Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016
|
|
- Paulina May
- 6 years ago
- Views:
Transcription
1 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016
2 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities update Columbia Pike transit stations 2
3 Transit Development Plan (TDP) TDP is a system-wide analysis of bus service in the County 10-year plan for new, modified or expanded bus service Plan for supporting capital improvements Major update required by Virginia Department of Rail and Public Transportation every 6 years Must be completed to be eligible for State funding Last major update was in
4 Nov Dec Jan Feb March April May June July Aug Sept Oct Nov Dec Jan Feb March Apr May June TDP Timeline Streetcar cancelled Streetcar closeout Phase I Outreach ART Service Improvements Selected TDP consultant Technical Analysis Phase II Outreach ART Service Improvements Draft Recommendations Phase III Outreach Opened Transitway Metroway to Pentagon City Refine Recommendations Present Recommendations
5 TDP Timeline Next steps: Brief Columbia Pike and Crystal City communities Adopt TDP recommendations at July County Board meeting Adjust County s Capital Improvement Plan (CIP) to reflect TDP recommendations 5
6 TDP Goals & Strategies Maximize accessibility to regional and local activity centers Add, expand or realign routes Create easier transfers Maximize transportation options to reduce singleoccupancy-vehicle travel Increase frequency or hours of service Balance different types of service (e.g., circulator, limited-stop) Ensure fiscal stewardship in provision of transit service Reduce service in areas with low transit usage Convert Metrobus routes to ART Meet the needs of underserved populations Use innovative approaches to maintain connections in neighborhoods with low transit usage 6
7 Service Enhancements ( ) 7
8 TDP Recommendations ( ) 8
9 TDP Recommendations ( ) 9
10 TDP Recommendations ( ) 10
11 TDP Recommendations 11
12 TDP: General Fund Subsidy $50,000 Metrobus General Fund Subsidy Need (in $1000s) $45,000 $40,000 $35,000 Route simplification on Columbia Pike Skyline to Crystal City connection Improved frequency on Glebe Rd Extend Columbia Pike Service to Navy Yard $30,000 $25,000 $20,000 Improved frequency on Washington Blvd ART takes over 4B $15,000 $10,000 $5,000 $- FY Existing Service Baseline service expected to increase 3% per year Proposed TDP Service 12
13 TDP: General Fund Subsidy $4,500 $4,000 $3,500 ART General Fund Subsidy Need (in $1000s) ART supplements new Columbia Pike service Convert Metrobus 22 to ART Convert 4B to ART $3,000 $2,500 $2,000 $1,500 New Rosslyn- Shirlington connection New connections: Crystal City Shirlington, Buckingham DHS $1,000 $500 FY19-26: ART expansion funded with savings from take over of Metrobus 22 and 4B $ Existing Service Proposed TDP Service 13
14 TDP: Capital improvements Capital projects to support TDP implementation were included in Manager s Proposed FY17-26 CIP: ART fleet expansion (+20 vehicles over 10 years) New ART heavy maintenance facility (to accommodate expansion) Off-vehicle fare collection Transit signal priority Transitway extension to Pentagon City and Alexandria city line Ballston Metro Station multimodal improvements East Falls Church Metro bus bay expansion Shirlington Bus Station expansion Countywide bus stop, shelter and ADA improvements Other station upgrades Projects to accommodate growth of ART and Metrobus 14
15 TDP: Capital Improvements $100,000 Transit CIP Funding Summary (in $1000s) $90,000 $80,000 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $- FY General Fund Transportation Capital Fund TIF Regional Funds State Funds Federal Funds Other 15
16 Transit Development Plan Methodology 16
17 Understanding the Service Area Projected Population Density (2025) Reviewed demographics to understand likely transit use Transit dependent populations Population densities Poverty levels, disabilities, age, labor force, etc. 17
18 System Assessment Density of Average Weekday Boardings by Stop Current ridership helps us identify where transit is used most Indicator of where transit is needed Corridors with highest concentration of ridership: Columbia Pike Glebe Road Wilson/Clarendon Boulevard Shirlington Bus Station Metro stations 18
19 Service Evaluation Projected Service Gaps from the Flow Analysis Analyzed gaps in service Weekdays: West Arlington to Crystal City-Pentagon City Clarendon to Potomac Yard Off-peak/Weekends: Lee Highway to Ballston Rosslyn to Shirlington Clarendon-Courthouse to Arlington Village & Shirlington Virginia Hospital Center to East Falls Church Nauck to Crystal City- Pentagon City 19
20 Methodology Public Outreach Technical Analysis 3,396 people surveyed Spring 2015 Input on transit usage and needs Analyze existing system & service area 406 people 4 workshops, 5 focus groups, online form Fall 2015 Input on initial findings of technical analysis Draft recommendations 1,008 people 6 pop-up workshops, online form Winter 2016 Input on draft recommendations Present draft final recommendations 20
21 Public Outreach What we heard: Increase how often the bus arrives and off-peak/weekend service Need better connections to key activity centers Draft recommendations: Opposition to changes to ART 53 (Ballston Metro-Old Glebe-East Falls Church- Westover) and ART 62 (Court House Metro-Lorcom Lane-Ballston Metro) Strong support for added weekend service and new direct connections Desire for premium service at all Columbia Pike transit stations On Columbia Pike, reconsider stations recommended for limited-stop service How we applied it: Validated findings from technical analysis Informed development of recommendations for new connections and increased service Refined recommendations to respond to public feedback 21
22 Premium Transit Network Findings, Recommendations & Next Steps 22
23 Columbia Pike Today 15 bus routes travel through Columbia Pike Buses every 2-3 minutes Among the most productive in the County (17,000 daily boardings) High ridership and congestion in the corridor impact ontime bus performance Top origins Fairfax, Arlington Mill, Shirlington, Virginia Square, Rosslyn-Ballston corridor Top destinations: Pentagon, Pentagon City, Courthouse, Crystal City, DC 23
24 Population Employment Crystal City-Pentagon City Today Existing Conditions Metroway August 2014, steady ridership growth Arlington segment of Transitway to Crystal City opened April 2016 Extension of Metroway service to Pentagon City began April 2016 Significant growth forecasted over the next 10 years 24
25 Premium Transit Network Goals & Strategies Increase transit capacity Increased weekday and weekend service More trips, more seats Invest in transit that supports economic development New high-frequency route serves every station along Columbia Pike One-seat ride from Skyline to Pentagon City-Crystal City Improve connectivity to key activity centers New connections to DC s Navy Yard Limited-stop service to Pentagon and DC Offer premium transit service that is fast, frequent, reliable & easy to use Simplified route structure Faster ride time Enhanced amenities for both local and limited-stop service 25
26 Premium Transit Network Service Columbia Pike Transit Stations 26
27 Premium Transit Network Service Columbia Pike Transit Stations 27
28 Premium Transit Network Service 28
29 PrTN Capital Improvement Timeline Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall ART Fleet Expansion Begin new Columbia Pike service Transit signal priority Columbia Pike multimodal Transit stations Off vehicle fare collection Design Feasibility + procurement Construction of Phases 2-6 Coordinated with transit stations Extension to Pentagon City Extension to Alexandria Planning PE/Design Completion in 2022 Design to begin in 2023 Next phase of Transit Stations to be completed in 2019 Transitway extension to Pentagon City to open in 2023 Transitway extension to Four-Mile Run to be timed with Alexandria construction 29
30 Premium Amenities Transit stations Near-level boarding, longer platform, real-time bus arrival information Discussed in detail later in presentation Off-vehicle fare collection WMATA cancelled Next Generation Fare Payment (NEPP) Jurisdictions coordinating on next steps Planning collaborative effort to identify and procure appropriate technology Transit signal priority Scope developed for consultant support Ongoing coordination with WMATA, Alexandria and DC to learn from their experience Branding Coordination with WMATA to begin Fall
31 Dedicated Bus Lanes (Columbia Pike) Reversible/repurposed lanes result in significant traffic impacts at key intersections Traffic causes delays for drivers and buses Express buses get stuck behind local buses Queue jumps are technically feasible but have major right-of-way impacts Bus-only lane approaching signalized intersection must be ~600 feet long (= 1 block) to be effective 31
32 Dedicated Bus Lanes (PrTN) Ongoing traffic simulation exploring improvements along Columbia Pike Testing 3 scenarios Update available in July Pursuing exclusive lanes leading to doorstep of Columbia Pike Transitway extension to Pentagon City Travel time savings benefits service along entire corridor 32
Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018
PROPOSED FY 2019-2028 CAPITAL IMPROVEMENT PLAN (CIP) Pages E-3 to E-145 CCCRC Presentation Thursday, June 14, 2018 in the CIP Continues Arlington s commitment to a transportation system that expands travel
More informationFY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices
FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family
More informationIntegrating Community Development and Transportation Strategies. November 13, 2014
R-B CORRIDOR 1970 R-B CORRIDOR TODAY Integrating Community Development and Transportation Strategies November 13, 2014 The Community Development Transportation Question Can communities support increased
More informationIntroductions John Carten noted that Linda Massaro has resigned from the TAC.
Arlington Transit Advisory Committee Meeting Notes September 11, 2018 7:00 p.m. Ellen M. Bozman Government Center 2100 Clarendon Boulevard Cherry and Dogwood Conference Room TAC Members Present: John Carten
More informationArterial Transitway Corridors Study. Ave
Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing
More informationCHAPTER 3: Service and System Evaluation
CHAPTER 3: Service and System Evaluation Report Prepared by: Contents 3 SERVICE AND SYSTEM EVALUATION... 3-1 3.1 Fixed Route Service Analysis... 3-4 3.1.1 ART Transit Service... 3-4 3.1.2 Metrobus Transit
More informationArterial Transitway Corridors Study
Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half
More informationBRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update
BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationVIRGINIA RAILWAY EXPRESS
PREPARING FOR THE NEXT QUARTER-CENTURY Arlington County Board Work Session June 28, 2017 1 TODAY S PRESENTATION VRE Overview VRE in Arlington County VRE System 2040 Plan Future Vision for Crystal City
More informationFY2006 Budget Board Budget Committee request for information. Board Request: Detailed information on bus route 5A DC-Dulless Airport
Board Request: Detailed information on bus route 5A DC-Dulless Airport Tracking Number: 29 Assigned to Dept/Office: OPER Contact Person: Jim Hughes Metrobus Route 5A was established in December 2000 in
More informationArterial Transitway Corridors Study. Sept. 26, 2011
Arterial Transitway Corridors Study Sept. 26, 2011 Purpose of Study Study 11 urban corridors in Minneapolis, St. Paul and surrounding communities Develop service and facilities plan to improve Transit
More informationEliminate on-street parking where it will allow for a dedicated bus only lane %
Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136
More informationthe Story of the 30s & 70s Bus Lines James Hamre - WMATA
Evaluation of a Service Restructuring: the Story of the 30s & 70s Bus Lines James Hamre - WMATA Metrorail is the second largest rail transit system in the nation 230 million annual riders 780,000 weekday
More informationPresentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN
Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses
More informationDULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion
More informationTRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR
TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR June 2018 This report summarizes the performance of public transportation systems serving the I-66 inside the Beltway corridor in Northern Virginia.
More informationCrystal City Citizen Review Council Meeting. July 10, 2013
Crystal City Citizen Review Council Meeting July 10, 2013 Topics to be covered Overview of Crystal City Transportation Projects Capital Program Investments Regional Coordination 9 Program Overview Crystal
More informationWashington DC Section of ITE Project Briefing
Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need
More informationVISION Long Range Plan Update Board Workshop. February 10, 2016
VISION 2040 Long Range Plan Update Board Workshop February 10, 2016 Vision 2040 Key Milestones UNDERSTAND THE NEED IDENTIFY A RANGE OF OPTIONS EVALUATE COMMUNITY OPTIONS DEFINE PROJECTS & PLANS Vision
More informationSpring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E
Coon Rapids Blaine Spring Lake Park Mounds View rth Oaks In 2011, Metro Transit embarked on the Arterial 494 Minnetonka Maple Grove Plymouth Hopkins Brooklyn Park New Hope Golden Valley Louis Park Edina
More informationSemi-Annual DC Circulator Forum. February 25, 2014
Semi-Annual DC Circulator Forum February 25, 2014 Overview DC Circulator service began in 2005. A major planning effort was undertaken in 2011 which established a long-range plan and goals for the system:
More informationScottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012
Scottsdale Road/Rural Road Alternatives Analysis (AA) Study Arizona ITE/IMSA Spring Conference March 7, 2012 Study Location and Duration Primary Study Corridor (major focus of effort) Rural Road and Scottsdale
More informationI-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016
I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager
More informationShort-Term Transit Ridership and Revenue Forecasting
Short-Term Transit Ridership and Revenue Forecasting presented to The 5 th Transportation Research Board Conference on Innovations in Travel Modeling presented by Cambridge Systematics, Inc. Feng Liu,
More informationCHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes
CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION 2030 Adopted xxx, xx, xxxx Mobility for all Modes Chapter 7, Page 0, Draft version 48 Context and Vision Why Automobiles Alone are not the Answer Because
More informationALTERNATIVES ANALYSIS EXECUTIVE SUMMARY
West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE
More informationAppendix B: Forecasting and Traffic Operations Analysis Framework Document
Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting
More informationCrystal City-Potomac Yard Transitway Extension
FINAL Crystal City-Potomac Yard Transitway Extension PREPARED FOR Department of Environmental Services 2100 Clarendon Boulevard, Suite 900 Arlington, VA, 22201 703.228.3344 PREPARED BY 8300 Boone Boulevard,
More informationTechnical Working Group November 15, 2017
Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationFY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,
FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview
More informationWELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.
WELCOME BUS RAPID TRANSIT PUBLIC MEETING MEETING TIME: 5 p.m. - 8 p.m. Milwaukee County in conjunction with the Federal Transit Administration is hosting today s meeting to give the public an opportunity
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationTransit Workshop with MPO Board
Transit Workshop with MPO Board Overview of Workshop What is a TDP? Historical trends Existing bus service 2028 Recent public outreach Future direction Policy Questions 1 What TDP is Not Not a budget Not
More informationSeattle Transit Master Plan
Seattle Transit Master Plan Seattle City Council Transportation Committee Briefing July 26, 2011 Seattle Department of Transportation In Association with: URS Corporation SVR DKS Associates The Underhill
More informationMETRO RTA TRANSIT MASTER PLAN. May 25-26, 2011
METRO RTA TRANSIT MASTER PLAN May 25-26, 2011 WHAT IS THE TRANSIT MASTER PLAN? A twenty-year plan for METRO RTA What will METRO look like in 2031? 1 TRANSIT TECHNOLOGIES 2 TRANSIT TECHNOLOGIES Transit
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationMetropolitan Council Transportation Committee
Nicollet-Central Transit Alternatives Metropolitan Council Transportation Committee August 2013 Project Purpose (approved by Policy Advisory Committee 10/25/2012) The purpose is to improve transit connectivity,
More informationBID Strategy Group and Stakeholders Meeting. April 17, 2018
BID Strategy Group and Stakeholders Meeting April 17, 2018 Agenda Meeting Objectives Background Short-Term Improvements Long-Term Study Goals Data Review Schedule & Next Steps Open House April 17, 2018
More informationNY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson
NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1 with Creighton Manning Engineering, LLP Logitrans Herb Levinson September 22, 2003 Overview Introduction to the consultant team Goals
More informationPURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5
SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between
More informationWilshire Boulevard Bus Rapid Transit Project
Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies
More informationTransform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies
Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia
More informationProvidence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016
Providence Downtown Transit Connector STAKEHOLDER MEETING #2 Stakeholder Meeting #1 October 24, 2016 February 2017 1 AGENDA 1 DTC Goals and Expectations 2 Street Design Concepts 3 Potential Benefits and
More informationCapital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives
Capital and Strategic Planning Committee Item III - B April 12, 2018 WMATA s Transit-Oriented Development Objectives Page 24 of 76 Washington Metropolitan Area Transit Authority Board Action/Information
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationTRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments
1 INTRODUCTION Maintaining a high quality of life is the essence of this plan for transit and non-motorized transportation in Butte County. Curbing greenhouse gas emissions (GHG) by reducing congestion,
More informationAurora Corridor to E Line
Aurora Corridor to E Line Jack Whisner Transit Planner, Service Development King County Metro Transit Seattle, Washington jack.whisner@kingcounty.gov 206-477-5847 King County Metro Transit Part of general
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationCommunity Task Force November 15, 2017
Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationDevelopment of Arlington County s Marked Crosswalk Guidelines. Jon Lawler, P.E. Design Engineer Arlington County, VA
Development of Arlington County s Marked Crosswalk Guidelines Jon Lawler, P.E. Design Engineer Arlington County, VA April 13, 2015 Transportation System Users Residents Estimated 215,000 in 2014 Lowest
More informationPrince George s County Council Retreat January 5, 2017
Rushern L. Baker, III County Executive Darrell B. Mobley Director Prince George s County Council Retreat January 5, 2017 DPW&T STRUCTURE AND SERVICES Office of Transportation: Fixed route transit service
More informationTRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY
TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY VTA S NEXT NETWORK CONNECT TO BART STATIONS INCREASE RIDERSHIP IMPROVE FAREBOX RECOVERY
More informationPublic Information and Participation Comments
Two public meetings were held in December. The first meeting was December 6, 2011 at Mary Ellen Henderson Middle School and had 36 public attendees. The second meeting was on December 14, 2011 at the Arlington
More informationPRIORITY CORRIDOR NETWORK
METROBUS PRIORITY CORRIDOR NETWORK POLICIES AND STANDARDS Presented to the Riders Advisory Council April 01, 2009 1 Purpose Follow up on Metrobus Priority Corridor Network Plan list of corridors and near-term
More informationKansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15
Kansas City Area Transportation Authority Downtown Transit Improvement Vision 2/11/15 Today s Meetings Downtown Transit Vision Long Term Vision for Downtown Bus Service Priorities for Short Term Implementation
More informationRidership in Virginia by System FY2017
#6C TO: FROM: Chairman McKay and NVTC Commissioners Kate Mattice, Andrew D huyvetter and Nobuhiko Daito DATE: August 30, 2017 SUBJECT: NVTC FY2017 Annual Ridership Report Overall transit ridership in Northern
More informationCrystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update
Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and
More informationCustomer Service and Operations Committee. Board Action Item III-A. February 12, 2015
Customer Service and Operations Committee Board Action Item III-A February 12, 2015 Approval Bus Fleet Management Plan Page 3 of 169 Washington Metropolitan Area Transit Authority Board Action/Information
More informationNAUCK SHIRLINGTON ALEXANDRIA FIGURE 2.22: CIRCULATION MAP 2.24
FIGURE 2.22: CIRCULATION MAP LEGEND DOUGLAS PARK Area Plan Boundary Parks Master Plan Boundary Existing Street Network Existing Sidewalks/Trails Primary Circulation Routes S NAUCK SW AL TE RR EE DD R 4MRV
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 200242 Resolution: Yes No TITLE: MWCOG Strategic Investment Plan & TPB Priorities PRESENTATION
More informationEverett Transit Action Plan. Community Open House November 16, 2015
Everett Transit Action Plan Community Open House Everett has a great location, but getting around the city and into surrounding communities is a problem for all ages Many Voices, One Future: The Everett
More informationDavid Jickling, Public Transportation Director Regional Transportation Commission, Washoe County
David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County Virginia Street Resort corridor connecting University of Nevada, Reno Downtown Truckee River Strip Casinos
More informationEL CAMINO REAL BUS RAPID TRANSIT PROJECT
EL CAMINO REAL BUS RAPID TRANSIT PROJECT Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make
More informationBus Rapid Transit ALTERNATIVES ANALYSIS. Open House
Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study
More informationN. Frederick Street to N. Manchester Street
November 20, 2014 N. Frederick Street to N. Manchester Street Goals and Summary, November 2007 Map, December 2007 Bicycle Element, July 2008 Pedestrian Element, July 2008 Demand and System Management,
More informationPocatello Regional Transit Master Transit Plan Draft Recommendations
Pocatello Regional Transit Master Transit Plan Draft Recommendations Presentation Outline 1. 2. 3. 4. What is the Master Transit Plan? An overview of the study Where Are We Today? Key take-aways from existing
More informationPurpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system
Purpose + Need I-29 NW Barry Road 64/68/72 MAIN STREET Connect: < Strengthen the spine of our regional transportation system Leavenworth Road Parallel Parkway State Avenue 18th Street Expressway Shawnee
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationDurham Region Long Term Transit Strategy
Durham Region Long Term Transit Strategy An adaptive, safe, reliable, frequent, accessible and desirable transit system that shapes and connects Durham Region and beyond in an economically and environmentally
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationJoseph Iacobucci. James Czarnecky, AICP
Chicago s Bus Rapid Transit Program Joseph Iacobucci Chicago Transit Authority Manager, Strategic Planning and Policy Chicago, IL James Czarnecky, AICP AECOM BRT Program Manager Chicago, IL Chicago s Multimodal
More informationPERFORMANCE ANALYSIS of The Draft 2015 CLRP
Item 9 PERFORMANCE ANALYSIS of The Draft CLRP Presentation to the Transportation Planning Board September 16, CLRP Performance Analysis 1 What is the Long-Range Transportation Plan (CLRP)? The CLRP identifies
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More informationEvaluation of Alternatives and Final Screening Results November 20 and 21, 2013
Midtown Corridor Alternatives ti Analysis Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013 Today s Agenda Alternatives background Process update Key evaluation factors cost
More informationGreater Cleveland Regional Transit Authority
Greater Cleveland Regional Transit Authority Transit Priority Corridor Initiatives West 25 th Street /East 105 th /East 93 rd Streets June 20, 2017 Presented to: Planning & Development Committee Greater
More information395 Express Lanes Extension
395 Express Lanes Extension January 2016 Building a network of Express Lanes Project overview Add capacity on I-395 with addition of a third HOV lane and active traffic management Generate guaranteed transit
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationCountywide Transit Corridors Functional Master Plan
Countywide Transit Corridors Functional Master Plan Makeover Montgomery II May 10, 2014 Master Plan Status Begun: August 2011 Planning Board Approved Draft Plan: July 2013 Council Approved Final Plan:
More informationHB 2017 Transit Advisory Committee. June 22, 2018
HB 2017 Transit Advisory Committee June 22, 2018 Meeting Agenda Agenda & Public Comment Timeline Program Appeals: Streetcar, Demand Response, Fares, Electric Bus, Enhanced Transit Corridors Online Survey
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationUpdate of the Master Transportation Plan s (MTP) Bicycle Element
Update of the Master Transportation Plan s (MTP) Bicycle Element April 23, 2019 Background & Context Arlington has an established reputation for advanced bicycle infrastructure and planning Bicycling addresses
More informationABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.
TOPICS Service Planning Overview April 25 Service Increases Muni Forward General Update Haight Street Rapid Project McAllister Street Rapid Project New System Map and Related Bus Stop Changes 2 ABOUT MUNI
More informationUnderstanding Rail and Bus Ridership
Finance Committee Information Item III-A October 12, 2017 Understanding Rail and Bus Ridership Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationPublic Event 1 Community Workshops
Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationWhere We Live and Work Today
San Diego Forward: The 2019-2050 Regional Plan Network Concepts Transportation Committee Item 4 October 19, 2018 Where We Live and Work Today 2018 2 2019 Regional Plan Transportation Committee Item 4 October
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More informationAfeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown
East-West Bus Rapid Transit Feasibility Study Update and Recommended Locally Preferred Alternative (LPA) Summary City of Wauwatosa, Transportation Affairs Committee June 2016 Afeasibility study to evaluate
More informationCraig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018
Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn Mankato City Council Meeting 6/25/2018 What is a Transit Development Plan (TDP)? Engagement Issues Goals, objectives, design guidelines and
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationTECHNICAL MEMORANDUM. Introduction
TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment
More informationEnvironment and Public Works Committee Presentation
Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study
More informationEL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT
Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives
More informationPenPlace SPRC #6. September 27, DRAFT
PenPlace SPRC #6 1 Agenda Site and Project Overview Multiple Transportation Options Traffic Analysis Neighborhood Analysis Street Network Street Sections/Sidewalk Width Pedestrian/Bicycle Circulation Secure
More informationDOT Performance Measurement and Reporting System All Performance Measures
DOT Performance Measurement and Reporting System 2015 All Performance Measures Arlington County Transportation & Development Division 2015 23 Table of Contents Table of Contents All Performance Measures...
More informationTelegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses
Telegraph Avenue Complete Streets DRAFT Recommendations Oakland Public Works Department September 11 and 13, 2014 Open Houses Presentation Overview What are complete streets? What problem are we trying
More informationHighway 217 Corridor Study. Phase I Overview Report
Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems
More information