1 SETTLEMENT AGREEMENT ARTICLE 101 FISH PROPAGATION 2010 ANNUAL REPORT REPORTING PERIOD JUNE 1, 2010 MAY 31, 2011 BAKER RIVER HYDROELECTRIC PROJECT FERC No April 2012 BAK SA 101 Annual Report 2010.Doc PUGET SOUND ENERGY Baker River Hydroelectric Project Doc ID: BAK PSE.FERC 16 April 2012

2 CONTENTS CONTENTS 1.0 Executive Summary Introduction Principal Management Activities Monitoring Results, Observations, and Analyses Acquisition and Related Activities Special Consultation Design and Planning Activities Documents Submitted Modifications to or Deviations from Implementation Plan Issues and Resolution Proposed Changes to the Fish Propagation Facilities Plan Accounting Funding Expenditures Adjustments Supporting Documents References Review Comments and Responses Distribution List Transmittal Message Summary of Reviewer Replies Reviewer Comments and PSE Responses Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page ii

3 List of Tables List of Tables Table 1. Fish Co-Managers preseason sockeye broodstock loading plan and actual broodstock loading, Table 2. An approach for sequential sockeye development at production facilities at Sulphur Springs, 2010 to Table 3. Salmon production from Baker fish propagation facilities, June 1, 2010 to May 31, Table 4. Salmon releases from Baker River fish propagation facilities, June 1, 2010 to May 31, Table 5. Salmon rearing inventory at fish propagation facilities as of May 31, Table 6. ARG representatives who received the draft Fish Propagation 2010 Annual Report as part of the SA 102 review process Table 7. Comments following formal review of the Fish Propagation 2010 Annual Report List of Figures Figure 1. Baker fish hatchery site layout... 6 Figure 2. Baker fish hatchery constructed facilities. Clockwise from top left: egg incubation, adult holding and fry transfer hoppers, outdoor rearing, early rearing... 6 Figure 3. Spawning Beach 4 prior to modifications... 7 Figure 4. Spawning Beach 4 during modifications, showing isolated water supply to each segment and the concrete walls between segments... 7 Figure 5. New pond liner... 8 Figure 6. Crane and outlet structure improvements... 8 Figure 7. Pad for spawning beach access during operation and maintenance activities... 9 Figure 8. Completed spawning beach sections Figure 9. Installation of fry outlet screens and fry enumeration stations Figure 10. Post-modification testing at Spawning Beach Figure 11. Fish hatchery and improved Spawning Beach 4, spring Figure 12. Yearly number of sockeye fry released into the reservoirs from Baker fish propagation programs, Figure 13. Baker fish hatchery facilities in first-year operation concurrent with Spawning Beach 4 modifications Figure 14. Baker fish hatchery facilities during first-year operation. Sockeye females selected for egg-take Figure 15. Egg incubation tray collection. 5.2 million eggs were collected in Figure 16. One of 784 egg incubators. The facility can incubate up to 7.8 million eggs Figure 17. Newly-hatched fry in one of many swim-up troughs Figure 18. The hatchery building houses 22 swim-up troughs and 10 early rearing tanks Figure 19. These fry swim-up troughs, along with other components of the sockeye program, are in separate walled areas shielded from other functions of rearing in order to isolate, control, and reduce the risk of disease outbreaks Figure 20. Sockeye fry in a holding pond, a staging area for the transfer hoppers that will release them to Baker Lake Figure 21. Juvenile fish rearing facilities in use in 2010 for sockeye and coho salmon and rainbow trout Figure 22. Juvenile fish rearing facilities with capacity for 20,000 pounds instantaneous production Figure 23. Transferring and releasing juvenile salmon from a transport tank Figure 24. message from PSE accompanying the Fish Propagation 2010 Annual Report Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page iii

4 1.0 Executive Summary This annual report reviews activities undertaken by Puget Sound Energy (PSE) during the reporting period of June 1, 2010 May 31, 2011 to implement settlement agreement article 101, Fish Propagation (SA 101) of the Order on Offer of Settlement, Issuing New License and Dismissing Amendment Application as Moot (the license) issued by the Federal Energy Regulatory Commission (FERC) on October 17, 2008 for the Baker River Hydroelectric Project. It has been prepared in consistence with SA 102, Aquatics Reporting, and SA 101. The report covers the SA 101 reporting period of June 1, 2010 through May 31, 2011, as outlined in the reporting schedule contained in SA 102. In this reporting period, PSE efforts under SA 101 included: Continuing to implement the Fish Propagation Facilities Plan in accordance with the plan s schedule. Substantially completing construction of additional fish culture facilities at the Sulphur Springs site, including additional Sulphur Springs water supply intake protection, and modifying Sockeye Spawning Beach 4 (also referred to as the Baker River fish hatchery renovation in the 100% final design documentation report) in accordance with SA 101 and the Fish Propagation Facilities Plan. Completing a study required by SA 101 c (1), estimating sockeye productive capacity in Baker Lake and Lake Shannon. Consulting with the U.S. Forest Service to develop a decommissioning proposal to restore Channel Creek to natural conditions at the site of Sockeye Spawning Beaches 1, 2, and 3. Funding fish propagation and enhancement programs for 2010 in the new hatchery and achieving the first-year production goal of 5 million sockeye fry. 2.0 Introduction This Fish Propagation Report has been prepared for the Baker River Hydroelectric Project (the Project), pursuant to the Order on Offer of Settlement, Issuing New License and Dismissing Amendment Application as Moot dated October 17, 2008 (the license). In the license, settlement agreement article (SA) 101, Fish Propagation (appendix A), sets forth the applicable requirements for the Fish Propagation Facilities Plan (the Plan), which in turn sets forth the requirements of this annual report. This annual report summarizes the activities conducted under SA 101 from June 1, 2010 through May 31, 2011, including management activities, monitoring, design and planning, surveys and data collection activities, consultation, documents prepared, modifications to or deviations from the Plan, issues and resolution, accounting, and purposed changes to the FERC-approved Plan. This report provides the ongoing format for future reports. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 1

5 Principal Management Activities Principal activities during the 2010 reporting period (June 1, 2010 through May 31, 2011) included the following (which are described in greater detail in sections through 3.1.7). Implementing the Fish Propagation Facilities Plan approved by the FERC on May 26, Substantially completing the improvements to Spawning Beach 4 as designed per the Baker Fish Hatchery Renovation 100% Final Design Documentation Report (dated March 11, 2009). Interim construction updates were provided to the Aquatic Resource Group at meetings during June, July, August, September, October, and November 2010; and March and April Operating the newly-constructed fish culture facilities at the Sulphur Springs site with a sockeye fry production goal of 5 million as established by the Fish Comanagers. Continuing the existing propagation and enhancement programs. The 20,000-pound production program, as determined by the Fish Co-managers, remained unchanged from 2009 (status quo) for sockeye, coho, and rainbow trout production. Allocated to this extended rearing program were approximately 130,000 sockeye, 60,000 coho, and 20,000 rainbow trout fry. Rearing and release objectives were achieved during the reporting period. Completing the study estimating sockeye productive capacity in Baker Lake and Lake Shannon, as prescribed by SA 101 c (1). Consulting with the U.S. Department of Agriculture Forest Service (USDA-FS) to develop a decommissioning proposal for the site of Sockeye Spawning Beaches 1, 2 and 3 on Channel Creek to restore site to natural conditions. Consulting with the Washington Department of Fish and Wildlife (WDFW) on interim hatchery operational protocols and the continuing PSE funding of fish propagation/enhancement programs and an onsite manager Fish Propagation Facilities Plan Per SA 101, PSE is implementing the Fish Propagation Facilities Plan (FPFP) which FERC approved on May 26, The FPFP identifies the following projects that will have information updates in future SA 101 annual reports. A short report on each project is provided below. Sockeye Spawning Beach 4. Interim construction updates will be provided until the final project completion report is submitted following completion of the Baker River fish hatchery renovation. Section contains an update. Sulphur Springs fish culture facility. Interim construction updates will be provided until the final project completion report is submitted following completion of the Baker River fish hatchery renovation. Section contains an update. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 2

6 Sockeye smolt capacity. Interim study progress updates will be provided until submittal of the final study report including Baker River Aquatic Resource Group (ARG) comments and recommendations. Section contains an update. Empirically-derived sockeye production estimate. A study plan and interim study progress updates will be provided, followed by submittal of the final study report including ARG comments and recommendations. This project has not started; a schedule will be determined in consultation with the ARG. One approach to managing the juvenile sockeye population would be to gradually increase the number of fry released and then monitor for subsequent indications of densitydependence in the form of reduced smolt size or length to weight ratio (condition factor). PSE collects juvenile sockeye size information at the juvenile downstream fish passage facilities. Sockeye Spawning Beach 4 production limits. A study plan and interim study progress updates will be provided until submittal of the final study report including ARG comments and recommendations. This project has not started; a schedule will be determined in consultation with the ARG. Spawning Beaches 1 3 (Channel Creek site). A decommissioning plan, documentation confirming U.S. Forest Service approval of the decommissioning plan, and interim progress updates will be provided until completion of Channel Creek site decommissioning activities. PSE has initiated discussions with the U.S. Forest Service, the ARG, and the Cultural Resource Advisory Group (CRAG). These consultations are continuing; a schedule will be determined in consultation with the USDA-FS. Per SA 101, decommissioning and restoration activities at this site are expected to be completed within five years of license issuance (October 2013), as outlined in the settlement agreement. Section includes an update. Confirmation of annual PSE funding of the Fish Propagation and Enhancement Program and the annual fish production plan. The Fish Co- Managers will provide an annual fish production plan to PSE. PSE funded the fish propagation and enhancement program during the reporting period. Following completion of the Baker fish hatchery renovation, PSE will request that the Fish Co- Managers provide the annual fish production plan to PSE annually by September 30 to accommodate the PSE budget, reporting processes, and timeline requirements. In an to Arnie Aspelund of PSE on June 21, 2010, the Fish Co-Managers provided a plan to PSE to distribute 3,800 adult sockeye from the 2010 return to the artificial incubation program in the new fish culture facilities, and to achieve a goal of 5 million eggs. During an ARG meeting on August 10, 2010, PSE requested that the Fish Co-managers provide the annual production plan. The WDFW informed PSE in an to Arnie Aspelund on August 12, 2010 that important information such as the smolt capacity report when completed in December would help inform their planning. In a subsequent to Arnie Aspelund on March 7, 2011 WDFW provided PSE with a fry ponding and planting plan for the resulting production of sockeye. Annual confirmation of PSE funding of the Reservoir Nutrient Enhancement Program. Funding, which is not to exceed $60,000 annually, will start in October Funding is scheduled for license years Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 3

7 Fish facility operations manual for the Sulphur Springs site. A manual will be provided following completion of the Baker fish hatchery renovation, with updates to the manual as needed. Section includes an update on this project. Annual contract and budgeting report governing operation of fisheries enhancement programs. This will report the annual budget and actual costs. A schedule will be determined in consultation with the ARG. PSE met with the WDFW in April 2011 to discuss items related to the Baker Fish Hatchery operations and the need for an interim operating process to assign work until settlement provisions for future contractor operating protocols are developed. WDFW is under a PSE contract, whereby PSE funds an onsite manager for operations. Expenditures from the WDFW contract during the reporting period are reported in Section 6.2. Updates on fisheries enhancement studies approved by the Fish Co-managers to optimize program success. These will be provided annually following completion of the Baker fish hatchery renovation. A schedule will be determined in consultation with the ARG. Fish propagation facilities operations audit. This will be included with the annual fish propagation facilities and programs report based on a June 1 to May 31 operating year. The audit will address financial accounting, fish handling and disease management operations, hazardous materials handling, and spill prevention and control countermeasures (SPCC) compliance. Prior to the start of Baker fish hatchery renovation, PSE contracted with a hazardous materials consultant (Phillips Environmental Services) to assess the presence of any hazardous materials associated with the removal of any structures, and it was determined that there were none. PSE, per the FERC license, developed an SPCC plan for the project. This plan was submitted to the FERC prior to construction, and compliance is mandatory. At the time of this report, there have been no incidents. Section includes an update SA 101 A & B Sockeye Spawning Beach 4 and Sulphur Springs Fish Culture Facility 100% Design Report, Baker Fish Hatchery Renovation Design There was substantial completion of the construction of new fish culture facilities and modification of Spawning Beach 4 at Sulphur Springs, which is based upon the Baker Fish Hatchery Renovation 100% Final Design Documentation Report of March 11, Interim construction updates were provided to the Aquatic Resources Group at regular meetings during June, July, August, September, October, and November 2010; and March and April The new hatchery and modified spawning beach facilities are intended to provide substantially increased artificial incubation program for up to 7,000,000 sockeye fry (with provisions to construct future facilities for up to 11,000,000 fry), support a 20,000 pound production program, and improve Spawning Beach 4. PSE developed the design for the Baker fish hatchery renovation, including a hatchery building, rearing units, adult holding ponds, improved alarm systems, renovation of the existing spawning beach, sediment reduction features for the existing water supply, and infrastructure improvements in the vicinity of the existing operation to support incrementally increased sockeye fry production. The design fully addressed the fish Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 4

8 propagation facility improvements and additional facilities required in sections A and B of SA 101. The Baker Fish Hatchery Renovation 100% Final Design Documentation Report (McMillen, 2009) serves as the record of the final design effort and provides the plans and specifications to begin construction. All of the aforementioned facilities were substantially completed by May The hatchery was placed into operational service in early June 2010, accepting adult sockeye broodstock. Beach 4 was shut down, and replacement production was transferred into the new fish culture facilities. Modifications to Sockeye Spawning Beach 4, including isolating the water supply and installing concrete walls between the segments, began in earnest in June 2010 and was completed in May The next Beach 4 operating cycle begins by accepting sockeye brood stock in June There were no significant deviations from the approved design as contained in the Baker Fish Hatchery Renovation 100% Final Design Documentation Report (McMillen, 2009). One addition was the installation of a pre-filter at the intake box for the hatchery water supply. The approved design included sand separators to filter out fine particulates from the water supply. However, upon hatchery start-up it became apparent that some organic matter was entering the intake box and making its way through into the filters. Because the filters were not intended to capture this type of material, a screen was designed, fabricated, and installed at the intake box. It was installed in May 2011, and has been effective at removing organic matter before it reaches the sand separators. Once final as-built drawings are completed, it is expected that the Baker Fish Hatchery Renovation Project will be declared complete in the fall of Final project completion will be documented in the 2011 annual report. Figures 1 10 show the Baker fish hatchery site layout, constructed facilities, modifications to Spawning Beach 4, and the substantially completed facilities at the Sulphur Springs site as of Spring Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 5

9 Figure 1. Baker fish hatchery site layout. Figure 2. Baker fish hatchery constructed facilities. Clockwise from top left: egg incubation, adult holding and fry transfer hoppers, outdoor rearing, early rearing. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 6

10 Figure 3. Spawning Beach 4 prior to modifications. Figure 4. Spawning Beach 4 during modifications, showing isolated water supply to each segment and the concrete walls between segments. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 7

11 Figure 5. New pond liner. Figure 6. Crane (at right) and outlet structure improvements. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 8

12 Figure 7. Pad for spawning beach access during operation and maintenance activities. Figure 8. Completed spawning beach sections. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 9

13 Figure 9. Installation of fry outlet screens and fry enumeration stations. Figure 10. Post-modification testing at Spawning Beach 4. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 10

14 Figure 11. Fish hatchery and improved Spawning Beach 4, spring Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 11

15 3.1.3 Fish Propagation /Enhancement Programs The following sections through present the results of the fish propagation programs during the reporting period. The information and results also represent an audit of the existing propagation and enhancement program. The audit describes results of biological, operational, and maintenance efforts related to implementing fish propagation and enhancement facilities and programs, and report whether the program goals were met based on the biologically-established June 1, 2010 to May 31, 2011 operating year. This calendar coincides with the operational cycle for the Baker Project fish propagation facilities, which starts with the first yearly adult sockeye returns to the Baker Project and ends with the completion of fry emigration from the sockeye spawning beaches. The audit summarizes the production results of the sockeye spawning beach and artificial propagation facilities, as well as the production results of the coho supplementation and rainbow trout enhancement programs. The information reported includes: Sockeye fry production numbers. A discussion of disease management and results. Reporting related to adult returns, facility loading, production totals, and release numbers for juvenile sockeye, coho, and the other fish propagation and enhancement programs for rainbow trout. The current fish production program at the Baker River Project is directed by the Fish Co-Managers and is a combination of sockeye, coho, and rainbow trout production. The program continues the previous propagation and enhancement programs established by PSE with the WDFW, the Upper Skagit Indian Tribe, the Sauk-Suiattle Indian Tribe, and the Swinomish Indian Tribal Community, the USFWS, NOAA Fisheries, and the USDA-FS except that these programs are now contained in the newly-constructed Baker River fish hatchery and will enable the continued sequential development of population enhancement for sockeye and a 20,000-pound-capacity production program made up of any one or any combination of several species. Program updates, directives, and changes are provided by the Fish Co-Managers and reviewed at scheduled ARG meetings Sockeye Salmon Spawning Beaches Spawning Beach 4, completed in 1990 to replace the aging, isolated, and vulnerable Beaches 2 and 3, is operated as four isolated compartments (A, B, C, and D) to reduce and contain the outbreaks of infectious hematopoietic necrosis (IHN), a viral disease endemic to sockeye populations. The WDFW provides on-site management of Spawning Beach 4, with support from PSE in the form of funds and personnel. Spawning beach 4 was not used during this reporting period. Modifications were completed, including an isolated water supply, concrete barriers for compartment isolation, a new pond liner, outlet structure improvements, and cranes and concrete pads for carcass removal and better access. If the IHN virus is detected above the threshold level for any one of the compartments during routine testing, a chlorination treatment system is activated and a protocol to stop collection of fry in that segment is triggered at the direction of the fish co-managers. The Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 12

16 fry emerging from the infected compartment are terminated, and effluent is diverted to the chlorination treatment system in accordance with the disease management protocol developed by the Fish Co-Managers for the facility. The disease management protocol (see section 7.0, Supporting Documents ) is a set of agreements on how to determine when to stop taking fry from a beach section. This protocol has been in place for the past 15 years, and is revised annually as more is learned about the disease. During this reporting period (winter/spring 2011), viral sampling detected no IHN in either Spawning Beach 4 (not operated during this reporting period) or the artificial incubation sockeye fry that were produced in the new hatchery. Surplus adult sockeye salmon may be released into Baker Lake for spawning in the upper Baker River and its tributaries. Spawning Beach 3 has been operated periodically as an unattended production facility until replacement production can be provided from the new fish culture facilities at Sulphur Springs. When operated, Spawning Beach 3 usually requires pumping to supplement the gravity water supply. PSE provides support in the form of equipment and personnel, at the request of the WDFW. Spawning Beach 3 was not operated during this reporting period Sockeye Adult Returns (2010 season) Each year, the Fish Co-Managers set spawning beach loading goals based on the predicted sockeye run size and ideal loading conditions. Spawning density goals help maximize production and manage for disease. The 2010 beach loading plan was suspended until renovations to Spawning Beach 4 were completed. Spawning Beach 4 is intended to be used again in In the interim, the plan called for holding 3,800 sockeye as brood stock for the artificial incubation (AI) program. The plan did not call for use of Spawning Beach 3, though the beach was considered available as a backup resource. A total of 18,806 sockeye returned to the Baker River adult trap during The return exceeded the Fish Co-Managers 2010 allocation for the fish propagation facilities, so 10,414 sockeye were placed into Baker Lake, while 4,542 were allocated to tribal harvest. A distribution methodology developed by the Fish Co-Managers allocated fish between the artificial incubation program, and lake release and tribal harvest based on representative portions of the expected run timing. Artificial incubation ponds were seeded with a total of 3,827 fish. Beach 3 was not seeded with fish. The loading plan and actual loading count are reported in table 1. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 13

17 Table 1. Fish Co-Managers preseason sockeye broodstock loading plan and actual broodstock loading, Number of Adults Location/Program Loading Plan based on Pre-season Forecast Actual Loading based on Available Returns AI pond AI pond AI pond AI pond Total 3,800 3, Facilities Operations Monitoring - Water Supply Monitoring alarms detected two turbidity incidents on February 14, 2011 in the primary water supply to the Upper Baker fish rearing facilities at Sulphur Springs. Because of the potential for soil slippage at the springs supplying water to the fish production facilities, turbidity events are monitored by alarm systems. Past events have resulted in temporary turbidity excursions in the water supply. PSE has responded to these by providing an alternate water supply until the primary supply could be restored. The newly-installed sand separators are designed to have sediment protection and removal built into the primary water supply to address these events. In the spring of 2011, the addition of an intake screen at the Sulphur Springs headworks also reduced the amount of organic debris entering the system; in the past, this debris had accumulated in pipe manifolds Sockeye Artificial Incubation Program This hatchery program, which as a pilot program had been producing 1 million fry annually in temporary incubation facilities, has now transitioned into the newlyconstructed fish culture facilities that will enable the sequential development of additional population enhancement for sockeye up to the capacity for 7 million fry annually, and which provide added protection in the event of losses from infectious hematopoietic necrosis (IHN). The production goal for 2010 at the artificial incubation facility was 5 million including 130,000 fry reserved for a delayed-release experiment. Table 2 shows an example approach for scheduling and increasing future sockeye fry production per SA 101 (c), Sequential Development of Sockeye Population, using both the spawning beach program and the artificial incubation (AI) program for enhancement. In this approach, PSE would provide for facility operations as directed by the Fish Co-managers. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 14

18 Table 2. An approach for sequential sockeye development at production facilities at Sulphur Springs, 2010 to Brood Year Spawning Beach 4 AI Program Total Fry Production 2010 [Modify Beach 4] 5,000,000 5,000, ,000,000+ 3,000,000 6,000, ,000,000+ 4,000,000 7,000, ,000,000+ 5,000,000 8,000, ,000,000+ 6,000,000 9,000, ,000,000+ 7,000,000 10,000,000 The Fish Co-Managers determine the allocation percentage of fry to Lake Shannon and Baker Lake. In 2010, roughly 80% (4,004,680) of the fed fry were allocated to Baker Lake, while approximately 20% (950,180) were planted into Lake Shannon Sockeye Egg Production Artificial egg incubation occurred in the renovated Baker Fish Hatchery for the 2010 brood year. The AI program yielded a total of 5,199,858 eyed eggs. Air bubbles were observed inside the trays of some egg incubation stacks. Some egg mortality was observed adjacent to these bubbles. In the future, the incubation stacks will be sloped approximately 5% to help dissipate any bubbles. The modifications will occur in the off season Sockeye Fry Production According to WDFW records, the AI program produced approximately 5,095,860 fry, meeting the fry production goal established for 2010 by the Fish Co-managers for the artificial incubation program (table 3). Table 3. Salmon production from Baker fish propagation facilities, June 1, 2010 to May 31, Production Year Brood Year Species Program Stock Number Artificial Incubation Extended Rearing Mar. - May Sockeye Mar. - May Coho Release Size Baker 5,095,860 a Fed Fry Release Site Baker Lake, Lake Shannon Baker 289,318 b Fed Fry (see table 5) a Approximately 130,000 are held in the extended rearing program and will be released in June 2011 and November 2011 (table 5). b Approximately 60,000 are held in the extended rearing program and will be released in April 2012 and May 2012 (table 5) Sockeye Fry Disposition According to WDFW records, 4,004,680 fry from the artificial incubation program were released into Baker Lake, and 950,180 fry from the artificial incubation program were released into Lake Shannon. Most artificial incubation fry were transported to swim-up troughs and fed for a minimum of one week before release into Baker Lake The intent of this action was to allow the fry to swim up and become active before release, to develop foraging behavior to increase survival, and to postpone release until Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 15

19 zooplankton populations were more likely to be available in Baker Lake. However, 403,216 fry were planted directly into AI pond #3 and reared for four weeks before being planted into Lake Shannon. The intent of rearing in AI pond #3 was to test the fry transport hopper system and to evaluate using the artificial incubation ponds as a rearing vessel. Of the 2011 fry production, approximately 127,486 sockeye fry (as of May 31, 2011) are being reared for use in future studies and for continuing fish propagation and enhancement programs (the goal was 130,000). Fry production in 2010 resulted in approximately 156,780 sockeye fry released as sub-yearlings: 365 fish per pound (fpp) released into Baker Lake during June 2010, and 46 fpp in November Approximately 4,819 yearlings, or 12 fpp, were released into Baker Lake in April 2011 to contribute to mark-recapture studies (table 4). All fish were raised to appropriate release sizes and released on schedule. In past years, swim-up fry from spawning at Beach 3 or Beach 4 were captured for the rearing program; however, since 2002 the source of fry has been from AI production Yearly Sockeye Fry Propagation Sockeye fry recruitment to the reservoirs since 1957 has come from four constructed spawning beaches, hatchery production using artificial incubation, and limited natural spawning. Figure 12 shows the trend of fry releases from spawning beaches and hatchery production. During the 2010 reporting period, the AI program (not including the spawning beach, which was being modified) produced the second-largest number of fry to be released from the Baker fish propagation facilities during a single season approximately 5,095,860 fry. Figure 12. Yearly number of sockeye fry released into the reservoirs from Baker fish propagation programs, Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 16

20 Coho Supplementation program The coho supplementation program continues to produce juvenile coho from the stock of naturally-reproduced wild origin coho adults in the Baker River system for use in studies and for the ongoing fish propagation and enhancement objectives determined by the Fish Co-Managers. From the 2010 fry production, 154,234 surplus coho fry (150 fpp) were released into Lake Shannon at Sulphur Creek in June Approximately 65,000 fry were allocated for extended rearing and released as smolts in the spring of 2011 to continue migration experiments and contribute to adult returns. These fry, reared in raceways at Upper Baker, resulted in a total of 64,950 yearlings. Of these fish, 10,300 (20 fpp) were released into Baker Lake in April 2011, 5287 (20 fpp) were released into Lake Shannon in April 2011 as part of the annual mark-recapture (reservoir migration response) studies, and 3443 were used for juvenile passage biological studies. The remaining 45,920 yearling fish (22 fpp) were released into the Baker River in April 2011 below both dams to contribute to future fall adult returns. All fish were raised to appropriate sizes and released on schedule (table 4). Table 4. Salmon releases from Baker River fish propagation facilities, June 1, 2010 to May 31, Release Date Brood Year Species Stock Number Size (fish/lb.) Pounds Planted Release Site June 23, Sockeye Baker 100, Baker Lake June 23, Coho Baker 154, ,026 Sulphur Creek Nov. 17, Sockeye Baker 56, ,227 Baker Lake March 23, Sockeye Baker 3, Baker Lake March 23, Coho Baker 3, Baker Lake April 7, Coho Baker 45, ,050 Skagit River April 12, Coho Baker 5, Sulphur Creek April 27, Coho Baker 5, Baker Lake April 27, Coho Baker 5, Baker Lake April 27, Sockeye Baker 4, Baker Lake Total Releases 384,913 6, Coho Adult Returns (2010 season) A total of 3,282 coho adults returned to the Baker River trap in 2010, of which 217 were removed from the trap for the supplementation program. These fish were held at the Upper Baker rearing facility until sexually mature and then spawned. The coded wire tags were recovered from their carcasses for stock identification Coho Egg and Fry Production For the 2010 brood year (2011 fry production), 94 coho females were spawned and an estimated total of 321,734 eyed eggs were incubated at the renovated Upper Baker facility. Bubbles were also observed inside the coho incubation stacks. Modifications will occur in the off season to remedy the issue. An inventory of fry based on weight samples provided a count of 289,318. Approximately, 60,000 fry will be allocated to the extended rearing program (the Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 17

21 program goal is 60,000), resulting in a surplus of approximately 229,000 coho fry. The surplus fry will be released into Lake Shannon at Sulphur Creek in June The estimated 60,000 fry allocated for extended rearing will be released as yearlings (~20 fpp) in the spring of 2012 to continue migration experiments and contribute to adult returns. About 10,000 smolts from this program will be marked with a freeze brand and released into Baker Lake in April 2012, and 5,000 will be marked with a freeze brand and released into Lake Shannon that same month. All of these fish reared at the Upper Baker rearing facility will be used for the annual mark-recapture (reservoir migration response) experiments. The remaining 45,000 yearling fish will be released into the Baker River below both dams to contribute to future fall returns (table 5). Table 5. Salmon rearing inventory at fish propagation facilities as of May 31, Planned Release Date Brood Year Species Program Stock Inventory June /Nov a 2010 Sockeye Extended Rearing June Coho Extended Rearing April Coho Extended Rearing April Coho Extended Rearing May Coho Extended Rearing Planned Release (fish/lb.) Baker 127, /60 Baker 151, Baker 10, Baker 5, Baker 45, a Approximately 100,000 fish will be released in June 2011 and 60,000 will be released in November (5,000 are anticipated to be released in April 2012.) Planned Release Site Baker Lake Sulphur Creek Baker Lake Sulphur Creek Baker River Rainbow Trout Production A cooperative trout stocking program initiated by the WDFW and PSE in the 1970s was continued during this reporting period. The WDFW provided 21,000 rainbow trout fingerlings for the program in June PSE supplied labor, rearing facilities, and food during this rearing period, and 20,770 fish at an average of 3.25 fish per pound were planted in Of those, 19,390 fish were released into Depression Lake for recreational fishing, 1,080 fish were allocated to the Upper Skagit tribe for their fishing derby, and 300 more were allocated for local charitysponsored events. All fish were raised to appropriate sizes and released on schedule. Most trout (14,792) were released a month earlier than scheduled in an attempt to reduce water demand due to the installation of a new headworks screen. This resulted in overall smaller fish size at planting. Figures show the newly constructed Baker fish hatchery in its first-year operating cycle, which began in June 2010 with the holding of the 2010 returning adult sockeye designated for broodstock, subsequent spawning, egg take, artificial egg incubation, fry swim-up, release and juvenile fish rearing for the 20,000 pound capacity production program directed by the Fish Co-manager s annual fish production goals at the constructed hatchery facilities. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 18

22 Figure 13. Baker fish hatchery facilities in first-year operation concurrent with Spawning Beach 4 modifications. The holding raceways contain 3,800 adult sockeye, and are capable of holding up to 6,000 broodstock). Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 19

23 Figure 14. Baker fish hatchery facilities during first-year operation. Sockeye females selected for egg-take. Figure 15. Egg incubation tray collection. 5.2 million eggs were collected in Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 20

24 Figure 16. One of 784 egg incubators. The facility can incubate up to 7.8 million eggs. Figure 17. Newly-hatched fry in one of many swim-up troughs Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 21

25 Figure 18. The hatchery building houses 22 swim-up troughs and 10 early rearing tanks. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 22

26 Figure 19. These fry swim-up troughs, along with other components of the sockeye program, are in separate walled areas shielded from other functions of rearing in order to isolate, control, and reduce the risk of disease outbreaks. Figure 20. Sockeye fry in a holding pond, a staging area for the transfer hoppers that will release them to Baker Lake Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 23

27 Figure 21. Juvenile fish rearing facilities in use in 2010 for sockeye and coho salmon and rainbow trout. Raceways and rectangular and circular tanks are provided for program flexibility and multiple species. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 24

28 Figure 22. Juvenile fish rearing facilities with capacity for 20,000 pounds instantaneous production. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 25

29 Figure 23. Transferring and releasing juvenile salmon from a transport tank SA 101 c (1) Sockeye Smolt Capacity Study Plan Following license issuance, a technical subgroup of the Aquatic Resources Group (ARG) was formed to review potential study methods and determine a recommended approach to estimate the sockeye smolt capacity of Baker Lake and Lake Shannon. Several meetings were held in the fall of 2008, and a draft study plan was developed and approved by the ARG. The subgroup examined pre-license study recommendations Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 26

30 (Mazumder, 2004), studied alternatives, and recommended a study methodology. Rather than a single study, the effort consisted of four independent estimating methodologies conducted simultaneously: zooplankton sampling, nutrient analysis, euphotic zone depth measurement, and translation of Mazumder (2004) smolt capacity estimates. The study plan was implemented and site-specific data collected during 2009 and The field sampling effort of the study (PSE, February 2009) began in February 2009 and continued through October 2009, resumed in February 2010, and continued through April Sample processing continued through July 2010, followed by analysis in August PSE provided interim study updates to the Aquatic Resources Group at ARG meetings in August, September, October, and December On September 14, 2010, the ARG decided to extend the deadline to complete the final report to November 15, PSE submitted a draft study report to the ARG for 30-day review on October 1, On October 22, 2010, the ARG decided to extend the comment period an additional 30 days and to move the final report deadline to December 15, PSE submitted the final report Sockeye Smolt Production Capacity in Baker Lake and Lake Shannon, including comments and replies to the ARG, on December 15, 2010 thus completing the requirements of settlement agreement 101(c) SA 101 d Maintain, Then Restore Natural Conditions at Spawning Beaches 1,2 & 3 When renovation of the Spawning Beach 4 site is complete, a Channel Creek decommissioning plan will be developed that identifies decommissioning procedures. Actual decommissioning of the Channel Creek site will not occur until the USDA-FS authorizes decommissioning. During the reporting period, PSE consulted informally with the USDA-FS towards an understanding of the decommissioning procedures. PSE and the USDA-FS sought input from the Aquatic Resources Group at meetings in July, September, October, November, and December 2010; and March, April, and May A joint ARG workshop with the Cultural Resources Advisory Group was held in March 2011 to clarify historical resources implications, review a draft scope-of-work document provided by the USDA-FS, and list possible decommissioning alternatives. In subsequent meetings conducted by PSE in April and May 2011, the ARG and CRAG reviewed a matrix developed by PSE outlining the various options. This process resulted in a scope of work agreed upon by the USDA-FS. The conceptual design process will begin in late SA 101 g Fish Facility Operations Manual for Sockeye Spawning Beach 4 and Sulphur Springs Fish Culture Facility Puget Sound Energy will provide an updated manual within six months following final project completion of renovation or construction of new facilities as part of the Baker fish hatchery renovation project. The updated manual will replace the April 2009 manual completed for the previous fish culture facilities. PSE and the Baker fish hatchery design and construction contractor, McMillen-McDougall, prepared operations and maintenance procedures for the Baker fish hatchery renovation project to be included in the updated manual SA 101 Fish Propagation Facilities Operations Audit Financial accounting. This information is reported in section 6.0, Accounting. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 27

31 Fish handling and disease management operations. The results of the propagation and enhancement programs are reported in section This information includes operation of the sockeye salmon spawning beaches, loading results, monitoring of the facility water supply, sockeye AI program, sockeye egg & fry production, sockeye fry disposition, coho supplementation, coho returns, coho egg and fry production, and rainbow trout production. The goal for every hatchery program is to provide optimum rearing conditions to produce healthy fish. Fish production goals were met for healthy fish (such as numbers of fish, growth, and release) for this reporting period. Best management practices were followed. Disease management procedures for IHN were in place. No IHN incidents occurred during this reporting period. Preventative treatments were applied when necessary. PSE works closely with the Fish Co-Managers fish health staff to determine when and what types of treatments are warranted. Hazardous materials handling. Prior to the start of the renovation of the Baker fish hatchery, PSE contracted with a hazardous materials consultant (Phillips Environmental Services) to assess the presence of any hazardous materials associated with the removal of any structures, and it was determined that there were none. Spill prevention and control countermeasures (SPCC) compliance. PSE, per the FERC license, developed an SPCC plan for the project. This plan was submitted to the FERC prior to construction, and compliance is mandatory. There have been no incidents. Several PSE documents currently address the management of water quality protection at the Baker Project. These are the SPCC Plan, the Upper Baker Generation Plan (GeoEngineers, August 2008), the Construction Stormwater Pollution Prevention Plan for the Upper Baker River hatchery (GeoEngineers, June 2008), and the SA 401 Water Quality Protection Plan (PSE, August 2009). 3.2 Monitoring Results, Observations, and Analyses SA 101 implementation activities did not produce monitoring data or other notable observations during the reporting period. 3.3 Acquisition and Related Activities No acquisitions or related activities under SA 101 occurred during the reporting period. 3.4 Special Consultation No special consultation under SA 101 occurred during the reporting period. 3.5 Design and Planning Activities No design or planning activities under SA 101 occurred during the reporting period. 3.6 Documents Submitted The final report summarizing the study of the sockeye smolt production capacity of Baker Lake and Lake Shannon, which was conducted in response to settlement agreement article 101(c)1 and developed in collaboration with the Aquatic Resources Group, was completed on December 15, Comments and responses from the ARG review have been included in the final report. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 28

32 Issues and Resolution The 2009 annual report that covers the SA 101 reporting period of June 1, 2009 through May 31, 2010, as prescribed by SA 102, was submitted to the ARG for comment on October 29, Comments and responses from the ARG review have been included in the revised 2009 report submitted to the FERC on December 13, 2010 under the May 26, 2010 Order Modifying and Approving Fish Propagation Facilities Plan, Settlement Agreement Article Modifications to or Deviations from Implementation Plan PSE executed a schedule change for the 101(c)1 Sockeye Smolt Capacity Study based on a decision by representatives of the ARG to extend the comment period on the draft report, and subsequently to extend the deadline for completion of the final report to December 15, 2010 (October 25, from Arnie Aspelund to the ARG). The final report was completed on December 15, 2010 and describes results of the study, including ARG comments and recommendations. 4.0 Issues and Resolution No SA 101 implementation issues were identified during the reporting period. 5.0 Proposed Changes to the Fish Propagation Facilities Plan There were no proposed changes to the Fish Propagation Facilities Plan during the reporting period. 6.0 Accounting Puget Sound Energy, pursuant to settlement agreement articles 102, 201, 301, 501, and 602, is required to provide an annual summary of expenditures made during the preceding year, as well as an accounting of funding expenditures, any interest earned, disbursements made as required by any article, and adjustments for inflation. This section provides an accounting of all expenditures made during the reporting period, including pre-license expenditures such as costs incurred for early land acquisition efforts. All disbursement adjustments and relevant calculations were determined using the guidelines provided in settlement agreement article Funding No funding was prescribed for SA 101 implementation during the reporting period. 6.2 Expenditures PSE budgeted to fund a contract with the WDFW to operate Sockeye Spawning Beach 4. $237,169 was spent on this contract during the reporting period. PSE budgeted for additional operations and maintenance costs for SA 101 implementation and spent $685,135 during the reporting period. This number represents costs attributed to continuing existing fish propagation and enhancement programs and implementation of the Fish Propagation Facilities Plan. Doc ID: BAK PSE.FERC Baker River Hydroelectric Project Page 29

FISH PROPAGATION 2015 ANNUAL REPORT

FISH PROPAGATION 2015 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 101 FISH PROPAGATION 2015 ANNUAL REPORT REPORTING PERIOD JANUARY 1, 2015 DECEMBER 31, 2015 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 November 2016 PUGET SOUND ENERGY

More information

FISH PROPAGATION 2012 ANNUAL REPORT

FISH PROPAGATION 2012 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 101 FISH PROPAGATION 2012 ANNUAL REPORT REPORTING PERIOD JUNE 1, 2012 MAY 31, 2013 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 December 2013 BAK SA 101 Annual Report 2012.Doc

More information

FISH PROPAGATION 2014 ANNUAL REPORT

FISH PROPAGATION 2014 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 101 FISH PROPAGATION 2014 ANNUAL REPORT REPORTING PERIOD JANUARY 1, 2014 DECEMBER 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 November 2015 PUGET SOUND ENERGY

More information

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT LICENSE ARTICLE 410 THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT REPORTING PERIOD JANUARY 1 DECEMBER 31, 2010 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 Puget Sound Energy Bellevue,

More information

UPSTREAM FISH PASSAGE 2015 ANNUAL REPORT

UPSTREAM FISH PASSAGE 2015 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 103 UPSTREAM FISH PASSAGE 2015 ANNUAL REPORT REPORTING PERIOD JANUARY 1, 2015 DECEMBER 31, 2015 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 November 2016 PUGET SOUND ENERGY

More information

Baker River Project License Implementation. Aquatics Resource Group Meeting Final Conference Call Notes. March 9, 2010 ~ 9:00-11:00 am

Baker River Project License Implementation. Aquatics Resource Group Meeting Final Conference Call Notes. March 9, 2010 ~ 9:00-11:00 am Baker River Project License Implementation Aquatics Resource Group Meeting Final Conference Call Notes March 9, 2010 ~ 9:00-11:00 am Team Leader: Arnie Aspelund, PSE (arnie.aspelund@pse.com) PRESENT: Arnie

More information

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018 Cushman Hydro Project Public Meeting Cushman Fire Hall Dec. 6, 2018 Reservoir Operations Florian Leischner Fish and Habitat Biologist Cushman Reservoirs Cushman dams were built in 1924-30 New Cushman license

More information

Yakima/Klickitat Fisheries Project

Yakima/Klickitat Fisheries Project Yakima/Klickitat Fisheries Project Lower Yakima River Supplementation and Research Project Operations and Maintenance Annual Report 2002-2003 March 2004 DOE/BP-00006677-1 This Document should be cited

More information

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, September 4, 27 9: a.m. : a.m. Place: CONFERENCE CALL ONLY Contacts: Frank

More information

P U B L I C U T I L I T Y D I S T R I C T N O.

P U B L I C U T I L I T Y D I S T R I C T N O. P U B L I C U T I L I T Y D I S T R I C T N O. 1 o f C H E L A N C O U N T Y P.O. Box 1231, Wenatchee, WA 98807-1231 327 N. Wenatchee Ave., Wenatchee, WA 98801 (509) 663-8121 Toll free 1-888-663-8121 www.chelanpud.org

More information

FISH CONNECTIVITY IMPLEMENTATION PLAN

FISH CONNECTIVITY IMPLEMENTATION PLAN FISH CONNECTIVITY IMPLEMENTATION PLAN SETTLEMENT AGREEMENT ARTICLE 104 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 October 2011 BAK SA 104 Fishconnectivityimplan.Doc PUGET SOUND ENERGY Baker River

More information

Attachment 1. Agenda Item Summary BACKGROUND

Attachment 1. Agenda Item Summary BACKGROUND Attachment 1 Agenda Item Summary BACKGROUND Spring Chinook Salmon: Prior to the late 1970s, non-treaty spring Chinook fisheries in the mainstem Columbia River occurred from February through May and harvested

More information

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Douglas County, Washington Project No. 2149-163 ORDER APPROVING BULL TROUT STRANDING, ENTRAPMENT,

More information

Platte River State Fish Hatchery Summary of 2012 Production and Operational Activities

Platte River State Fish Hatchery Summary of 2012 Production and Operational Activities Platte River State Fish Hatchery Summary of 2012 Production and Operational Activities Antibiotic Use The antibiotic use at the Platte River State Fish Hatchery (Hatchery) in 2012 only focused on disease

More information

FINAL Caples Lake Fisheries Management Plan. Version 4.0

FINAL Caples Lake Fisheries Management Plan. Version 4.0 FINAL Caples Lake Fisheries Management Plan Version 4.0 August 15, 2008 Purpose The Caples Lake Fisheries Management Plan (Plan) outlines the stocking plan to reestablish a sport fishery in Caples Lake

More information

UPSTREAM FISH PASSAGE 2013 ANNUAL REPORT

UPSTREAM FISH PASSAGE 2013 ANNUAL REPORT SETTLEMENT AGREEMENT ARTICLE 103 UPSTREAM FISH PASSAGE 2013 ANNUAL REPORT REPORTING PERIOD JUNE 1, 2013 MAY 31, 2014 BAKER RIVER HYDROELECTRIC PROJECT FERC No. 2150 January 2015 PUGET SOUND ENERGY Baker

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Lochsa River Spring Chinook Population and Related Hatchery Programs January 31, 2009 Lochsa River Spring Chinook Population Report Page - 1

More information

SALMON RIVER HATCHERY

SALMON RIVER HATCHERY SALMON RIVER HATCHERY PROGRAM MANAGEMENT PLAN 2018 Salmon River Hatchery INTRODUCTION Salmon River Hatchery is located seven miles north of Lincoln City off Highway 18 near Otis. Site is at an elevation

More information

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

APPENDIX D: LEWIS RIVER HATCHERY REVIEW APPENDIX D: LEWIS RIVER HATCHERY REVIEW JANUARY 14, 2004 Prepared for PacifiCorp and Cowlitz PUD Prepared by S.P. Cramer & Associates, Inc. 600 NW Fariss Gresham, Oregon 97030 www.spcramer.com D-1 TABLE

More information

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell: From: To: Cc: Subject: Date: Attachments: Hemstrom, Steven "Lewis, Stephen" Sokolowski, Rosana 2014 Rocky Reach Bull Trout Report Wednesday, June 18, 2014 3:01:07 PM Final 2014 Rocky Reach Bull Trout Observations

More information

Conditions affecting the 2011 and 2012 Fall Chinook Adult Returns to Spring Creek National Fish Hatchery.

Conditions affecting the 2011 and 2012 Fall Chinook Adult Returns to Spring Creek National Fish Hatchery. FISH PASSAGE CENTER 1827 NE 44 th Ave., Suite 240, Portland, OR 97213 Phone: (503) 230-4099 Fax: (503) 230-7559 http://www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO: Liz Hamilton, NSIA FROM:

More information

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, and Joseph T. Kelliher. Public Utility District No. 1 of

More information

CEDAR CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018

CEDAR CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018 CEDAR CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018 Cedar Creek Hatchery INTRODUCTION Cedar Creek Hatchery is located 1.5 miles east of Hebo off Highway 22, adjacent to Three Rivers, a Nestucca River tributary.

More information

NORTH NEHALEM HATCHERY

NORTH NEHALEM HATCHERY NORTH NEHALEM HATCHERY PROGRAM MANAGEMENT PLAN 2018 Nehalem Hatchery Plan Page 1 North Nehalem Hatchery INTRODUCTION The North Nehalem Hatchery is located on the North Fork Nehalem River 12 miles East

More information

OXBOW FISH HATCHERY AND HELLS CANYON FISH TRAP

OXBOW FISH HATCHERY AND HELLS CANYON FISH TRAP Hatchery 13 Article 07 OXBOW FISH HATCHERY AND HELLS CANYON FISH TRAP 1 9 8 8 A n n u a l R e p o r t b y Brent R. Snider, Fish Hatchery Superintendent I March 1993 TABLE OF CONTENTS Page ABSTRACT... 1

More information

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery Jeffrey P. Koenings, PhD. Washington Department of Fish and Wildlife American Fisheries Society

More information

Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar

Shasta Dam Fish Passage Evaluation. Public Stakeholder Webinar Shasta Dam Fish Passage Evaluation Public Stakeholder Webinar 9-24-2015 Today s Topics 1. Introduction Craig Moyle (MWH) 2. Project Overview John Hannon (Reclamation) 3. Sacramento River Conditions and

More information

Reproductive success of hatchery chinook salmon in the Deschutes River, Washington

Reproductive success of hatchery chinook salmon in the Deschutes River, Washington Reproductive success of hatchery chinook salmon in the Deschutes River, Washington Howard Fuss Hatchery Wild Interactions Team Washington Department of Fish and Wildlife Acknowledgments HSRG for providing

More information

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program: F 1 Generation

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program: F 1 Generation Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program: F 1 Generation Tim Hoffnagle, Rich Carmichael, Joseph Feldhaus, Deb Eddy, Nick Albrecht and Sally Gee Oregon Department of Fish and

More information

Don Pedro Project Relicensing

Don Pedro Project Relicensing Don Pedro Project Relicensing M ODESTO I RRIGATION D ISTRICT TURLOCK I RRIGATION D ISTRICT FERC PROJECT N O. 2299 Resident Fish in Don Pedro Reservoir Don Pedro Reservoir Fish Stocking (1971-Present) CDFG

More information

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager Kirt Hughes Region 6 - Fish Program Manager Habitat Hatcheries Harvest Clean Water Act Shorelines Harvest Hydro Habitat Forest Practices Non-regulatory Programs Water Supply & Conservation Growth Management

More information

ROCK CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2017

ROCK CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2017 ROCK CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2017 Rock Creek Hatchery INTRODUCTION Rock Creek Hatchery is located on the North Umpqua River, 23 miles east of Roseburg, just off Highway 138. The site is

More information

2016 Annual Work Plan

2016 Annual Work Plan Rocky Reach Hydroelectric Project FERC No. 2145 2016 Annual Work Plan 2015 Progress Report d per Rocky Reach Settlement Agreement, Sections 15.1.1 & 15.6.5 Reports provided by Chelan PUD Leads: Ray Heit

More information

IRRIGON HATCHERY PROGRAM MANAGEMENT PLAN 2018

IRRIGON HATCHERY PROGRAM MANAGEMENT PLAN 2018 IRRIGON HATCHERY PROGRAM MANAGEMENT PLAN 2018 Irrigon Hatchery INTRODUCTION Irrigon Hatchery is located along the Columbia River above John Day Dam 3 miles west of Irrigon, Oregon. The facility is at an

More information

Ned Currence, Nooksack Indian Tribe

Ned Currence, Nooksack Indian Tribe Ned Currence, Nooksack Indian Tribe Problem Status Distribution Habitat Hatcheries Harvest 25000 20000 Natural-Origin Spawners 15000 10000 22500 5000 0 Historic catch Spawners (2011-2015) Problem Status

More information

Lakelse Sockeye Recovery Program

Lakelse Sockeye Recovery Program Lakelse Sockeye Recovery Program The Ninth Annual BC Interior Stewardship Workshop May 7 th and 8 th, 2013 DFO North Coast Resource Restoration Unit Presentation Overview History/background Stock and habitat

More information

SALMON RIVER HATCHERY

SALMON RIVER HATCHERY SALMON RIVER HATCHERY OPERATIONS PLAN 2006 Salmon River Hatchery Plan Page 1 Salmon River Hatchery INTRODUCTION Salmon River Hatchery is located four miles north of Lincoln City off Highway 18 near Otis.

More information

TAY DISTRICT SALMON FISHERIES BOARD POLICY ON SALMON STOCKING

TAY DISTRICT SALMON FISHERIES BOARD POLICY ON SALMON STOCKING TAY DISTRICT SALMON FISHERIES BOARD POLICY ON SALMON STOCKING August 2011 1 INTRODUCTION This document describes the policy adopted by the Tay District Salmon Fisheries Board for the artificial stocking

More information

LOOKINGGLASS HATCHERY

LOOKINGGLASS HATCHERY LOOKINGGLASS HATCHERY PROGRAM MANAGEMENT PLAN 2018 Lookingglass Hatchery And Imnaha Satellite Facility INTRODUCTION Lookingglass Hatchery is located along Lookingglass Creek, a tributary to the Grande

More information

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, August, 27 9: a.m. :45 a.m. Place: CONFERENCE CALL ONLY Contacts: Frank

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-49 2013 LAKE TAHOE WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS REPORT

More information

SANDY HATCHERY OPERATIONS PLAN Sandy Hatchery Plan Page 1

SANDY HATCHERY OPERATIONS PLAN Sandy Hatchery Plan Page 1 SANDY HATCHERY OPERATIONS PLAN 2014 Sandy Hatchery Plan Page 1 Sandy Hatchery INTRODUCTION Sandy Hatchery is located along Cedar Creek (a Sandy River tributary) 1.5 miles north of Sandy, Oregon, off Highway

More information

MARION FORKS HATCHERY

MARION FORKS HATCHERY MARION FORKS HATCHERY PROGRAM MANAGEMENT PLAN 2018 Marion Forks Hatchery INTRODUCTION Marion Forks Hatchery is located along Marion and Horn Creeks (Santiam River tributaries in the Willamette Basin) about

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 Lake Tahoe Rainbow Trout Study WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION

More information

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report Ms. Jessica Gonzales April 15, 2015 Wenatchee Office Lead Central Washington Field Office U. S. Fish and Wildlife Service 215 Melody Lane, Suite 119 Wenatchee, WA 98801-5933 Subject: Wells Hydroelectric

More information

Management Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond

Management Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond Management Strategies for Columbia River Recreational and Commercial Fisheries: 2013 and Beyond Recommendation of the Columbia River Fishery Management Workgroup to the Fish and Wildlife Commissions of

More information

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO. OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO. 3a Columbia River Compact/Joint State Hearing February 21, 2018 Fisheries under consideration: Mainstem

More information

McKENZIE RIVER HATCHERY

McKENZIE RIVER HATCHERY McKENZIE RIVER HATCHERY PROGRAM MANAGEMENT PLAN 2017 McKenzie River Hatchery INTRODUCTION McKenzie River Hatchery is located along the McKenzie River approximately 22 miles east of Springfield, Oregon.

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-48 2012 LAKE TAHOE WESTERN REGION Contents NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS

More information

Mass Marking and Management of Great Lakes Fisheries

Mass Marking and Management of Great Lakes Fisheries Mass Marking and Management of Great Lakes Fisheries T. Newcomb and K. Smith Michigan Department of Natural Resources M. Staggs Wisconsin Department of Natural Resources D. Stang New York Department of

More information

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT Attachment 4 NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT Figures in Draft Plan of February 28, 27 Figure 1. Map of the Rogue River Basin. PASSAGE ESTIMATES

More information

Kootenay Lake Kokanee and other Fish 2017 Status

Kootenay Lake Kokanee and other Fish 2017 Status Kootenay Lake Kokanee and other Fish 2017 Status Friends of Kootenay Lake 5th Annual Kootenay Lake Summit November 2017 Matt Neufeld and Jeff Burrows BC Fish and Wildlife Nelson Outline Kootenay Lake Fish

More information

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State

More information

OXBOW HATCHERY PROGRAM MANAGEMENT PLAN 2018

OXBOW HATCHERY PROGRAM MANAGEMENT PLAN 2018 OXBOW HATCHERY PROGRAM MANAGEMENT PLAN 2018 Oxbow Hatchery and Satellites (Upper and Lower Herman Creek Ponds) INTRODUCTION Oxbow Hatchery is located approximately 1 mile east of Cascade Locks, Oregon,

More information

Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016

Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016 Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016 North Fork Lewis River Hydroelectric Project Yale FERC No. 2071 Prepared by: Jeremiah Doyle, PacifiCorp April 4, 2017 1.0 INTRODUCTION

More information

R & E Grant Application 15 Biennium

R & E Grant Application 15 Biennium R & E Grant Application 15 Biennium Project #: 15-026 Project Information R&E Project Request: Total Project: Start Date: End Date: Organization: Cedar Creek Hatchery Raceway and Pump Replacement $500,000.00

More information

ADDENDUM I TO AMENDMENT 3 OF THE INTERSTATE FISHERY MANAGEMENT PLAN FOR WEAKFISH

ADDENDUM I TO AMENDMENT 3 OF THE INTERSTATE FISHERY MANAGEMENT PLAN FOR WEAKFISH ATLANTIC STATES MARINE FISHERIES COMMISSION ADDENDUM I TO AMENDMENT 3 OF THE INTERSTATE FISHERY MANAGEMENT PLAN FOR WEAKFISH Prepared by the Weakfish Plan Review Team Approved October 18, 2000 TABLE OF

More information

June 14, Sincerely,

June 14, Sincerely, Joan M. Dukes Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Rhonda Whiting Vice-Chair Montana Bill Bradbury Oregon Tom Karier Washington Phil Rockefeller Washington June

More information

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Introduction In September 2008, the National Marine Fisheries Service issued the Russian River Biological Opinion, which

More information

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A. Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon 1998- February 8, 2 By Greg A. Taylor Oregon Dept. of Fish & Wildlife 315 E. Main Street Springfield, OR 97478

More information

FALL RIVER HATCHERY OPERATIONS PLAN Fall River Hatchery Plan Page 1

FALL RIVER HATCHERY OPERATIONS PLAN Fall River Hatchery Plan Page 1 FALL RIVER HATCHERY OPERATIONS PLAN 2006 Fall River Hatchery Plan Page 1 Fall River Hatchery INTRODUCTION Fall River Hatchery is located off of South Century Drive about 25 miles south of Bend. The site

More information

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania

Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania Striped Bass and White Hybrid (x) Striped Bass Management and Fishing in Pennsylvania Prepared by R. Lorantas, D. Kristine and C. Hobbs PFBC Warmwater Unit 2005 (stocking numbers updated after 2005) Goal:

More information

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON To: Branch of Natural Resources P.0. Box C, Warm Springs, Oregon 97761 Phone (541) 553-2002/2003 Fax (541) 553-1994 The Independent Science

More information

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Primary Outcome Area: Economy & Jobs Secondary Outcome Area: Healthy Environments Program Contact: Ed Bowles, 503-947-6206

More information

BIG CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018

BIG CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018 BIG CREEK HATCHERY PROGRAM MANAGEMENT PLAN 2018 Big Creek Hatchery INTRODUCTION Big Creek Hatchery is located 16 miles east of Astoria, Oregon, 2 miles south of Knappa off Highway 30, and is approximately

More information

Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin

Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin ACC Participants Present (13) Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin Eli Asher, Lower Columbia River Fish Recovery

More information

The Fishery. Newfoundland Region Stock Status Report D2-05

The Fishery. Newfoundland Region Stock Status Report D2-05 Fisheries Pêches and Oceans et Océans DFO Science Newfoundland Region Stock Status Report D2-05 ATLANTIC SALMON INSULAR NEWFOUNDLAND, SOUTHWEST COAST, SALMON FISHING AREAS 12-13 Background Salmon Fishing

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

Kootenay Lake Update and Actions Matt Neufeld and Jeff Burrows Ministry of Forests, Lands and Natural Resource Operations - Nelson

Kootenay Lake Update and Actions Matt Neufeld and Jeff Burrows Ministry of Forests, Lands and Natural Resource Operations - Nelson Kootenay Lake Update and Actions 2015 Matt Neufeld and Jeff Burrows Ministry of Forests, Lands and Natural Resource Operations - Nelson History Leading to 2015 Kokanee Gerrard Rainbow Kootenay Lake Fishery

More information

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, December 14, 2017 9:00 a.m. 11:15 a.m. Place: Merwin Hydro Control Center

More information

COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN Cole Rivers Hatchery Plan Page 1

COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN Cole Rivers Hatchery Plan Page 1 COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN 2018 Cole Rivers Hatchery Plan Page 1 Cole Rivers Hatchery INTRODUCTION Cole Rivers Hatchery is located on the Rogue River, 30 miles northeast of Medford, Oregon,

More information

COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN Cole Rivers Hatchery Plan Page 1

COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN Cole Rivers Hatchery Plan Page 1 COLE RIVERS HATCHERY PROGRAM MANAGEMENT PLAN 2019 Plan Page 1 INTRODUCTION is located on the Rogue River, 30 miles northeast of Medford, Oregon, on Highway 62, about ½ mile downstream of Lost Creek Dam.

More information

Incidental Take Permits for HCP Plan Species

Incidental Take Permits for HCP Plan Species Incidental Take Permits for HCP Plan Species Permit No. 1391 Permit for Incidental Take of Endangered or Threatened Species during the Operation and Maintenance of the Wells Hydroelectric Project (2003)

More information

Oregon Hatchery Research Center January 2014 David L. G. Noakes, Professor & Director

Oregon Hatchery Research Center January 2014 David L. G. Noakes, Professor & Director Oregon Hatchery Research Center January 2014 David L. G. Noakes, Professor & Director Research Proposal Homing Homing behavior is a striking feature of the biology of Pacific salmon, and is the basis for

More information

BONNEVILLE HATCHERY PROGRAM MANAGEMENT PLAN 2018

BONNEVILLE HATCHERY PROGRAM MANAGEMENT PLAN 2018 BONNEVILLE HATCHERY PROGRAM MANAGEMENT PLAN 2018 Bonneville Hatchery INTRODUCTION Bonneville Hatchery is located 4 miles west of Cascade Locks, off of Interstate 84 (Exit 40) within the Bonneville Dam

More information

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO.

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO. OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO. 1 Columbia River Compact/Joint State Hearing June 28, 2018 Fisheries under consideration: Treaty commercial

More information

Hatcheries: Role in Restoration and Enhancement of Salmon Populations

Hatcheries: Role in Restoration and Enhancement of Salmon Populations Hatcheries: Role in Restoration and Enhancement of Salmon Populations Hatcheries play a large role in the management, ecology, and evolution of Pacific salmon. Why were/are they built? What are the assumptions

More information

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, February 14, 219 9: a.m. 1:3 a.m. Place: CONFERENCE CALL ONLY Contacts:

More information

Okanagan Sockeye Reintroduction

Okanagan Sockeye Reintroduction Okanagan Sockeye Reintroduction Backgrounder Elders accounts, and other forms of Traditional Ecological Knowledge (TEK) tell us that many species of salmon once came into the Okanagan Valley and tell us

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

LOWER SNAKE RIVER COMPENSATION PLAN: Oregon Spring Chinook Salmon Evaluation Studies 2006 Annual Progress Report

LOWER SNAKE RIVER COMPENSATION PLAN: Oregon Spring Chinook Salmon Evaluation Studies 2006 Annual Progress Report LOWER SNAKE RIVER COMPENSATION PLAN: Oregon Spring Chinook Salmon Evaluation Studies 2006 Annual Progress Report Oregon Department of Fish and Wildlife Fish Research and Development, NE Region Fred R.

More information

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH Horsefly River Angling Management Plan January 30 th, 2006 Area/Fishery Description The Horsefly River watershed provides

More information

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River Kris Homel NW Fish Culture Concepts Wilsonville, OR 2015 Historic distribution and abundance

More information

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy. Lewis River Interim Final Upstream Transport Plan Lewis River Upstream Transport Plan Interim Final Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy December 18, 2009 Page 1 of 31 Table

More information

Red Cliff Hatchery bolsters Lake Superior coaster population - Stocks walleye in local lakes

Red Cliff Hatchery bolsters Lake Superior coaster population - Stocks walleye in local lakes Red Cliff Hatchery bolsters Lake Superior coaster population - Stocks walleye in local lakes By Sue Erickson, Staff Writer Red Cliff,Wis_Rehabilitation of the coaster brook trout population in Lake Superior

More information

Managing for IHNV in Rainbow Trout at Leaburg Hatchery. Erik Withalm

Managing for IHNV in Rainbow Trout at Leaburg Hatchery. Erik Withalm Managing for IHNV in Rainbow Trout at Leaburg Hatchery Erik Withalm erik.j.withalm@state.or.us Background Mitigate for lost recreational fishing opportunities due to the construction of Blue River and

More information

R & E Grant Application Biennium

R & E Grant Application Biennium R & E Grant Application 15-17 Biennium Project #: 15-053 Elk River Hatchery Maintenance Project Information R&E Project Request: Total Project: Start Date: End Date: Organization: $116,262 $139,300 8/8/2016

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 LAKE TAHOE WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL PROGRESS REPORT

More information

11426 Moorage Way P.O. Box 368 LaConner, WA Phone: Fax:

11426 Moorage Way P.O. Box 368 LaConner, WA Phone: Fax: Skagit River System Cooperative 11426 Moorage Way P.O. Box 368 LaConner, WA 98257-368 Phone: 36-466-7228 Fax: 36-466-447 www.skagitcoop.org BULL TROUT USE OF SWINOMISH RESERVATION WATERS Eric Beamer, Rich

More information

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary Introduction In September 2008, the National Marine Fisheries Service issued the Russian River Biological Opinion, which

More information

Agenda Item Summary BACKGROUND. Public Involvement ISSUE ANALYSIS. Attachment 1

Agenda Item Summary BACKGROUND. Public Involvement ISSUE ANALYSIS. Attachment 1 Agenda Item Summary Attachment BACKGROUND Between 996 and 03 white sturgeon fisheries in the Columbia River downstream from Bonneville Dam were managed under a series of management accords between the

More information

FALL RIVER HATCHERY PROGRAM MANAGEMENT PLAN 2018

FALL RIVER HATCHERY PROGRAM MANAGEMENT PLAN 2018 FALL RIVER HATCHERY PROGRAM MANAGEMENT PLAN 2018 Fall River Hatchery INTRODUCTION Fall River Hatchery is located off of South Century Drive about 25 miles south of Bend. The site is at an elevation of

More information

Atlantic States Marine Fisheries Commission

Atlantic States Marine Fisheries Commission Atlantic States Marine Fisheries Commission DRAFT ADDENDUM XXIV TO THE SUMMER FLOUNDER, SCUP AND BLACK SEA BASS FISHERY MANAGEMENT PLAN FOR PUBLIC COMMENT Summer Flounder Recreational Management in 2013

More information

Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys

Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys FEDERAL AID IN FISH RESTORATION Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys By Judy Hall-Griswold, Fishery Technician

More information

WALLOWA HATCHERY PROGRAM MANAGEMENT PLAN 2018

WALLOWA HATCHERY PROGRAM MANAGEMENT PLAN 2018 WALLOWA HATCHERY PROGRAM MANAGEMENT PLAN 2018 Wallowa Hatchery and Satellites (Big Canyon and Little Sheep Creek) INTRODUCTION Wallowa Hatchery is located along Spring Creek, a tributary of the Wallowa

More information

ESCA. Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times

ESCA. Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times ESCA Endangered Species Conservation Act of 1969 Changed in 1973 to ESA Amended several times International Efforts http://www.cites.org/ Convention on International Trade in Endangered Species of Wild

More information

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat National Marine Fisheries Service March 2003 The Department

More information

Report Outlined Improvements to: Shepherd of the Hills Hatchery Montauk Hatchery Bennett Spring Hatchery Roaring River Hatchery Maramec Spring Park

Report Outlined Improvements to: Shepherd of the Hills Hatchery Montauk Hatchery Bennett Spring Hatchery Roaring River Hatchery Maramec Spring Park Report Outlined Improvements to: Shepherd of the Hills Hatchery Montauk Hatchery Bennett Spring Hatchery Roaring River Hatchery Maramec Spring Park Project Scope Objective 1: Evaluate and make recommendations

More information

ROUND BUTTE HATCHERY PROGRAM MANAGEMENT PLAN Round Butte Hatchery Plan Page 1

ROUND BUTTE HATCHERY PROGRAM MANAGEMENT PLAN Round Butte Hatchery Plan Page 1 ROUND BUTTE HATCHERY PROGRAM MANAGEMENT PLAN 2018 Round Butte Hatchery Plan Page 1 Round Butte Hatchery and Satellite (Pelton Ladder) INTRODUCTION Round Butte Hatchery is located on the Deschutes River

More information

WILLAMETTE HATCHERY PROGRAM MANAGEMENT PLAN 2017

WILLAMETTE HATCHERY PROGRAM MANAGEMENT PLAN 2017 WILLAMETTE HATCHERY PROGRAM MANAGEMENT PLAN 2017 Willamette Hatchery (Dexter Ponds) INTRODUCTION Willamette Hatchery is located along Salmon Creek, approximately 3 miles upstream from its confluence with

More information