1 Page 1 of PURPOSE Axiall, Plaquemine Complex, has developed this Program to minimize potential accidents and injuries, and to enhance employee protection. Personnel in or around equipment, machinery, or lines must be protected from injury due to unexpected activation, start-up, or release of stored energy. 2.0 SCOPE This Program covers the servicing and maintenance of machines and equipment in which the "unexpected" energization or start up of the machines or equipment, or release of stored energy could cause injury to employees. The need to lockout, tagout, and tryout is not limited to when the equipment or machinery is inspected, serviced, repaired, installed, or removed. 3.0 DEFINITIONS 3.1 Affected employee--an employee who works in an area where lockout/tagout/tryout procedures are used. An affected employee does not perform or implement the lockout/tagout/tryout procedure. An affected employee can become an authorized employee. 3.2 Authorized employee--an employee who performs servicing or maintenance or initiates lockout/tagout/tryout on equipment and machinery. Authorized employees have received required training. 3.3 Energy Source--Any electrical, mechanical, hydraulic, pneumatic, chemical, thermal, gravitational, or any other source of "static" or "dynamic" energy that could cause injury. 3.4 Energy Isolating Device--A physical device that prevents the transmission or release of energy, such as: Manually-operated electrical circuit breaker; Disconnect switches; A manually-operated switch; Slide gate; A line valve; Blocks, springs, or support bars; Blinds/pancakes/blank flanges; and Pipe plugs. NOTE: Push buttons, selector switches, limit switches, or other control-circuit type devices are not considered energy isolating.

2 Page 2 of Equipment Proprietor--An individual who maintains supervision and authority over an operating unit's equipment, machinery, or lines. 3.6 Isolation List-- A complete list of all system hazardous energy sources that must be addressed when isolating a system for maintenance inspection and repair. The list will include, but is not restricted to, electrical, hydraulic, pneumatic, all valves, lines to be disconnected, and areas where blinds are to be installed. 3.7 Lockout Device-- Any of the hardware used to isolate a hazardous energy source and render it inoperable. These devices may include, locks with proper identification, chains, hasps, blinds, cables, and tags. 3.8 Lock Removal Authorization Form -- The form used to notify management of the necessary removal of a lock in an employee s absence. 3.9 Tagout Device--A prominent warning. A tag securely attached to equipment or machinery that forbids operation and identifies the Equipment Proprietor or Maintenance Crew Leader who attached the lockout/tagout device and gives the details for locking out Blinds--A red handled plate installed in pipes to effectively block and isolate lines or equipment. A common blind is one which is used for multiple jobs at the same time Chains--Chains and locks are used to lock valves and hand wheels. The chain is placed through the hand wheel and around an immovable structure and then locked Gang Hasps--Scissor-like devices that accept numerous locks and are applied directly to the equipment being isolated Group Lock Box--A tamper-proof enclosure capable of accommodating gang hasps and locks that prevents physical access to a key(s) locked inside Locks--Locks are the primary method to isolate equipment and machinery out-ofservice.

3 Page 3 of Pipe Plugs--A plumber's stopper placed on the end of lines to effectively isolate hazardous energy Electrical Plug Locks--A device that encloses and locks over an electrical plug connected to equipment to protect against inadvertent energizing Valve Covers--An encapsulating device used to lock some valves controlled by hand wheels or handles. The valve is turned to the desired position and the handle or hand wheel is removed. The valve cover is placed over the valve stub and tightly locked Valve Lock--A device that locks out a valve found on lines, such as steam, water, and compressed air lines. This may consist of a chain and lock or a device that encapsulates the valve handle or wheel Long-term lockout - Any equipment that will be taken out of service and locked out for greater than a 6-month time period will be considered as a long-term lock out Long Term Lock Out Form A long-term lock out form will be used to document the equipment that will be locked out. The form will contain the equipment name, the equipment number (when applicable) a brief description of why the equipment is locked out, the date the equipment was locked out and the name of the person who locked out the equipment. Appropriate signatures are required on the form depending on the areas affected Long-term locks -Will be a black lock and keyed area specific. 4.0 RESPONSIBILITIES Axiall has provided a Control of Hazardous Energy Program for employees, and is responsible for training employees and for notifying contractors of its Control of Hazardous Energy Program. Specific responsibilities are listed below: 4.1 Health and Safety (H&S): Trains affected employees to an awareness level on control of hazardous energy.

4 Page 4 of Trains authorized employees on the proper use of hazardous energy control procedures Orients contractors to Axiall's Control of Hazardous Energy Program Ensures that Annual Lockout/Tagout/Try Inspections are conducted. (Appendix C) Maintains audit records Audit contractors compliance. 4.2 Equipment Proprietors: Learn, understand, and follow Axiall's Control of Hazardous Energy Program Initiate hazardous energy control procedures utilizing red proprietor locks and tags Provide specific energy isolating details that are unique to the job or area to the Maintenance Crew Leader Ensure the equipment and machinery is effectively isolated and enforces the hazardous energy control procedure Ensure personnel safety by reviewing drawings, consulting people with system knowledge, and by testing hazardous energy isolation Develop corrective action plans covering deficiencies found during the H&S Control of Hazardous Energy Procedure audits. 4.3 Maintenance Crew Leaders: Learn, understand, and follow Axiall's Control of Hazardous Energy Program Issue individual (blue) locks to all authorized maintenance crew personnel.

5 Page 5 of Consult with Department Supervision or Equipment Proprietor to identify proper energy isolating devices for equipment and machinery Verify and control the equipment proprietor's isolation by attaching a Crew (yellow) lock to all isolation points. In those areas where it is found that a lock cannot be attached, a work request will be made to have the isolation point modified to accept a lockout device. (See section 5.1, Equipment or Machinery Upgrade.) 4.4 Authorized Employees: Learn, understand, and follow Axiall's Control of Hazardous Energy Program Inform affected employees of all lockouts and tagouts in their immediate area Use proper hazardous energy control procedures. 4.5 Affected Employees: Learn, understand, and follow the Axiall Control of Hazardous Energy Program Do not use or attempt to use locked and tagged equipment or machinery. 4.6 Contractors: 5.0 PROCEDURE Contractors are required to meet or exceed this Axiall Program. 5.1 Equipment or Machinery Upgrade It is Axiall's Policy that all process equipment and machinery be able to accept a lockout device. If process equipment or machinery cannot accept a lockout device, whenever replacement or major repair, renovation or modification of machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machine or equipment shall be designed to accept a lockout device. 5.2 Lock Identification Proprietor Lock

6 Page 6 of 35 The Proprietor Lock is utilized as the initial isolation by the equipment owner. The Proprietor Lock is not used for individual protection and work cannot be performed on equipment without the addition of an Individual Lock. Additional requirements are: Keyed alike; Each unit s lock set is keyed differently; The Do Not Operate Tag is affixed to the gang hasp of this lock; and Lock has a red band; and Is not to be used as the only isolation device Crew Lock The Crew Lock is utilized by Maintenance to take control of the isolated equipment. The Crew Lock is not used for individual protection and work cannot be performed on equipment without the addition of an Individual Lock. Additional requirements are: Each set is keyed differently; Has crew identification consisting of crew name and company name; and Are maintained by a Maintenance Crew Leader or designee; and Lock has a yellow band Individual Lock The Individual Lock is utilized by an employee for their personal protection. It is the only lock that provides true employee protection and work cannot be performed without it. Additional requirements are: Individual locks have only one key and are held by the person to whom the lock and key is assigned. Each lock is keyed differently; Must have employee identification consisting of employee name and company name; and Maintained by an individual in a crew; and Lock has a blue band Lock Box, Group Lock The Group Lock Box is utilized to control multiple isolation points with a

7 Page 7 of 35 limited use of Proprietor, Crew and Individual Locks required. Additional requirements are: Each lock is keyed alike; The key for lock box, group locks is placed in the lock box; Are maintained by the Tool Room or individual units; and The lock box, locks and keys are checked out as a kit. All spare keys to these locks will be maintained by the H&S Department; and Lock has a green band. 5.3 Preparation for Lockout The Equipment Proprietor will know the type and magnitude of energy that the process equipment or machinery utilizes, as well as the hazards, and ways to control the energy The Equipment Proprietor will determine the process equipment or machinery to be locked out; identify all energy isolating devices; and provide an isolation list with necessary work permits to Maintenance The equipment will also be inspected by the Equipment Proprietor to identify all potential energy sources in consultation with the Maintenance Crew Leader and/or the work crew Tagging a control power on-off selector switch only is not safe and will not be considered as meeting these requirements. The control breaker/panel must be locked out Shut down equipment or machinery by normal shutdown procedures The Equipment Proprietor will turn the main power switch, or appropriate energy isolating devices, to the "off" position so that the process equipment or machinery is isolated from its energy source. Rotating flywheels, chucks, and blades will be allowed to stop and pneumatic or hydraulic systems will be depressurized. Portions of steam and chemical lines will be blocked, drained or blanked as appropriate I/E/HVAC I/E/HVAC performs a number of routine minor preventative maintenance checks on certain low hazard/low risk job tasks where the technician maintains direct control of the isolation devices. Examples of these tasks include, testing pressure transmitters or DP cells,

8 Page 8 of 35 cleaning and flushing ph or conductivity probes, testing level transmitters process analyzers HVAC Performing these tasks may be accomplished without installing lockout/tagout devices by either the area proprietor or the instrument technician as long as the technician is within reach of, and maintains direct control of the isolation devices at all times. In the event the technician must leave the work area unattended, all isolation devices shall be locked out, or the equipment returned to normal operations. During routine preventive maintenance, a qualified technician isolating equipment for their sole protection may lock the equipment with their individual (blue) lock without the additional proprietor (red) and crew leader (yellow) locks. Custodianship shall remain with the Instrument or Analyzer Technician until the work permit is turned in to the Equipment Proprietor. Custodianship then reverts back to the Equipment Proprietor. If continued lockout is required, then the Equipment Proprietor must lockout using the red lock Each piece of process equipment or machinery associated with the process will be examined for sources of potential energy, such as residual pressure or rotating parts. Each source will be blocked, removed, or otherwise stabilized to eliminate potential energy Once all pressurized systems have been depressurized, rotating parts have stopped, and any other potential energy sources stabilized, the energy isolation devices or switch will be locked out and tried out by the Equipment Proprietor. The Equipment Proprietor will: Affix a proprietor (red) lock; and Complete information on the Proprietor Do Not Operate Tag: o Equipment Proprietor's name; o Date; o Explanation of lockout.

9 Page 9 of 35 The shackle of the lock must be placed through the eyelet of the tag when affixing the tag to the lockout device. (See Appendix A - Lockout Tag) Issue a complete isolation list to the Maintenance Crew Leader After verifying that all energy sources have been isolated, the Maintenance Crew Leader will then affix a crew (yellow) lock with proper identification that lists the Maintenance Crew name and company name The Maintenance Crew Leader will, after assuring that all employees are clear of the process equipment or machinery, operate or "tryout" the start button, circuit breaker, or other device to make certain the equipment will not operate. Operating controls will be returned to the neutral or "off" position after the test Custodianship of the instrument pressure device or on-stream analyzer system shall be transferred from the Equipment Proprietor to the Instrument or Analyzer Technician upon approval of the work permit. The boundary of the custodianship shall be the manifold or valve where the Instrument or Analyzer Technician is in direct control. Custodianship shall remain with the Instrument or Analyzer Technician until the work permit is signed off as complete by the Equipment Proprietor. Custodianship then reverts back to the Equipment Proprietor.

10 Page 10 of Lockout/Tagout/Try Procedure Sequence Each member of each work crew will then affix an individual (blue) lock with proper employee identification, which list the employee's name and company name, on the gang hasp at each isolation point Isolation points will be verified by each of the work crews leader The equipment is now locked, tagged, and tried out Failure to lockout and tagout equipment or machinery, or any other devices during a planned outage, emergency breakdown, or necessary normal repairs, including improper use, is cause for disciplinary action Unauthorized removal of, tampering with, or ignoring any isolation device without proper authorization is cause for disciplinary action Lock Box In situations where multiple lockout devices are required for a single job, a lock box can be utilized to accomplish control of hazardous energy. The following procedure will be adhered to: A group lock box kit may be obtained from the tool room The group lock box will be placed at the work site or designated area The Equipment Proprietor will take steps following proper lockout/tagout/tryout procedures and attach the group locks (green) and Danger Do Not Operate tags on all appropriate equipment energy isolating devices The key for the group lock box locks will be placed in the group lock box.

11 Page 11 of The Equipment Proprietor will install a proprietor (red) lock and Do Not Operate on the group lock box so that it cannot be opened without removing the lock Using the isolation list, the Maintenance Supervisor in charge of the job or his designee who is familiar with the area will verify that the proprietor has properly isolated all possible energy sources and locked and tagged each device. He will then affix a Maintenance Do Not Operate Tag at each lock box lock (green) location All maintenance crew personnel will then install locks with proper identification on the group lock box as described in the lockout/tagout/tryout procedure It is the responsibility of each Crew Leader who performs lockout using a single lock box to review isolation lists, as well as physical equipment to ensure that the sources of hazardous energy, which apply, have been controlled by lock box locks. All authorized employees may verify lockouts and lockout procedures have been properly implemented After use, group lock boxes must be returned to the Tool Room or unit-designated area for proper inventory and maintenance. 5.5 Equipment Testing If lockout devices must be temporarily removed to test equipment, the following actions will be taken: Clear the process equipment and machinery of all tools and materials Employees not involved in testing will move away from the area Maintenance personnel will remove their individual (blue) locks Maintenance Crew Leaders will remove their crew (yellow) locks The Equipment Proprietor will remove the proprietor (Red) lock and Do Not Operate tag.

12 Page 12 of The Equipment Proprietor, with consultation from the Maintenance Crew Leader, will energize and proceed with testing The Equipment Proprietor will de-energize and repeat lockout/tagout/tryout procedure sequence as necessary. 5.6 Restoring Equipment and Machinery to Normal Operation When all work has been completed and maintenance locks removed, the Equipment Proprietor will be notified by the Maintenance Crew Leader. The Equipment Proprietor will remove the proprietor (red) lock and proprietor lockout tag and re-energize the circuit Maintenance Crew: Remove all tools and other equipment used to service the equipment and ensure that appropriate parts are all properly replaced Only after all individual blue locks of a maintenance crew have been removed and the crew's work completed will the (yellow) Maintenance Crew lock be removed Reinstall all guards that have been removed Check the area to make sure that all employees are clear The Equipment Proprietor will then be notified that the maintenance crew's work is completed Equipment Proprietors: Notify affected employees of completion of the job Remove proprietor (red) lock, tag, and lockout device Inspect equipment to ensure proper operation. 5.7 Absent Employee Lock Removal All equipment and machinery will be restored to "normal operation" by the Equipment Proprietor. If an individual is no longer on plant premises, then Department Supervision will:

13 Page 13 of Verify that the individual who engaged the lockout device is not at the plant Make every possible effort to contact the owner(s) of the lock to notify him/her of the lock removal Upon contacting the maintenance crew leader, both department supervision and the maintenance crew leader must mutually agree to the safe removal of this lock In such instances of removal, a Lock Removal Authorization form must be completed by operations supervision. The Authorization form will be sent to H&S within 24 hours. (See Appendix A) The Maintenance Crew Leader will take the Authorization form to the main gate so that they can void the employees PIN number. This will ensure that the owner of the lock knows of the lock removal before resuming work at the plant. 5.8 Transfer of Authority When work will be continued to the on coming shift The proprietor lock and tag will remain. All individual (blue) and crew (yellow) locks will be removed prior to leaving the plant. Maintenance personnel for the on coming shift will repeat the required lockout/tagout/tryout sequence and apply their respective crew (yellow) and individual (blue) locks When work will not be continued to the on coming shift The proprietor lock and tag will remain All individual (blue) will be removed prior to leaving the plant The crew (yellow) lock and orange tag will remain if the work is not complete The Maintenance Supervisor in charge of the work or his designee who is familiar with the job will also make a notation in the comment section of the work permit stating

14 Page 14 of Long Term Lockout that the work is not complete before returning the permit to unit operations. Long-term lockout - Any equipment that will be taken out of service and locked out for greater than a 6-month time period will be considered as a long-term lock out Procedure Prior to locking out equipment a long-term lock out form will be filled out Each Department Manager will designate a responsible person for filing long term lock out forms and maintaining locks and tags Before locking out any electrical equipment for long term, consult with your I&E department The equipment will be locked out using a long-term lockout (black) lock A designated long-term lockout tag will be affixed to the isolation point(s) Training Prior to putting back in service a Management of Change (class 2) must be followed The training for this procedure will be done via a monthly safety meeting module Cord and Plug Connected Equipment or Machinery Cord and plug connected equipment may be de-energized by unplugging the equipment from the energy source so long as the authorized employee performing the maintenance or servicing is in visual contact of the plug If the plug is not under exclusive control of the authorized employee, the plug must be locked and tagged following the lockout/tagout/tryout procedures.

15 Page 15 of If work is suspended for a period of time, (such as during breaks, lunch, or overnight), the plug must be locked and tagged following lockout/tagout/tryout procedures Isolation of Process lines and Blinding Procedure Isolation of process lines is accomplished to effectively isolate lines or process equipment to allow smaller areas to be purged, gas freed, and worked, instead of complete systems. When lines or equipment are being prepared for hot work, confined space entry, or when required by the equipment proprietor, the line or equipment must be isolated by utilizing single valve blocking and blinding, valve blocking and line or spool removal, or valve blocking and plugging all attached piping. Isolation of lines using double block and bleed should only be used when no other method can be used and requires Manager approval. Prior to attempting process line isolation, lockout/tagout of applicable valves is required Isolation of Process Lines: The Equipment Proprietor will provide an isolation list with necessary work permits to maintenance The Equipment Proprietor will check equipment and issue proper safe work permits for isolation of process lines to commence The Equipment Proprietor will assure maintenance crew personnel that there are no open lights, fires, or other sources of ignition within a safe distance downwind of the line or equipment to be opened Proper protective clothing and equipment will be worn according to the Axiall Personal Protection Equipment program HSP Lines and equipment will be depressurized and then opened very slowly to assure that there is no holdup of gas or liquid and that block valves and blinds are holding Lines and equipment will be prepared in accordance with the Axiall First Flange/Line Breaking program HSP prior to line breaking.

16 Page 16 of Precautions will be taken to minimize spillage The bleed valve that is utilized for purposes of de-pressuring and draining the system must be locked in the open position and be included on the isolation list. The bleed valve near the line break should also be locked in the open position if piping intersects the line between the low point drain valve and the line break (unless this is the same bleed valve). The intent is to provide an indication of a leaking valve Blinding: The Equipment Proprietor will determine the exact location where the process lines are to be blinded The Equipment Proprietor will consult his isolation list for locations requiring blinding and lockout procedures Blinding tags will be filled out by the Equipment Proprietor and Maintenance Crew Leader as described in the lockout/tagout/tryout procedure sequence. The entry location will then be placed on the Blinding Tag by the Equipment Proprietor If an isolation location will require a blind to be installed in the line, the Equipment Proprietor responsible for the line or equipment will provide a Blind Tag and a nylon tie, to be used at the location where the blind is to be installed The nylon tie must be: non-reusable; self-locking; and minimum unlocking strength of 50 lbs The maintenance crew who installs the blind will attach the Blind Tag securely to the blind handle The Equipment Proprietor who verifies that the blind has been correctly installed will complete all entries, remove the bottom portion of the blind tag and sign in the appropriate location on the isolation list.

17 Page 17 of The preferred placement for blinds will be at the flange closest to the vessel, tank or equipment. Blinds may be installed at flanges farther from the vessel if the first location is not practical Blinds may be installed on the side of blocked valves that is most consistent with pressure testing requirements When spool pieces are removed, open lines may be effectively plugged or blind flanged before work on that equipment is allowed Blinds will only be installed or removed at the request of the Equipment Proprietor Blinding locations will be documented on an isolation list that has been approved by the Equipment Proprietor The Equipment Proprietor is responsible for assuring that line or equipment preparation procedures are used before the installation or removal of blinds Managing Common Blinds The equipment proprietor will ensure that a locking mechanism is used on the blind and all locks are installed to make sure that the common blind is not removed until all jobs are complete. (Ref HSP for removal) Restoration of Process Lines and/or Blind Removal Procedures After maintenance has been accomplished to the Equipment Proprietor or designee's satisfaction, maintenance will return equipment to production When maintenance has removed the blind and restored the process lines to their original condition, they will then remove the Blind Tag and return it to the Equipment Proprietor or their designee The Equipment Proprietor will verify that the process line has been restored correctly. He will then sign the appropriate place on the isolation list and/or blind list

18 Page 18 of Common Blind Removal Provisional comments may be needed on Safe Work Permits and Isolation Lists until all jobs are complete and the blind is removed Isolation List Each operating unit will have isolation lists for confined space entries. Isolation list for other pieces of process equipment and machinery will be developed prior to the issuance of a Safe Work Permit. A copy of the isolation list must be attached to the permit. (Appendix B for Example) An isolation list will provide: A mechanism for recording relevant information on isolation practices; and A record that can be utilized during unit turnarounds and start-up as a means of "checking-off" as process lines are isolated or restored Isolation lists will consist of the following information: Entity/Equipment name Equipment number Electrical devices/switches to be isolated Valves to be isolated Process lines or spools to be removed Flange location where blinds will be installed All blinds installed (date and operator); All blinds removed (date and operator) Remarks and/or special precautions Bleed valves Tanks Under Construction

19 Page 19 of Tanks under construction that are not connected to process lines or other operating equipment are generally exempted from the rules governing lockout/tagout/tryout procedures Each case must be reviewed on an individual basis by Department Supervision Job-Made Slip Blinds Job-made slip blinds or Pancake blinds are to be cut from the appropriate material in the size desired. Blinds must be the correct diameter and flange rating and of sufficient thickness to withstand the pressures which may be encountered Specific attention should be given to cutting the blind handle as this will serve as a distinguishing characteristic of a blind versus a typical orifice plate Handles are to be painted red in color to provide a second means of identification Pipe Plugs Pipe plugs are alternative isolating devices for piping. Pipe plug procedures will follow the same requirements as blinds Pipe plugs will not be used without approval of the Unit Management Pipe plugs or plumbers/stoppers used in maintenance work should be of the appropriate pressure rating for the intended job. Pressures are usually stamped on the plug Work will not be performed in front of a line containing a pipe plug Always clean inside the pipe prior to inserting a plug A mandatory in-line gauge is required to assure appropriate pressure is not exceeded Working On Or Near Energized Equipment Due to the maintenance constraints and the need for operating continuity, it is sometimes necessary to perform tests and/or minor repairs to energized

20 Page 20 of 35 equipment and machinery. This procedure is designed to allow this type of work with a minimum danger to person and equipment. This procedure is not intended to replace the lockout/tagout/tryout procedure and should never be used when that procedure may be applied. This procedure will be employed when it is necessary for maintenance to perform tests; inspections and/or trouble shoot process equipment and machinery in a way that may expose them to the danger of coming into contact with hazardous energy sources It is the primary responsibility of Operations Supervision with consultation from the Maintenance Crew Leader as to the necessity of employing this procedure Operations Supervision must consider the possible impact on production and equipment should mishaps occur during the course of the work. Department Supervision will take all possible precautions as dictated by the nature of the work The Maintenance Crew Leader's first consideration will be the safety and qualifications of the personnel performing the work and secondly the safety of the equipment involved. A very deliberate approach in outlining the work to be performed and in enforcing all applicable safety precautions must be taken Procedure: When work will be conducted on or near energized equipment a Safe Work Permit must be issued by the Equipment Proprietor to the individual performing the work. The Safe Work Permit must clearly state that work will be done on energized equipment and list any special requirements, including PPE and standby When the work to be performed necessitates that an explosionproof seal be broken in a classified area, that area will be tested for combustible mixtures before a safe work permit is issued When electrical testing requires that a technician work with a potential greater than 120 volts to ground, they will be accompanied by an observer who will not take part in the actual work, but will serve as a standby The standby will be required to wear the same personal protective equipment as the person performing the work.

21 Page 21 of The standby need not be an electrical technician, but anyone who is briefed beforehand as to the proper emergency procedures as detailed by the electrician At a minimum the emergency procedures will include the electrician wearing a non-conductive tag line if there are no options for remotely shutting off the power The individual performing the work will employ all applicable safety precautions as dictated by the nature of the work. An individual working in an enclosure containing greater that 120 volts to ground will be required to wear goggles or face shield and rubber gloves rated at a voltage greater than the phase to phase potential available If the work area must be left unattended at any time, it is the responsibility of the person performing the work to secure all exposed energized equipment parts and to lock all associated switches before leaving. If the equipment cannot be secured, the area must be barricaded with Red Barricade Tape and posted with a sign stating Danger Live Electrical Equipment Authorized Personnel Only During routine preventive maintenance, a qualified electrician isolating electrical equipment for their sole protection may lock the equipment with their individual (blue) lock without the additional proprietor (red) and crew leader (yellow) locks When the work is completed, the person performing the work will notify the Equipment Proprietor in person Plugged Line Safety Procedure Note: This section is a subpart of this program and addresses uncommon tasks that are completed on irregular basis. It identifies the more hazardous materials and the basic steps to follow when dealing with each Operating Department personnel will prepare equipment to reduce risk of unnecessary exposure to personnel performing the job.

22 Page 22 of The section of line containing the pluggage shall be isolated to ensure that no hazardous energy is present Personal protective equipment must be used to protect personnel performing the work. Applicable Departmental Hazard Assessments and/or Operating Procedures should be referenced for PPE requirements. The The contained pressure must be released in some controlled, safe fashion. methods authorized to release confined pressure are: a Bleeders - This is the most preferred method. Bleeders can be plugged but may be cleared using pressure, vacuum, or rodding (with caution) b opposite side ofthe line. Flanges - Red Barricade Tape the work area. Break flanges on c Drill Hole in Pipe - If there are no bleeders or flanges to release the contained pressure, a small pilot hole must be drilled to the center of the pipe. (An air-operated drill must be used for flammable materials.) Once the contained pressure has been released, the pipe may be cut using cold methods at the location of the drilled pilot hole. This method can be used only with permission from the Department Manager and Maintenance Manager. HSP-201 Hot Tap Permit must be followed d This requirement also applies to long sections of plugged flanged piping that has been removed from its normal location. Multiple cuts require multiple pilot holes Permits must specifically describe the work to be done, equipment to be used, necessary personal protective equipment, special exposure precautions, and any other items deemed necessary by the operating supervisor. The Safe Work Permit must be clearly posted at the job site The scope of work can be changed only after a thorough supervisory review and a new permit is issued The work area must be barricaded to keep unprotected personnel out of the area All personnel performing work must know the location of the nearest safety shower and eyewash. When safety showers are either not available or not functioning properly, the job shall be delayed until this condition is corrected All lines shall be treated as they are liquid full and under pressure until the ends are broken and it has been determined that the line is not plugged nor does it contain any hazardous energy or material.

23 Page 23 of The Operations and Maintenance Supervisors will verbally review the safety considerations regarding that job as the last item prior to the start of the job. This safety reminder shall include the job specific PPE relevant to the job If the scope of work must be changed, plant or contract personnel must discuss the proposed method with their plant supervisor and gain approval. A new permit should then be requested and issued from Operations. 6.0 TRAINING 6.1 All technicians will receive annual control of hazardous energy awareness training for all authorized and affected employees. Affected employees will be instructed in the purpose and use of the hazardous energy control procedure. 6.2 Axiall provides additional detailed instructions to authorized employees on: The types and magnitude of hazardous energy at Axiall Plaquemine Complex; The potential hazards of process equipment and machinery which can store potentially hazardous energy; The methods and means necessary for energy isolation and control; and Proper use of hazardous energy control procedures. 6.3 All new employees will receive appropriate lockout/ tagout/tryout training prior to performance of any process equipment or machinery-related tasks. 6.4 Employees will reexamine procedures for hazardous energy control for any updated procedures or whenever changes in job assignment or process equipment and machinery occur. 6.5 Retraining will be conducted whenever a periodic inspection reveals that employees are not fully aware of or are not following established procedures, or if regulatory requirements change. 7.0 RECORD KEEPING 7.1 Training records will be kept on each employee. 7.2 Isolation list records will be kept for one week upon work completion.

24 Page 24 of PROGRAM REVIEW AND ANNUAL INSPECTIONS 8.1 Program Review This Axiall Control of Hazardous Energy Program will be reviewed at least every three years. H&S will ensure this review is performed. The purpose is to assess compliance, to ensure that all necessary employees are included, and to evaluate program effectiveness Following the review, the Control of Hazardous Energy Program will be revised to include any necessary changes. Review results will be documented. All employees will be informed of any changes made in the plan Safety Involvement Team will develop corrective action plans and schedules to address any deficiencies documented during reviews Corrective action plans will be submitted to H&S. 8.2 Annual Lockout/Tagout/Try Inspections 9.0 REFERENCES Annual LO/TO inspections will be conducted to ensure compliance with OSHA s LO/TO Standard. (Appendix C) The inspection will be conducted by authorized employees not involved in the energy control procedure being inspected All LO/TO documentation will be forward to H&S The inspection shall include a review of: All employee work practices involving activities and application of the hazardous energy control procedures; Equipment and machinery energy isolating devices; and Isolation lists. American National Standards Institute (1982). "Safety Requirements for the Lock Out/Tag Out of Energy Sources." ANSI Z244.1, New York, NY.

25 Page 25 of 35 American Petroleum Institute (February, 1983). "Safe Maintenance Practices in Refineries," API Publication No. 2007, Washington, D.C. National Institute for Occupational Safety and Health (September, 1983). "Guidelines for Controlling Hazardous Energy During Maintenance and Servicing," DHHS (NIOSH) Publication No , Cincinnati, OH. Occupational Safety and Health Administration's 29 CFR (September 1, 1989). "The Control of Hazardous Energy (Lockout/Tagout)." Occupational Safety and health Administration's 29 CFR (August 6, 1990). "Training." Occupational Safety and health Administration's 29 CFR (August 6, 1990). "Selection and Use of Work Practices."

26 Page 26 of APPENDICES Appendix A - Lock Removal Authorization Form Appendix B - Equipment Isolation List (Example) Appendix C - Annual Lockout/Tagout/Try Inspection Appendix D Long Term Lockout Form

27 Page 27 of 35 Appendix A Lock Removal Authorization Form

28 Page 28 of 35 LOCK REMOVAL AUTHORIZATION FORM Refer to the Control of Hazardous Energy Program in the Safety Program and Procedures Manual. Policy: It is the policy of Axiall Plaquemine Complex that no action will be taken to remove an isolation device belonging to another individual without this form being completed which is the written approval of management. USE THIS FORM FOR EACH INDIVIDUAL(S ) LOCK(S) REMOVED LOCK IDENTIFICATION Employee's Name Location of Lock(s) Company Reason for Removal: Equipment and Area Inspected by: Servicing/Repairs Verified Complete by: Production Supervision Maintenance Supervision APPROVAL Date Date Notify the Main Guard Gate that an isolation device has been removed and give employee's name. The guard will void the employee's PIN number to prevent him/her from entering the plant until they have been made aware that their isolation device (lock) has been removed. Note: This form must be sent to the Health & Safety Department within 24 hours. Revised 8/31/98

29 Page 29 of 35 Appendix B Equipment Isolation List Example

30 Equipment Name: Description of Task: EQUIPMENT ISOLATION LIST Equipment Number: Work Order Number: Energy Isolation Points: (electrical devices and switches, valves, blinds installed, double blocks and bleeds, spools removed, etc.) Date of Isolation Tech. Initials Removed EXAMPLE SPECIAL PRECAUTIONS / COMMENTS

31 Appendix C ANNUAL LOCKOUT/TAGOUT/TRY INSPECTION

32 ANNUAL LOCKOUT/TAGOUT/TRY INSPECTION (To be completed at a time when a Lockout Activity is in progress) UNIT Equipment DATE LOCKOUT ACTIVITY IN PROGRESS: EMPLOYEE(S) INTERVIEWED: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) Is the equipment isolation log for the lockout/tagout/try activities posted where all employees can check it. Have all lockouts been tried? Are lockout devices installed properly? Is any equipment locked out, but is not listed on the equipment isolation log? Is any equipment on equipment isolation log not locked out? Are all affected employees and/or contractors in the area aware of the lockout activities in progress and the specific equipment that is locked out? Are employees familiar with Axiall s lockout/tagout/try policy and procedures? Are contractors familiar with the lockout/tagout/try policy and procedures? If chains/locks are being used as interim lockouts for valves, are the chains tightly wrapped in such a way as to prevent operation of the valve? Are all lockout devices in good condition? Are all electrical breakers capable of being locked out? AUDITED BY: REMARKS: Deficiencies must be reported to management for mitigation. File audits in unit and route copy to Health and Safety.

33 Appendix D Long Term LockOut

34 Long Term Lock Out Form Date of Long Term Lock Out: Unit or Area Equipment that is involved in the lock out: Reason for the Lock Out: Tag Number Anticipated return to service date. Employee performing the lock out. Is an MOC established for this lockout? Yes No Have all affected employees been notified (I&E, Maintenance, Shifts ) Yes No If no was checked please state the reason. Manager (or designee)

35 Signature

LOCKOUT/TAGOUT PLAN August 2015

LOCKOUT/TAGOUT PLAN August 2015 LOCKOUT/TAGOUT PLAN August 2015 Office of Environmental Health and Safety 423-354-5224 TABLE OF CONTENTS Purpose and Intended Use... 2 A. Types of Energy Sources... 2 B. Activities Requiring Lockout/Tagout

More information

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Introduction 2 Regulatory Requirements 2 Protective Materials

More information

LO/TO LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) PURPOSE This program establishes the general and specific requirements for the control of

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) 1. PURPOSE The purpose of this program is to establish policy, rules and procedures for the protection of employees against the unexpected energizing, start-up,

More information

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.147 BASIS: Approximately three million workers in the United States face risks from uncontrolled energy when servicing machinery

More information

230-LOCKOUT/TAGOUT PROGRAM

230-LOCKOUT/TAGOUT PROGRAM 230.1 PURPOSE A. To confirm implementation, operation, and recordkeeping of Central New Mexico Community College(CNM) lockout/tagout program in compliance with 29 CFR 1910.147. 230.2 SCOPE A. The requirements

More information

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) WAC Page 296-307-320 Control of hazardous energy (lockout-tagout). 1 296-307-32001 What does this section cover? 1 296-307-32003 When does this section

More information

Lockout / Tagout Safety Program

Lockout / Tagout Safety Program Lockout / Tagout Safety Program Prepared by: The Ohio State University Environmental Health and Safety Occupational Safety & Industrial Hygiene 1314 Kinnear Road Columbus, OH 43212-1168 614-292-1284 Phone

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY) DRAFT [name of unit] LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY) PURPOSE This program establishes the general and specific requirements for the control of hazardous energy during the servicing

More information

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR Volunteer State Community College Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR 1910.147 The information contained in this maual documents the policies and procedures

More information

Facilities Management

Facilities Management Facilities Management Policy Number: 700.6 Title: Lockout/Tag Out Policy Implementation Date: 2004 Last Audited: July 2 nd, 2018 Last Revised: March 25 th, 2015 Introduction This policy contains the necessary

More information

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0 () 30.0 The purpose of the Energy Control Policy (Lockout/Tagout) is to ensure that before any employee performs any servicing and/or maintenance on machinery or equipment, where the unexpected energizing,

More information

Lockout/Tagout Safety Policy

Lockout/Tagout Safety Policy University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Lockout/Tagout Safety Policy GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized by UNCW

More information

University of Vermont Department of Physical Plant Burlington, Vermont

University of Vermont Department of Physical Plant Burlington, Vermont University of Vermont Department of Physical Plant Burlington, Vermont CONTROL OF HAZARDOUS ENERGY SOURCES AND ELECTRICAL HAZARDS LOCKOUT AND TAGOUT PROGRAM in accordance with OSHA 29 CFR 1910.147 REVISED

More information

Product Information Report Lockout/Tagout Hazardous Energy Control

Product Information Report Lockout/Tagout Hazardous Energy Control Overview A properly implemented (LOTO) program is designed to protect workers involved in the maintenance and servicing of equipment from the dangerous effects of hazardous energy caused by the unexpected

More information

Lockout/Tagout - Energy Control Program

Lockout/Tagout - Energy Control Program Lockout/Tagout - Energy Control Program Lockout and Tagging of ELECTRICAL Circuits This portion of the K.R. Miller Contractors, Inc. safety program has been created to maintain a written copy of procedures

More information

University of Arkansas Office of Environmental Health and Safety

University of Arkansas Office of Environmental Health and Safety University of Arkansas Office of Environmental Health and Safety Procedure Name: Lockout / Tagout Procedure Number: 600.26 Effective Date: 12-1-2015 Procedure: Developed in accordance with the OSHA Control

More information

Lockout/Tagout - Control of Hazardous Energy Program

Lockout/Tagout - Control of Hazardous Energy Program Lockout/Tagout - Control of Hazardous Energy Program The University Of Iowa Environmental Health & Safety 122 Grand Avenue Court Iowa City, IA 52242-1000 Phone: 319-335-8501 Date Revised/Reviewed: 6/8/2018

More information

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees. SAFETY DIRECTIVE Title: Control of Hazardous Energy Lock-out/Tag-out/Try-out Issuing Department: Town Manager s Safety Office Effective Date: July 1, 2014 Approved: Gilbert Davidson, Town Manager Type

More information

THE UNIVERSITY OF NORTH CAROLINA

THE UNIVERSITY OF NORTH CAROLINA THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CHILLED WATER DEPARTMENT ENERGY CONTROL PROCEDURE The purpose of this document is to establish minimum requirements for the manual isolation and securing

More information

Hazardous Energy Control (Lockout-Tagout)

Hazardous Energy Control (Lockout-Tagout) Hazardous Energy Control (Lockout-Tagout) The purpose of this program is to prevent inadvertent operation or energization of machines, equipment, or processes in order to protect employees and establish

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM 0 Appendix C OCCUPATIONAL SAFETY AND HEALTH PROGRAM LOCKOUT/TAGOUT PROGRAM Hazardous Energy Control Lockout/Tagout Program TABLE OF CONTENTS Section Page I. Purpose and Scope. 1 II. Definitions 1 III.

More information

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Lockout/Tagout Plan Environmental Health & Safety Office July 2017 July 2017 Table of Contents Acronyms... iii Foreword... iv Document History... iv 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Scope... 1 1.3 Lockout/Tagout Program... 1 2.0 Roles and Responsibilities...

More information

Control of Hazardous Energy. Environmental Health and Safety

Control of Hazardous Energy. Environmental Health and Safety Control of Hazardous Energy Environmental Health and Safety 11/01/2014 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT) OSHA CFR 1910.147 Revised Date: November 2014 STATEMENT OF POLICY Ball State University

More information

Control of Hazardous Energy Lockout / Tagout Program

Control of Hazardous Energy Lockout / Tagout Program Control of Hazardous Energy Lockout / Tagout Program August 2016 Table of Contents Purpose... 1 Scope and Application... 1 Responsibilities... 1 Environmental Health and Safety Personnel (EH&S)... 1 Directors

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

Lock Out - Tag Out Safety Program

Lock Out - Tag Out Safety Program Lock Out - Tag Out Safety Program Daniel Schmid 4-22-15 Pam Schmid 4-22-15 Dan Schmid Pam Schmid Safety Director Quality Director Table of Contents DOCUMENT REVISION TABLE... 3 PURPOSE... 4 RESPONSIBILITY...

More information

Lock Out/Tag Out Control of Hazardous Energy

Lock Out/Tag Out Control of Hazardous Energy Lock Out/Tag Out Control of Hazardous Energy University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob Wells 1.0 Program Objective UF

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM LOCKOUT / TAGOUT PROGRAM Developed in accordance with the OSHA Control of Hazardous Energy Standard, 29 CFR 1910.147 DECEMBER 7, 2017 SKIDMORE COLLEGE 815 NORTH BROADWAY, SARATOGA SPRINGS, NY 12866 Table

More information

Lockout/Tagout Program

Lockout/Tagout Program Purpose Hazardous energy appears in the workplace in the form electrical, mechanical, pneumatic, hydraulic and thermal energy and includes chemical, water, steam and gaseous energy systems. Lockout/Tagout

More information

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established: OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM Environmental Health and Safety Established: Developed in accordance with OSHA Standard 29 CFR 1910.147 1 1.0 SCOPE. Oklahoma City Community

More information

Lockout/Tagout Manual

Lockout/Tagout Manual Manual 2408 Wanda Daley Drive Ames, Iowa 50011-3602 (515) 294-5359 www.ehs.iastate.edu Copyright Environmental Health and Safety 2809 Daley Drive Ames, IA 50011-3660 Ph: (515) 294-5359 www.ehs.iastate.edu

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012 PAGE 1 OF 7 LOCK-OUT TAG-OUT (LOTO) THE CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM PURPOSE: 1. This standard establishes lockout/tagout (LOTO) procedures for the safety of personnel working on

More information

Gettysburg College. Energy Control Program

Gettysburg College. Energy Control Program Gettysburg College Energy Control Program Adopted October 2009 Reviewed and Updated February 2015 Reviewed and Updated July 2015 I. Energy Control Procedures Table of Contents A. General Lockout Procedures

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM LOCKOUT/TAGOUT PROGRAM HOW CLIMATE ENGINEERS INC. COMPLIES WITH THELO/TO STANDARD It is the intent of Climate Engineers Inc. to comply with OSHA s Control of Hazardous Energy Standard (1910.147). The following

More information

Lockout/Tagout Program

Lockout/Tagout Program Lockout/Tagout Program Control of Hazardous Energy Subpart J - 29 CFR 1910.147 29 CFR 1926.417 OSHA Standard All industries must comply Estimated to prevent Approximately 120 fatalities per year 28,000

More information

RiskTopics. Lockout/Tagout October 2017

RiskTopics. Lockout/Tagout October 2017 RiskTopics Lockout/Tagout October 2017 This Risktopic is designed to outline guidelines for lockout/tagout and provide assistance in developing a management program to reduce the risk of injury from unintended

More information

LOCKOUT/TAGOUT PROGRAM

LOCKOUT/TAGOUT PROGRAM Santa Clarita Community College District LOCKOUT/TAGOUT PROGRAM Revised March 2018 TABLE OF CONTENTS PURPOSE... 3 COMPLIANCE...4 DEFINITIONS...5 SECTION I - ENERGY CONTROL PROCEDURES... 7 SECTION II -

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program Table of Contents INTRODUCTION... 2 FORWARD... 2 OBJECTIVE... 2 APPLICABILITY... 2 RESPONSIBILITIES... 3 PROGRAM ENFORCEMENT... 4 RECORDKEEPING... 4 LOCKOUT TAGOUT EQUIPMENT... 5

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM Page: 1 of 15 1.0 Purpose and Applicability 2.0 Scope 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the

More information

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices. 1 of 6 1.0 PURPOSE This program applies to the installation, service, maintenance, or removal of any type of machinery, equipment, or components, in which the unexpected start up or release of stored energy

More information

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5 Classroom, Occupational Safety & Health Plan Date: August 5, 2017 PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5 1. Purpose This document establishes the Lockout Program for Tidewater Community

More information

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107 Draft Issued 12/97 Revised 11/00 Please direct any questions or comments about the applicability of this document to Luigi Marcone, WCSU

More information

Lockout/Energy Control

Lockout/Energy Control Lockout/Energy Control Presented By: Sotaris, LLP 2000 Auburn Drive, Suite 200 Beachwood, Ohio 44122 P: 216-378-7650 F: 866-794-5756 W: www.sotaris.com E: awj@sotaris.com 1 About Me Andrew W. Johnson,

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018 University Policy Volume E2: Environment, Health, Safety and Security E2.14 Control of Hazardous Energy Responsible Office: Facilities Management Responsible Officer: Safety Officer POLICY STATEMENT All

More information

H. Control of Hazardous Energy: Lockout/Tag Out

H. Control of Hazardous Energy: Lockout/Tag Out H. Control of Hazardous Energy: Lockout/Tag Out 1. Purpose Control of Hazardous energy is the purpose of the Lockout- Tagout Program. This program establishes the requirements for isolation of both kinetic

More information

Management Plan for Lockout Tagout (LOTO) ISD #535

Management Plan for Lockout Tagout (LOTO) ISD #535 Management Plan for Lockout Tagout (LOTO) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN 55904 507-328-4507 Modification Date Document Modification Form All

More information

Lockout/Tagout Program

Lockout/Tagout Program Lockout/Tagout Program Prepared by: Occupational Health and Safety Reviewed by: Joint Health and Safety Committees Approved by: Chief Human Resources Officer November 2014 TABLE OF CONTENTS 1.0 Purpose...3

More information

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE Office of Environmental Health & Safety CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE LOCK OUT/TAG OUT OSHA 29 CFR 1910.147 rev. 3 2014 Director of Environmental Health & Safety Control of Hazardous Energy

More information

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office Lockout / Tagout Program The Control of Hazardous Energy Environmental Health and Safety Office Revised: 07/2014 TABLE OF CONTENTS 1.0 PURPOSE STATEMENT... 1 2.0 SCOPE:... 1 3.0 RESPONSIBILITY:... 2 4.0

More information

LOCKOUT-TAGOUT PROGRAM

LOCKOUT-TAGOUT PROGRAM LOCKOUT-TAGOUT PROGRAM Please Note: This material, or any other material used to inform employers/employees of compliance requirements of OSHA standards through simplification of the regulations should

More information

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS A. PURPOSE 1 B. FACILITIES STAFF RESPONSIBILITIES 2 C. TRAINING AND RETRAINING of AFFECTED and EUTHORIZED EMPLOYEES 3 NINE POINTS TO REMEMBER 5 LOCKOUT/TAGOUT

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program RIM of the World Unified School District 27315 North Bay Road Blue Jay, CA 92352 (909) 336-4100 July 2016 Safety and Risk Management Department RIM of the World Unified School District

More information

UCHC Lockout/Tagout Policy (4/09)

UCHC Lockout/Tagout Policy (4/09) UCHC Lockout/Tagout Policy (4/09) Background: This safety policy is applicable to all Health Center activities and addresses practices and procedures that are necessary to disable machinery or equipment

More information

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout) Purpose: To provide the minimum requirements for the lockout or tagout of energy isolating devices whenever work is performed or servicing is done on County of DuPage machinery, equipment, vehicles and

More information

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4. Lockout/Tagout Page Introduction Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4 How It Works General Lockout/Tagout Procedure. 5 General Lock/Tag Removal Procedure.

More information

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout) PRESCOTT SCHOOL DISTRICT NO. 402-37 207 South A Street Prescott, WA 99348 509-849-2217 The Control of Hazardous Energy (Lockout/Tagout) I. Purpose The Control of Hazardous Energy (Lockout/Tagout) This

More information

Control of Hazardous Energy Program (LOTO)

Control of Hazardous Energy Program (LOTO) 1.0 PURPOSE The purpose of this program is to establish minimum safety requirements for the lockout and tagout of hazardous energy sources and the verification of energy isolation through the use of isolating

More information

Lockout / Tagout Program OSHA 29 CFR

Lockout / Tagout Program OSHA 29 CFR Lockout / Tagout Program OSHA 29 CFR 1910.147 Baylor University utilizes outside contractors to perform set-up, maintenance, service, and repair to equipment utilized on campus. University staff perform

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

MCW s Control of Hazardous Energy Program

MCW s Control of Hazardous Energy Program 2018 MCW s Control of Hazardous Energy Program - Lockout Tagout Program This document is MCW s written program for managing the lockout and tagout of hazardous energy, and identifies roles and responsibilities

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 00 Effective Date June 1, 2014 I. Purpose II. III. IV. Scope

More information

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout) University of Illinois at Chicago Control of Hazardous Energy Program (Lockout/Tagout) 10/4/2018 UNIVERSITY OF ILLINOIS AT CHICAGO Control of Hazardous Energy (Lockout/Tagout) Program TABLE OF CONTENTS

More information

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS)

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS) Environmental Health and Safety (EH&S) Energy Control Procedure (Lockout/Tagout/Tryout) Date of Issuance: 1/1/2019 Revision Number: Initial Revision Date: Initial Prepared by: EH&S and Facility Management

More information

CONTROL OF HAZARDOUS ENERGY

CONTROL OF HAZARDOUS ENERGY Table of Contents 1.0 Applicability...2 2.0 Scope...2 3.0 Definitions...2 4.0 Core Information and Requirements...3 5.0 Roles and Responsibilities... 12 6.0 Goals, Objectives and Performance Measures...

More information

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico The Control of Hazardous Energy (Lockout/Tagout) California State University Chico Department of Environmental Health and Safety Reviewed July 2008 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION... 1-1

More information

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by SAINT MARY S COLLEGE OF CALIFORNIA STANDARD 1.1.4 HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT Prepared by SAINT MARY S COLLEGE OF CA MORAGA, California KAREN LAURICELLA Original Date: 1 JULY

More information

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06) OF OF STATE THE TEXAS TEXAS Texas Department of Insurance Division of Workers Compensation Lockout Tagout HS96-100D (8-06) Contents Purpose 1 Definitions 1-2 Responsibility 2-3 Training 3 Periodic Inspections

More information

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM (HAZARDOUS ENERGY CONTROL) May 1, 2003 1 LOCKOUT/TAGOUT PROGRAM (HAZARDOUS ENERGY CONTROL) I. PURPOSE The purpose of this Hazardous Energy Control Program is to

More information

Energy Control Procedures Lockout/Tagout 29 CFR

Energy Control Procedures Lockout/Tagout 29 CFR Energy Control Procedures Lockout/Tagout 29 CFR 1910.147 Paul Schlumper, PE, CSP Georgia Tech Research Institute What is covered? Servicing and maintenance Normal production operations where: Employees

More information

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Lockout - Tagout. Control of Hazardous Energy OSHA Standard Lockout/Tagout Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147 What Is Lockout/Tagout? Referred to as LOTO Blocks the flow of energy from power source to the equipment Provides means

More information

Health and Fire Safety Review 2/15

Health and Fire Safety Review 2/15 Health and Fire Safety Review 2/15 1 TABLE OF CONTENTS Page 3 Scope 3 Control of Hazardous Energy (Introduction) 3 Authorized Employee 3 Employer Responsibility 4 Tagout Devices 4 Lockout Devices 5 General

More information

Lockout Tagout Program

Lockout Tagout Program Lockout Tagout Program 1.0 INTRODUCTION Public Safety Department Environmental, Health and Safety (EHS) Division Standard Operating Procedure (SOP) #18 Purpose To ensure that machinery or equipment is

More information

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS Page 1 of 15 1.0 PURPOSE 1.1. Axiall, Plaquemine Complex, has developed this Hot Tap Permit Program to eliminate potential accidents, injuries, and to enhance employee protection. 1.2. To provide for the

More information

LOCKOUT/TAGOUT POLICY

LOCKOUT/TAGOUT POLICY NAVAJO COUNTY Safety Procedures Reference: PERSONNEL POLICIES & PROCEDURE SECTION: 5.4 Approved: Brett Starns Subject: LOCKOUT/ RM-Safety 09/04/2014 TAGOUT POLICY Revised: 9/16/2014 Initiating Department:

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY HAZARDOUS ENERGY CONTROL LOCKOUT PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 1-4 EMPLOYEE TRAINING INCLUDING DOCUMENTATION 5-6 HEC APPLICATION AND REMOVAL 7-14 COMMITTEE A HEC DEVICE 15 SPECIAL SITUATIONS 16-23

More information

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM INTRODUCTION Mariposa County ( County ) facilities have equipment and systems that must be deenergized to allow for safe cleaning, repairing, servicing, setting-up,

More information

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM 1.0 REGULATORY AUTHORITY Code of Federal Regulations, 29 CFR 1910.147; California Code of Regulations, Title 8, Sections 2320.1 and 3314; CSU, Fullerton

More information

Hazardous Energies Control and Lockout/Tagout Program

Hazardous Energies Control and Lockout/Tagout Program Hazardous Energies Control and Lockout/Tagout Program Summary: This program applies to the installation, service, maintenance, or removal of any type of machinery, equipment, or components, in which the

More information

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM Procedure Number EHS-LOTO-2013 Revision Number 01 02 Effective Date June 1, 2014 October 15, 2017 I. Purpose

More information

University of Tennessee Safety Program

University of Tennessee Safety Program University of Tennessee Safety Program Policy Subject: Lockout/Tagout Program Effective Date: 4/22/98 Area Affected: All areas on campus where equipment can be locked out for service. Contact Information:

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 20 I. PURPOSE The purpose of this program is to prevent injuries and accidents from occurring while servicing or maintaining machinery or equipment that is capable of sudden energy

More information

Elements of a Lockout/Tagout Program OSHA

Elements of a Lockout/Tagout Program OSHA September 15, 2015 Elements of a Lockout/Tagout Program OSHA 1910.147 Dayna Noble Industrial Safety Consultant Specialist Ohio BWC 567-204-8917 Dayna.noble@bwc.state.oh.us Top 10 most frequently cited

More information

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT 1. De-energize circuit serving the outlet following LOTO procedure (see pages 3 5). PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT Department: Facilities Campus: All

More information

Environmental Health & Safety Programs

Environmental Health & Safety Programs 1.0 Program Description The Radford University Hazardous Energies Control and, as maintained by Environmental Health and Safety (EHS), applies to all employees who service or maintain machinery, equipment,

More information

Environmental Health & Safety

Environmental Health & Safety Environmental Health & Safety Oklahoma State University LOCKOUT / TAGOUT PROGRAM MANUAL Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu

More information

Safety Manual: Hazardous Energy. January, 2017

Safety Manual: Hazardous Energy. January, 2017 Safety Manual: Hazardous Energy January, 2017 9.0 Hazardous Energy Introduction Energized equipment in the workplace pose a significant risk of injury and death. If the unexpected energization or start-up

More information

Isolation and Lockout

Isolation and Lockout Work Procedure Facilities Management UBCO-RMS-OHS-WP 16-001 Date Created: July 13, 1999 Date Updated: April 4, 2016 Supersedes: September 18, 2003 1. SCOPE Isolation and Lockout This procedure establishes

More information

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE Lockout/Tagout Program Approved: October 10, 2005 Reviewed and Modified: March 7, 2016 Reviewed: March 4, 2019 TABLE OF CONTENTS Section Page 1.0 Program

More information

Hazardous Energy Control

Hazardous Energy Control Lockout Tagout This program has been prepared to provide assistance in compliance with USA OSHA standards and/or Best Management Practices. It should not be used without consideration of the unique conditions

More information

Hazardous Energy Program Lockout/Tagout

Hazardous Energy Program Lockout/Tagout Hazardous Energy Program Lockout/Tagout Last Revision Date: 11/7/2016 I. PURPOSE... 2 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... 2 A. Supervisors... 2 B. Employees:... 3 1. Authorized

More information

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM Northern Illinois University Department of Environmental Health and Safety October 10, 2017, Rev 1 Review and Updates Date Reviewed by Changes Made October

More information

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT SAMPLE WRITTEN PROGRAM The objective of this procedure is to establish a means of positive control to prevent the accidental starting

More information

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS Quick Reference FAQs i LOCKOUT TAGOUT BACKGROUND OSHA COVERAGE REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS CONTENTS Background...2 OSHA Coverage...3 Requirements of the Standard. 7 Commonly Used Terms...12

More information

Central Washington University

Central Washington University Central Washington University Lockout / Tagout (LOTO) Program Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg, WA 98926 P: 509-963-2252

More information