C ML-766505-Z www.wolfrange.com TYG48C ITW Food Equipment Group, LLC An Illinois Tool Works Company 3600 North

More information

GAS KITS & ACCESSORIES 504,986M 11/2004 HIGH ALTITUDE KIT

GAS KITS & ACCESSORIES 504,986M 11/2004 HIGH ALTITUDE KIT LENND 2004 Lennox Industries Inc. DaItas, Texas, USA GAS KITS & ACCESSORIES Litho U.S.A. 504,986M 11/2004 HIGH ALTITUDE KIT INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KIT (83M75) USED WITH G43UF & G51MP

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 1 Page 1 of 6 I. PURPOSE This policy/procedure establishes the proper steps for set up, and operation of the BullEx I.T.S Xtreme training system. II. PERSONNEL AFFECTED Fire Safety staff

More information

Your safety and the safety of others are very important.

Your safety and the safety of others are very important. NATURAL GAS TO PROPANE CONVERSION KIT ALPKT57- INSTALLATION INSTRUCTIONS PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements... Table of Contents INSTALLATION

More information

RS 28/1-38/1 On - Off Operation

RS 28/1-38/1 On - Off Operation Installation, use and maintenance instructions Gas Burners RS 28/1-38/1 On - Off Operation C6505054 CONTENTS TECHNICAL DATA.............................. page 3 Burner models.......................................

More information

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4 Calibration....

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established

More information

GM Series Dual-Block Multi-Function Gas Control Valves

GM Series Dual-Block Multi-Function Gas Control Valves Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin GM Issue Date 0297 GM Series Dual-Block Multi-Function Gas Control Valves Figure 1: GM Series

More information

UNIVERSAL GAS FRYER Instruction Manual Model #8065NS

UNIVERSAL GAS FRYER Instruction Manual Model #8065NS Part No. 88847 Revised: August 2004 UNIVERSAL GAS FRYER Instruction Manual Model #8065NS Cincinnati, OH 45241-4807 USA GAS SAFETY PRECAUTIONS OPERATING INSTRUCTIONS UNPACKING AND ASSEMBLY After unpacking

More information

INSTALLATION & MAINTENANCE MANUAL FOR RIVERSIDE HYDRONICS BG400 GAS BURNER 140,000 thru 1,400,000 Btu/h

INSTALLATION & MAINTENANCE MANUAL FOR RIVERSIDE HYDRONICS BG400 GAS BURNER 140,000 thru 1,400,000 Btu/h INSTALLATION & MAINTENANCE MANUAL FOR RIVERSIDE HYDRONICS BG400 GAS BURNER 140,000 thru 1,400,000 Btu/h CARBON MONOXIDE WARNING: CAUTION: IMPROPER COMBUSTION MAY CAUSE SERIOUS INJURY. RIVERSIDE HYDRONICS

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS HIGH ALTITUDE APPLICATION CONVERSION INSTRUCTION HIGH EFFICIENCY GAS FURNACES 1PS0306 / 1PS0307 / 1PS0308 / 1PS0309 / 1PS0901 / 1PS0902 / 1PS0903 FOR USE WITH MODELS:

More information

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021-PR Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021-PR For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Pressure Dump Valve Service Kit for Series 2300 Units

Pressure Dump Valve Service Kit for Series 2300 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 00 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00 applicator tanks when the unit

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 36C53 Combination Gas Valves (24 Volt Model) INSTALLATI INSTRUCTIS Electrical Rating: Voltage: 24 Volts, (30 Volts Max.), 60 Hz. Current Rating: 0.23 Amps Type of Gas Natural Gas Pressure

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CTROL COULD CAUSE PERSAL INJURY AND/OR PROPERTY DAMAGE.

More information

GEN-1e CO2 Generator OVERVIEW INSTALLATION PROPANE GENERATORS ONLY NATURAL GAS GENERATORS ONLY

GEN-1e CO2 Generator OVERVIEW INSTALLATION PROPANE GENERATORS ONLY NATURAL GAS GENERATORS ONLY GEN-1e CO2 Generator Custom Automated Products offers economical and safe carbon dioxide generators. They produce CO2 by burning either propane or natural gas. We have designed our CO2 generator to allow

More information

Universal Valve Company Inc

Universal Valve Company Inc 1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Universal Air Towers Please read closely to identify the components that are

More information

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F29, F30, F31, F32 & F33

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F29, F30, F31, F32 & F33 INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F29, F30, F31, F32 & F33 FOR TWO-STAGE 90 PLUS DOWNFLOW/HORIZONTAL (-GTK) MODELS Recognize this symbol as an indication of Important Safety Information

More information

Automatic Valve Proving Control

Automatic Valve Proving Control ISO 9001 Automatic Valve Proving Control 7 696 LDU11 UL recognized FM approved Features Performs leak test of the gas shut-off valves before start-up and/or immediately after burner shut-down No inlet

More information

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F13, RXGY-F27 AND RXGY-F28

INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F13, RXGY-F27 AND RXGY-F28 INSTALLATION INSTRUCTIONS FOR HIGH ALTITUDE KITS: RXGY-F13, RXGY-F27 AND RXGY-F28 FOR TWO-STAGE (GPL/GPR/GPE/GLL/GLR/GLE) MODELS Recognize this symbol as an indication of Important Safety Information THESE

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Instructions for Use

Instructions for Use Select-380 T-Auto T-Auto Contents Page Instructions for Use Ref: 3.0 IFU 380 T-Auto Mar 18 2 Schematic layout of the doser 3 Quick-fit instructions 4 Description/Installation/Operation Pump tubes & Water

More information

installation instructions

installation instructions installation instructions GAS CONVERSION KIT PROPANE-TO-NATURAL P/N 315572-71201 4GAD 6GAD Cancels: IIK 4G-50-4 IIK 4G-50-5 7/15/91 NOTE: Read the entire instructions before starting the installation.

More information

Propane Conversion Kit Instruction

Propane Conversion Kit Instruction Propane Conversion Kit Instruction Condensing gas boiler Required Input Rates Logamax plus GB62-80 kw 270,000 btu/hr Logamax plus GB62-00 kw 35,000 btu/hr This kit and instructions are for converting the

More information

North American Orifice Metering System

North American Orifice Metering System Combustion North American Orifice Metering System 8697 and M8697 Metering Orifices accurately measure gas flows to industrial burners. They are compact, inexpensive, and can be installed in individual

More information

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2. FANs 216, 1628.3 Technical Bulletin CDS4000 Issue Date 0797 CDS4000 CO 2 Sensor Calibration and Troubleshooting Table of Contents Introduction 1 Handling Information 1 Calibration 2 Preparation 2 Cautions

More information

Commercial Softeners. Installation, Operation & Maintenance Guide. Manual 002.1

Commercial Softeners. Installation, Operation & Maintenance Guide. Manual 002.1 Commercial Softeners Installation, Operation & Maintenance Guide Manual 002.1 Contents Page 1. Unpacking Instructions 3 2. Installation 3 Pre-installation checks Fitting the bottom distribution system

More information

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation, Operation and Maintenance Manual for Back Pressure Regulator Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Sampler Model GSS-1 The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct

More information

Booster Pump PB4-60 Replacement Kits

Booster Pump PB4-60 Replacement Kits Booster Pump PB4-60 Replacement Kits FOR YOUR SAFETY - This product must be installed and serviced by a contractor who is licensed and qualified in pool equipment by the jurisdiction in which the product

More information

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank

DRS4-RM Manual. Set Up Instructions for DRS4 Series Single Tank Set Up Instructions for DRS4 Series Single Tank Inspect the packaging of the equipment to confirm that nothing was damaged during shipping. (Figure 1) Remove the resin tank(s) and valve(s) from the packaging.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Propane Gas Conversion Kit WGCK-1 Instructions for 0-6,000 Feet Elevation Installations This propane gas conversion kit is to be used only when converting the following furnace

More information

GAS SUPPLY APPLICATION GUIDE

GAS SUPPLY APPLICATION GUIDE GAS SUPPLY APPLICATION GUIDE Natural Gas or Propane Modulating & Condensing Boilers and Water Heaters This document applies to the following models: Boilers AM 399B AM 500B AM 750B AM 1000B Gas-Fired Boilers

More information

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual Fisher Controls Instruction Manual Type S301 & S302 Gas Regulators October 1981 Form 5180 WARNING Fisher regulators must be installed, operated, and maintained in accordance with federal, state, and local

More information

Operating Instructions for Cobra and Lynx Duct Leakage Testers

Operating Instructions for Cobra and Lynx Duct Leakage Testers Operating Instructions for Cobra and Lynx Duct Leakage Testers Table of Contents Introduction Introduction... 2 Safety Precautions Safety Precautions.. 2 Prior to Testing System Preparation.. 4 Power Requirements...

More information

Propane Conversion Kit Instructions

Propane Conversion Kit Instructions 604 8 0/ US/CA For heating engineers Propane Conversion Kit Instructions Logano G4 X gas-fired boiler This conversion kit and the accompanying instructions are for conversion of G4 X gas-fired boilers

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS Type 36C67 Combination (24 Volt Models) INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS PROPANE CONVERSION - INDUCED COMBUSTION FURNACES 1NP0347 FOR USE WITH 90% MODELS: GF9S, GY9S, GM9S, PS9, FL9S, FC9S, PT9, FL9T, FC9T, GM9T, PV9, FL9V, FC9V, GM9V,

More information

Instruction Manual 742 5/1/2009. Eclipse Ratio Regulators ES Series Version 1

Instruction Manual 742 5/1/2009. Eclipse Ratio Regulators ES Series Version 1 Instruction Manual 742 5/1/2009 Eclipse Ratio Regulators ES Series Version 1 Copyright Copyright 1997 by Eclipse, Inc. All rights reserved worldwide. This publication is protected by federal regulation

More information

Section 3- Repair and Calibration Procedures

Section 3- Repair and Calibration Procedures Section 3- Repair and Calibration Procedures 1. Refrigerant Removal Procedures 2. Scale/PC Board Recalibration Procedure 3. PC Board Configuration Procedure of AR400 4. Scale Tare Procedure 5. Gauge Calibration

More information

Pressure Dump Valve Service Kit for Series 3000 Units

Pressure Dump Valve Service Kit for Series 3000 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 000 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00, 400, 500, and 700 applicator

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW, DOWNFLOW, UPFLOW/HORIZONTAL & HORIZONTAL ONLY INDUCED DRAFT GAS FURNACES Recognize this symbol as an indication of Important Safety Information If the information in this

More information

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 The following tasks parallel the Jr. Tech (JT-1, 2, 3) description and development plan and use the Refrigeration and Air conditioning

More information