JLG Models 1200SJP 1350SJP Service and Maintenance Manual P/N PDF download

Size: px
Start display at page:

Download "JLG Models 1200SJP 1350SJP Service and Maintenance Manual P/N PDF download"

Transcription

1 JLG Models 1200SJP 1350SJP Service and Maintenance Manual P/N PDF download This is the Most Practical Service Repair Manual for the JLG 1200SJP, 13500SJP Workshop Service Repair Manual Download ever compiled by mankind. This DOWNLOAD contains of high quality diagrams and instructions on how to service and repair your JLG. Download JLG 1200SJP, 13500SJP Workshop Service Repair Manual Form PDF at: File size: 39.3 MB (41,243,220 ) Instant Download The Repair Manual Covers: SECTION A - INTRODUCTION - MAINTENANCE SAFETY PRECAUTIONS A General A-1 B Hydraulic System Safety A-1 C Maintenance A-1 SECTION 1 - SPECIFICATIONS 1 1 Capacities Tires Engine Data 1-1 Engine Data Prior to S/N / 14

2 Engine Data S/N to Present Specifications and Performance Data 1-2 Reach Specifications 1-2 Dimensional Data 1-2 Chassis Torque Requirements Hydraulic Oil Major Component Weights Pressure Settings Lubrication and Operator Maintenance 1-7 SECTION 2 - GENERAL 2 1 Machine Preparation, Inspection, and Maintenance 2-1 General 2-1 Preparation, Inspection, and Maintenance 2-1 Pre-Start Inspection 2-1 Pre-Delivery Inspection and Frequent Inspection 2-1 Annual Machine Inspection 2-1 Preventative Maintenance Service and Guidelines 2-2 General 2-2 Safety and Workmanship 2-2 Cleanliness 2-2 Components Removal and Installation 2-2 Component Disassembly and Reassembly 2-3 Pressure-Fit Parts 2-3 Bearings 2-3 Gaskets 2-3 Bolt Usage and Torque Application 2-3 Hydraulic Lines and Electrical Wiring 2-3 Hydraulic System 2-3 Lubrication 2-3 Battery 2-3 Lubrication and Servicing Lubrication and Information 2-3 Hydraulic System 2-3 Hydraulic Oil 2-4 Changing Hydraulic Oil 2-4 Lubrication Specifications Cylinder Drift Test 2-4 Platform Drift 2-4 Cylinder Drift Pins and Composite Bearing Repair Guidelines Welding on JLG Equipment 2-5 Do the Following When Welding on JLG Equipment 2-5 Do NOT Do the Following When Welding on JLG Equipment 2-5 SECTION 3 - CHASSIS & TURNTABLE 2 / 14

3 3 1 Tires & Wheels 3-1 Tire Inflation 3-1 Tire Damage 3-1 Wheel and Tire Replacement 3-1 Wheel Installation Extending Axles Axle Limit Switch Adjustment Procedure Drive System Steering Control System Drive/Steering Speed Control Traction Control System Drive Orientation System Oscillating Axle System Oscillating Axle Bleeding Procedure and Lockout Test 3-14 Lockout Cylinder Bleeding 3-14 Oscillating Axle Lockout Test Drive Hub (Prior to S/N ) 3-16 Disassembly 3-16 Disassembly of Cover 3-16 Disassembly of the First Stage Planetary Assembly (7) 3-16 Disassembly of Second Stage Planet Gears (1) 3-16 Assembly of First Stage Planetary Assembly (7) 3-17 Assembly of End Cover Unit (8) 3-17 Final Assembly 3-17 Initial Start-up And After Repairs 3-17 Oil Change Interval-Gear Drive Drive Hub - Bonfiglioli (S/N to Present) 3-20 Product Identification 3-20 Hydraulic Motor Installation 3-20 Installation of the Wheel Drive on the Machine 3-20 Start Up and Running In 3-20 General Information 3-21 Connecting the Brake 3-21 Filling-up the Gearbox with Lubricating Oil 3-21 Gearbox Disengagement 3-23 Maintenance Information 3-25 Changing the Lubricating oil 3-25 Troubleshooting 3-26 Disassembly Information 3-26 Disassembly Procedure 3-26 Inspection of Parts 3-34 Assembly 3-35 Final Test and Reinstallation Drive Hub - Reggiana Riduttori (S/N to Present) 3-50 Symbol Nomenclature 3-50 Tools / 14

4 Disassembly 3-55 Assembly Swing Drive 3-65 Roll and Leak Testing 3-65 Tightening and Torquing Bolts 3-65 Motor Control Valve Disassembly 3-66 Motor and Brake Disassembly 3-67 Main Disassembly 3-68 Hub-Shaft Disassembly 3-69 Carrier Disassembly 3-70 SECTION NO TITLE PAGE NO Hub-Shaft Sub-Assembly 3-71 Carrier Sub-Assembly 3-72 Main Assembly 3-74 Motor and Brake Assembly 3-76 Motor Control Valve Assembly Swing Brake 3-78 Pre-Installation Checks 3-78 Installation 3-79 Maintenance 3-79 Disassembly 3-79 Examination 3-79 Assembly Swing Motor 3-81 Disassembly and inspection 3-81 Assembly 3-88 One Piece Stator Construction Procedure For Setting Gear Backlash Swing Drive Lubrication Swing Bearing 3-98 Turntable Bearing Mounting Bolt Condition Check 3-98 Wear Tolerance Swing Bearing Removal Swing Bearing Installation Swing Bearing Torque Values Swing Speed Proportioning Chassis Tilt Indicator System Rotary Coupling Generator Every 250 hours Every 500 hours Overload Protection Inspecting Brushes, Replacing Brushes, and Cleaning Slip Rings Auxiliary Power System Cold Weather Package Engine / 14

5 Glow Plugs Checking Oil Level Changing Engine Oil Changing the Oil Filter Replacing the Fuel Filter Cleaning the Fuel Strainer Deutz EMR 2 (S/N to Present) Bio Fuel in Deutz Engines General Bio Fuel Biological Contamination In Fuels SECTION 4 - BOOM & PLATFORM 4 1 Boom Systems 4-1 Broken Cable Indicator System 4-1 Platform Control Enable System 4-1 Transport Position Sensing System 4-1 Beyond Transport - Drive Speed Cutback System 4-1 Drive/Steer Boom Function Interlock System (CE ONLY) 4-2 Jib Stow System 4-2 Envelope Tracking System 4-2 Moment Control System 4-3 Boom Control System (BCS) Functional Check (Push to Test) System 4-3 Controlled Arc System 4-3 Controlled Boom Angle System 4-4 Envelope Tracking 4-4 Slow Down System 4-4 Dual Capacity System 4-5 Electronic Platform Leveling 4-5 Boom Control Select Boom Assembly 4-7 Removal 4-7 Disassembly 4-16 Assembly Jib Rotator Orientation Jib Lift End of Stroke Dampening Load Sensing Pin Removal and Installation Hose Routing Procedure Wire Rope 4-44 Inspection 4-44 Three Month Inspection 4-44 Seven Year Inspection 4-44 Replacement Criteria 4-44 Wire Rope Tensioning Procedure Broken Boom Cable Proximity Switch 4-49 Adjusting the Proximity Switch Electronic Platform Leveling / 14

6 Description 4-49 Normal Operation Rotary Actuator 4-51 Theory of Operation 4-51 Required Tools 4-51 Disassembly 4-54 Inspection 4-58 Assembly 4-58 Bleeding After Installation 4-63 SECTION 5 - HYDRAULICS 5 1 Lubricating O-Rings in the Hydraulic System 5-1 Cup and Brush 5-1 Dip Method 5-2 Spray Method 5-2 Brush-on Method Cylinder Repair 5-3 Disassembly 5-3 Cleaning and Inspection 5-12 Assembly Hydraulic Tank Pressure Setting Procedure 5-24 SECTION NO TITLE PAGE NO Set Up of the Function Pump 5-24 Adjustments made at the Main Valve Bank 5-25 Adjustments Made at the Frame Valve Bank 5-26 Adjustments Made at the Platform Valve Bank Drive Pumps 5-31 Troubleshooting Procedure 5-31 Charge Pressure Relief Valve Adjustment 5-34 Mechanical Centering of Pump 5-35 Hydraulic Centering of Control Modules 5-35 High Pressure Relief Valve Adjustments 5-36 Removal and inspection of charge pump 5-36 Routine Maintenance 5-37 Removal and Installation of Shaft Seal Function Pump 5-40 Spare Parts 5-40 Sealing the Drive Shaft 5-41 Disassembly and Assembly of the Complete Unit 5-42 Assembly 5-45 Adjustments 5-46 Tightening Torques 5-46 Pump Control Disassembly For Cleaning Drive & Function Pump Start Up Procedures 5-50 Start-Up Procedure 5-50 SECTION 6 - JLG CONTROL SYSTEM 6 / 14

7 6 1 Introduction CANbus Communications Calibration Instructions To Connect the JLG Control System Analyzer Using the Analyzer Changing the Access Level of the Hand Held Analyzer Adjusting Parameters Using the Hand Held Analyzer Machine Setup Machine Personality Settings/Function Speeds Machine Orientation When Setting Function Speeds 6-27 Test Notes System Test 6-28 Test from the Platform 6-28 Test from the Ground Station Calibrating Steer Calibrating Drive Electronic Platform Leveling 6-52 Platform Leveling Fault Warning 6-52 Fault Response 6-52 CAN Errors 6-53 Additional Platform and Jib Valves 6-53 Platform Leveling Calibration Procedure Calibrating Platform Level 6-55 STEP 1: SETTING THE PLATFORM VALVE MINIMUMS 6-55 STEP 2: CALIBRATING THE PLATFORM LEVEL SENSORS 6-56 STEP 3: BLEEDING THE PLATFORM VALVES 6-57 STEP 4: CALIBRATING THE PLATFORM LEVEL UP AND DOWN VALVE CRACKPOINTS 6-58 SECTION NO TITLE PAGE NO 6 16 Calibrating Lift Crack Point Calibrating Telescope Crack point Calibrating Tilt Sensor Calibrating the Boom Sensors 6-67 Boom Control System Check Procedure CANbus Troubleshooting CANbus Communication Failure Load Moment Pin Troubleshooting SECTION 7 - BASIC ELECTRICAL INFORMATION & SCHEMATICS 7 1 General Multimeter Basics 7-1 Grounding 7-1 Backprobing 7-1 Min/Max 7-1 Polarity 7-1 Scale 7-1 Voltage Measurement / 14

8 Resistance Measurement 7-2 Continuity Measurement 7-2 Current Measurement Applying Silicone Dielectric Compound to Electrical Connections AMP Connector 7-4 Applying Silicone Dielectric Compound to AMP Connectors 7-4 Assembly 7-4 Disassembly 7-6 Wedge Lock 7-6 Service - Voltage Reading Deutsch Connectors 7-8 DT/DTP Series Assembly 7-8 DT/DTP Series Disassembly 7-8 HD30/HDP20 Series Assembly 7-9 HD30/HDP20 Series Disassembly 7-9 FIGURE NO TITLE PAGE NO 1-1 Lubrication and Operator Maintenance Diagram Torque Chart (SAE Fasteners - Sheet 1 of 3) Torque Chart (SAE Fasteners - Sheet 2 of 3)) Torque Chart (SAE Fasteners - Sheet 3 of 3) Torque Chart (METRIC Fasteners - Sheet 1 of 3) Torque Chart (METRIC Fasteners - Sheet 2 of 3) Torque Chart (METRIC Fasteners - Sheet 3 of 3) Engine Operating Temperature Specifications - Deutz Axle Limit Switch Adjustment Conventional Two Wheel Steer Mode Crab Steer Mode Coordinated Steer Mode Chassis Component Location - Sheet 1 of Chassis Component Location - Sheet 2 of Turntable and Boom Component Location - Sheet 1 of Turntable and Boom Component Location - Sheet 2 of Oscillating Axle - Sheet 1 of Oscillating Axle - Sheet 2 of Axle Loctite Application Steering Installation Drive Hub - Sheet 1 of 2) Drive Hub - Sheet 2 of Drive Hub Identification Plate Hub Assembly Gearbox engaged Gearbox Disengaged Drive Hub S/N to Present Drive Hub Special Tools - Sheet 1 of Drive Hub Special Tools - Sheet 2 of Drive Hub Special Tools - Sheet 3 of / 14

9 3-23 Drive Hub Special Tools - Sheet 4 of Bearing Track Spacer Mounting C Oil Seal Spacer Mounting C Bearing Spacer Mountng CO Assembly Diagram Wrench For Ring Nut Anti-rotation Flange Anti-rotation Block Anti-rotation Pin Assembly Diagram Tools For Assembling Bearing 3rd Stage Planetary Gear Assembly Diagram Reggiana Riduttori Hub - Sheet 1 of Reggiana Riduttori Hub - Sheet 2 of Swing System Swing Drive - Motor Control Valve Disassembly Swing Drive - Motor and Brake Disassembly Swing Drive - Main Disassembly Swing Drive - Hub Shaft Disassembly Swing Drive - Carrier Disassembly Swing Drive - Hub Shaft Sub-Assembly Swing Drive - Carrier Sub-Assembly Swing Drive - Main Assembly Swing Drive - Motor and Brake Assembly Swing Drive - Motor Control Valve Assembly Swing Brake Swing Brake Assembly Swing Drive Motor 3-82 FIGURE NO TITLE PAGE NO 3-50 Swing Drive Ports Swing Drive Lubrication Swing Bearing Tolerance Boom Placement - Sheet 1 of Swing Bearing Tolerance Boom Placement - Sheet 2 of Swing Bolt Feeler Gauge Check Swing Bearing Removal Swing Bearing Torque Sequence Rotary Coupling Seal Installation Rotary Coupling Cutaway Rotary Coupling Installation Rotary Coupling Port Location Inspecting Generator Brushes, Replacing Brushes, and Cleaning Slip Rings Auxiliary Pump Installation Cold Weather Package Engine Oil Viscosity EMR 2 Engine Side Equipment Deutz EMR 2 Troubleshooting Flow Chart Deutz EMR 2 Vehicle Side Connection Diagram / 14

10 3-68 Deutz EMR 2 Engine Side Connection Diagram - Sheet 1 of Deutz EMR 2 Engine Side Connection Diagram - Sheet 2 of EMR 2 Engine Plug Pin Identification EMR 2 Vehicle Plug Pin Identification EMR2 Fault Codes - Sheet 1 of EMR2 Fault Codes - Sheet 2 of EMR2 Fault Codes - Sheet 3 of EMR2 Fault Codes - Sheet 4 of EMR2 Fault Codes - Sheet 5 of Boom Assembly - Sheet 1 of Boom Assembly - Sheet 2 of Boom Assembly - Sheet 3 of Boom Assembly - Sheet 4 of Boom Assembly - Sheet 5 of Boom Assembly - Sheet 6 of Boom Assembly - Sheet 7 of Boom Assembly Torque Values - Sheet 1 of Boom Assembly Torque Values - Sheet 2 of Locations for Loctite Application - Sheet 1 of Locations for Loctite Application - Sheet 2 of Locations for Loctite Application - Sheet 3 of Locations for Loctite Application - Sheet 4 of Jib Rotator Orientation Load Pin Removal Tool, JLG P/N Boom/Jib Sensors and Switches Installation - Sheet 1 of Boom/Jib Sensors and Switches Installation - Sheet 2 of Boom/Jib Sensors and Switches Installation - Sheet 3 of Boom/Jib Sensors and Switches Installation - Sheet 4 of Boom Wiper Installation Pivot Pin Installation Powertrack Installation - Sheet 1 of Powertrack Installation - Sheet 2 of Powertrack Installation - Sheet 3 of Powertrack Installation - Sheet 4 of Powertrack Installation - Sheet 5 of Powertrack Installation - Sheet 6 of Wire Rope Tensioning Figure A Wire Rope Adjustment Tools (Optional) Broken Boom Cable Proximity Switch Location 4-49 FIGURE NO TITLE PAGE NO 4-31 Rotary Actuator - Exploded View Rotary Actuator - Assembly Drawing Platform Support Torque Values Cylinder Barrel Support Cap Screw Removal Axle Extension Cylinder / 14

11 5-4 Axle Lockout Cylinder Level Cylinder Lift Cylinder Jib Cylinder Steer Cylinder - Prior to S/N Steer Cylinder - S/N to Present Telescope Cylinder Cylinder Rod Support Tapered Bushing Removal Composite Bearing Installation Rod Seal Installation Poly-Pak Piston Seal Installation Wiper Seal Installation Installation of Head Seal Kit Piston Seal Kit Installation Tapered Bushing Installation Seating the Tapered Bearing Rod Assembly Installation Hydraulic Tank Chassis Control Valve Locations Platform Valve Identification - JLG P/N Platform Valve Identification - JLG P/N Main Valve Identification Main Valve Cartridge Torque Values Hydraulic Oil Level Gauge Steer Pressure Adjustments Function Pump - Sectional View Function Pump, Pressure and Flow Control - Sheet Function Pump, Pressure and Flow Control - Sheet Function Pump, Pressure and Flow Control - Sheet Hand Held Analyzer Control System Block Diagram Analyzer Flow Chart Analyzer Flow Chart - Personalities (Software Version 7 X to Present) Analyzer Flow Chart - Machine Setup (Software Version 7 X to Present) Analyzer Flow Chart - Calibrations (Software Version 7 X to Present) Analyzer Flow Chart - Diagnostics (Software Version 7 X to Present) - Sheet 1 of Analyzer Flow Chart - Diagnostics (Software Version 7 X to Present) - Sheet 2 of Analyzer Flow Chart - Diagnostics (Software Version 7 X to Present) - Sheet 3 of Control Module Location Analyzer Connecting Points System Test Flow Chart - Platform Tests System Test Flow Chart - Ground Station Tests Boom Sensor Calibration Position Boom Sensor Calibration Position Boom Sensor Calibration Position / 14

12 6-17 Boom Sensor Calibration Position Boom Sensor Calibration Position Boom Sensor Calibration Position Boom Sensor Calibration Position Boom Sensor Calibration Position FIGURE NO TITLE PAGE NO 6-22 Boom Sensor Calibration Position Boom Sensor Calibration Position Fault Code Light Location CANbus Connections Diagram CANbus Connections - Sheet 1 of CANbus Connections - Sheet 2 of CANbus Connections - Sheet 3 of CANbus Connections - Sheet 4 of CANbus Connections - Sheet 5 of CANbus Circuit Moment Chart Voltage Measurement (DC) Resistance Measurement Continuity Measurement Current Measurement (DC) Connector Assembly Figure AMP Connector Connector Assembly Figure Connector Assembly Figure Connector Assembly Figure Connector Disassembly Connector Installation DT/DTP Contact Installation DT/DTP Contact Removal HD/HDP Contact Installation HD/HDP Locking Contacts Into Position HD/HDP Contact Removal HD/HDP Unlocking Contacts Chassis Electrical Components - Sheet 1 of Chassis Electrical Components - Sheet 2 of Turntable Electrical Components - Prior to S/N Sheet 1 of Turntable Electrical Components - Prior to S/N Sheet 2 of Turntable Electrical Components - S/N to Present - Sheet 1 of Turntable Electrical Components - S/N to Present - Sheet 2 of Electrical Schematic - Sheet 1 of Electrical Schematic - Sheet 2 of Electrical Schematic - Sheet 3 of Electrical Schematic - Sheet 4 of Electrical Schematic - Sheet 5 of Electrical Schematic - Sheet 6 of / 14

13 7-30 Hydraulic Schematic - Boom Control - Sheet 1 of Hydraulic Schematic - Boom Control - Sheet 2 of Hydraulic Schematic - Pump Circuit - Sheet 1 of Hydraulic Schematic - Pump Circuit - Sheet 2 of Hydraulic Schematic - Platform Control - Sheet 1 of Hydraulic Schematic - Platform Control - Sheet 2 of Hydraulic Schematic - Axle Steer Control - Sheet 1 of Hydraulic Schematic - Axle Steer Control - Sheet 2 of Hydraulic Schematic - Traction Control - Sheet 1 of Hydraulic Schematic - Traction Control - Sheet 2 of TABLE NO TITLE PAGE NO 1-1 Capacities Tire Specifications Deutz BF4M2011 Specifications Deutz TD2011L4 Specifications Reach Specifications Dimensional Data Chassis Specifications Torque Requirements Engine Torque Requirements Hydraulic Oil Specifications Mobilfluid 424 Specs Mobil DTE 13M Specs UCon Hydrolube HP Mobil EAL H 46 Specs Exxon Univis HVI 26 Specs Component Weights Pressure Settings Lubrication Specifications Inspection and Maintenance Cylinder Drift Inspection and Preventive Maintenance Schedule Wheel Torque Chart Steering Assembly Notes Brake Technical Data Suggested Lubricants According SAE 80W/90 and SAE 85W/140 API GL5 Grade Drive Hub Maintenance Schedule Troubleshooting Coupling Port Information Table Hose/Cable Pull Chart Hose/Cable Pull Chart Cylinder Head and Tapered Bushing Torque Specifications Holding Valve Torque Specifications Cartridge Torque Values Torque Specs for Relief Valves into Port Block Tightening Torques / 14

14 Powered by TCPDF ( pdf download Factory&Workshop Repair Manual Service Manuals 6-1 Calibration Instructions Machine Configuration Programming Information - Version P7 X to Present Personality Ranges/Defaults System Test Messages Machine Diagnostics Parameters Diagnostic Trouble Code Chart Troubleshooting: Platform Can Communications Lost Troubleshooting: BLAM Can Communications Lost Troubleshooting: Chassis Can Communications Lost Load Moment Pin Troubleshooting: Can Communications Lost Load Moment Pin Troubleshooting: Moment Pin Horizontal Force Out of Range Load Moment Pin Troubleshooting: Moment Pin Vertical Force Out of Range Load Moment Pin Troubleshooting: Moment Pin Sensor Fault Load Moment Pin Troubleshooting: New Moment Pin Detected Fault / 14

1.0 - OPENING AND CLOSING THE DOOR

1.0 - OPENING AND CLOSING THE DOOR The purpose of this manual is to provide the user with instructions on how to safely open and close, how to conduct routine maintenance, and how to install the PEI TWINLOCK Closure on a pressure vessel.

More information

100C Air Compressor Kit

100C Air Compressor Kit 10010 100C Air Compressor (standard mounting bracket, CE Spec) 10014 100C Air Compressor (no leader hose or check valve, CE Spec) 10016 100C Air Compressor (with Omega Bracket, CE Spec) IMPORTANT: It is

More information

IMPORTANT SAFETY INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS CAUTION - To reduce risk of electrical shock: - Do not disassemble. Do not attempt repairs or modifications. Refer to qualified service agencies for all service and repairs.

More information

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only) 42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) 42047 Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only) 45052 Constant Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor

More information

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO 97C COMPRESSOR KIT 12V PART NO. 00097 97C COMPRESSOR KIT 24V PART NO. 02497 98C COMPRESSOR KIT PART NO. 00098 97C 98C IMPORTANT: It is essential that you and any other operator of this product read and

More information

200 PSI COMPRESSORS - MODEL NUMBERS

200 PSI COMPRESSORS - MODEL NUMBERS 200 PSI COMPRESSORS - MODEL NUMBERS 380C AIR COMPRESSOR KIT PART NO. 38033 480C AIR COMPRESSOR KIT PART NO. 48043 380C 480C IMPORTANT: It is essential that you and any other operator of this product read

More information

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment OPERATOR S MANUAL FOR MORSE TILT-TO-LOAD DRUM ROTATOR SAFETY INFORMATION: While Morse Manufacturing Co. drum handling equipment is engineered for safety and efficiency, a high degree of responsibility

More information

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO 420C AIR COMPRESSOR KIT PART NO. 42042 460C AIR COMPRESSOR KIT PART NO. 46043 420C 460C IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this

More information

200 PSI FAST-FILL AIR SOURCE KIT

200 PSI FAST-FILL AIR SOURCE KIT 200 PSI FAST-FILL AIR SOURCE KIT 55% Duty Compressor on 2.0 Gallon Air Tank PART NO. 20007 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of

More information

Installation and Service Manual

Installation and Service Manual An Actuant Company Installation and Service Manual Heavy Duty Hydraulic Stabilization Legs CONTENTS Part # 3010003129 REV 0D Section Page 1.0 Receiving Instructions 2 2.0 Safety Issues 2 3.0 Hydraulic

More information

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank IMPORTANT SAFETY INSTRUCTIONS CAUTION - To reduce risk of electrical shock or Electrocution: MODEL NUMBER: 20008 200 PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank IMPORTANT: It is

More information

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE MODEL NUMBER: M20005 AIR SOURCE KIT 30% Duty Compressor on 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE USER MANUAL IMPORTANT SAFETY INSTRUCTIONS CAUTION - To reduce risk of electrical shock

More information

444C DUAL PERFORMANCE VALUE PACK

444C DUAL PERFORMANCE VALUE PACK (Chrome) PART NO. 44432 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this product. SAVE THIS MANUAL

More information

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO 400H HARDMOUNT AIR COMPRESSOR KIT PART NO. 40042 450H HARDMOUNT AIR COMPRESSOR KIT PART NO. 45042 400H 450H IMPORTANT: It is essential that you and any other operator of this product read and understand

More information

ALL TERRAIN CRANE AR-1200M-1

ALL TERRAIN CRANE AR-1200M-1 ALL TERRAIN RANE AR-12M JAPANESE SPEIFIATIONS ARRIER MODEL FAUN RTF12-5 SPE. NO. AR-12M-1 AR ontrol No. JA-3-279 - Return to INDEX AR-12M RANE SPEIFIATIONS RANE APAITY 12.2m Boom 12,kg at 2.7m (17part-line)

More information

ATV 90 Y-12 YOUTH 2-STROKE RED (A2004ATB2BUSR) Page 1 of 52 A-ARM, FLOOR PANEL, AND BUMPER ASSEMBLY

ATV 90 Y-12 YOUTH 2-STROKE RED (A2004ATB2BUSR) Page 1 of 52 A-ARM, FLOOR PANEL, AND BUMPER ASSEMBLY 2004 ATV 90 Y-12 YOUTH 2-STROKE RED (A2004ATB2BUSR) Page 1 of 52 A-ARM, FLOOR PANEL, AND BUMPER ASSEMBLY 2004 ATV 90 Y-12 YOUTH 2-STROKE RED (A2004ATB2BUSR) Page 2 of 52 A-ARM, FLOOR PANEL, AND BUMPER

More information

ULTRA-LIGHT DUTY ONBOARD AIR SYSTEM

ULTRA-LIGHT DUTY ONBOARD AIR SYSTEM ULTRA-LIGHT DUTY ONBOARD AIR SYSTEM PART NO. 10000 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using

More information

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO 250C-IG COMPRESSOR KIT 12V PART NO. 25050 250C-IG COMPRESSOR KIT 24V PART NO. 25058 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual

More information

Spare parts list ( ) Spare parts list high-pressure 9/20-4M *

Spare parts list ( ) Spare parts list high-pressure 9/20-4M * Spare parts list (5.971-969.0) Spare parts list high-pressure 9/20-4M * 05.05.2015 www.kaercher.com EN Page 2 Page 3 Page 4 Table of contents Spare parts list high-pressure 9/20-4M * (5.971-969.0)... 6

More information

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Model PSI Compressor with 3-Gallon Air Tank 12VDC Model 6350 150 PSI Compressor with 3-Gallon Air Tank 12VDC IMPORTANT: It is essential that you and any other operator of this product read and understandd the contents of this manual before installing

More information

APP pumps APP and APP Disassembling and assembling

APP pumps APP and APP Disassembling and assembling Service guide APP pumps APP 11-13 and APP 16-22 Disassembling and assembling hpp.danfoss.com Table of Contents Contents 1. Introduction... 2 2. Disassembling the pump... 3 3. Assembling the pump... 6 4.

More information

400C & 450C DUAL PERFORMANCE VALUE PACKS

400C & 450C DUAL PERFORMANCE VALUE PACKS (Chrome) PART NO. 40013 (Silver) PART NO. 45012 (Chrome) PART NO. 45013 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before

More information

General maintenance engineering applications

General maintenance engineering applications Unit 068 General maintenance engineering applications Level: 2 Credit value: 12 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover

More information

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO 250C-IG COMPRESSOR KIT 12V PART NO. 25050 250C-IG COMPRESSOR KIT 24V PART NO. 25058 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual

More information

Inverse Proportional Pressure-Relief Cartridge, Size 10

Inverse Proportional Pressure-Relief Cartridge, Size 10 Inverse Proportional Pressure-Relief Cartridge, Size 1 Q max = 12 l/min, p max = 3 bar Seated pilot, spool-type main stage, damped design 1 Description inverse-proportional pressure-relief valves are size

More information

K Page 1 of 48 Air Intake - Pg. 17

K Page 1 of 48 Air Intake - Pg. 17 K532-53168 Page 1 of 48 Air Intake - Pg. 17 Ref # Part Number Qty Description 24 25 041 06-S 1 Gasket, elbow 25 48 054 09 1 Elbow, air cleaner Discontinued not available at Kohler Co. 35 277116-S 1 Brace,

More information

200 PSI HIGH-FLOW AIR SOURCE KIT

200 PSI HIGH-FLOW AIR SOURCE KIT 200 PSI HIGH-FLOW AIR SOURCE KIT 50% Duty Compressor on 2.0 Gallon Air Tank PART NO. 20008 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of

More information

Assembling and testing fluid power systems

Assembling and testing fluid power systems Unit 020 Assembling and testing fluid power systems Level: 2 Credit value: 14 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover

More information

30T A/Manual Hydraulic Shop Press

30T A/Manual Hydraulic Shop Press 30T A/Manual Hydraulic Shop Press Operation Manual 1 1. Important Information 1.1 Safety Information 1.1.1 Hazard Symbols Used in the Manuals This manual includes the hazard symbols defined below when

More information

Spare parts list ( ) Spare parts list HD 1050 DE

Spare parts list ( ) Spare parts list HD 1050 DE Spare parts list (5.972-503.0) Spare parts list HD 1050 DE 07.05.2013 www.kaercher.com EN Table of contents Spare parts list HD 1050 DE (5.972-503.0)... 6 10 Frame (0.116-553.0)... 7 11 Cover (0.116-551.0)...

More information

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS STORAGE INSTRUCTIONS Until it is time to install a new or reconditioned valve on the car, the valve must be kept in its original packaging in order to protect it from dirt and damage. INSTALLATION INSTRUCTIONS

More information

REPAIR PART NUMBER NUMBER DESCRIPTION 0137 ELE 0136 ELE 12 VOLT SOLENOID

REPAIR PART NUMBER NUMBER DESCRIPTION 0137 ELE 0136 ELE 12 VOLT SOLENOID PART REPAIR PART NUMBER NUMBER DESCRIPTION 0137 ELE 0136 ELE 12 VOLT SOLENOID 0203 WHL 0250 WHL WHEEL HUB 0251 WHL AXLE 0252 WHL DUST CAPS 0253 WHL TIRE - 210 SP 0204 WHL 0211 WHL TIRE & WHEEL - SP 0250

More information

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment Overview This standard covers a broad range of basic fluid power maintenance competences which will prepare you for entry into the engineering or manufacturing sectors, creating a progression between education

More information

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM 1 You have purchased a very high quality piece of equipment that should provide years of useful life. Following the instructions

More information

LENNOX SLP98UHV DIAGNOSTIC CODES

LENNOX SLP98UHV DIAGNOSTIC CODES Code Status of Equipment Action required to clear and recover - Idle mode (Decimal blinks at 1 Hertz -- 0.5 second ON, 0.5 second OFF) A Cubic feet per minute (cfm) setting for indoor blower (1 second

More information

Fiber Cable Puller with Tuf-Lugger lite

Fiber Cable Puller with Tuf-Lugger lite 7 OPERATING INSTRUCTION MANUAL Fiber Cable Puller with Tuf-Lugger lite Copyright 2015 DCD Design & Manufacturing Ltd. Revision 1.0 IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE USING The Fiber

More information

OPERATING INSTRUCTIONS. Parts List N. Note: Owner and operator MUST read and understand this operating instructions before use this lift table.

OPERATING INSTRUCTIONS. Parts List N. Note: Owner and operator MUST read and understand this operating instructions before use this lift table. OPERATING INSTRUCTIONS Parts List 770N te: Owner and operator MUST read and understand this operating instructions before use this lift table. Thank you for using this lift table. Your lift table is made

More information

OPERATION INSTRUCTIONS Form 6899-TE, Four-Post Lift Rack. MODELS L451 and L454 (all model variations) Copyright 2014 Hunter Engineering Company

OPERATION INSTRUCTIONS Form 6899-TE, Four-Post Lift Rack. MODELS L451 and L454 (all model variations) Copyright 2014 Hunter Engineering Company OPERATION INSTRUCTIONS Form 6899-TE, 11-14 Four-Post Lift Rack MODELS L451 and L454 (all model variations) Copyright 2014 Hunter Engineering Company Hunter Rack and Jack - Equipment Training Report Hunter

More information

General maintenance engineering applications

General maintenance engineering applications Unit 868 General maintenance engineering applications UAN: J/600/6007 Level: Level 2 Credit value: 12 GLH: 55 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived

More information

6000SLX HYDRAULIC CRAWLER CRANE

6000SLX HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE Contents Specifications 3-4 Symbols 4 Outline Winch Assingment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications : Luffing

More information

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY

More information

SpeciÞcations. Engine Dimensions Dimensions in millimeters. Inch equivalents shown in [].

SpeciÞcations. Engine Dimensions Dimensions in millimeters. Inch equivalents shown in []. SpeciÞcations Engine Dimensions Dimensions in millimeters. Inch equivalents shown in []. Ê ßÔ Ê ÛÝ Ñ Ê Û ÎÊ Û É 5 ENGINE IDENTIFICATION NUMBERS Kohler engine identiþcation numbers (model, speciþcation

More information

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL WedgeRock RW Series Worm Gear Actuators INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL Revision 01 Date 4/3/17 Page 1 Table of Contents 1.0 INTRODUCTION... 4 1.1 PURPOSE... 4 1.2 AUDIENCE...

More information

Disassembling and assembling APP and APP 16-22

Disassembling and assembling APP and APP 16-22 MAKING MODERN LIVING POSSIBLE Instruction Disassembling and assembling APP 11-13 and APP 16-22 ro-solutions.com Table of Contents 1. Disassembling...3 2. Disassembling the pump...3 3. Assembling the pump....7

More information

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 Sub Section INDEX Page Number 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 6. INSTALLATION AND OPERATION 6 7. MAINTENANCE 8 8. REPAIR 9 9. ASSEMBLY 10 10.

More information

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator. RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to

More information

6000SLX SL-N HYDRAULIC CRAWLER CRANE

6000SLX SL-N HYDRAULIC CRAWLER CRANE SL-N SL-N HYDRAULIC CRAWLER CRANE 1804 05H.EA292 SL-N Specifications Contents Specifications 3-4 Symbols 4 Outline Winch Assignment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications

More information

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

LOAD CHARTS RT890E METRIC DIN / ISO / 75% LOAD CHARTS RT89E METRIC DIN / ISO / 75% 232729 SERIAL NUMBER RT89E - S/N 232729 1 RT89E - S/N 232729 2 TABLE OF CONTENTS GENERAL NOTES...4 WEIGHT REDUCTIONS / LINE PULLS & REEVING INFO / RIGGING CHART

More information

OPERATOR SERVICE MANUAL

OPERATOR SERVICE MANUAL OPERATOR SERVICE MANUAL POSITECH CORPORATION 191 N RUSH LAKE ROAD LAURENS, IA 50554 Phone Number: 800-831-6026 24 Hour Service Phone Number: 541-954-2948 Email: service@positech.com SERIAL NO: RUN NO:

More information

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation, Operation and Maintenance Manual for Back Pressure Regulator Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN

More information

Operators & Maintenance Manual OPERATOR S MANUAL USAGE AND MAINTENANCE F100M F100M. Powered Fixed Hoist Ideal for raised swimming pools and hot tubs

Operators & Maintenance Manual OPERATOR S MANUAL USAGE AND MAINTENANCE F100M F100M. Powered Fixed Hoist Ideal for raised swimming pools and hot tubs MIllside House Anton Road Andover Hampshire SP10 2RW T: +44 (0)1256 896000 E: info@poollifts.co.uk Operators & Maintenance Manual OPERATOR S MANUAL USAGE AND MAINTENANCE F100M F100M Powered Fixed Hoist

More information

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL Index 1. List of components / General arrangement 2. Description 3. Handling 4. Installation 5. Actuators / Operation 6. Maintenance a. Changing

More information

1650EXLT, ,

1650EXLT, , 1650EXLT, 96193008901, 2012-10 "CHASSIS, ENGINE & PULLEYS" - 000 00 00-00 W/O DESCRIPTION 1 B&S 21M307-0135-F1 FOR SERVICE & PARTS 1-800-233-3723 1 532 42 92-03 FRAME 1 2 532 15 04-06 BOLT 1 3 532 42 88-67

More information

Code AWC20HP Air Compressor

Code AWC20HP Air Compressor Code 951816 AWC20HP Air Compressor Index of Contents Index of Contents 02 Declaration of Conformity 02 What s Included 03 Safety Precautions 03 Specifications (AWC20HP Air Compressor) 04 Assembly Instructions

More information

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C 1 BRONZE BUSHING REPLACEMENT PROCEDURE V.2 12/3/2014 DN345 & NL450C 2 Safety Instructions Removing Walking Beams 3 1. Position spreader on a flat concrete surface capable of supporting weight of spreader

More information

Key. counterweight. Lifting capacities on outriggers 360. Superlift

Key. counterweight. Lifting capacities on outriggers 360. Superlift Specifications Dimensions Lifting capacities main boom with Superlift Lifting capacities main boom Working ranges main boom Working ranges main boom extension Working ranges fixed fly jib Working ranges

More information

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE

LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE LV LOADER DIRECTIONAL CONTROL VALVES INSTALLATION & USER GUIDE SPECIFICATIONS: 10 gpm (38 lpm) Nominal Capacity. Rated up to 4000 psi (275 bar). Port Sizes-Inlet/Outlet #8SAE (3/4-16). Work Ports #8SAE

More information

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves

More information

PDY TON HYDRAULIC CRIMPING TOOL WARNING

PDY TON HYDRAULIC CRIMPING TOOL WARNING OPERATORS ORS GUIDE PDY-1220 12 TON HYDRAULIC CRIMPING TOOL All information found in this guide must be read and understood before use or testing of this tool. Failure to read and understand these warnings

More information

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER SERIAL NUMBER 1 2 TABLE OF CONTENTS GENERAL NOTES... 4 WT. REDUCTIONS / LINE PULLS & REEVING INFO / HOIST PERFORMANCE. 5 LIFTING AREA

More information

REV0709. Parts List. Hydraulic Cylinder Model MODEL C SINGLE-ACTING, SPRING RETURN HYDRAULIC CYLINDER. Max. Capacity: 55.2 Tons at 10,000 PSI

REV0709. Parts List. Hydraulic Cylinder Model MODEL C SINGLE-ACTING, SPRING RETURN HYDRAULIC CYLINDER. Max. Capacity: 55.2 Tons at 10,000 PSI REV0709 Parts List Hydraulic Cylinder Model 10312 MODEL C SINGLE-ACTING, SPRING RETURN HYDRAULIC CYLINDER Max. Capacity: 55.2 Tons at 10,000 PSI REV0709 Item No. Part No. No. Req d Description 1 10606

More information

Spare parts list ( ) Spare parts list HDS 700 B

Spare parts list ( ) Spare parts list HDS 700 B Spare parts list (5.955-875.0) Spare parts list HDS 700 B 02.09.2013 www.kaercher.com EN Page 2 Page 3 Page 4 Table of contents Spare parts list HDS 700 B (5.955-875.0)... 6 10 Individual parts... 7 11

More information

Service and Maintenance Manual

Service and Maintenance Manual Service and Maintenance Manual Model(s) AM Series 20AM 25AM 30AM 36AM 41AM P/N - 3120872 April 2, 2013 NOTES: FOREWORD The purpose of this manual is to provide users with the operating procedures essential

More information

Inverse Proportional Pressure-Relief Cart., Size 2 4

Inverse Proportional Pressure-Relief Cart., Size 2 4 Inverse Proportional Pressure-Relief Cart., Size Q max = l/min, p max = 5 bar Direct acting, electrically operated 1 Description inverse proportional pressure-relief valves are direct acting screw-in cartridges

More information

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No DP 2800 Spare parts list Demolition pulverizer DP 2800 s/n DEQ139266-2018 Construction Tools GmbH No. 3390719501 2018-01-01 General information This spare parts list applies to the following: Part number

More information

USE AND MAINTENANCE LIGHT TOWER

USE AND MAINTENANCE LIGHT TOWER USE AND MAINTENANCE LIGHT TOWER General Safety Information Allowed use The light tower has been designed to lighten the area in which it is positioned and oriented, after installing it on a generating

More information

12S 1st Stage. -Maintenance Procedure-

12S 1st Stage. -Maintenance Procedure- 12S 1st Stage -Maintenance Procedure- 1 Warning! All maintenance and repair procedures MUST be performed by a Mares authorized Service Center and/or Distributor. Therefore, the information provided below

More information

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment Assisting in the installation of compressed air equipment Overview This unit identifies the competences you need to assist in the installation of compressed air equipment and systems, in accordance with

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk HP690A Intensifier Panel including the following versions: Model Intensification

More information

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT ATTENTION SYRINGE REPLACEMENT Please read through the document completely before starting any repairs. Refer to the proper section in the service manual for complete removal and replacement procedures.

More information

Proportional Pressure-Relief Cartridge Valve, Size 2...4

Proportional Pressure-Relief Cartridge Valve, Size 2...4 Proportional Pressure-Relief Cartridge Valve, Size... Q max = l/min, p max = 3 bar Direct acting, electrically operated 1 Description proportional pressure-relief valves are direct acting screw-in cartridges

More information

Spare parts list ( ) Spare parts list HD 2.3/14 C Ed Food

Spare parts list ( ) Spare parts list HD 2.3/14 C Ed Food Spare parts list (5.972-564.0) Spare parts list HD 2.3/14 C Ed Food 05.08.2013 www.kaercher.com EN Page 2 Page 3 Page 4 Table of contents Spare parts list HD 2.3/14 C Ed Food (5.972-564.0)... 6 10 Housing

More information

Product Guide. Crawler Crane

Product Guide. Crawler Crane Crawler Crane 220 US Tons (100 Metric Tons) @ 16 ft 5 in Radius 285 ft Max Tip (Main Boom) Main Boom, Fixed Jib and Luffing Jib Configurations Product Guide KEY FEATURES ULTRA CAB The Ultra Cab, designed

More information

Booster Pump PB4-60 Replacement Kits

Booster Pump PB4-60 Replacement Kits Booster Pump PB4-60 Replacement Kits FOR YOUR SAFETY - This product must be installed and serviced by a contractor who is licensed and qualified in pool equipment by the jurisdiction in which the product

More information

HPB25 Hydraulic Paving Breaker

HPB25 Hydraulic Paving Breaker INSTRUCTION MANUAL HPB25 Hydraulic Paving Breaker Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product at www.greenlee.com

More information

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

SEMEM3-73 Maintaining medical gas pipeline systems and equipment Maintaining medical gas pipeline systems and equipment Overview This unit identifies the competences you need to carry out maintenance activities on medical gas pipeline systems and equipment, in accordance

More information

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL 2 54 ROTATING DISC GATE VALVE OPERATION & MAINTENANCE MANUAL Rel. 5/27/16 1 TABLE OF CONTENTS 3 General 3 Receipt & Inspection 4 Gate Valve Storage & Handling 5 6 Installation 7 Operation 8 Field Testing

More information

Technical Data Sheet TI-F50 Locking Units series KFH

Technical Data Sheet TI-F50 Locking Units series KFH English translation of German original Locking Units series KF Further important practical advice is given in Operating Manual BA-F50., Rod diameter 18 mm 50 mm øz 8 L 2 6 x 6 0 min. 4x30 KF 18 to KF 32,

More information

IMPORTANT SAFETY INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS CAUTION - To reduce risk of electrical shock or electrocution: - Do not disassemble. Do not attempt repairs or modifications. Refer to qualified service agencies for all service

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: 2244025 OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product, please

More information

Puyuan. QUY 160 Crawler Crane Technical Manual

Puyuan. QUY 160 Crawler Crane Technical Manual Puyuan QUY 160 Crawler Crane Technical Manual 5 Pictures and technical parameters in sample books may not accord with the delivery goods because of the improvement in design. Please understand and make

More information

Budget Range Operators Handbook

Budget Range Operators Handbook Budget Range Operators Handbook BAMBI AIR COMPRESSORS LTD 152 Thimble Mill Lane Heartlands Birmingham B7 5HT United Kingdom Tel: 0121 322 2299 Fax: 0121 322 2297 Email: sales@bambi-air.co.uk www.bambi-air.co.uk

More information

Freedom8 ShoeBox Compressor Manual

Freedom8 ShoeBox Compressor Manual Freedom8 ShoeBox Compressor Manual Warning!! This product is not a toy! Use or misuse can cause severe injury or death! Use only with adult supervision. This unit is only to be used with tanks, hoses and

More information

Proportional Pressure-Relief Cartridge Valve, Size 2...4

Proportional Pressure-Relief Cartridge Valve, Size 2...4 Proportional Pressure-Relief Cartridge Valve, Size... Q max = l/min (6 gpm), p max = bar (58 psi) Direct acting, electrically operated Description proportional pressure-relief valves are direct acting

More information

TABLE OF CONTENTS... 2... 2... 3... 5... 6... 7... 7... 15... 16... 17... 17... 19... 20... 21 IMPORTANT INFORMATION Two Post Lifts 1. 2. - There can be no cracks in the slab within 36 in. of the base

More information

USER GUIDE TO POWER ASSISTED BIKES

USER GUIDE TO POWER ASSISTED BIKES USER GUIDE TO POWER ASSISTED BIKES 1 PAGE CONTENTS Page. 3 Unpacking Page. 3-4 Easy steps to get started Page. 5 General Assembly Instructions Page. 6 Aligning H/Bars, Page. 7 Tightening pedals onto Crank

More information

LRS(H)4 Pressure-Reducing Regulator User Manual

LRS(H)4 Pressure-Reducing Regulator User Manual LRS(H)4 Pressure-Reducing Regulator User Manual Read the complete manual before installing and using the regulator. 2 Safe Product Selection When selecting a product, the total system design must be considered

More information

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN Differential Pressure Regulator Type 45-6 Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN Edition March 2008 Contents Contents Page 1 Design and principle of operation...................

More information

Spare parts list. ( ) Spare parts list HD 3.0/20 C Ea

Spare parts list. ( ) Spare parts list HD 3.0/20 C Ea Spare parts list (5.972-551.0) Spare parts list HD 3.0/20 C Ea 24.06.2016 www.kaercher.com EN Page 2 / 51 Page 3 / 51 Page 4 / 51 Table of contents Order instructions Spare parts list HD 3.0/20 C Ea (5.972-551.0)

More information

HYDRAULIC PALLET TRUCKS. MODEL Nos: PT550BC, PT685BC, PT550NC, PT685NC OPERATION & MAINTENANCE INSTRUCTIONS

HYDRAULIC PALLET TRUCKS. MODEL Nos: PT550BC, PT685BC, PT550NC, PT685NC OPERATION & MAINTENANCE INSTRUCTIONS HYDRAULIC PALLET TRUCKS MODEL Nos: PT550BC, PT685BC, PT550NC, PT685NC OPERATION & MAINTENANCE INSTRUCTIONS 0711 WARNING! PT550NC MAXIMUM LOAD - 2000KG PT685NC MAXIMUM LOAD - 2000KG PT550BC MAXIMUM LOAD

More information

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment Overview This standard covers a broad range of basic mechanical maintenance competences that will prepare you for entry into the engineering or manufacturing sectors, creating a progression between education

More information

ModelsEZU-15 & EZU-15-R. BISHAMON INDUSTRIES CORPORATION 5651 East Francis Street Ontario, California 91761, USA (909) (800)

ModelsEZU-15 & EZU-15-R. BISHAMON INDUSTRIES CORPORATION 5651 East Francis Street Ontario, California 91761, USA (909) (800) UP P n e u m a t i c ModelsEZU-15 & EZU-15-R BISHAMON INDUSTRIES CORPORATION 5651 East Francis Street Ontario, California 91761, USA (909) 390-0055 (800) 231-3187 Table of Contents GETTING STARTED......................................

More information

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Index Table. Model 794. Installation, Operating and Maintenance Instructions CLOCKWISE MANUAL MAKING INTO CCW TABLE Index Table Model 794 Installation, Operating and Maintenance Instructions Black & Webster Products Division 545 Hupp Ave. P.O. Box 831, Jackson, Michigan 49204 2009

More information

Spare parts list. ( ) Spare parts list HD 3.0/20 C Ea

Spare parts list. ( ) Spare parts list HD 3.0/20 C Ea Spare parts list (5.972-551.0) Spare parts list HD 3.0/20 C Ea 20.04.2016 www.kaercher.com EN Table of contents Order instructions Spare parts list HD 3.0/20 C Ea (5.972-551.0) 10 Housing 20 Pump set 21

More information

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913 24L AIR COMPRESSOR MODEL NO: RANGER 7/240 PART NO: 2242000 OPERATION & MAINTENANCE INSTRUCTIONS LS0913 INTRODUCTION Thank you for purchasing this CLARKE 24L Air Compressor. Please read this manual fully

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

Pressure Dump Valve Service Kit for Series 3000 Units

Pressure Dump Valve Service Kit for Series 3000 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 000 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00, 400, 500, and 700 applicator

More information

PRESSURE ADJUSTMENT Main pressure adjustment

PRESSURE ADJUSTMENT Main pressure adjustment 8001-38 PRESSURE ADJUSTMENT Main pressure adjustment Adjustment preparation work Pressure is adjusted with control valves. The following preparations are required for adjusting with control valves. 1.

More information

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference. English Lubrication Free Air Turbine Handpiece with Water Spray OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference. OM-T0286E 001 Thank you for purchasing

More information