PRE-FEASIBILITY REPORT SURKANDA DEVI ROPEWAY PROJECT. Kaddukhal, District- Tehri Garhwal Uttarakhand

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT SURKANDA DEVI ROPEWAY PROJECT. Kaddukhal, District- Tehri Garhwal Uttarakhand"

Transcription

1 PRE-FEASIBILITY REPORT SURKANDA DEVI ROPEWAY PROJECT Kaddukhal, District- Tehri Garhwal Uttarakhand Submitted to: Ministry of Environment, Forests & Climate Change Government of India Submitted by: SURKANDADEVI ROPEWAY PROJECT COMPANY PRIVATE LIMITED 23/1 RAJPUR ROAD, DEHRADUN, UTTRAKHAND Environment Consultant Prepared By: M/S PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants organizations/ Rev 21A/ 19 th August, 2014 at S.No-110) 5 th Floor, NN Mall, Mangalam Place, Sector 3, Rohini, New Delhi Phone No.: , Fax No:

2 Project Description The Government of Uttarakhand (GOU) wishes to develop an aerial passenger ropeway between Kaddukhal & Surkanda Devi Temple in order to promote tourism in the region. The proposed ropeway shall be developed through Public Private Partnership mode on Build, Operate and Transfer (the BOT ) basis. The Project is a 500 m long ropeway, covering an area of 5620 sq m (including Lower Terminal Station, Upper Terminal Station & ropeway corridor). Lower Terminal Point (LTP) and Upper Terminal Point (UTP) are proposed near Kaddukhal and Surkanda Devi Temple. Type of Project The project being an Aerial Ropeway falls under the item 7 (g) of the EIA notification, 2006 and is a designated Project as per Schedule and falls under category A, as the Temple is at an elevation of 2737 m above MSL. Project Proponent Uttrakahnd Tourism Development Board (UTDB) as part their initiative to improve tourism based facilities and socio economic structure of local population directed Uttrakahnd Infrastructure Project Company Private Limited (UPIC) (a 50:50 joint venture company between Government of Uttrakahnd and ILFS) to undertake detailed Feasibility and Project Viability Analysis for establishment of passenger ropeway to the temple of Surkanda Devi. UPIC on their part issued RFP/RFQ documents to prospective bidders in October 2012; after ascertaining project viability and obtaining all mandatory approval for the captioned project. The Surkanda Devi Ropeway Project was awarded to M/s K. R. Anand and M/s KRA Infrastructure Developers Pvt. Ltd. through competitive bidding and letter of award (LOA) on A special purpose company was formed as Surkanda devi Ropeway Project Company Private Limited for design, construction, operation and maintenance of the ropeway project under revenue sharing model. The lease duration of the project is 30 years, extendable by an additional 10 years. 2

3 Description of Project Site: Surkanda Devi temple is dedicated to Sati-wife of Lord Shiv. According to the legend, Sati gave up her life in the argument with her father, as Prajapati Daksha was not ready to accept Shiv as her daughter's husband. It is said that Lord Shiv brought Sati's dead body, on his trishul to this place from Haridwar. Because Lord Shiv was dancing furiously with the dead body of his wife, Lord Vishnu started cutting the body parts of Sati with his Sudarshan Chakra. The head of Sati fell at this place and hence the place got the name Surkanda. Temple is situated on the peak of a hill approachable by 1.6 km fairly steep foot path from the nearest motorable road. It is surrounded by dense forests and affords a scenic view of the surrounding region including the Himalayas to the north, and certain cities to the south (e.g., Dehradun, Rishikesh) Need/Justification of the Project: Presently the devotees face hardship in climbing this stretch of approach to the temple. This ropweway system is proposed to negotiate this tough reach in a comfortable & environment friendly way. Location of the Project Alignment Surkanda Devi Temple is situated on the peak of a hill at Village Kaddukhal in the western part of Tehri Tehsil, District Tehri Garhwal, Uttrakhand. The temple is at elevation of 2737 m from MSL. The lower terminal Station, Kaddukhal is on Dhanaulti- Chamba road. Kddukhal is at 40 Km distance from Mussoorie, 75 Km from Dehradun & at 8 Km distance from Dhanaulti.The location map of the Project alignment is shown below: 3

4 4

5 The lat long of the site are given below: Station Latitude Longitude Lower Terminal Station E N Upper terminal Station E N Connectivity (distances from Surkanda Devi Temple): Airport: Jolly Grant, 26 kms Railway Station: Rishikesh Railway Station, 33 kms Dehradun Railway Station,26 Kms 5

6 Road: The nearest road head is at Kaddukhal which is connected by road going from Dhanaulti to Chamba. Surkanda Devi Temple is 1.6 kms from Kaddukhal on foot. Area Requirement: The area required for the construction of the terminal stations and line towers would be about 5620 sqm. The detailed area summary is given below: Area required for Area (sq m) Lower Terminal Station, 300 Kadukhal Upper Terminal Station, 300 Surkanda Devi Temple Ropeway corridor 5020 Total 5620 sq m Alternative routes assessed Five alternative routes were assessed, which are as discussed below: Alternative Latitude Longitude Elevation Difference Alternative I LTP N LTP E 215 m UTP N UTP E Alternative-II LTP N LTP E 231 m UTP N UTP E Alternative-III LTP N LTP E 291 m UTP N UTP E Alternative-IV LTP N LTP E 226 m UTP N UTP E Alternative-V LTP N LTP E 223 m UTP N UTP E 6

7 Selected Alignment: Out of the five alternative routes the Alternative-II was found appropriate as it was the most stable stretch, the requirement of space was minimum and minimal no. of trees will be disturbed. Also, the UTP is located reasonably away from the Shrine so as to not cause any interference. The five alternative alignments are shown in the figure below: The total length of proposed ropeway alignment is working out to be 500 m. The LTP is proposed near GMVNL rest house at Kaddukhal. The UTP is proposed near the Dharamshala towards South West on gradual slope. Merits of the selected Alignment: The alignment for the proposed ropeway project was selected based on the following guidelines: i) Availability of adequate space for proposed terminal stations; 7

8 ii) iii) iv) Low density of forest cover thereby reducing number of trees to be felled; Major points / locations to be connected along the route; Minimum possible infringement with the environment; v) No rehabilitation or relocation involved vi) vii) Stability of the location vis-à-vis geology; and Financialfeasibility of constructing terminal stations. viii) Minimum numbers of trees are required to be cut. Proposed Ropeway System Technology Mono-cable Jig back system In this system one endless hauling rope supports and hauls two cabins, one in forward direction and the other in reverse direction between the terminal stations. The cabins are fixed to the rope. Once the cabins reach the terminal stations the movement of the ropeway is reversed. Mono-cable uses cabins of comparatively lower passenger carrying capacity. Advantages Reduced terminal space requirement Cost effective Simplicity of operation and maintenance Constraints Low transportation capacity Specifications & Guidelines The specifications and guidelines are provided for the various project components (Ropeway System, associated infrastructure) including, but not limited to the following major provisions: The Concessionaire shall consider Specifications provided by Bureau of Indian Standards and other applicable statutory code of practices like Indian Electricity Act, National Building Code, 8

9 Municipal Building Bylaws of Uttarakhand, etc for design, construction, operation and applicable maintenance of the project facilities. The Concessionaire shall adhere to the provisions of any Act for passenger ropeway that is applicable for enacted in future in the state of Uttarakhand. In case of ropeway Cabins and its associated part to be mandatorily procured imported, suitable international standards with justification may be followed. Maintenance Schedule: Detailed operation and maintenance instruction manuals covering all aspects of maintenance of the Ropeway System would form an integral part of system documentation. The essential aspects of maintenance are, however, briefly listed below: cabins, hangers and grips etc shall be done. Periodic lubrication at the Stations shall be done. Routine lubrication at the Stations. Regular cleaning at stations to ensure a clean and dust-free atmosphere. Periodic Inspection, checking and replacement of hauling rope especially the spliced zones. Inspection, checking, lubrication and replacement if and when required of line components such as line sheaves. Tightening of all station tower bolts periodically. Checking of prime mover such as motors, gearbox, couplings etc. Regular checking of service and emergency brakes. Regular checking of DG set and Diesel Engine. Mock trial of rescue system at periodic intervals. Adequate maintenance spares will be stocked for smooth operation. Special tools & tackles will kept in the workshop 3. ENVIRONMENT MANAGEMENT PLAN Land Environment: Construction phase: 9

10 The land is a forest Land, of which 0.68 ha has been procured for the project. There is no eco sensitive zone within the 10 Km radius of the project alignment. The diversion of forest land will be required for construction of terminal stations, and line towers along the corridor. Operation Phase: Although no major impact on land is envisaged during the operation phase, proper collection shall be taken care for no disposal of solid or hazardous waste & wastewater on land. Air Environment Construction phase: During the construction activities for the proposed terminal stations there will be fugitive emission such as particulate emission etc. on small scale. Water sprinkling shall be done to mitigate the impacts of dust generation. The particulate emissions will be minimal and short term in nature. For the construction of line towers, the generation of the dust will be low as compared to the construction of terminal stations. Moreover, the dust generated during the construction phase will be considerably reduced due to localized meteorological conditions. Operation Phase: The operation of the proposed ropeway will not involve major air emissions. Ropeway operation is an environment friendly non-polluting transport system. DG set of 750 KVA are proposed at LTP & DG set of 15 KVA are proposed at UTP for backup power supply. These D.G. Sets will be provided with proper stack height as per the CPCB norms. As per the specifications from D.G. Set manufacturer, the emissions rates that shall be maintained are given in Table below: D. G. Set. Capacity No. Location PM gm/kw-hr NOx gm/kw-hr SO 2 gm/kw-hr CO gm/kw-hr 750 KVA 1 LTP kva 1 UTP

11 The impact of pollutants such as SO 2, NO x and CO mainly released from D.G sets and their concentration & impact will be very negligible and of short term duration. The system will be operated mainly on electricity provided by Grid. DG sets will be used as a stand-by only at the time of power failure. Noise Environment Construction Phase: The noise emission sources during construction phase will include construction machineries/ equipments to be employed at site. The management measures for noise & vibration control are as follows: Standard methods and machinery shall be used. Job rotation and provision of earmuffs to the workers in high noise areas. Operation Phase: DG set of capacity 1 X 750 kva at LTP and DG set of 1 X 15 kva at UTP are proposed for backup power supply. Acoustically enclosed DG Sets will be bought and installed. The noise & vibration management measures are discussed below: Noise free and less air pollution emitting, acoustically enclosed DG Sets, approved by the CPCB will be bought and installed. The system will be operated mainly on electricity provided by Grid. DG sets will be used as a stand-by only at the time of power failure. DG sets shall be installed on proper vibration pads to avoid vibration impacts. The noise pollution due to operation of DG set can be controlled by installation of silent cowling to a value of 65 db (A). The normal ropeway operations are always lower than 50 db (A) of noise level. Proper maintenance of the ropeway during the operational phase will be done to ensure low or no noise and environmental impacts. 11

12 Water Environment Construction Phase: During construction Phase, water will mainly be required for ropeway development, dust suppression & human consumption. It is estimated that around 5 KLD of water shall be required. Operation Phase: The total water requirement has been estimated as 15 KLD as per detailed below and the source will be Spring Water. Water shall be used mainly for flushing, drinking, hand washing & horticulture purposes. Total quantity of waste water generation has been estimated to be 9 KLD. The waste water generated will be treated in 2 STPs of 10 KLD each. S. No. Population Factor (lpcd) Water Requirement (in KLD) Waste Discharge (in KLD) Water Visitors Staff Sub Total Domestic 5 Hand washing 2 Drinking Hand washing 2 Drinking - Nil 2. Flushing Gardening Miscellaneous 2 1 Total

13 WATER BALANCE SCHEME OF SEWAGE TREATMENT PLANT The generation of total waste water will be 9 KLD, which will be treated in total 2 sewage treatment plants of 10 KLD capacities each based on FAB (Fluidized Aerobic Bio-reactor) Technology. DESIGN CRITERIA TREATMENT PROCESS: THE PROCESS FOR SEWAGE TREATMENT PLANT IS AS FOLLOWS: The sewage is first passed through a Bar Screen Chamber & an Oil & Grease Chamber where any extraneous / floating matter gets trapped. 13

14 The sewage is then collected in a Receiving Sump where the variations in flow and characteristics are dampened, which otherwise can lead to operational problems and moreover it allows a constant flow rate downstream. Here the sewage is kept in mixed condition by means of coarse air bubble diffusion. The equalized sewage is then pumped to the Fluidized Aerobic Bed Reactors (FAB) where BOD/COD reduction is achieved by virtue of aerobic microbial activities. The FAB reactors run in series. The oxygen required is supplied through coarse air bubble diffusers. The excess bio-solids formed in the biological process are separated in the downstream Tube Settler Tank. The clear supernatant after disinfections is sent to the tertiary polishing section comprising of a Dual Media Filter and an Activated Carbon Filter, passes through Softener for reducing the hardness. The biological sludge generated from the FAB, which is settled in the Tube Settler, is drained through the Filter Press. Raw Sewage Characteristics Flow m 3 / day 10 KLD each ph BOD mg / l COD mg / l TSS mg / l 100 Oil & Grease mg / l 10 The Sewage Treatment Plant (STP) can give treated water, which can be reused for Flushing, Hand washing & other miscellaneous purposes. 14

15 Treated Sewage Characteristics ph BOD mg / l <10 COD mg / l <60 TSS mg / l < 10 Oil & Grease mg / l < 10 Benefits: 1. Small space requirement The concept of compact sewage treatment plant is promoted so that expensive conventional treatment is dispensed herewith. The treatment scheme is also versatile, in the sense that units can be re-arranged in any way in which the space and pile caps are available. 2. Lower operating power requirements The system utilizes aeration tanks of much smaller size, thereby reducing the overall power required in aerating the raw sewage. Since the bio-reactor depth is more, efficient transfer of oxygen takes place, thereby reducing the overall power consumed in treatment. 3. Simplicity in operation and maintenance The system adopted has much less moving parts (only pumps and blowers). Further there is no moving part inside the bio-reactor. This gives the advantage of continuously running the bioreactor system, under widely fluctuating conditions. All the maintenance on the mechanical systems can be done with normal skilled mechanics available. The system is unique in operation, such that, only inlet and outlet parameters (i.e. raw sewage BOD / COD / TSS /TP and treated sewage BOD / COD / TSS / TP etc.) need to be analysed. Since the bio-reactor is self sustaining, there is no requirement of recycling the biomass from the secondary clarifier. Hence, analysis such as MLSS / MLVSS / SVI (sludge volume index) / F / M ratio etc. is not required to be done. This greatly reduces the analytical load on the plant chemist / supervisor, and makes the system very simple to operate and control. 15

16 The bio-reactor system adopted in the FAB based STP is provided with nutrients removal, and removal of disease causing E-coli bacteria. 4. Nutrient removal The bio-reactor system operates at very food to micro-organisms ratio (F / M ratio). This helps in totally converting the Ammonical nitrogen to nitrate nitrogen. In the process of synthesis of organic substrate, about 40 50% of the total phosphates load is also reduced. The remaining phosphates can be precipitated by addition of aluminum ions dosed in form of Poly Aluminum Chloride (PAC). Phosphates react with aluminum ions and precipitate as aluminum phosphate, which is an insoluble salt. Thus the total phosphates load can be easily reduced by more than 90%. 5. Coliform removal The outlet BOD of the bio-reactor system being very low (in other words, hardly any food is available to the E-coli), most of the coliform are killed in the reactor itself. The treated sewage outlet coliform count will conform to WHO standards. 6. Sludge handling The sludge generated in the bio-reactors is totally digested. Since the F / M ratio in the bioreactors is very low, the excess sludge generation is lower than compared to the conventional ASP system. Normally, this sludge is anaerobically digested to stabilize the organic matter. The present system does not envisage any sludge digestion (since the sludge is aerobically stabilized in the bioreactors itself), making the system more suitable for operation with less manpower. The excess sludge is separated in the secondary clarifier, and then disposed off either on drying beds, or can be directly used as soil conditioner. 16

17 P G PG HYDRAULIC FLOW DIAGRAM OF SEWAGE TREATMENT PLANT Storm Water Management Maximum collection of rain water shall be done and the stored water shall be reused wherever possible. Garland drains are proposed around the pillars/towers to ensure the proper drainage of the storm water and to prevent disturbance to the drainage pattern of the area. Solid Waste Management Construction Phase: Wastes which are likely to be generated during the construction of terminals include the following: Municipal Waste: Site clearance Construction Waste: Construction materials arising from the construction may include waste timber work, spent concrete and cement screening and material and equipment wrappings. 17

18 Excavated materials: Excavation during pillar foundations will lead to generation of excess soil. Top soil will be used for landscaping and left out soil will be used for land filling. Local labors will be preferably employed; no labour camp will be setup at the site. Approx. 3 Kg/day wastes will be generated which will be sent to solid waste/landfill site. Operations Phase: During operation phase, solid waste will be generated by ropeway users, employee, etc. The estimates of the solid waste generated from the proposed project have been shown in table below: Type of Waste Colour of Bin Category Disposal Method Total Waste (kg/day) Organic Waste Green Biodegradable The waste will be disposed by pyrolysis method 92 Recyclable Waste Total Waste Blue Recyclable Collected and given to approved recycler kg/ day The above table indicates that the total 153 Kg/day of waste will be generated due to the proposed development. The waste oil generated from D.G sets will be sent to authorize hazardous waste disposal authority. Pyrolysis is a thermochemical decomposition of organic material at elevated temperatures in the absence of oxygen (or any halogen). It involves the simultaneous change of chemical composition and physical phase, and is irreversible. The waste is broken down to create gas, solid and liquid residues. The gases can then be combusted in a secondary process. Most pyrolysis processes have four stages: 18

19 1) Preparation of the waste feedstock: The plant may take mixed waste and process it first through some sort of materials recycling facility, to remove some recyclables and materials that have no calorific value (e.g. grit) 2) Heating the waste in a low-oxygen atmosphere to produce a gas, oils and char (ash) 3) Scrubbing (cleaning) the gas to remove some of the particulates, hydrocarbons and soluble matter 4) Using the scrubbed gas to generate electricity and, in some cases, heat (through combined heat and power CHP). There are different ways of generating the electricity from the scrubbed gas steam turbine, gas engine and maybe some time in the future, hydrogen fuel cells. Benefits: Stable operation for a broad range of waste quality Emissions from the system are well below the limit values Flexibility in design and operation achieved by a modular design Effective initial waste volume reducing Efficient recovery of the materials and energy from the process Low operational costs; no supplementary external fuel supply for the normal operation, i.e. significant reduction of running costs 19

20 Ecological Environment The alignment falls within a Forest land which needs to be diverted for development of terminal stations & line towers. About 6800 sq m (0.68 ha) of area of forest land will be required to be diverted. This activity will be carried out as per the guidelines of the Forest (Conservation) Act, A compensatory afforestation plan will be developed in the ratio of 1:2 and hence, an amount for plantation of trees in an area of 1.4 hectare will be given to the forest department. 32 trees falls within the corridor of the alignment. Socio Economic Scenario There will be no displacement or immigration of the human population due to the proposed project. Elderly, children and disabled people, who have to climb the arduous steps, will be able to take safe and convenient travel to the holy place. Provide direct and indirect employment opportunities to the local people. Enhance visitor experience and boost tourism in the region. Would create a world-class destination and help in reviving the brand Uttarakhand Simply Heaven. SAFETY AND RESCUE PLAN Safety Plan The ropeway system is proposed to be of best engineering standards in accordance with the relevant Indian and International standard codes. The state government wish to appoint an Independent Engineer to oversee and monitor the construction and operation of the project. The Independent Engineer shall be an expert / firm of experts in the ropeway operations & maintenance. 20

21 Alternatively, the state of Uttarakhand is in process of enacting rules & regulations for the operations of the ropeway projects in the state under which a Chief Ropeway Inspector has been proposed which would be assisted by District / Divisional Inspectors. The Chief Ropeway Inspector shall be the licensing authority and would be supervising and monitoring the ropeway projects specially on account of safety, maintenance, traffic, etc. Before making it for public use the ropeway project shall be thoroughly inspected by Chief Ropeway Inspector, Government of Uttarakhand to ensure the ropeway project is safe for public use. After getting clearance certificate, the commercial operation of the ropeway would be able to commence. Safety Measures (a) The Gondolas should be provided with door lock, which cannot be opened by the passengers. (b) Carriage of each cabin should be provided with 2 Nos. Detachable rope grips. (c) Two separate brakes should be provided in the drive of ropeway system. One no. weight operated and thrust or released brake should be provided on brake ring fitted on drive sheave. This will act as normal and emergency brake. A second weight operated thrust or released brake should e proved on high speed brake drum coupling which will act as Service brake. (d) In the event of main supply power failure, full capacity D.G. Sets provided to supply power to run drive motors. (e) Standby Diesel Engine should be provided for each section to run ropeway at slow speed to rescue passengers from line in case of failure of main D.C. Motor. (f) Line safety devices should be installed on each trestle, hold downs and pressure frames which immediately stop the ropeway in the unlikely event of rope derailment. This should comprise of electrical trip limit switch with attachment mounted on line sheave it should automatically trip the ropeway by the actuation of limit switch through the attachment. 21

22 (g) Rope catcher should be provided on the incoming side of mount beams on line trestles, hold down, P.F. and Stations to arrest/ support the hauling rope in case of deropement. (h) Emergency push buttons should be provided at all stations to stop the ropeway, if required. (i) The ropeway Main drive motors to be tripped if: Set rope speed exceeds by 5% Wind speed exceeds the set limit 4.3 Rescue Arrangement: The ropeway system would be provided with following Rescue Arrangement: The ropeway system would be provided with suitable means for rescue shall be provided (ladders capstans, etc.) to facilitate the rescue of passengers who might remain trapped along the line on account of unforeseen stopping of the installation, in a reasonable short time and in the easiest and safest manners. The use of such equipment shall not require the help of the passengers. The chosen rescue equipment shall be such that the rescue operation can be carried out in a perfect manner even at the most critical points of the route (over water spread, rigged terrain, high elevation above ground, etc.) PROJECT SCHEDULE & COST ESTIMATES The estimated project cost of is Rs. 5 crores. The scheduled completion date shall occur on the 550 th day from the appointed date. On or before the scheduled Completion date, the concessionaire shall have completed the construction of the entire project. 22

23 COST ON EMP CAPITAL EXPENDITURE Sl No Description Capital Cost ( Rs. In Lacs) 1 Landscaping STP / Waste water treatment D.G. set Stack D.G. set Enclosure Solid Waste Management/ Pyrolysis plant 12.0 Total Rs Lacs 23

INSPECTION REPORT ON 450? KLD STP SOBHA CHRYSANTHEMUM APARTMENTS THANISANDRA MAIN ROAD

INSPECTION REPORT ON 450? KLD STP SOBHA CHRYSANTHEMUM APARTMENTS THANISANDRA MAIN ROAD INSPECTION REPORT ON 450? KLD STP SOBHA CHRYSANTHEMUM APARTMENTS THANISANDRA MAIN ROAD Dr. Ananth S. Kodavasal June 13, 2012 Ecotech Engineering Consultancy Pvt. Ltd. Bangalore 560 066 98450-62033 ecotech.bangalore@gmail.com

More information

ENCLOSURE-III- PRE-FEASIBILITY REPORT

ENCLOSURE-III- PRE-FEASIBILITY REPORT ENCLOSURE-III- PRE-FEASIBILITY REPORT 19 PROJECT DESCRIPTION With a view to increase its religious tourism, the Department of Tourism, Government of Uttar Pradesh has identified three sites for development

More information

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the written

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Transport Infrastructure for Smart Cities in Hilly States

Transport Infrastructure for Smart Cities in Hilly States Transport Infrastructure for Smart Cities in Hilly States Dr. Pawan Kumar, Associate TCP Town and Country Planning Organization, MoHUA,New Delhi E mail: pawan612@gmail.com 1 Introduction Smart City : i.

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

Siting and Installation Manual

Siting and Installation Manual Siting and Installation Manual B-Series Advanced Wastewater Treatment Units Revolutionary Waste Treatment Advanced Wastewater Treatment Units (ATUs) that deliver an unsurpassed performance at an unbeatable

More information

Design a grit chamber for population with water consumption of 135 LPCD.

Design a grit chamber for population with water consumption of 135 LPCD. 1 Example:1 Design a grit chamber for population 50000 with water consumption of 135 LPCD. Solution Average quantity of sewage, considering sewage generation 80% of water supply, is = 135 x 50000 x 0.8

More information

Module 15 : Grit Chamber. Lecture 20 : Grit Chamber

Module 15 : Grit Chamber. Lecture 20 : Grit Chamber 1 P age Module 15 : Grit Chamber Lecture 20 : Grit Chamber 2 P age 15.6 Square Grit Chamber The horizontal flow rectangular grit chamber faces the problem of sedimentation of organic matter along with

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide Water Play/Spray Grounds are aquatic facilities where patrons (primarily children) become

More information

The activated sludge process

The activated sludge process The activated sludge process Most wastewater treatment plants are using the activated sludge process. The heart of such a process mainly consists of an aeration tank, a sedimentation tank or clarifier

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

Associated Hazard (outcome) Control Measures. Reduction of water supply

Associated Hazard (outcome) Control Measures. Reduction of water supply Raw water Intake Low lift pumphouse Structural failure of intake Source water Inability to pump-all 4 pumps (loss of power, etc.), structural failure, fire Loss of the 2 larger capacity pumps Structural

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

District Cooling System at Kai Tak Development Content

District Cooling System at Kai Tak Development Content District Cooling System at Kai Tak Development Content Background District Cooling System (DCS) at Kai Tak Benefits of DCS DCS Connection Technical Guidelines for DCS Connection / Supply Rules on District

More information

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company Content Introduction Risk Assessment Legal Obligations Planning

More information

aeration and mixing systems

aeration and mixing systems 1 air diffusers The Zenit range includes both disc and tube membrane air diffusers. Both models are fitted with high-quality membranes with perforation ensuring high oxygen transfer with low headloss.

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption

High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption Paper # 35 Andrew C. Bartocci Envitech, Inc. 2924 Emerson Street- Suite 320 San Diego, CA 92106 Ph: 619-223-9925, ext. 203 ABSTRACT An

More information

In Vessel Composter Installation & Commissioning Manual

In Vessel Composter Installation & Commissioning Manual In Vessel Composter Installation & Commissioning Manual Contents Customer responsibilities Transportation Lifting Delivery Pre-installation requirements Installation Drainage Ventilation Levelling Unpacking

More information

Technical Specifications of Hydrogen Isotope Handling and Recovery System

Technical Specifications of Hydrogen Isotope Handling and Recovery System SECTION - C TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. Technical Specifications of Hydrogen Isotope Handling and Recovery System INSTITUTE FOR PLASMA RESEARCH GANDHINAGAR, GUJARAT 382428 ANNEXURE-I

More information

Chlorinator MODEL MK-I

Chlorinator MODEL MK-I Chlorinator MODEL MK-I The New model MK- I is semi automatic gas type. Vacuum operated Solution feed Chlorinator designed to provide a continues & measured quantity of gas while in operation. It is suitable

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 16, 2015 OPPD North Omaha Station CCR Landfill Fugitive Dust Control Plan Table of Contents Revision

More information

Advanced Pump Control for Irrigation Applications

Advanced Pump Control for Irrigation Applications Advanced Pump Control for Irrigation Applications Paul Nistler VFD Applications Engineer And Julian Atchia Director of Research and Development SJE Rhombus 22650 County Hwy 6 Detroit Lakes MN 56502 Executive

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry 1 of 8 level: 3 credit: 7 planned review date: October 2006 sub-field: purpose: Civil Works and Services This unit standard is a component of the selfregulation system for operations in the civil infrastructure.

More information

Becker* Products Below Ground Ball Valve Regulators

Becker* Products Below Ground Ball Valve Regulators GE Oil & Gas Becker* Products Below Ground Ball Valve Regulators Reduce Noise Levels at Large Volume Regulator Stations GE s Becker* Below Ground ball valve regulator has the long-term proven reliability,

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

How HSE regulates onshore oil and gas

How HSE regulates onshore oil and gas Health and Safety Executive How HSE regulates onshore oil and gas Paul Bradley (Operations Manager Wells and Mines) Craig Norman (Well Engineering and Operations Inspector) Health & Safety Executive Health

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

Risk Assessment RA-1. Risk Assesment

Risk Assessment RA-1. Risk Assesment Risk Assessment The complete mining operation will be carried out under the management control and direction of a qualified mine manager The DGMS have been regularly issuing standing orders, model standing

More information

SRL Series. Oil-less Scroll Air Compressors. Pharmaceutical. Research & Development. Food & Beverage. Chemical. Electronic

SRL Series. Oil-less Scroll Air Compressors. Pharmaceutical. Research & Development. Food & Beverage. Chemical. Electronic Pharmaceutical SRL Series Oil-less Scroll Air Compressors Research & Development Food & Beverage Chemical Electronic Hitachi Industrial Equipment Product Brochure Hitachi SRL Series scroll compressors

More information

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors.

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors. Home Lecture Quiz Design Example Grit Chambers Types of Grit Chambers Aerated Grit Chamber Principle of Working of Grit Chamber Design of Grit Chambers Primary Sedimentation Grit Chambers Grit chambers

More information

Urban Street Design and Development

Urban Street Design and Development Urban Street Design and Development Ashok Bhattacharjee, Advisor, Clean Air and Sustainable Mobility, Centre for Science and Environment CSE Workshop on Safe Access and Parking - Lytton Hotel, Kolkata

More information

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly. Components preparation and pressure adjustment ABP Overview ABP is a component that enables boosting by s only up to twice primary pressure (.0MPa max.) in combination with using air tank but not using

More information

International Journal of Research (IJR) Vol-1, Issue-8, September *

International Journal of Research (IJR) Vol-1, Issue-8, September * Development towards Sustainable Transportation Planning in India through Management of Non-motorized Transport Akshay Patil 1 * & 2 * 1 3 rd year B. Tech Planning student at College of Engineering Pune,

More information

AquaDDM. Direct-Drive Mixer. Often Imitated Never Duplicated

AquaDDM. Direct-Drive Mixer. Often Imitated Never Duplicated AquaDDM Direct-Drive Mixer Often Imitated Never Duplicated AquaDDM Mixer Proven mixing efficiency The AquaDDM Mixer is designed to provide maximum mixing efficiency. For those applications where mixing

More information

Multiple Pressure Booster Systems With Variable Speed Controller Type BL

Multiple Pressure Booster Systems With Variable Speed Controller Type BL Multiple Pressure Booster Systems With Variable Speed Controller Type BL General Characteristics - Single or multistage pumps - Horizontal or vertical mounting - Total head 30m ~ 250m - Material construction:

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

IMPROVING PLANT AERATION USING GAS INFUSION TECHNOLOGY

IMPROVING PLANT AERATION USING GAS INFUSION TECHNOLOGY IMPROVING PLANT AERATION USING GAS INFUSION TECHNOLOGY AERATION IN WASTEWATER Municipal sewer collection systems-odor Mgmt. Lift and transfer stations Lagoons / Retention Ponds BOD / COD treatment Enhanced

More information

POOL BACKWASH SYSTEM. Installation manual. Proudly manufactured by

POOL BACKWASH SYSTEM. Installation manual. Proudly manufactured by POOL BACKWASH SYSTEM Installation manual Proudly manufactured by Content 1. 2. 3. 4. 4.1 4.2 4.3 4.4 4.5 5. 5.1 5.2 5.3 Backwashing your pool Background Description ecogator component description (bill

More information

Mobile Training Unit (MTU)

Mobile Training Unit (MTU) Mobile Training Unit (MTU) The MTU provides a convenient way of meeting training requirements by bringing a range of short duration health & safety and operative training onsite. Through the MTU, employees

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN OPERATIONS MANUAL RIGHT ANGLE CAPSTAN TABLE OF CONTENTS Patterson Heritage... 3 ISO 9001 Certification and Affiliates... 4 Warranty and Return Policy... 5 Important Operations Manual Instructions, Basic

More information

Instructions. To complete this independent study program, view the entire program, advancing through each slide by pressing the enter key.

Instructions. To complete this independent study program, view the entire program, advancing through each slide by pressing the enter key. Instructions To complete this independent study program, view the entire program, advancing through each slide by pressing the enter key. While viewing the slides, complete the accompanying Independent

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Title MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Duration 5 days Training Venue and Dates REF Mechanical Equipments:

More information

Inprocess Operator Training Programme

Inprocess Operator Training Programme 2016 Inprocess Operator Training Programme ABSORPTION COLUMN These exercises are intended to provide an understanding of absorption columns and the fundamental principles they use to eliminate pollutants

More information

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established

More information

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages TECHNICAL BENEFITS OF CJS / RAISE HSP Technical Advantages The HSP is designed for low- to mid- volume applications at flow rates of 1 cubic meter to 30 c. m per day. The benefits are in the details. The

More information

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle SB Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing A family of API liquid ring compressors has been developed and has been in the market for nearly a decade, they are specifically made

More information

Supratec AERATION TECHNOLOGY. von-drais-straße 7 D Simmern / Hunsrück. tel.: / fax: /

Supratec AERATION TECHNOLOGY. von-drais-straße 7 D Simmern / Hunsrück. tel.: / fax: / PERMOX OM120 Oval Membrane Tu b e D i ffuser w i th stainless steel b o d y Supratec for fine bubble or coarse bubble diffusion of liquids Supratec UND GESELLSCHAFT FÜR UMWELT- VERFAHRENSTECHNIK MBH AERATION

More information

Columbus Instruments

Columbus Instruments 0215-003M Portable O 2 /CO 2 /CH 4 Meter User s Manual Columbus Instruments 950 NORTH HAGUE AVENUE TEL:(614) 276-0861 COLUMBUS, OHIO 43204, USA FAX:(614) 276-0529 1 www.colinst.com TOLL FREE 1-800-669-5011

More information

Exhaust Scrubbers. What you need to know. Move Forward with Confidence

Exhaust Scrubbers. What you need to know. Move Forward with Confidence Exhaust Scrubbers What you need to know Move Forward with Confidence Wärtsilä From January 1, 2015 ships navigating in designated areas globally will face very tight limits on how much sulphur can be emitted

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

PERKFILTER. Inspection and Maintenance Guide

PERKFILTER. Inspection and Maintenance Guide PERKFILTER Inspection and Maintenance Guide PerkFilter Media Filtration System Description The PerkFilter is a stormwater treatment device used to remove pollutants from urban runoff. Impervious surfaces

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

CTB3365x Introduction to Water Treatment

CTB3365x Introduction to Water Treatment CTB3365x Introduction to Water Treatment W4e Aeration Merle de Kreuk There is one last thing of the biological part that needs some design. As you know, nitrifyers need oxygen, and also the heterotrophs,

More information

INSTALLATION INSTRUCTIONS FOR SSI WIDEBAND DIFFUSER

INSTALLATION INSTRUCTIONS FOR SSI WIDEBAND DIFFUSER INSTALLATION INSTRUCTIONS FOR SSI WIDEBAND DIFFUSER Comment Sheet: 1. Installation, Operation and Maintenance Manual contains detailed information on the SSI-Cap Diffuser unit. This manual covers start-up,

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX

SCOTTISH WATER. Waste Water Treatment Works. Typical WWTW Ellipse Equipment No: XXXX Ellipse Plant No: STW00XXXX SCOTTISH WATER Waste Water Treatment Works Typical WWTW Ellipse Equipment No: 500000XXXX Ellipse Plant No: STW00XXXX Works Manual Volume 1/3 Operating Manual (OMA) Non-Routine Operations Manual Ref No:

More information

September Sept ember 18,

September Sept ember 18, September 18, 2013 Objective of SWM Plan for Mumbai Technologically Suitable and Commercially Sustainable solution for managing MSW in Greater Mumbai for planning period of 25 years (2005-2030) Status

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

White Paper. Electrical control valve actuators on oil and gas production separators

White Paper. Electrical control valve actuators on oil and gas production separators White Paper Electrical control valve actuators on oil and gas production separators Electrical control valve actuators on oil and gas production separators White Paper 18 th August 2014 Electrical control

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Hazardous Materials Management Guidelines

Hazardous Materials Management Guidelines Environmental, Health and Safety Guidelines Hazardous Materials Management Guidelines Applicability These guidelines apply to facilities and activities involving the transportation, production, handling,

More information

Float operated valve TYPE (SWDS)

Float operated valve TYPE (SWDS) Float operated valve TYPE (SWDS) Assembly and Operating Instructions for all models Float operated valve Type SWDS Assembly and Operating Instructions Rev.0 Page 1 of 12 Table of Contents 1 General 3 2

More information

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland Abstract Flooding, cleaning, gauging, dewatering and venting of offshore oil and gas pipelines

More information

DEPARTMENT OF TRANSPORT

DEPARTMENT OF TRANSPORT DEPARTMENT OF TRANSPORT UPDATE ON THE IMPLEMENTATION OF SHOVA KALULA BICYCLE PROJECT SELECT COMMITTEE ON PUBLIC SERVICES 14 SEPTEMBER 2010 Outline of the presentation Objectives of the project Legislative

More information

Liquid Thin Film Technology

Liquid Thin Film Technology Liquid Thin Film Technology New innovative way of enabling gas transfer in/out of liquid with extremely high power efficiency US Patent No. US 8,292,271 B2 and US 7,494,534 B2 3/15/2015 Riverforest Corporation

More information

DISASTER MANAGEMENT PLAN

DISASTER MANAGEMENT PLAN CHAPTER-VII DISASTER MANAGEMENT PLAN 7.1 INTRODUCTION 7.1.1 Definition A major emergency in a works is one, which has the potential to cause serious injury or loss of life. It may cause extensive damage

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Confined Space in Construction

Confined Space in Construction Confined Space in Construction 1926.1201 1926.1213 Confined space means a space that: 1. Is large enough and so configured that an employee can bodily enter it; 2. Has limited or restricted means for entry

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk

More information

Hydraulic lift crane. Complies with ANSI/ASME B 30.5 LR enus LR

Hydraulic lift crane. Complies with ANSI/ASME B 30.5 LR enus LR Hydraulic lift crane LR 1110 Complies with ANSI/ASME B 30.5 enus LR 1001.02 Concept and characteristics LR 1110 Standard Excellent lifting capacities thanks to optimized distribution of forces New cabin

More information

Simplicity in VRU by using a Beam Gas Compressor

Simplicity in VRU by using a Beam Gas Compressor Simplicity in VRU by using a Beam Gas Compressor By Charlie D. McCoy and Mark Lancaster Abstract: Vapor Recovery Units are often expensive, complicated to operate and unable to deal with High H2S and liquids.

More information

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /

More information

TRICABLE GONDOLA LIFTS

TRICABLE GONDOLA LIFTS TRICABLE GONDOLA LIFTS The 3S Technology Tricable ropeways have a single haul rope and two carrying ropes. The system is implemented using detachable grips and offers very high transport capacity. They

More information

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL DESCRIPTION 1. No mar 2. No mar tip 3. Housing grip 4. Trigger 5. Air inlet 6. Air inlet plug 7. Plastic board Important! It is essential that you read the

More information

Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200

Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200 Specification Bulletin (rev.01) Series CH4200 Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200 Easy, fast& accurate digital with 11 points calibration Laser sensor offering actual feed

More information

3. HAZARDS IDENTIFICATION COMPOSITION OF INGREDIENTS

3. HAZARDS IDENTIFICATION COMPOSITION OF INGREDIENTS 1. IDENTIFICATION OF THE MATERIAL AND THE MANUFACTURER Product Name Statement of Hazard Nature Premium Food Grade Silicone Grease All formats: 500g, 1kg, 4kg Not considered a Hazardous Substance according

More information

GEO Certified Independent Verification Report

GEO Certified Independent Verification Report Golf Facility: Hørsholm Golf Prepared by: Ole Riger-Kusk Date: October 2017 Executive Summary Hørsholm Golf is located approx. 20 km north of Copenhagen. The first 9 holes were established in 1992 at the

More information

Once Printed This Document May No Longer Be Current

Once Printed This Document May No Longer Be Current Maricopa Integrated Health System Administrative Policy & Procedure Effective Date: 08/01 Reviewed Dates: 09/04, 06/08, 05/10, 04/16 Revision Dates: 11/06, 06/08, 05/10, 12/12, 04/13 Policy #: 14018 T

More information

Low gas volume & flow measurements made easier Gas Endeavour

Low gas volume & flow measurements made easier Gas Endeavour Low gas volume & flow measurements made easier Gas Endeavour www.bioprocesscontrol.com Low gas volume and flow high accuracy and precision Measure gas volume and flow for a wide range of applications The

More information

KITIGAN ZIBI ANISHINABEG P.O. Box 309, Maniwaki, QC J9E 3C9 Tel: (819) 449-5170 Fax: (819) 449-5673 KITIGAN ZIBI ANISHINABEG Request for Proposal (RFP) RFP PROJECT: Feasibility Study on First Nations Tourism

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

SMART Explosion. Efficient Boiler Cleaning with Explosion Generators

SMART Explosion. Efficient Boiler Cleaning with Explosion Generators SMART Explosion Efficient Boiler Cleaning with Explosion Generators Problem and Solution The use of solid fuels, such as coal, waste or biomass, is liable to intense fouling of the steam generator heating

More information

Rate of Flow Valve Series 120

Rate of Flow Valve Series 120 SPECIFICATIONS Rate of Flow Valve Series DIMENSIONS The OCV Series 120 Rate of Flow control valve is designed to control or limit flow to a predetermined rate, regardless offl uctuations in downstream

More information