1 CRENSHAW/GREEN LINE OPERATING PLAN PUBLIC WORKSHOPS 1 SEPTEMBER 2018

2 CRENSHAW/GREEN LINE Average Daily Boardings (Weekdays) Current Ridership 1) 5,764 Redondo Segment 2) 26,090 Norwalk Segment 3) 16,400 Est. Crenshaw + AMC Projected Ridership with Torrance Extension 1) 16,264 Redondo/Torrance 2) 26,090 Norwalk Segment 3) 16,400 Est. Crenshaw + AMC 3 Projected Redondo Beach/Torrance ridership is comparable with Crenshaw ridership. Therefore, the Crenshaw operating plan should be reevaluated at least 1 year prior to Green Line Torrance Extension

3 CRENSHAW/GREEN LINE Bus/Rail Connections 740 Expo/ Crenshaw MLK Leimert Park Crenshaw Line Hyde Park Fairview Heights Aviation/ Century Blue Line \ Westchester/ Veterans Silver Line Downtown Inglewood /1266 Green Line Westbound Ridership / / / / / / / Silver Line Green Line 504/1684 0/ / / / / Boardings Alightings SOUTH BAY GALLERIA 3

4 2. Transit Travel (TAP data) Norwalk-Aviation Green Line Destinations Transit Destinations from Norwalk Segment 4

5 2. All Travel (cell phone data) Norwalk-Aviation Green Line Destinations All Destinations from Norwalk Segment 5

6 2. Transit Travel (TAP data) RB-Mariposa Green Line Destinations Transit Destinations from Redondo Beach Segment 6 6

7 2. All Travel (cell phone data) RB-Mariposa Green Line Destinations All Destinations from Redondo Beach Segment 7

8 OPERATIONAL CONSTRAINTS Junction Limitations Branched operations (e.g. Expo RB followed by Expo Norwalk) at a 6 min headway results in uneven headways (e.g. 5 min, then 7 min, then 5 min, etc. vs. an even 6 min headway) Design Capacity Design capacity does not allow better than a 5 min headway along the Crenshaw/LAX Line 8

9 ALT C-1 SIMULATION RESULTS Every 6 min Norwalk-Expo/Crenshaw and Redondo Beach-LAX 9

10 ALT B-2 SIMULATION RESULTS ALL BRANCHES EVERY 12 MIN 10

11 CRENSHAW/GREEN LINE Alternative Operating Scenarios 11

12 CRENSHAW/GREEN LINE Evaluation Criteria B-2 Alternatives Direct connection to LAX from all three terminals Even spacing between trains and frequencies match Blue and Expo Lines Minimize wait times and transfers Amount of service on each segment matches ridership demand Routing matches where most people want to go Routes and schedules are easy to understand Operating Cost/Year C-1 Uneven frequencies on Green Line segments. Does not match Blue Line frequencies. Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 6 min Norwalk Redondo Beach 6 min Expo/Crenshaw Norwalk 6 min Expo/Crenshaw Redondo Beach 6 min Redondo Beach Norwalk 6 min Redondo Beach Expo/Crenshaw 6 min $93.5M Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 3 min Norwalk Redondo Beach 3 min 7 min Expo/Crenshaw Norwalk 3 min Expo/Crenshaw Redondo Beach 3 min 3 min Redondo Beach Norwalk 3 min 7 min Redondo Beach Expo/Crenshaw 3 min 3 min $79.6M C-2 Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 3 min 3 min Norwalk Redondo Beach 3 min 7 min Expo/Crenshaw Norwalk 3 min 3 min Expo/Crenshaw Redondo Beach 3 min Redondo Beach Norwalk 3 min 7 min Redondo Beach Expo/Crenshaw 3 min $76.0M C-3 Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 3 min Norwalk Redondo Beach 3 min 3 min Expo/Crenshaw Norwalk 3 min Expo/Crenshaw Redondo Beach 3 min 7 min Redondo Beach Norwalk 3 min 3 min Redondo Beach Expo/Crenshaw 3 min 7 min $90.6M C-4 Does not match Blue Line frequencies. I-105/Norwalk segment overserved. Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 3 min 3 min Norwalk Redondo Beach 3 min Expo/Crenshaw Norwalk 3 min 3 min Expo/Crenshaw Redondo Beach 3 min 7 min Redondo Beach Norwalk 3 min Redondo Beach Expo/Crenshaw 3 min 7 min $90.6M C-5 Does not match Blue Line frequencies. I-105/Norwalk segment overserved. Origin Destination Avg Wait Xfer Cost Norwalk Expo/Crenshaw 3 min 7 min Norwalk Redondo Beach 3 min Expo/Crenshaw Norwalk 3 min 7 min Expo/Crenshaw Redondo Beach 3 min Redondo Beach Norwalk 3 min Redondo Beach Expo/Crenshaw 3 min $83.3M Redondo Beach segment overserved. 12

13 RECOMMENDATION Provides direct connections to LAX from all three directions. Best matches current ridership patterns with most customers from I-105/Norwalk segment wanting to travel north into Central LA. Provides direct service for the greatest number of current riders. Provides even spacing between trains on all segments and matches Blue and Expo Line frequencies. Simple routing and consistent schedules make this alternative easy to navigate. Second least expensive alternative. 13

14 PUBLIC ENGAGEMENT Councils of Government Thursday, July 26 - South Bay Cities COG Transportation Committee Monday, August 13 - South Bay Cities COG Transportation Committee Wednesday, September 5 - Gateway Cities COG Transportation Committee September 27 South Bay Cities COG Board Meeting Service Councils Wednesday, September 12 - Westside Central Service Thursday September 13 Gateway Cities Service Council Friday, September 14 - South Bay Service Council Community Tuesday, September 25 - Crenshaw Community Leadership Council (CLC) Monday, September 17 - Public Meeting (Gateway Cities Council of Governments) Thursday, September 20 - Public Meeting (The Proud Bird Aviation Blvd) Wednesday, September 26 Public Meeting (Baldwin Hills Crenshaw Mall) Metro Board Thursday, October 18, 2018 Operations Committee Thursday, October 25, Board 14

15 QUESTIONS? SEPTEMBER 20, 2018

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

Crenshaw Transit Corridor Study. Working Group Meetings March 2009 Crenshaw Transit Corridor Study Working Group Meetings March 2009 1 Concepts to Think About Today Alternatives and Design Options Grade Separation Analysis Supplemental Inglewood Alignment Analysis Evaluation

More information

PUBLIC TRANSPORTATION February 2016 ARRIVING For those traveling late at night, please see the notes at the end. LAX TO CLAREMONT Exit the baggage claim area. Look for the FlyAway bus stop on the island

More information

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT Title Metropolitan Council Transportation Committee December 12, 2016 Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest Metro Brad Larson Metro District MnDOT Background

More information

DAILY TRIPS (OUTBOUND) Monday-Friday 6:45 AM to 7:40 PM 30/30/30 26 Saturday 6:45 AM to 6:40 PM 30/30 24 Sunday - - -

DAILY TRIPS (OUTBOUND) Monday-Friday 6:45 AM to 7:40 PM 30/30/30 26 Saturday 6:45 AM to 6:40 PM 30/30 24 Sunday - - - ROUTE 8 City Loop SERVICE OVERVIEW Route 8 is an Urban Local route that operates as a one-way loop serving the Downtown Transit Center (DTC), Fern Hill, McAuley Square, UVM s Waterman Building, and Champlain

More information

Midtown Corridor Alternatives Analysis

Midtown Corridor Alternatives Analysis Midtown Corridor Alternatives Analysis Ridership Forecast Methodology and Results December 2013 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Methodology... 1 Assumptions...

More information

DAILY TRIPS (OUTBOUND/INBOUND) Weekdays 6:05 AM to 11:23 PM 30/30/ /28 Saturday 6:15 AM to 8:23 PM 60/60 24/23 Sunday / /

DAILY TRIPS (OUTBOUND/INBOUND) Weekdays 6:05 AM to 11:23 PM 30/30/ /28 Saturday 6:15 AM to 8:23 PM 60/60 24/23 Sunday / / ROUTE 6 Shelburne Road SERVICE DESIGN Figure 1: Route Map Route 6 is a Major Local route that operates between Shelburne and the Burlington Downtown Transit Center (DTC). The route travels primarily along

More information

Arterial Transitway Corridors Study. Ave

Arterial Transitway Corridors Study. Ave Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing

More information

Gratiot Avenue Transit Study Tech Memo #4: Ridership

Gratiot Avenue Transit Study Tech Memo #4: Ridership Gratiot Avenue Transit Study Tech Memo #4: Ridership 5/31/2016 Table of Contents 1 INTRODUCTION... 3 PROJECT DESCRIPTION... 3 2 TECH MEMO #4 OVERVIEW... 5 METHODOLOGY... 5 3 THE ALTERNATIVES AND POTENTIAL

More information

I-105 Corridor Sustainability Study (CSS)

I-105 Corridor Sustainability Study (CSS) I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.1 AGENDA TITLE: Provide Guidance on Proposed e-tran Service Modifications MEETING DATE: PREPARED BY: DEPARTMENT HEAD: Jean Foletta, Transit

More information

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400 Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)

More information

Public Event 1 Community Workshops

Public Event 1 Community Workshops Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn

More information

Cotton Belt Corridor Regional Rail Project

Cotton Belt Corridor Regional Rail Project Cotton Belt Corridor Regional Rail Project Ridership July 2013 Prepared by URS Corporation Prepared for Dallas Area Rapid Transit General Planning Consultant Managed by URS Corporation Document Revision

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 30, 2012 SUBJECT: ADDITIONAL OPERATING RESOURCE REQUIREMENTS TO MEET INCREASING TTC RIDERSHIP ACTION ITEM RECOMMENDATIONS

More information

SMARTTRACK RIDERSHIP ANALYSIS

SMARTTRACK RIDERSHIP ANALYSIS SMARTTRACK RIDERSHIP ANALYSIS EXECUTIVE SUMMARY Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute

More information

ROUTE 52 ALLENTOWN. Port Authority of Allegheny County

ROUTE 52 ALLENTOWN. Port Authority of Allegheny County ROUTE 52 ALLENTOWN Route 52 Allentown is a limited service LRT line that operates on weekdays between South Hills Junction and downtown Pittsburgh. The route serves the Allentown neighborhood and skirts

More information

Wilshire Boulevard Bus Rapid Transit Project

Wilshire Boulevard Bus Rapid Transit Project Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies

More information

Philadelphia Bus Network Choices Report

Philadelphia Bus Network Choices Report Philadelphia Bus Network Choices Report JUNE 2018 SEPTA Table of Contents Executive Summary...7 What if transit gave us more freedom?... 8 What is this report?... 8 The main conclusions... 9 What is happening

More information

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida A Change in Accessibility and Convenience? Implementing BRT and the Impact on Transit Riders Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida Project Background Greater station spacing

More information

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development 12th National LRT Conference Salt Lake City, UT November 12, 2012 Outline METRO Light Rail Overview

More information

Central Jersey Transportation Forum. March 2007

Central Jersey Transportation Forum. March 2007 Central Jersey Transportation Forum March 2007 Feasibility Analysis of BRT on Dinky Right of Way from Princeton Station to Alexander Rd. in West Windsor (west of Rt. 1) Study spurred by Princeton University's

More information

Interim Transit Ridership Forecast Results Technical Memorandum

Interim Transit Ridership Forecast Results Technical Memorandum Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership

More information

ROUTE 30 Bob Billings & Kasold to KU SERVICE DESIGN

ROUTE 30 Bob Billings & Kasold to KU SERVICE DESIGN ROUTE EVALUATION ROUTE 3 ROUTE 3 Bob Billings & Kasold to KU SERVICE DESIGN Route 3 is a route that operates between the Kansas Union and the intersection of 14 th Street and Apple Lane. The route travels

More information

Semi-Annual DC Circulator Forum. February 25, 2014

Semi-Annual DC Circulator Forum. February 25, 2014 Semi-Annual DC Circulator Forum February 25, 2014 Overview DC Circulator service began in 2005. A major planning effort was undertaken in 2011 which established a long-range plan and goals for the system:

More information

Arterial Transitway Corridors Study

Arterial Transitway Corridors Study Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half

More information

Demand Estimation Model for Park-and-Ride Service: Fort Bend County to Central Houston

Demand Estimation Model for Park-and-Ride Service: Fort Bend County to Central Houston Demand Estimation Model for Park-and-Ride Service: Fort Bend County to Central Houston 1 Investigation of past and present methods/thoughts LITERATURE/SOURCE REVIEW RELATIVE DEMAND ESTIMATION 2 General

More information

Andi Lovano, Project Development Administrato~

Andi Lovano, Project Development Administrato~ CITY COUNCIL CONSENT CALENDAR JUNE 6, 2016 SUBJECT: INITIATED BY: PREPARED BY: RESOLUTION IN SUPPORT OF 2024 SUMMER OLYMPICS IN LOS ANGELES MAYOR PRO TEMPORE JOHN HEILMAN COUNCILMEMBER LINDSEY HORVATH

More information

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

the Story of the 30s & 70s Bus Lines James Hamre - WMATA Evaluation of a Service Restructuring: the Story of the 30s & 70s Bus Lines James Hamre - WMATA Metrorail is the second largest rail transit system in the nation 230 million annual riders 780,000 weekday

More information

Project Introduction January 2017

Project Introduction January 2017 Kent Station Access Improvements Project Introduction January 2017 Kent Station Access Improvements Auburn Station Access Improvements Project Background How did we get here? 2008 ST2 funded Kent and Auburn

More information

Gateway Cities Maximum Transit Scenario Assessment Final Draft

Gateway Cities Maximum Transit Scenario Assessment Final Draft Gateway Cities Maximum Scenario Assessment Final Draft Date: March 11, 2014 Prepared for: Gateway Cities Council of Governments Los Angeles County Metropolitan Transportation Authority Prepared by: 445

More information

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013 CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant February 5, 2013 Service Overview Study Overview East Cooper Service Analysis Provide additional analysis as a follow up

More information

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan AGENDA 1 Introductions & Project Scope 2 Public Outreach Recap 3 Living Streets Design Manual 4 Aviation Boulevard

More information

Westside Transportation Access Needs Assessment - Short and Long Term Improvements

Westside Transportation Access Needs Assessment - Short and Long Term Improvements ABSTRACT The Los Angeles County Metropolitan Transportation Authority (MTA) adopted the 2001 Long Range Transportation Plan (LRTP), which sets out the County s transportation investments for the next 20-25

More information

2016 REGIONAL ORIGIN AND DESTINATION STUDY TDCHR WORKSHOP APRIL 27, 2017

2016 REGIONAL ORIGIN AND DESTINATION STUDY TDCHR WORKSHOP APRIL 27, 2017 2016 REGIONAL ORIGIN AND DESTINATION STUDY TDCHR WORKSHOP APRIL 27, 2017 WORKSHOP AGENDA 2016 Regional Origin & Destination (O&D) Study Purpose Methodology How our Riders use the HRT System? Who Are Our

More information

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY VTA S NEXT NETWORK CONNECT TO BART STATIONS INCREASE RIDERSHIP IMPROVE FAREBOX RECOVERY

More information

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

EL CAMINO REAL BUS RAPID TRANSIT PROJECT EL CAMINO REAL BUS RAPID TRANSIT PROJECT Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make

More information

ROUTE 11 Downtown to KU to 31 st and Iowa SERVICE DESIGN

ROUTE 11 Downtown to KU to 31 st and Iowa SERVICE DESIGN ROUTE EVALUATION ROUTE 11 s ROUTE 11 Downtown to KU to 31 st and Iowa SERVICE DESIGN Route 11 is a route coordinated between Lawrence Transit and KU on Wheels that operates between the Downtown Transit

More information

Staff Report City of Manhattan Beach

Staff Report City of Manhattan Beach Agenda Item #: Staff Report City of Manhattan Beach TO: THROUGH: FROM: Honorable Mayor Wilson and Members of the City Council Geoff Dolan, City Manager Richard Thompson, Director of Community Development

More information

FY2006 Budget Board Budget Committee request for information. Board Request: Detailed information on bus route 5A DC-Dulless Airport

FY2006 Budget Board Budget Committee request for information. Board Request: Detailed information on bus route 5A DC-Dulless Airport Board Request: Detailed information on bus route 5A DC-Dulless Airport Tracking Number: 29 Assigned to Dept/Office: OPER Contact Person: Jim Hughes Metrobus Route 5A was established in December 2000 in

More information

ROUTE 67A MONROEVILLE

ROUTE 67A MONROEVILLE ROUTE 67A MONROEVILLE Route 67A Monroeville is a radial service that operates between the Community College of Allegheny County Boyce (CCAC Boyce ) and downtown Pittsburgh via Churchill, Wilkinsburg, Point

More information

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5 SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information

Final Recommendation US 36 Service Plan

Final Recommendation US 36 Service Plan Final Recommendation US 36 Service Plan June, 2015 6/23/2015 1 TABLE OF CONTENTS 1 Introduction... 5 1.1 Background... 5 1.2 Information Sources... 5 2 Existing Conditions... 6 2.1 Corridor Description...

More information

MTA Surveys: Facts and Findings. NYMTC Brown Bag March 12, 2014 Julia Seltzer, MTA Planning

MTA Surveys: Facts and Findings. NYMTC Brown Bag March 12, 2014 Julia Seltzer, MTA Planning MTA Surveys: Facts and Findings NYMTC Brown Bag March 12, 2014 Julia Seltzer, MTA Planning MTA Planning Survey Program Why survey? Who was surveyed? Challenges Methodologies Findings Uses for data 1 Why

More information

Appendix 3.2 D. Ridership Errata Sheet

Appendix 3.2 D. Ridership Errata Sheet Appendix 3.2 D Ridership Errata Sheet January 14, 2010 Since the release of the Alternatives Description for the South Coast Rail project, the Massachusetts Department of Transportation has identified

More information

El Paso to Las Cruces Proposed Rail Service Estimated Ridership and Proposed Schedule

El Paso to Las Cruces Proposed Rail Service Estimated Ridership and Proposed Schedule to Las Cruces Proposed Rail Service Estimated Ridership and Proposed Schedule Ridership estimation is a central consideration when assessing the feasibility of a proposed transit line. A sketch model is

More information

Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013

Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013 Community Transit Solutions for the Suburbs APTA Annual Meeting Steve Fittante, New Jersey Transit Corporation September 30, 2013 New Suburban Challenges Lower density development patterns Where is the

More information

Feasibility Study. Expo-Downtown Bicycle Connector

Feasibility Study. Expo-Downtown Bicycle Connector Feasibility Study Expo-Downtown Bicycle Connector May 2017 Table of Contents Introduction... 2 Project Goals... 2 Study Scope... 2 Community Engagement... 3 Project Description... 6 Considerations... 6

More information

Los Angeles County. Metropolitan Transportation Authority. FY 2002 On-Board Bus Weekend Survey Report. Report to the Los Angeles County

Los Angeles County. Metropolitan Transportation Authority. FY 2002 On-Board Bus Weekend Survey Report. Report to the Los Angeles County Los Angeles County Metropolitan Transportation Authority FY 2002 On-Board Bus Weekend Survey Report Report to the Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles,

More information

Scheduling 101 Calculating Running Time Metropolitan Atlanta Rapid Transit Authority Multimodal Operations Workshop Houston, TX

Scheduling 101 Calculating Running Time Metropolitan Atlanta Rapid Transit Authority Multimodal Operations Workshop Houston, TX Calculating Running Time Metropolitan Atlanta Rapid Transit Authority 2015 Multimodal Operations Workshop Houston, TX MARTA FACTS MARTA is the ninth largest transit system in the U.S. that provides bus

More information

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY:

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY: To: From: Subject: Ujari Mohite Vijay Mahal and Vincent Sanders Revised Ridership Forecasts for the Uptown DBL project Date: August 17, 2015 INTRODUCTION/SUMMARY: This memorandum presents updated ridership

More information

Metropolitan Council Transportation Committee

Metropolitan Council Transportation Committee Nicollet-Central Transit Alternatives Metropolitan Council Transportation Committee August 2013 Project Purpose (approved by Policy Advisory Committee 10/25/2012) The purpose is to improve transit connectivity,

More information

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 9/27/2012 TRANSIT PLANNING WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 2012 Calgary Transit 1 Table of Contents Purpose... 3 Area of Change... 3 Background... 3 Access to destinations... 5 Connecting

More information

ROUTE 68A MONROEVILLE EXPRESS

ROUTE 68A MONROEVILLE EXPRESS ROUTE 68A MONROEVILLE EXPRESS Route 68A Monroeville Express operates between Turnpike Gardens in Monroeville and downtown Pittsburgh via Northern Pike, the Monroeville Mall, Route 22, I-376, and Wilkinsburg,

More information

Transit Operations in the I-95 Express Lanes

Transit Operations in the I-95 Express Lanes Transit Operations in the I-95 Express Lanes TRB 15 th International Conference on Managed Lanes Miami, Florida Presented by Diane Quigley FDOT Transit Planning Administrator May 5, 2016 FDOT Governance

More information

Everett Transit Action Plan. Community Open House November 16, 2015

Everett Transit Action Plan. Community Open House November 16, 2015 Everett Transit Action Plan Community Open House Everett has a great location, but getting around the city and into surrounding communities is a problem for all ages Many Voices, One Future: The Everett

More information

O-D Study Transit Staff Workshop January 23, 2014

O-D Study Transit Staff Workshop January 23, 2014 Agenda I. Survey and Data Entry Status II. Survey Data Analysis Mode of Access / Egress Trip Purpose III. Transfer Evaluation IV. Socio-economic Mapping V. Travel Patterns by Corridor VI. Discussion VII.Project

More information

Transit Ridership - Why the Decline and How to Increase. Hosted by the. Virginia Transit Association

Transit Ridership - Why the Decline and How to Increase. Hosted by the. Virginia Transit Association Transit Ridership - Why the Decline and How to Increase Hosted by the Virginia Transit Association Virginia Transit Association 1108 East Main Street, Suite 1108 Richmond, VA 23219 804.643.1166 www.vatransit.com

More information

Tables related to Proposed Project impacts are located at the end of this section due to their size and length.

Tables related to Proposed Project impacts are located at the end of this section due to their size and length. 4.13 Transportation and Traffic This tion analyzes the potential traffic impacts created by the Proposed Project. The Proposed Project has the potential to result in traffic impacts at intertions and along

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

SMARTTRACK RIDERSHIP ANALYSIS

SMARTTRACK RIDERSHIP ANALYSIS SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research

More information

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report. TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology

More information

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP To: Copies: From: Evan Johnson, Tindale Oliver & Associates Matt Muller, RTS Jesus Gomez, RTS Alan Danaher, P.E., PTOE, AICP, PTP Date: January 14, 2014 Subject: Ridership Projections Gainesville Streetcar

More information

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN PRESENTATION TO CITY COUNCIL JANUARY 22, 2008 PUBLIC TRANSIT FOR THE CITY OF GEORGETOWN LOCAL SERVICE For Georgetown residents to Georgetown destinations.

More information

Fiscal Year Big Blue Bus Year End Performance Report

Fiscal Year Big Blue Bus Year End Performance Report Information Item Date: October 25, 2016 To: From: Subject: Mayor and City Council Edward F. King, Director of Transit Services Fiscal Year 2015-16 Big Blue Bus Year End Performance Report Introduction

More information

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1 with Creighton Manning Engineering, LLP Logitrans Herb Levinson September 22, 2003 Overview Introduction to the consultant team Goals

More information

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008 - Committee of the Whole January 30, 2008 Improving mobility Easing congestion Strengthening our communities Today s Agenda Bridges 2 or 3-car trains/platforms Reconstruction of right-ofway Traffic signals

More information

City of Davenport CitiBus Public Transportation Study. April 2015

City of Davenport CitiBus Public Transportation Study. April 2015 City of Davenport CitiBus Public Transportation Study April 2015 Overview Project Background Key Findings CitiBus Service Allocation Policy Discussion 2 Project Background 3 About CitiBus Operates 17 routes

More information

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary Nanaimo Transportation Master Plan Phase 1 Consultation Summary Transportation Advisory Committee Meeting Wednesday December 12, 2012 Agenda Study Update Phase 1 Consultation Process Phase 1 Consultation

More information

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Pocatello Regional Transit Master Transit Plan Draft Recommendations Pocatello Regional Transit Master Transit Plan Draft Recommendations Presentation Outline 1. 2. 3. 4. What is the Master Transit Plan? An overview of the study Where Are We Today? Key take-aways from existing

More information

ROUTE 75D PENN HILLS-MONROEVILLE

ROUTE 75D PENN HILLS-MONROEVILLE ROUTE 75D PENN HILLS-MONROEVILLE Route 75D Penn Hills-Monroeville is a crosstown route that operates between Verona and the Monroeville Mall. It travels through local streets for much of its length serves

More information

Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018

Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018 Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn Mankato City Council Meeting 6/25/2018 What is a Transit Development Plan (TDP)? Engagement Issues Goals, objectives, design guidelines and

More information

Innovative BRT Operating Solutions through a Congested Segment in San Jose

Innovative BRT Operating Solutions through a Congested Segment in San Jose Innovative BRT Operating Solutions through a Congested Segment in San Jose Michael Iswalt (Corresponding Author) Arup 560 Mission Street, 7th Floor, San Francisco, CA 94103 michael.iswalt@arup.com Phone:

More information

Arterial Transitway Corridors Study. Sept. 26, 2011

Arterial Transitway Corridors Study. Sept. 26, 2011 Arterial Transitway Corridors Study Sept. 26, 2011 Purpose of Study Study 11 urban corridors in Minneapolis, St. Paul and surrounding communities Develop service and facilities plan to improve Transit

More information

Major Bike Routes 102 Avenue Workshop April 21, 2015

Major Bike Routes 102 Avenue Workshop April 21, 2015 Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how

More information

Travel and Rider Characteristics for Metrobus

Travel and Rider Characteristics for Metrobus Travel and Rider Characteristics for Metrobus 040829040.15 Travel and Rider Characteristics for Metrobus: 2012-2015 Overview The Miami Dade County Metropolitan Planning Organization (MPO) conducted a series

More information

POST OAK BOULEVARD DEDICATED BUS LANES PROJECT

POST OAK BOULEVARD DEDICATED BUS LANES PROJECT POST OAK BOULEVARD DEDICATED BUS LANES PROJECT January 2015 Uptown Dedicated Bus Lanes project Post Oak Boulevard Uptown Employees by Zip Code Number of Employees by Zip Code 750 to 999 500 to 749 300

More information

Welcome. Wilmington Transit Moving Forward Workshop Presentation. October 16, 2013

Welcome. Wilmington Transit Moving Forward Workshop Presentation. October 16, 2013 Welcome Wilmington Transit Moving Forward Workshop Presentation October 16, 2013 Project Purpose Evaluate recommendations from previous studies Wilmington Downtown Circulation Study (WDCS) 2012 State Smart

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

I-35W Solutions Alliance Project Update July 13, 2017

I-35W Solutions Alliance Project Update July 13, 2017 Title I-35W Solutions Alliance Project Update July 13, 2017 Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest Metro, Investigating options for improved bus service

More information

ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT

ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT 6.h DATE: APRIL 2, 2009 TO: FROM: BOARD OF DIRECTORS RICHARD D. THORPE CHIEF EXECUTIVE OFFICER ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT RECOMMENDATION

More information

Liz Smith, P.E., PMP Manager of Long-Range Planning Strategic Planning & Analysis SEPTA. Norristown High Speed Line Extension Draft EIS

Liz Smith, P.E., PMP Manager of Long-Range Planning Strategic Planning & Analysis SEPTA. Norristown High Speed Line Extension Draft EIS Liz Smith, P.E., PMP Manager of Long-Range Planning Strategic Planning & Analysis SEPTA Norristown High Speed Line Extension Draft EIS Project Schedule We are 2013 Here 2017 2018 2020 2023 Alternatives

More information

2012 Transit Study Randolph County

2012 Transit Study Randolph County 2012 Transit Study Randolph County Appendix B Technical Memorandum 2011 Transportation Survey Prepared for: Randolph County Housing Authority Country Roads Transit Submitted by: July 1, 2012 Table of Contents

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Twin Cities Regional Bicycle System Study

Twin Cities Regional Bicycle System Study Twin Cities Regional Bicycle System Study Developing a Regional Bicycle Network Steven Elmer, Metropolitan Council Tony Hull, Toole Design Group LLC CTS Research Conference May 21, 2014 Introduction Study

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Calgary Transit Route 302 Southeast BRT Year One Review June

Calgary Transit Route 302 Southeast BRT Year One Review June Calgary Transit Route 302 Southeast BRT Year One Review 2011 June Calgary Transit Route 302 Southeast BRT: Year One Review 2011 April Table of Contents 1.0 Executive Summary... 1 2.0 Introduction... 3

More information

IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION. Word Count: 3,386 (body) + 2,000 (8 tables) + 1,500 (6 figures) = 6,886 words

IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION. Word Count: 3,386 (body) + 2,000 (8 tables) + 1,500 (6 figures) = 6,886 words IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION TRB PAPER -0 Brian Pessaro, AICP Senior Research Associate Center for Urban Transportation Research (CUTR) University of South Florida

More information

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study

More information

TPA Committee Meetings May 2018

TPA Committee Meetings May 2018 TPA Committee Meetings May 2018 Purpose Develop a comprehensive plan to identify multimodal improvements for all users of the roadway and evaluate the potential for a premium express bus service Overview

More information

South Bay Bicycle Master Plan American Planning Association National Conference Los Angeles, CA

South Bay Bicycle Master Plan American Planning Association National Conference Los Angeles, CA South Bay Bicycle Master Plan 2012 American Planning Association National Conference Los Angeles, CA April 17, 2012 Overview I. Background II. The Importance of Partnerships III. Approach and Success Stories

More information

2017 COAST TRANSIT AUTHORITY SERVICE REVIEW

2017 COAST TRANSIT AUTHORITY SERVICE REVIEW 2017 COAST TRANSIT AUTHORITY SERVICE REVIEW The Service Review Plan, which takes place annually, provides for a general evaluation of all transit services. The evaluation process guidelines include service

More information

BEAR CREEK PARK AND RIDE

BEAR CREEK PARK AND RIDE BEAR CREEK PARK AND RIDE 7760 178th Pl NE, Redmond, WA 98052 700 Average weekday transit boardings 283 Parking spaces Owned by King County Metro Served by Sound Transit and King County Metro Bear Creek

More information

VIP Tours of California Los Angeles Hotels Pickup Times

VIP Tours of California Los Angeles Hotels Pickup Times 4 POINTS ( LAX ) 08:15 09:05 10:35 11:45 02:15 05:25 9750 AIRPORT BLVD. (310)645-4600 4 POINTS (CULVER CITY) 08:00 08:50 10:30 11:30 02:00 05:00 5990 GREEN VALLEY CIRC. (310)641-7740 ADVENTURER 08:05 09:05

More information

Public Meeting #1 January 30, 2018

Public Meeting #1 January 30, 2018 Public Meeting #1 January 30, 2018 Meeting Outline Mayor s Introduction Presentation Q&A Group Activities Wrap-up Presentation Outline Introduction Existing Conditions Market Assessment Break-out Setup

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

West Broadway Transit Study

West Broadway Transit Study West Broadway Transit Study Policy Advisory Committee Meeting #6 October 31, 2016 2:30 3:30 PM Davis Center, Minneapolis Public Schools 1250 W Broadway Avenue, Minneapolis, MN 55411 Room N1-101 Meeting

More information

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

Model Applications for Oakland Park Boulevard Transit Corridor Study

Model Applications for Oakland Park Boulevard Transit Corridor Study Model Applications for Oakland Park Boulevard Transit Corridor Study Southeast Florida FSUTMS Users Group June 13, 2014 Vikas Jain, AICP, GISP FDOT District Four Auditorium 3400 West Commercial Boulevard,

More information

Transit Workshop with MPO Board

Transit Workshop with MPO Board Transit Workshop with MPO Board Overview of Workshop What is a TDP? Historical trends Existing bus service 2028 Recent public outreach Future direction Policy Questions 1 What TDP is Not Not a budget Not

More information