1 Document History JOB NUMBER: DOCUMENT REF: REVISIONS: Revision Comments By Checked Authorised Date Draft 1 Preliminary issue SA PS 15/5/2007 PDF processed with CutePDF evaluation edition
2 Contents 1 Introduction 1 2 Policy framework 2 Introduction 2 Planning Policy Statement 3 Housing 2 Planning Policy Guidance 13 Transport 3 Smarter Choices Changing the Way We Travel 4 East of England Regional Spatial Strategy 5 Buckinghamshire County Council Structure Plan 5 Adopted Chiltern District Local Plan 6 Design Guidance 7 3 The Local Transport Network and Base Line Conditions 8 Introduction 8 Location and Existing Land Use 8 Local Travel Characteristics 8 Pedestrian and Cycle Accessibility 10 Public Transport 11 The Local Road Network 12 Road Safety 13 4 Development Proposals 14 Introduction 14 Overview 14 Green Travel Plan 14 Pedestrian & Cycle Access 14 Highway Access 14 5 Transport Impact Assessment 16 Introduction 16 Expected Trips 16 Expected Transport Impact 18 6 Conclusions 19 Appendices 20 Appendix: A Site location plan A-1 Appendix: B Local facilties plan B-2
3 Appendix: C Amersham bus map C-3 Appendix: D Accident plot D-4 Appendix: E Proposed masterplan E-5 Appendix: F Proposed site access plan F-6
4 Introduction 1 Introduction 1.1 EAS Transport Planning has been commissioned by Bidwells to prepare a Transport Statement (TS) for the land off Copperkins Lane, Amersham. This TS considers a total of up to 200 dwellings on the development site, allowing for a capacity of up to 50 dwellings per Ha for the 4.1 Ha site. A site location plan is contained in Appendix A. 1.2 The role of a TS as set out in the DCLG/DfT, 2007 Guidance on Transport Assessments is to: set out the transport issues relating to a proposed development site (existing conditions) and details of the development proposals (proposed development). 1.3 This TS is intended to demonstrate that the proposed development: is in line with local, regional and national policy, particularly in terms of sustainability; has accesses and internal layout that meet the appropriate design standards; and is not likely to result in a significant adverse impact on the local transport network. 1.4 This TS is not intended to replace a full Transport Assessment, that would be likely to be required in support of a planning application for such a development. 1.5 The contents this TS are: Section 2 sets out the national, regional and local transport policy relevant to the development proposal and also the development design guidance that will be used; Section 3 describes the existing site and the baseline conditions, including the current travel characteristics of the area; Section 4 describes the development proposals; Section 5 gives an overview of the likely trip generation characteristics of the development and expected impact on the local transport network; and Section 6 contains the conclusions. Copperkins TS draft May 2007 Page 1 Draft Report
5 Policy framework 2 Policy framework Introduction 2.1 This section identifies the current planning policy documents at National, Regional and Local levels that are relevant to the development. The policy documents reviewed include: Planning Policy Statement 3 - Housing Planning Policy Guidance 13 Transport DfT Green Travel Plan Guidance for Residential Development East of England Regional Spatial Strategy Buckinghamshire Structure Plan 2001 to 2016 Adopted Replacement Chilterns District Local Plan 2016 Draft 2.2 The latest design guidance is also reviewed including: IHIE 2002 Home Zone Design Guidelines ; and DfT s Manual for Streets, March A brief description of the above documents and their potential relevance are described below. Planning Policy Statement 3 Housing 2.4 PPS3 (November 2006) sets out the national planning policy framework for delivering the Government s housing objectives. 2.5 In discussing how to deliver high quality housing the considerations relating to transport and layout include that development: is easily accessible and well-connected to public transport and community facilities and services, and is well laid out so that all the space is used efficiently, is safe, accessible and user-friendly. and should; Take a design-led approach to the provision of car-parking space that is well-integrated with a high quality public realm and streets that are pedestrian, cycle and vehicle friendly. 2.6 When identifying suitable locations for development and in support of the Government s objective of creating sustainable communities, Local Planning Authorities should: Ensure that housing is developed in suitable locations which offer a range of community facilities and with good access to jobs, key services and infrastructure. 2.7 Additionally they should take into account: Copperkins TS draft May 2007 Page 2 Draft Report
6 Policy framework Accessibility of proposed development to existing local community facilities, infrastructure and services, including public transport. The location of housing should facilitate the creation of communities of sufficient size and mix to justify the development of, and sustain, community facilities, infrastructure and services. 2.8 It is our view that the development proposals are compliant with PPS3 and satisfy the requirements discussed because the site is located with good access to local facilities by non-car modes, and therefore represents a sustainable location for housing. Planning Policy Guidance 13 Transport 2.9 PPG13 (Transport) was published in March Its objectives are to integrate planning and transport at the national, regional, strategic and local level to: promote more sustainable transport choices for both people and for moving freight; promote accessibility to jobs, shopping, leisure facilities and services by public transport, walking and cycling; and reduce the need to travel, especially by car Paragraph 13 of PPG13 emphasises the use of modes of transport other than the car, namely: seek to reduce car dependence by facilitating more walking and cycling, by improving linkages by public transport between housing, jobs, local services and local amenity Paragraph 33 refers to Information and Communications Technology (ICT) which has the potential to encourage: home working, which has the potential to reduce daily commuting to work and enable some journeys to take place outside the peak periods 2.12 At paragraphs 75, 76 and 77 of PPG13 advice is given on ways of encouraging walking as a mode of transport, these include: the preparation of local walking strategies; review of existing pedestrian routes between key land uses such as schools, town centres and transport interchanges; pay particular attention to the design, location and access arrangements of new developments to help promote walking as a prime means of access; and promote and protect local day to day shops and services which are within easy walking distance of housing At paragraphs 78, 79 and 80 of PPG13 advice is given on ways of encouraging cycling as a mode of transport, these include: preparation of a local cycle strategy; review existing cycle routes including those to transport interchanges; and Copperkins TS draft May 2007 Page 3 Draft Report
7 Policy framework influence the design, location and access arrangements to ensure it promotes cycling The advice given in PPG13 is consistent with that given in PPS3 and additionally encourages local planning authorities to give greater consideration to walking, cycling and public transport and use of ICT It is our view that the development proposals are compliant with PPG13 and satisfy the requirements discussed because the site is located within walking and cycling distance to Amersham town centre and all its facilities including the rail station. Therefore there is the opportunity to reduce the car trips especially for short journeys Furthermore, as section 3 will demonstrate, Amersham has a relatively high proportion of home workers. The development proposals will encourage home working through provision of live-work units. Smarter Choices Changing the Way We Travel 2.17 In 2005 the DfT published guidance on techniques aimed at influencing the way people travel. This guidance includes evidence based documentation of how choices influence travel and also guidance, including Making Residential Travel Plans Work: Good practice guidelines for new development (DfT September 2005) The smarter choices document includes a chapter on teleworking which concludes that for the UK: the net effect, per teleworker, was 12.3 miles saved per day (an overall reduction in commuting mileage of approximately 75%) (National Opinion Polls Survey of 1,600 internet users: Section ) Other studies suggest a saving for teleworkers of between 48 and 77% in mileage between teleworking and non-teleworking days and an overall saving of up to 19% comparing teleworkers and nonteleworkers, taking into account days when teleworkers work in the office The DfT guidance Making Residential Travel Plans Work: Good practice guidelines for new development states that: Travel planning for residential development has potential to help achieve more sustainable communities by improving their accessibility. New housing development is normally characterized by high car trip generation. However, better choices about the location and density of new housing, combined with the increased use of residential travel plans, should deliver a real impact on travel patterns and aid progress towards sustainable transport and land use objectives. and Residential travel plans are likely to achieve the greatest impacts in relation to larger residential developments (i.e. over 100 dwellings) 2.21 The proposed development will include a travel plan that will include a range of appropriate measures that are covered in more detail in section 4 below, including measures to help promote teleworking. Copperkins TS draft May 2007 Page 4 Draft Report
8 Policy framework East of England Regional Spatial Strategy 2.22 The draft Regional Spatial Strategy for the East of England (RSS) is comprised of three documents which cover the different areas of the East of England. The draft RSS has been subject to an examination in public, following which in June 2006 the panel published its recommendations Chapter 8 of the draft RSS contains the Regional Transport Strategy (RTS). There are six objectives of the RTS: improve opportunities for all to access jobs, services and leisure/tourist facilities enable infrastructure programmes and transport service provision to support both existing development (addressing problems of congestion) and that proposed in the spatial strategy (economic regeneration needs and further housing growth) reduce the need to travel reduce the transport intensity of economic activity, including freight minimise the environmental impact of transport provision and travel, protecting and enhancing the natural, built and historic environment improve safety and security The RTS expects that these objectives will be achieved by: widening travel choice: increasing and promoting opportunities for travel by means other than the private car, particularly walking, cycling and public transport, improving seamless travel through the provision of quality interchange facilities and raising travel awareness; and stimulating the efficient use of the existing transport infrastructure by efficiently maintaining and managing the existing road, rail, port and airport infrastructure The development proposals will help achieve these objectives by being suitably located to increase opportunities for travel other than the private car, and reducing the need to travel by car. Buckinghamshire County Council Structure Plan 2.26 The current adopted Structure Plan, which covers the period, will remain relevant for at least until 2007, after which time the new Regional Spatial Strategy (RSS) for the South East is expected to be in place The current Structure Plan was adopted by the County Council in March Its main elements relating to transport and applicable here are as follows: A close correlation between new homes, jobs and community facilities Concentration of most new urban development at Milton Keynes City, Aylesbury Town and in the High Wycombe area A general reduction in trip lengths and the need to travel as a result of the above, both of which will help to counter global warming, save energy and reduce pollution Copperkins TS draft May 2007 Page 5 Draft Report
9 Policy framework An integrated approach to transport planning, with an increasing shift towards more energyefficient and environment-friendly modes of transport than private cars The maintenance of a buoyant local economy, with new employment-generating development in appropriate locations Policies to safeguard and improve the vitality, viability and diversity of town centres Positive management of urban fringe areas to improve their environmental and amenity value 2.28 The development proposals will help achieve the transport related objectives by being suitably located to increase opportunities for travel other than the private car, and reducing the need to travel by car. Adopted Chiltern District Local Plan 2.29 The Chiltern District Local Plan was adopted in 1997 and including Adopted Alterations The Local Plan contains the following transport policies that are relevant to the proposed development: POLICY TR1: All major development and, as far as is practicable, all other development should be located in areas which are served by public transport. Where development proposals are acceptable in accordance with this Policy, other policies in this Local Plan should also be complied with; POLICY TR2: With regard to the highway aspects of planning applications, proposed development should accord with the following if planning permission is to be granted: 1. Satisfactory access onto the existing highway should be provided. Wherever possible, access should be taken from the lowest category of road appropriate development. In general, access will not be permitted the primary road network, or routes designated as more than local importance". 2. The highway network in the vicinity of the development should have the capacity to accept the additional traffic generated by that development without significantly exacerbating any existing overloading or other traffic problems. 3. Traffic of excessive volume, size or weight will not be accepted on unsuitable roads, including rural lanes conservation areas or residential areas. 4. Standards of road safety for all users should, at minimum, maintained and where appropriate, improved. POLICY TR3: The highway access and layout arrangements of proposed developments should be in accordance with the Residential Road Layout Standards adopted by Buckinghamshire County Council and current policy guidance from the Department of the Environment, Transport and the Regions, or such other documents as may replace them. Off-site highway improvements may be required in some circumstances to permit development proposals to be implemented satisfactorily. In these circumstances developers will be expected to enter into an appropriate planning obligation with the local highway authority to contribute towards the cost of any necessary works. Copperkins TS draft May 2007 Page 6 Draft Report
10 Policy framework 2.30 The development proposals will help achieve policy TR1 by being suitably located to increase opportunities for travel other than the private car, and reducing the need to travel by car. Policies TR2 and TR3 are addressed through provision on suitable access to the development proposals and internal streets designed in accordance with the latest design guidance including IHIE 2002 Home Zone Design Guidelines and the DfT s Manual for Streets. Design Guidance 2.31 Current relevant national design guidance is taken from the IHIE 2002 Home Zone Design Guidelines and the DfT s Manual for Streets Home Zone guidance uses inclusive design principles: encouraging pedestrian and cyclist movements and improving the overall community by providing more shared surfaces, and restricting vehicle speeds. The layout of the streets should be designed with the perception of motorist s in mind, to establish an informal priority to other road users and provide a safer more inclusive environment The Manual for Streets (MfS) reinforces these principles by bringing together existing guidance with new research and case studies to identify the role of streets in providing sustainable, inclusive developments; and provide a single source of guidance for the layout /access of new developments, replacing existing Design Bulletin 32 guidance. The aims of MfS are to create streets that: help to build and strengthen the communities they serve; meet the needs of all users, by embodying the principles of inclusive design (see below); form part of a well-connected network; are attractive and have their own distinctive identity; are cost-effective to construct and maintain; and are safe Inclusive design is one of the major thrusts of the document, and is described as: places people at the heart of the design process; acknowledges diversity and difference; offers choice where a single solution cannot accommodate all users; provides for flexibility in use; and provides buildings and environments that are convenient and enjoyable to use for everyone The development proposals will be designed to these principles, and so will comply with Chilterns Local Plan Policy as well as national policy. Copperkins TS draft May 2007 Page 7 Draft Report
11 The Local Transport Network and Base Line Conditions 3 The Local Transport Network and Base Line Conditions Introduction 3.1 This section describes the travel characteristics of the area local to the proposed development site, and sets out the base line conditions prior to any development or any proposed transport improvements associated with the development. Location and Existing Land Use 3.2 A location plan of the site is included at Appendix A. 3.3 The development site is bordered to the north by open fields, to the east by an area of woodland and a small residential estate, to the south by Copperkins Lane, and to the west by the Mayhall Farm access road which provides access to about six properties built around the original farm buildings. 3.4 The site is currently open agricultural land and forms part of a larger farm site surrounding the Mayhall Farm dwellings. Local Travel Characteristics 3.5 Table 3.1 compares the travel characteristics for the ward of Chesham Bois and Weedon Hill, which includes the site and an area north of Amersham town centre, with data for the whole of England. 3.6 This data is taken from the 2001 census and is for travel to work only, which represents about 15-20% of all journeys. The table also shows economically active people only and so excludes retired people, students and all others not in full time employment. However, the data does give a useful indication of the relative sustainability of the area in terms of potential modes of travel to work. Copperkins TS draft May 2007 Page 8 Draft Report
12 The Local Transport Network and Base Line Conditions Chesham Bois and Weedon Hill Count Chesham Bois and Weedon Hill % England Count England % All People (Persons)1 1, % 22,376, % Works mainly at or from home (Persons) % 2,055,224 9% Underground, metro, light rail or tram (Persons)1 11 1% 706,080 3% Train (Persons)1 22 2% 945,100 4% Bus, minibus or coach (Persons)1 20 2% 1,682,127 8% Taxi or minicab (Persons)1 4 0% 115,495 1% Driving a car or van (Persons) % 12,308,844 55% Passenger in a car or van (Persons)1 56 5% 1,368,226 6% Motorcycle, scooter or moped (Persons)1 3 0% 248,824 1% Bicycle (Persons)1 15 1% 632,231 3% On foot (Persons) % 2,231,539 10% Other (Persons)1 3 0% 82,430 0% 1 National Statistics Table 3.1: 2001 Census, Journey to Work Data 3.7 It can be seen in the table above that the proportion of commuting car drivers is actually 3.2% below the national average. This is largely due to a high proportion of the residents working from home within the ward compared to the country as a whole. Commuter journeys by foot or cycle are slightly lower than the national average totalling 11% of all commuter journeys compared to 13% nationally. Additionally journeys by public transport are significantly lower with bus, train/tube journeys mode share of 5% compared to 14% nationally. 3.8 If the figures in table 3.1 are rebased to exclude those people working at home, then the mode shares shown in table 3.2 would apply. These figures probably reflect the relatively high car ownership and relatively low public transport penetration for the area. 3.9 In summary, the proportion of people who commute by car to work slightly below the national average because relatively high numbers of people work from home. Of those who do not work from home, the proportion who drive is significantly higher than the national average, with relatively few people commuting by public transport. Copperkins TS draft May 2007 Page 9 Draft Report
13 The Local Transport Network and Base Line Conditions Chesham Bois and Weedon Hill % England % All People (Persons) excluding Home Workers 100% 100% Underground, metro, light rail or tram (Persons)1 1% 3% Train (Persons)1 3% 4% Bus, minibus or coach (Persons)1 3% 9% Taxi or minicab (Persons)1 0% 1% Driving a car or van (Persons)1 71% 60% Passenger in a car or van (Persons)1 7% 7% Motorcycle, scooter or moped (Persons)1 0% 1% Bicycle (Persons)1 1% 3% On foot (Persons)1 14% 11% Other (Persons)1 0% 0% Table 3.2: Mode of Journey to Work Excluding Home-Workers Pedestrian and Cycle Accessibility 3.10 Pedestrian and cycle access to and from the development site to the local footway/cycleway/road network is via Copperkins Lane. However the north of the site is bordered by a public footpath which provides access to fields to the north of the site (and access to the south of Chesham) and to Amersham Road via an unpaved footway and Mayhall Lane There are currently no formal footways/cycleways adjacent to the site, with footways commencing approximately 200m from the centre of the site boundary on the opposite side of the road, adjacent to Deep Acres. As part of the development proposals a new footway/cycleway is proposed along Copperkins Lane to link into the existing footway via a proposed crossing point and new length of footway PPG13 states that walking is the most important mode of travel at a local level and suggests that a distance of 2km walking provides the greatest potential to replace short car trips; and that cycle journeys of 5km or under play an equally important role in replacing short car trips, and also linking to longer public transport trips Sketch SK02 indicating a 2km walk isochrone around the development and the location of the town centre facilities is included at Appendix B.The sketch demonstrates that the majority of the Amersham s town centre amenities are within the 2km isochrone The main shopping facilities in Amersham new town are located along Sycamore Road which is within a 1.6km or 20 minute walk from the development site. There are a wide range of shopping facilities within Copperkins TS draft May 2007 Page 10 Draft Report
14 The Local Transport Network and Base Line Conditions this area as expected for a town of this size including most types of retail outlets. Also within the 2km boundary within the town centre area is a doctor s surgery, dentists and vetinary surgery, as well as access to local bus services and the railway station discussed in more detail in the Public Transport section below There are a number of schools accessible by foot and cycle from the development site. Within the 2km walk isochrone are three primary schools: Our Lady s Catholic Primary School, Elangeni School, Chesham Bois Church of England Combined School; and one senior school: Dr Challoners Grammer (Boys) School. There are an additional five secondary schools accessible well within the 5km threshold for cycling including: The Amersham School, Chesham High School, Chesham Park Community College and Dr Challoners Grammer (Girls) School In summary the site is within walking or cycling distance of a wide range of facilities that would be accessed on a day-to-day basis, making the site accessible for non-car users and providing residents with a good alternative to short car trips. Public Transport 3.17 There are currently a limited number of buses serving Copperkins Lane. However Amersham Road which is within 800m or less than a10 minute walk from the site is on one of the main bus corridors between Amersham and the surrounding towns and villages. A map of bus services in the Amersham area is contained in Appendix C The bus services serving Amersham Road are summarised below: Main Destinations Frequency 52 Hemel Hempstead Chesham Amersham Every Hour Mon - Sat 59 Chesham Ballinger Chesham Limited service 60 Chesham Hyde Heath Amersham Chesham Tuesday / Thursday only 336 Watford Amersham Chesham (via Rickmansworth Chorleywood Little Chalfont) Every Hour Mon - Sat 362 High Wycombe Amersham Chesham Every Half Hour (good commuter service) 374 Little Chalfont Amersham Beaconsfield Coleshill Amersham Limited Daytime Service Table 3.3: Bus Services 3.19 It can be seen that three of the six bus services serving the area are regular services, with up to four buses every hour serving both Amersham and Chesham. Wider destinations accessible by bus include Hemel Hempstead, Watford, Richmansworth, Chorleywood, Little Chalfont, Beaconsfield and High Wycombe Amersham railway station is owned and operated by Transport for London (TfL), and is situated on the Copperkins TS draft May 2007 Page 11 Draft Report
15 The Local Transport Network and Base Line Conditions Metropolitan line. It is served by the following Train Operating Companies (TOCs) and routes: Chiltern Railways (Aylesbury to London Marylebone); London Underground - Metropolitan line (Amersham to Aldgate); 3.21 Amersham rail station/tube station is accessible from the development site in under a 2km walk / cycle or via bus service 336 & 362. The rail station provides services from Amersham to Baker Street approximately every mins and from services between Aylesbury and Marylebone (via Amersham) every half an hour; with services extending to Aldgate running approximately every 17 mins in the peak hours Stops on the Amersham line include : Aylesbury, Stoke Mandeville, Wendover, Great Missenden, Amersham, Chalfont & Latimer, Chorleywood, Rickmansworth, Moor Park, Harrow-on-the-Hill, Wembley Park, Finchley Road, Baker Street, Marylebone (extended service - Great Portland Street, Euston Square, King s Cross St. Pancras, Farringdon, Barbican, Moorgate, Liverpool Street, Aldgate) The Amersham tube station is the eastern limit of the Metropolitan line into central London. Services run at regular intervals of approximately 10 minutes during the day. The Local Road Network 3.24 Traffic counts have been provided by BCC / Jacobs at the junction of Weedon Hill / Copperkins Lane / Fullers Hill, carried out on 25 April, The full traffic survey results are contained in Appendix F, a summary is included in table 3.4 below: 2006 Traffic Count Data - All motor vehicles Fullers Hill Copperkins Lane Weedon Hill Left Ahead In Out Way Left Right In Out Way Ahead Right In Out Way 06:00-07: :00-08: :00-09: :00-10: :00-11: :00-12: :00-13: :00-14: :00-15: :00-16: :00-17: :00-18: :00-19: :00-20: :00-21: :00-22: hr Est AADT Total In Table 3.4: Buckinghamshire 2006 Traffic Count Data Copperkins TS draft May 2007 Page 12 Draft Report
16 The Local Transport Network and Base Line Conditions 3.25 The results of the count show that the Weedon Hill / Copperkins Lane / Fullers Hill junction is not heavily trafficked in either the morning or evening peak hours, and that traffic flows out of Amersham in the morning peak is substantially lower than traffic into Amersham (over three times the level of traffic) The results therefore confirm the expectation that Amersham performs as a local centre for employment, retail and education among other uses to the local area; and that many trips are contained within Amersham. As the development site is well located to access the facilities within Amersham town centre the number of trips between the development and Amersham town centre would be expected to reflect this pattern of traffic movements; and as discussed in the pedestrian and cycle accessibility chapter a large number of these movements are expected to be by non car modes Based on the level of traffic identified above it is not perceived that that there will be any traffic issues associated with the access proposals, described in more detail in the next chapter. Road Safety 3.28 Accident data has been provided by BCC for the 5 year period between the dates 01/01/2001 and 31/12/2005. A copy of the accident plot and data is contained in Appendix D The accident data identified 7 accidents had taken place between the junction of Copperkins Road / Weedon Lane and Copperkins Lane / Chesham Road, with only 3 accidents in close proximity of the development boundary. Of the 7 accidents 5 were slight and 1 serious, one of the accidents did not have a description available The serious accident was caused by a car veering off a relatively straight part of the road into oncoming traffic. The slight accidents included a shunting accident at the junction of Copperkins Lane / Chesham Road, one vehicle losing control on the left hand bend to the west of the site boundary, two accidents as a result of ice, an accident caused by a car turning into a private drive and an accident on entry to Copperkins Lane at the junction with Weedon Lane These accidents do not represent an existing road safety issue, and do not appear indicate any specific problems that would need to be overcome. Copperkins TS draft May 2007 Page 13 Draft Report
17 Development Proposals 4 Development Proposals Introduction 4.1 This section discusses the development proposals based upon a proposed 200 dwelling development. Overview 4.2 The proposed 200 dwelling development consists of a mix of residential units for both private and affordable housing. Upto 20% or 40 of the dwellings will be made suitable as live-work units, reflecting the high proportion of residents in the area (27%) who work from home. A convenience store will also be considered as part of the development. 4.3 The development will be designed according to the inclusive design principles set out in the DfT 2007 Manual for Streets and the IHIE 2002 Home Zone Design Guidelines. 4.4 The development mix is shown below and the proposed master plan is contained in Appendix E. The proposed site access plan is contained in Appendix F. INSERT PROPOSED DEVELOPMENT MIX AND COMMENTS Green Travel Plan 4.5 In line with the latest DfT guidance, a Green Travel Plan will be prepared for the proposed development. Measures that will be considered will range from: site design, that will be based on a home zone principle; improvements to off-site access including the proposed pedestrian facilities; and facilities that reduce the need to travel including a convenience store, live/work accommodation, broadband provision and a telecentre. Pedestrian & Cycle Access 4.6 Pedestrian access to and from the development site will be via Copperkins Lane. As there is currently no provision for pedestrians and cyclists adjacent to the development site, a 3m shared footway / cycleway is proposed on the development side of Copperkins Lane. It is proposed that a new crossing point will be provided to link pedestrians into the existing footway 200m southeast of the site and that cyclists will be guided on to the road and the cycleway terminated at the crossing point. Highway Access 4.7 To provide access to the site it is proposed that a ghost island junction is provided on Copperkins Lane, Copperkins TS draft May 2007 Page 14 Draft Report
18 Development Proposals this could be achieved within the existing 40mph zone, although a reduction in the speed limit may be considered. The ghost island junction provides for right turning vehicles into the site and will minimise any potential delay along Copperkins Lane. 4.8 A secondary access could be provided if required, in the form of a simple give way junction with 6m radii, however this could be downgraded to an emergency access only if required. 4.9 The access proposals are illustrated in Appendix F. The ghost island junction and give way junction have been designed to meet the design criteria for a 40mph road set out in TD 42/95 Geometric Design of Major/Minor Priority Junctions. Copperkins TS draft May 2007 Page 15 Draft Report
19 Transport Impact Assessment 5 Transport Impact Assessment Introduction 5.1 This section estimates the expected numbers of person trips that will be generated by the development and briefly describes the expected impact of these trips on the local transport network. 5.2 As recommended by the DfT guidance on Transport Assessment, a first principles approach has been used based upon the local travel characteristics described in section 3. Expected Trips 5.3 Based upon data from the National Travel Survey and elsewhere, a typical household will generate approximately 10 person trips per day. Of these, typically 10%, or 1 person trip per household will occur in each of the peak hours on a typical weekday. 5.4 Given the expected accessibility of the development site, including the provision of a footpath linking the site to Amersham centre, it is expected that the travel profile for a typical development in the proposed location will be similar to that of Chesham Bois and Weedon Hill within which the development lies. 5.5 Using the commuting to work mode share figures from Table 3.2 and assuming typically 1 person trip per dwelling in the peak hour, would give the peak hour trips shown in table 5.1. Mode Peak Hour Trip Rate Peak Hour Trips for 200 Dwellings Excluding Home Workers Including Home Workers* Excluding Home Workers Including Home Workers Car Driver Car Passenger Public Transport Walk Cycle Total *note includes an allowance to account for non-commuter trips made by home workers Table 5.1: Estimated Peak Hour Person Trips for 200 dwellings; with and without home working 5.6 Note that if home workers made no trips at all in the peak hour, then the peak hour trip rate would be 0.73 when including home workers. The trip rate of 0.81 reflects the fact that the 27% home workers will contribute a further 9% to total trips (a reduction in commuter trips of 66% for teleworkers compared Copperkins TS draft May 2007 Page 16 Draft Report
20 Transport Impact Assessment to the 75% reduction in commuter trips document ted in section 2 above). 5.7 In order to validate the potential number of vehicle trips that could be generated from the development, car trip rates for mixed private housing have also been derived from the TRICS travel database. These trip rates are for developments of dwellings within the South and Central England. AVERAGE TRIP RATES 85 th PERCENTILE TRIP RATES Arr. Dep. Total Arr. Dep. Total AM Peak PM Peak Table 5.2: Mixed Housing Trip Rates Derived From TRICS 5.8 The total peak hour car trip-rates vary between 0.56 and 0.74 for the average and 85 percentile values. This compares to the range of peak car trip-rates from the census data of 0.57 and Clearly there is a good correspondence between the two. 5.9 The trip rates from table 5.1 including Home Workers are expected to be the most realistic values and they compare well with the average car TRICS data for similar development sites. Table 4.3 below shows the trips for all modes using the home-worker based trip rates from table 5.1, but with morning and evening arrival and departure proportions based upon table 5.2 average trip rates. Expected AM Peak Trips Expected PM Peak Trips Arr. Dep. Total Arr. Dep. Total Car Driver Car Passenger Public Transport Walk Cycle Total Table 5.3: Estimated Peak Hour Person Trips 5.10 Based upon the site s location and the anticipated high numbers of home workers who will be attracted by the proportion of live-work units, the site is expected to be relatively sustainable. It is expected to Copperkins TS draft May 2007 Page 17 Draft Report
21 Transport Impact Assessment generate relatively low peak-hour person-trips, and relatively low peak-hour car trips. The development is estimated to generate 162 peak-hour person-trips, of which 48 will be non-car based and 114 will be vehicle trips. Expected Transport Impact 5.11 The expected total vehicle trips generated by the development of 114 in the peak hours suggest that a home zone layout based upon the IHIE 2002 Home Zone Design Guidelines would be suitable for the complete development if either one or two access points are provided, as long as the development layout ensures that all streets within the home zone have a maximum flow below 100 vehicles per hour The expected public transport users will add to the viability of existing services in the area and will therefore provide a positive local impact. Improved pedestrian facilities will provide benefits for all local residents The observed two-way traffic flows for Copperkins Lane to the north of the development site, were 438 in the morning peak hour and 434 in the evening peak hour The expected increase in traffic volumes on Copperkins Lane of 114 would give rise to a third increase in traffic. However given the existing low level of traffic on Copperkins Lane the additional traffic is not expected to generate significant queues or delays or other capacity problems at the proposed access or local junctions. Copperkins TS draft May 2007 Page 18 Draft Report
22 Conclusions 6 Conclusions 6.1 The proposed development of 200 dwellings will be designed according to the latest DfT guidelines, based on a home zone principle. The development could include upto 40 live-work units, a convenience store, broad band provision and a telecentre. The proportion of live-work units proposed reflects the existing 27% home-workers for the area. A Green Travel Plan will be put in place to further encourage sustainable travel in accordance with DfT best practice. 6.2 Pedestrian access to and from the development site will be via Copperkins Lane. A 3m shared footway / cycleway is proposed on the development side of the Copperkins Lane, with a new crossing point. This footway/cycleway will benefit all local users. Increased pedestrian, cyclists and bus users in the area will benefit all. 6.3 The site has been shown to be within walking or cycling distance of a wide range of facilities that would be accessed on a day-to-day basis, making the site accessible for non-car users and providing residents with a good alternative to short car trips. 6.4 There are three regular bus services serving Amersham Road within 800m of the site, with up to four buses every hour serving both Amersham and Chesham. Wider destinations accessible by bus include Hemel Hempstead, Watford, Richmansworth, Chorleywood, Little Chalfont, Beaconsfield and High Wycombe. 6.5 Amersham railway station which is within 2km of the development site is served by, Chiltern Railways (Aylesbury to London Marylebone) with services every 10-20mins, and London Underground Metropolitan line (Amersham to Aldgate) with services every 10mins. These rail services provide an important role for commuters from Amersham. 6.6 Given the proposed location in relation to Amersham and its facilities, the proposed development mix and the Green Travel Plan, the development proposals are relatively sustainable and in line with local and national policy. 6.7 To provide vehicle access to the site it is proposed that a ghost island junction is provided on Copperkins Lane, with the potential for a secondary simple junction access also on Copperkins Lane. 6.8 There is no existing accident risk associated with Copperkins Lane. The proposed vehicle accesses have been designed to the appropriate standards. Therefore vehicular access is safe and feasible. 6.9 The potential increase in traffic volumes on Copperkins Lane is up to one third of existing levels. However as there is currently a low level of traffic on Copperkins Lane, there is not expected to be a significant reduction in capacity or increase in delays on the local road network. Copperkins TS draft May 2007 Page 19 Draft Report
23 Conclusions Appendices Appendix: A Site location plan Appendix: B Local facilties plan Appendix: C Amersham bus map Appendix: D Accident plot Appendix: E Proposed masterplan Appendix: F Proposed site access plan Copperkins TS draft May 2007 Page 20 Draft Report
24 Appendices Appendix: A SITE LOCATION PLAN TS draft May 2007 Page A-1 Draft Report
25
26 Appendices Appendix: B LOCAL FACILTIES PLAN TS draft May 2007 Page B-2 Draft Report
27
28 Appendices Appendix: C AMERSHAM BUS MAP TS draft May 2007 Page C-3 Draft Report
29 Appendices Appendix: D ACCIDENT PLOT TS draft May 2007 Page D-4 Draft Report
30 Appendices Appendix: E PROPOSED MASTERPLAN TS draft May 2007 Page E-5 Draft Report
31 Appendices Appendix: F PROPOSED SITE ACCESS PLAN TS draft May 2007 Page F-6 Draft Report
32
Document History. PDF processed with CutePDF evaluation edition JOB NUMBER: DOCUMENT REF: REVISIONS:
Document History JOB NUMBER: DOCUMENT REF: REVISIONS: Revision Comments By Checked Authorised Date Draft 1 Preliminary issue SA PS 15/5/2007 Final Client Issue PS SA PS 24/9/07 PDF processed with CutePDF
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More information21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE
21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel
More information9. Parking Supporting Statement
9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits
More informationLiving Streets response to the Draft London Plan
Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London
More informationAPPELLANT S STATEMENT OF CASE
TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT
More informationTransport Assessment Haine Road Ramsgate CT12 5ET
Haine Road Ramsgate CT12 5ET September 2016 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk This report has been prepared by in accordance with the instructions of
More informationReport to Cabinet. 18 May 2016
Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment
More informationPhone: Ref No: 06/2018/0884
Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018
More informationDeveloping a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council
Developing a Birmingham Transport Space Allocation policy David Harris Transport Policy Manager Economy Directorate Birmingham City Council Birmingham s Sustainable Urban Mobility Plan Birmingham Connected
More informationMarch Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016
Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local
More informationNorth West Non-Technical Summary of the Transport Assessment September 2011
North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North
More informationAdditional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne
Ashbourne Strategic Policies SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County Development Plan as follows: i) The
More informationA future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network
Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely
More informationWalking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland
Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints
More informationDouglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013
Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationDRAFT for a State Policy for Healthy Spaces and Places
DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationBristol City Council has produced a draft Bristol Transport Strategy document.
Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have
More informationLaunceston's Transport Futures. Greater travel options for the people of Launceston
Launceston's Transport Futures Greater travel options for the people of Launceston Final Draft 13 Jan 2014 1 Page Number Executive summary 3 What is Transport Futures? 4 Vision 6 Economy, access and liveability
More informationAppendix N(b): Portishead Station Outline Travel Plan
Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple
More information1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,
1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationDetermining bicycle infrastructure preferences A case study of Dublin
*Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,
More informationANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025
ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.
More informationThis objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.
Walking for life The Norwegian Walking Strategy Guro Berge Norwegian public Roads Administration "Walking for life" is the slogan for the National Walking Strategy that is now being formulated in Norway.
More informationTravel Plan Monitoring Report. Bourton View, Wellingborough - Residential
Travel Plan Monitoring Report Bourton View, Wellingborough - Residential Prepared by: Developer Eyes Property and Estate Management, Broughton Grange Business Centre, Headlands, Kettering, Northants, NN15
More information94-98 St Albans Road. Sustainable Transport Strategy St Albans Road November 2018
94-98 St Albans Road Sustainable Transport Strategy 94-98 St Albans Road November 2018 Well-connected sustainable location Birmingham 70 mins Average 2 trains per hour To Aylesbury and Hemel Hempstead
More informationTransportation Consultants. Construction Consultants PROPOSED RESIDENTIAL DEVELOPMENT ON LAND AT WILBURTON ROAD, HADDENHAM TRANSPORT ASSESSMENT
PROPOSED RESIDENTIAL DEVELOPMENT ON LAND AT WILBURTON ROAD, HADDENHAM TRANSPORT ASSESSMENT Client: Gladman Developments Ltd February 2014 Transportation Consultants Woolstone Centre, 1-2 Mill Lane, Woolstone,
More informationChapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails
Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique
More information4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT
4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 Registered Company Address: Mansion House
More informationActive Travel Strategy Dumfries and Galloway
Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel
More informationTRANSPORT AND MOVEMENT
TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationAdditional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne
Ashbourne Strategic Policies SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County Development Plan as follows: i) The
More information21/02/2018. How Far is it Acceptable to Walk? Introduction. How Far is it Acceptable to Walk?
21/2/218 Introduction Walking is an important mode of travel. How far people walk is factor in: Accessibility/ Sustainability. Allocating land in Local Plans. Determining planning applications. Previous
More informationGD 0043/18 ACTIVE TRAVEL STRATEGY
GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationRoads and public rights of way
Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:
More informationJoint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010
Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationE4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign
E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon
More informationWicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy
Chomairle Chontae Chill Mhantáin Adopted by Wicklow County Council on the 11th of June, 2012 Contents Section Page 1. Introduction 3 2. Legislation 3 3. Guidance Documentation 3 4. Policy Objectives &
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationWarfield Neighbourhood Plan: 4.4 Infrastructure
Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy
More informationYour views are important. Please fill in a form before you leave. Or alternatively
Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people
More informationChapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London
Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which
More informationSandwell General Hospital Travel Plan 2014
Sandwell General Hospital Travel Plan 2014 Travel Plan Survey Dated 24 th June 2013 Travel plan finalised March 2014 Prepared by Michael Raynor, JMP Consultants Ltd Site Address Lyndon, West Bromwich,
More informationBELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development
BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality
More informationENFIELD TOWN THE REVISED DESIGN
TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationDesign Workshops Summary of all Feedback January 2017
Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000
More informationEXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY
EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing
More information1 Road and HGV danger in London. Hannah White, Freight & Fleet Programme Manager November 2017
1 Road and HGV danger in London Hannah White, Freight & Fleet Programme Manager November 2017 2 London and its transport networks London: 8.6m residents + 30m visitors 30m journeys per day 6.3m by bus
More informationABERDEEN: CITY OF THE FUTURE
ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010
More informationPERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK
PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation
More informationFinal Plan 20 December 2016
Final Plan 20 December 2016 Introduction Aims of the Travel Plan How do we travel? Understanding travel behaviours? The University Master Plan and its implications Galway City sustainable transport policies
More informationStanding Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements
POLICY REPORT Report Date: April 23, 2018 Contact: Lon LaClaire Contact No.: 604.873.7722 RTS No.: 9944 VanRIMS No.: 08-2000-20 Meeting Date: May 16, 2018 TO: FROM: SUBJECT: Standing Committee on Policy
More informationHarriet Fraser Traffic Engineering & Transportation Planning
Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668
More informationLondon Cycle Network Annual Report 2000
London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway
More informationHAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY
HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy
More informationATTACHMENT 4 - TDM Checklist. TDM Checklist Overview
ATTACHMENT 4 - TDM Checklist TDM Checklist Overview The proposed checklist rates developments on the degree to which they are TDM and transit supportive. Points are assigned based on the level of transit
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationTravel Plan Monitoring Report. Buttercross Park, Whittlesey - Residential
Travel Plan Monitoring Report Buttercross Park, Whittlesey - Residential Prepared by: Developer Eyes Property and Estate Management Limited Headlands, Kettering, Northants NN15 6XA Company Registration
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationActive travel and economic performance: A What Works review of evidence from cycling and walking schemes
1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel
More informationIMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING
IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE
More informationSection 2 Strategic Alignment. Contents
Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...
More informationPIMMS CAPITAL Import Visit 2012 Ostrava Czech Republic 17 th January 2012
PIMMS CAPITAL Import Visit 2012 Ostrava Czech Republic 17 th January 2012 The Limerick Experience Bus Priority Corridors/cycle Lanes/ITS Vincent Murray, Senior Engineer Limerick City Council PIMMS CAPITAL
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan
More informationRIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS
TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential
More informationHigh frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;
Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable
More informationYork Scarborough Bridge Economic Appraisal Update Technical Note
York Scarborough Bridge Economic Appraisal Update Technical Note Specification No. 1 Client name West Yorkshire Combined Authority Client reference M088 Discipline Transportation Project name CCAG2 Economics
More informationSustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council
Sustainable Urban Mobility Plan for Aberdeen, Scotland Louise Napier Senior Planner Aberdeen City Council A bit about me.. Louise Napier Senior Planner (Transport Strategy & Programmes) Aberdeen City Council
More informationA127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017
A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place
More informationM6 Junction 10 Public Consultation
M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory
More informationStrategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment
Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -
More informationBICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN
Proceedings 31st August 1st ITRN2011 University College Cork Brick, McCarty and Caulfield: Bicycle infrastructure preferences A case study of Dublin BICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN
More informationDouglas Land Use and Transportation Study
Douglas Land Use and Transportation Study Summary: Key: Yellow Box = key project information Green Box = project recommendations Grey Box = anticipated project outcomes Background: It is an objective of
More informationPublic Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY
Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout
More informationCork to Limerick Route Pre-Feasibility Study Update
Cork to Limerick Route Pre-Feasibility Study Update November 2008 Document Title: Cork to Limerick Route Pre-Feasibility Study Update Document Ref(s). : Date Rev Status Originator Checked Approved 01/12/08
More informationRAA Submission to: The City of Adelaide Draft Integrated Movement Strategy Moving Adelaide
RAA Submission to: The City of Adelaide Draft Integrated Movement Strategy 2012-22 Moving Adelaide May 2012 RAA Submission to the City of Adelaide Draft Integrated Movement Strategy 2012-22 Moving Adelaide
More informationChapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions
Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation
More informationMap 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.
Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public
More informationONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT
One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport
More informationCUERDEN TRANSPORT PROPOSALS
1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This
More informationBuilding a sustainable world city: the role of transport and land use in London. London s relationship with transport
Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationAmendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008
Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationTransport Assessment. Curtis Street Plan Change
Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3
More information5 Highways and Transport Assessment
5 Highways and Transport Assessment INTRODUCTION 5.1 This chapter identifies and assesses the potential effects that the development, as described in Chapter 3 may have on the traffic, transport and access
More informationActive Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities
Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5
More informationAPPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY
STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue
More informationQUEENSTOWN TOWN CENTRE TRANSPORT STRATEGY
QUEENSTOWN TOWN CENTRE TRANSPORT STRATEGY Consultation Document April 2015 This is a summary of the Draft Strategy, which is on the Council s website at www.qldc.govt.nz The summary is designed as an introduction
More information