1 DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND 1322 PATTERSON AVENUE, SE, SUITE 1000 WASHINGTON NAVY YARD, DC Ser EV/ JAN 2018 From: Commander, Naval Facilities Engineering Command Subj: MID-TERM UPDATE TO THE FY17-19 NAVFAC ENVIRONMENTAL BUSINESS LINE ACQUISITION STRATEGY SUBMISSION Encl: (1) Enclosure A.2 - Proposed Environmental Contracts FY Enclosure (1) provides the Mid-Term Update to the FY17-19 Naval Facilities Engineering Command Environmental Business Line Acquisition Strategy (EBLAS). This Strategy is supported by the individual strategies of each NAVFAC Echelon III Commands, NAVFAC Atlantic, NAVFAC Pacific, and the Naval Facilities Engineering and Expeditionary Warfare Center. The purpose of this Strategy is to identify workload projections for our environmental programs, to evaluate our current contracts and their capacity to meet program requirements, to develop plans for future contract requirements, and to track and project contract usage toward achieving Strategy objectives and metrics. 2. This Strategy is the product of teamwork throughout the Environmental Business Line and Acquisition Support Line. As we execute this Strategy, the Environmental Business Line and the Acquisition Support Line will continue to work closely in delivering best-value services to our clients. Our teamwork extends from each component command through all echelons of NAVFAC. 3. The Mid-Term Update focuses on the changes in the proposed contracts as outlined in Enclosure A.2 of the EBLAS; the latest version of the enclosure can also be found in the web posting on the NAVFAC portal: As of October 2017, the Environmental Business Line (EVBL) has awarded 35 contracts out of the 104 contracts (includes 12 proposed contracts to be awarded beyond FY19) originally planned in the FY17-19 EBLAS. Of the 104 planned contracts, 25 are delayed and 3 are cancelled due to schedule slippage and changes in the requirements (Figure 1 and Figure 2). The EVBL plans to add 24 new contracts with an estimated value of $187.5 million (M). These proposed contracts are to provide the Navy Environmental Restoration Program with a wide range of acquisition tools to facilitate the uncertainties in both environmental investigation and remediation areas. Overall, the total contracts planned changes from 104 at an estimated requirement of $2,863M to 96 at an estimated requirement of $2,107M. Figure 3 shows the changes in the proposed contracts profile between the original plan and the October 2017 snapshot.
2 Subj: FY17-19 EBLAS MID-TERM UPDATE SUBMISSION 2
3 Subj: FY17-19 EBLAS MID-TERM UPDATE SUBMISSION 4. The NAVFAC Headquarters points of contact for this letter are Ms. Gunarti Coghlan at telephone (202) and Ms. Jee Blanton at telephone (202) LARRY E. DOUCHAND, PE Assistant Commander for Environmental Programs Distribution: NAVFAC ATLANTIC (00) NAVFAC PACIFIC (00) NAVFAC EURAFSWA (00) NAVFAC FAR EAST (00) NAVFAC HAWAII (00) NAVFAC MARIANAS (00) NAVFAC MIDLANT (00) NAVFAC NORTHWEST (00) NAVFAC SOUTHEAST (00) NAVFAC SOUTHWEST (00) NAVFAC WASHINGTON (00) CO NAVFAC EXWC BCC: ACQ, ACQ-EO SB EV1, EV2, EV3, EV4, EV3 (GC) EV RF EV RC 3
4 ENCLOSURE 1 FY EBLAS (Mid Term Update) PROPOSED NAVFAC CONTRACTS AND CRITICAL MILESTONES (Mid Term FY17-19 EBLAS Update) FEC CONTRACT TITLE A/E? (YES/NO) CP, FP, or BOTH SB or UB SINGLE or MAC CONTRACT TOTAL CAPACITY FEDBIZ DATE AWARD DATE DURATION (Yrs) ($M) EXWC EPR Web Portal NO FP UB Single FY17 Q1 FY17 Q3 Delayed, FY18 Q2 EXWC Western Region 8(a) Environmental Services Contract Replacement NO FP SB Single 5 4 FY18 Q2 EXWC BAA-LMR FY20 Start NO FP UB Single FY18 Q4 FY19 Q4 EXWC BAA-LMR FY20 Start NO FP UB Single FY18 Q4 FY19 Q4 EXWC BAA-LMR FY20 Start NO FP UB Single FY18 Q4 FY19 Q4 EXWC BAA-LMR FY20 Start NO FP ACA Single FY18 Q4 FY19 Q4 EXWC BAA-LMR FY20 Start NO FP ACA Single FY18 Q4 FY19 Q4 EXWC BAA-NESDI FY18 Start NO FP SB Single FY18 Q2 FY18 Q3 EXWC BAA-NESDI FY18 Start NO CP UB Single FY18 Q2 FY18 Q3 EXWC BAA-NESDI FY18 Start NO FP UB Single FY18 Q2 FY18 Q3 EXWC BAA-NESDI FY18 Start NO FP UB Single FY18 Q2 FY18 Q3 EXWC BAA-SERDP/ESTCP FY18 Start NO CP UB Single FY18 Q2 FY18 Q3 EXWC BAA-SERDP/ESTCP FY18 Start NO CP ACA Single FY18 Q2 FY18 Q3 EXWC BAA-SERDP/ESTCP FY18 Start NO CP UB Single FY18 Q2 FY18 Q3 EXWC BAA-LMR FY19 Start NO FP UB Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP UB Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP UB Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP SB Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP SB Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP ACA Single FY17 Q4 FY18 Q4 EXWC BAA-LMR FY19 Start NO FP ACA Single FY17 Q4 FY18 Q4 EXWC State Legislative Monitoring NO FP SB Single 5 1 Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-NESDI FY19 Start NO FP SB Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-NESDI FY19 Start NO FP UB Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-NESDI FY19 Start NO FP UB Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-NESDI FY19 Start NO CP UB Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-SERDP/ESTCP FY19 Start NO CP UB Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-SERDP/ESTCP FY19 Start NO CP ACA Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS EXWC BAA-SERDP/ESTCP FY19 Start NO CP ACA Single Beyond FY19 Beyond FY19 Outside of FY17-19 EBLAS LANT Cultural Resources Archaeology/Architecture YES FP SB MAC 5 30 FY16 Q2 FY17 Q2 Delayed, FY19 Q1 LANT Remedial Action (RAC) NO CP UB Single 5 95 FY17 Q1 FY17 Q3 Delayed, FY18 Q4 LANT Munitions Response Investigations YES FP UB MAC 5 75 FY17 Q3 FY18 Q2 Delayed, FY18 Q4 LANT Remedial Action (RAC MAC) NO CP SB MAC FY16 Q4 FY17 Q2 Delayed, FY18 Q2 LANT Operational Range Clearance YES FP SB Single 5 4 FY17 Q3 Delayed, FY18 Q2 LANT Vieques General Site Maintenance and Support NO FP SB Single 5 4 FY15 Q3 FY17 Q1 Delayed, FY18 Q1 LANT Terrestrial Natural Resources Management YES FP SB Single FY17 Q1 FY17 Q4 LANT Coastal Resilience/Mission Sustainment YES FP SB Single 5 22 FY17 Q1 FY17 Q4 LANT Air Compliance YES FP UB Single 5 30 FY17 Q2 FY18 Q4 LANT TAP East YES FP UB Single 5 40 FY17 Q4 FY19 Q2 LANT Water Compliance YES FP UB Single 5 50 FY18 Q2 FY19 Q4 LANT Multimedia Compliance YES FP UB Single 5 75 FY18 Q2 FY19 Q4 MAR MAR EC IDIQ Yes FP SB MAC 5 15 FY18Q1 FY18Q2 IDIQ contract for EV services at sites in the Marine Corps IPT Area of Responsibility (AOR), ML primarily MCB Camp Lejeune NO FP SB Single 5 4 FY18 Q1 FY18 Q1 IDIQ for EV Services and Training, primarily for sites in the Midlant AOR, primarily in the ML MC and HR IPT AORs NO FP SB Single 5 4 FY18 Q2 FY18 Q2 IDIQ contract for EV services at sites in the Marine Corps IPT Area of Responsibility (AOR), ML primarily MCLB Albany NO FP SB Single 5 4 FY19 Q1 FY19 Q1 ML Environmental Services NO FP SB single 5 4 FY18 Q2 FY18 Q2 ML IR Remediation NO FP SB single 5 4 FY18 Q2 FY18 Q2 ML POL Remediation NO FP SB single 5 4 FY18 Q2 FY18 Q2 ML Terrestrial Natural Resources Management YES FP SB Single FY17 Q1 FY17 Q4 NW Environmental Services No FP SB Single 5 3 FY18Q1 FY19Q1 NW LTM O&M No FP SB Single 5 30 FY18Q2 FY19Q2 NW Environmental A&E Yes FP SB Single 5 30 FY18Q2 FY19Q2 PAC NEPA - large business Yes FP UB Single 5 80 FY19Q3 FY19Q4 PAC NEPA - large business Yes FP UB Single 5 80 FY19Q3 FY19Q4 SE ETS Petroleum Region 4 NO FP SB Single 5 4 N/A FY17 Q4 Delayed, FY19 Q1 SE ETS Petroleum Region 6 NO FP SB Single 5 4 N/A FY17 Q4 Delayed, FY19 Q1 SE ETS Remedial Actions NO FP SB Single 5 4 N/A FY18 Q1 Delayed, FY19 Q1 SE ETS Natural Resources NO FP SB Single 5 4 N/A FY17 Q1 Delayed, FY18 Q4 SE ETS Environmental Sampling & Analysis NO FP SB Single 5 4 N/A FY17 Q4 Delayed, FY18 Q4 SE ETS Herbicide NO FP SB Single 5 4 N/A FY17 Q4 Delayed, FY18 Q4 SE ETS Cultural Resources NO FP SB Single 5 4 N/A FY17 Q3 Delayed, FY18 Q2 SE ETS Remedial Actions NO FP SB Single 5 4 N/A FY17 Q1 Delayed, FY18 Q1 SE ETS Operational Range Clearance NO FP SB Single 5 4 N/A FY18 Q2 SE EMAC NO FP SB MAC 5 30 FY19 Q2 SE IDIQ Spill Prevention YES FP SB Single 5 5 N/A Beyond FY19 Outside of FY17-19 EBLAS SE IDIQ Water/Wastewater YES FP SB Single 5 10 N/A Beyond FY19 Outside of FY17-19 EBLAS SE ETS Waste Management and Small Range Support NO FP SB Single 5 4 N/A Beyond FY19 Outside of FY17-19 EBLAS SE ETS Remedial Actions NO FP SB Single 5 4 N/A Beyond FY19 Outside of FY17-19 EBLAS SE IDIQ Hazardous Waste Management YES FP SB Single FY17 Q4 FY18 Q3 SE IDIQ Hazardous Waste Management YES FP SB Single FY17 Q4 FY18 Q3 SE Forest Re-vegetation Yes FP SB Single 5 4 FY17Q1 FY17Q3 Comments 1 of 2
5 ENCLOSURE 1 FY EBLAS (Mid Term Update) PROPOSED NAVFAC CONTRACTS AND CRITICAL MILESTONES (Mid Term FY17-19 EBLAS Update) FEC CONTRACT TITLE A/E? (YES/NO) CP, FP, or BOTH SB or UB SINGLE or MAC CONTRACT TOTAL CAPACITY FEDBIZ DATE AWARD DATE DURATION (Yrs) ($M) SW CERCLA/RCRA Yes FP SB Single 5 20 FY18Q2 FY19Q2 Outside of FY17-19 EBLAS SW ELIN Curation Yes FP UB Single 5 3 FY17Q2 FY18Q1 Delayed, FY19 Q3 SW RAC-VII / MARAC Yes Cost UB MAC FY17Q1 FY17Q3 Delayed, FY19 Q1 SW Stormwater Yes FP SB Single 5 30 FY18Q2 FY19Q2 Expedited, FY19 Q1 SW UR EMAC Yes FP UB MAC FY18Q1 FY17Q3 Delayed, FY18 Q3 SW 8(a) EMAC Yes FP SB MAC 5 95 FY17Q1 FY19Q2 Delayed, FY18 Q3 SW RAD - SONGS Yes FP SB Single 5 50 FY17Q4 FY18Q2 Delayed, FY18 Q3 SW CR MAC Yes FP SB Single 5 30 FY18Q1 FY19Q1 Expedited, FY18 Q3 SW CERCLA/RCRA Yes FP SB Single 5 75 FY15Q1 FY17Q4 Delayed, FY18 Q2 SW Admin Record Yes FP SB Single 5 4 N/A FY18Q1 SW Range Sustainment III Yes FP UB Single N/A FY20Q4 Outside of FY17-19 EBLAS SW 8(a) Range Sustainment Yes FP SB Single 5 4 FY17Q3 FY18Q3 SW 8(a) Potable Water Yes FP SB Single 5 10 FY18Q3 FY19Q3 SW NR MAC Yes FP SB MAC 5 40 FY18Q2 FY19Q2 SW Invasive - Exotic Plant Yes FP SB Single 5 20 FY18Q2 FY19Q2 SW NEPA SW 01 Yes FP SB Single 5 30 FY18Q1 FY19Q1 SW NEPA SW 02 Yes FP SB Single 5 30 FY19Q1 FY20Q1 Outside of FY17-19 EBLAS WASH Restoration Services NO FP SB Single 5 4 FY17 Q1 FY17 Q3 Delayed, FY19 Q1 WASH IDIQ Water YES FP SB Single 5 15 FY18 Q1 FY18 Q3 WASH OEL/EC EV Services NO FP SB Single 5 4 FY18 Q1 FY18 Q2 WASH Air/EC EV Services NO FP SB Single 5 4 FY18 Q1 FY18 Q2 WASH Biological Services NO FP SB Single FY17 Q1 FY17 Q3 Comments 2 of 2
FINDING OF NO SIGNIFICANT IMPACT
DEPARTMENT OF THE ARMY CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A HAGOOD AVENUE CHARLESTON, SOUTH CAROLINA 29403-5107 FINDING OF NO SIGNIFICANT IMPACT EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL
More informationDEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND,
- DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING 47123 BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND, 20670-1547 NAVAIRINST 4790.20C AIR-6.0 NA VAIR INSTRUCTION 4790.20C
More informationDEPARTMENT OF THE NAW USS JUNEAU (LPD 10) FPO AP Ser Nav/ From: Commanding Officer, USS JUNEAU (LPD 10)
DEPARTMENT OF THE NAW USS JUNEAU (LPD 10) FPO AP 96669-1713 Ser Nav/ From: Commanding Officer, USS JUNEAU (LPD 10) 2 5 APR 1994 To : Director of Naval History (OP-09BH), Washington Navy Yard, Washington
More informationHunters Point Naval Shipyard Environmental Remediation Program Overview
NAVFAC Southwest Hunters Point Naval Shipyard Environmental Remediation Program Overview Bayview Hunters Point Mr. Derek Robinson, BRAC Environmental Coordinator Introductions and Overview Derek Robinson
More informationDEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND NAYAL AIR SYSTEMS COMMAND HEADQUARTERS BUSE ROAD, NlT #L PATUXENT RIVER, MD
NAVAIR INSTRUCTION 4790.20A DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND NAYAL AIR SYSTEMS COMMAND HEADQUARTERS 47123 BUSE ROAD, NlT #L PATUXENT RIVER, MD 20670-1547 From: Commander, Naval Air Systems
More informationDEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C21 21 Dec 92
DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MCO 1543.8 C21 MARINE CORPS ORDER 1543.8 From: Commandant of the Marine Corps To: Distribution List Subj: MATERIEL
More informationFrom: Commander, Carderock Division, Naval Surface Warfare Center, Philadelphia, PA To: Program Executive Officer, Ships (PMS 400D)
9551 Ser 926/051 22 May 2006 From: Commander, Carderock Division, Naval Surface Warfare Center, Philadelphia, PA 19112-1403 To: Program Executive Officer, Ships (PMS 400D) Subj: SELECTIVE APPROVAL OF MONEL
More informationAPPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationU.S. Fish and Wildlife Service Native American Crosscut Funding
U.S. Fish and Wildlife Service Native American Crosscut Funding Tribal / Interior Budget Council National Budget Meeting L Enfant Plaza Hotel Washington, DC November 8, 2013 U.S. Fish and Wildlife Service
More informationCruise Report Marine Mammal and Sea Turtle Observer UNDET Monitoring Hawaii Range Complex: 3 April 2014
January 15, 2015 Cruise Report Marine Mammal and Sea Turtle Observer UNDET Monitoring Hawaii Range Complex: 3 April 2014 Prepared for: Commander, U.S. Pacific Fleet Prepared by: Naval Facilities Engineering
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Crew Systems Development. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 15.675 12.513 8.689
More informationWisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )
Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527
More informationAtlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update
Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal
More informationMR. DAVID DALE, SES, PE, PMP DIRECTOR, US
Olmsted Locks & Dam Inland Waterways Users Board MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 02 December 2015 US Army Corps of Engineers Agenda Status Project Overview/BLUF
More informationCountry report. Austrian bathing water quality in Austria. May Photo: Peter Kristensen
Country report Austrian bathing water quality in 2016 Austria May 2017 Photo: Peter Kristensen BWD Report For the Bathing Season 2016 Austria The report gives a general overview of information acquired
More informationOlmsted Locks & Dam. Inland Waterways Users Board. MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016
Olmsted Locks & Dam Inland Waterways Users Board MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016 US Army Corps of Engineers Agenda Status BLUF/Project
More informationVieques Munitions Response: Current Issues
Vieques Munitions Response: Current Issues NAOC General Membership Meeting December 7, 2016 Agenda Project Overview Surface Clearance Subsurface Clearance Remote Controlled Equipment Underwater MEC Open
More information2013 FEDERAL STORM RESPONSE
2013 FEDERAL STORM Presented to the Florida Shore & Beach Association Sep 26, 2013 Presented by: COL Alan Dodd Commander, Jacksonville District September 2013 THE COLLABORATION 2 THE PROGRAM 3 THE STORMS
More informationMOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)
MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element
More informationShips 2-Reefs Program Annual Report
Florida Fish and Wildlife Conservation Commission Ships 2-Reefs Program 2016-17 Annual Report Ships-2-Reefs Program In 2008, the Florida Legislature passed Ships-2-Reefs Program legislation (SB 432), Chapter
More informationPress Release New Bilateral Agreement May 22, 2008
Informational Report 3 June 2008 Press Release New Bilateral Agreement May 22, 2008 The Pacific Salmon Commission is pleased to announce that it has recommended a new bilateral agreement for the conservation
More informationDEPARTMENT OF THE NAVY NAVAL SERVICE TRAINING COMMAND 2601A PAUL JONES STREET GREAT LAKES, ILLINOIS NSTCINST 5720.
DEPARTMENT OF THE NAVY NAVAL SERVICE TRAINING COMMAND 2601A PAUL JONES STREET GREAT LAKES, ILLINOIS 60088-2845 NSTCINST 5720.1 N2 NSTC INSTRUCTION 5720.1 From: Commander, Naval Service Training Command
More informationRE: Request for Audit of Ineligible Federal Aid Grants to Alaska Department of Fish & Game for Support of Predator Management
June 30, 2014 Ms. Kim Elmore Assistant Inspector General Audits, Inspections & Evaluations Office of Inspector General U.S. Department of Interior 1849 C Street, NW, Mail Stop 4428 Washington, DC 20240
More informationAGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS FOR CONDUCTING FISH AND WILDLIFE COORDINATION ACT ACTIVITIES
AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS FOR CONDUCTING FISH AND WILDLIFE COORDINATION ACT ACTIVITIES ARTICLE I- INTRODUCTION a. Section 1 of the Fish and
More informationFEDERAL SUBSISTENCE REGIONAL ADVISORY COUNCIL Membership Application & Nomination Packet for CLOSING DATE: January 29, 2016
FEDERAL SUBSISTENCE REGIONAL ADVISORY COUNCIL Membership Application & Nomination Packet for 2016 CLOSING DATE: January 29, 2016 Like us on Facebook! www.facebook.com/subsistencealaska Federal Subsistence
More informationCharter Boat Fishing in Lake Michigan: 2017 Illinois Reported Harvest
Illinois Department of Natural Resources Division of Fisheries Charter Boat Fishing in Lake Michigan: 2017 Illinois Reported Harvest Steven R. Robillard Illinois Department of Natural Resources Lake Michigan
More informationSeptember 4, Update on Columbia basin Salmon and Steelhead Recovery Planning
Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington September
More informationCounty of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.
County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History
More information(See or refer to the Investigation into the events aboard the Cliffs 12.)
United States Coast Guard 2100 Second Street SW Stop 7126 Washington D.C. 20593-7126 Reference: Docket ID USCG 1998-3786 Attention: R.C. Proctor, Captain, United States Coast Guard December 17, 2010 Dear
More informationNotice of Receipt from Pembina Prairie Pipeline (U.S.A.) Ltd., of a Notification. Concerning Its Acquisition of Vantage Pipeline US LP, Which Holds a
This document is scheduled to be published in the Federal Register on 02/06/2015 and available online at http://federalregister.gov/a/2015-02468, and on FDsys.gov [Billing Code: 4710-AE] DEPARTMENT OF
More informationSubj: ANTHROPOMETRIC ACCOMMODATION IN NAVAL AVIATION
NAVA I R INSTRUCTION 3710.9D DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WlLLlAM A. MOFFETT BUILDING 47123 BUSE ROAD, BLDG 2272 PATUXENT RIVER. MARYLAND 20670-1547 NAVAIRINST ""S"~Y'B"~D AIR-4.6
More informationJuneau Douglas Harbor
Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More information<:\_J Senior Manager- Safety, Security & Emergency Response. Ell ORIGINAL DELIVERED BY COURIER. June 7, 2017
ORIGINAL DELIVERED BY COURIER June 7, 2017 National Energy Board Suite 210, 517-10 th Avenue SW Calgary, Alberta T2R 0A8 Ell J 111 ' - 7 I Attention: Ms. Sheri Young Secretary of the Board Dear Ms. Young:
More informationMILITARY STANDARD INTERFACE STANDARD FOR SHIPBOARD SYSTEMS SECTION 106 COMPRESSED AIR SERVICE FOR SURFACE SHIPS
SUPERSEDING SECTION 106A 19 April 1973 (See 9.2) MILITARY STANDARD INTERFACE STANDARD FOR SHIPBOARD SYSTEMS SECTION 106 COMPRESSED AIR SERVICE FOR SURFACE SHIPS AMSC N/A FSC 1990 DISTRIBUTION STATEMENT
More informationNOAA Fisheries Update:
NOAA Fisheries Update: A Presentation to the Pacific States Marine Fisheries Commission August 20, 2012 Dr. Paul N. Doremus Deputy Assistant Administrator for Operations 1 A Milestone Year for Fisheries
More informationUnion Pacific Railroad
Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity
More informationKITIGAN ZIBI ANISHINABEG P.O. Box 309, Maniwaki, QC J9E 3C9 Tel: (819) 449-5170 Fax: (819) 449-5673 KITIGAN ZIBI ANISHINABEG Request for Proposal (RFP) RFP PROJECT: Feasibility Study on First Nations Tourism
More informationCountry report. Croatian bathing water quality in Croatia. May Photo: Peter Kristensen
Country report Croatian bathing water quality in 2016 Croatia May 2017 Photo: Peter Kristensen BWD Report For the Bathing Season 2016 Croatia The report gives a general overview of information acquired
More informationProject Mobility - Route 3 South Express Toll Lanes. Industry Day Overview
Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project
More informationCommanding Officer, Chemical Biological Incident Response Force All Sections
UNITED STATES MARINE CORPS CHEMICAL BIOLOGICAL INCIDENT RESPONSE FORCE II MARINE EXPEDITIONARY FORCE 3399 STRAUSS AVENUE SUITE 219 INDIAN HEAD, MD 20640-5035 POLICY LETTER 1-11 3551 S-3 11 JAN 2011 From:
More informationGulf States Marine Fisheries Commission. Dave Donaldson Assistant Director
Gulf States Marine Fisheries Commission Dave Donaldson Assistant Director Interjurisdictional Fisheries Program The purpose of the IJF Program: Promote and encourage state activities in support of management
More informationFedRAMP Plan of Actions and Milestones (POA&M) Template Completion Guide. Version 2.0
FedRAMP Plan of Actions and Milestones (POA&M) Template Completion Guide Version 2.0 January 31, 2018 DOCUMENT REVISION HISTORY DATE VERSION PAGE(S) DESCRIPTION AUTHOR 02/18/2015 1.0 All Publish Date FedRAMP
More informationSACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT
SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road
More informationCasing and Cementing Requirements
Directive PNG005 May 2018 Revision 2.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Order: 148/18 Record of Change Revision Date
More informationParatransit Service. ADA Paratransit Service
Paratransit Service June 8, 2011 ADA Paratransit Service Operating Statistics Redi-Wheels & RediCoast Customer Service Paratransit Eligibility ADA Program Costs Efficiency Measures Summary 2 1 Redi-Wheels
More informationCharter Boat Fishing in Lake Michigan: 2015 Illinois Reported Harvest
Illinois Department of Natural Resources Division of Fisheries Charter Boat Fishing in Lake Michigan: 2015 Illinois Reported Harvest Steven R. Robillard Illinois Department of Natural Resources Lake Michigan
More informationBOARD MEETING MINUTES OF THE STATE FACILITIES BOARD (SFB) NEBRASKA. NGNE-FMO 13 April 2018
BOARD MEETING MINUTES OF THE STATE FACILITIES BOARD (SFB) NEBRASKA NGNE-FMO 13 April 2018 A. CONVENING THE SFB In accordance with DoD Instruction 1225.08, Reserve Component (RC) Facilities Programs and
More informationTitle: Recreational Facilities 3 - Athletic Facilities
Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Management Department Original Environmental Management Department William
More informationPLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS
PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS Project: Insert Client Repair/ Replacement of low level light units/ low level
More informationSAFETY DATA SHEET T-CUT COLOUR FAST (MISC COLOURS) NC
Report Date : 28/05/2012 1 / 5 SAFETY DATA SHEET 1 IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING PRODUCT NAME PRODUCT NO. INTERNAL ID APPLICATION SUPPLIER CMW001, CMW002, CMW003,
More informationMid-Atlantic Coastal Bays and Sounds -- an Overlooked Opportunity?
Mid-Atlantic Coastal Bays and Sounds -- an Overlooked Opportunity? Princeton Energy Resources International PERI Daniel F. Ancona III, Bruce Buckheit, Dr. Lynn Sparling Daniel F. Ancona III Vice President
More informationUpwelling and Phytoplankton Productivity
Name: Date: Guiding Questions: Upwelling and Phytoplankton Productivity How does nutrient concentration influence phytoplankton growth in coastal and open ocean waters? What and where are the upwelling
More informationSafeSeaNet Norway PEC Administration Guide
SafeSeaNet Norway PEC Administration Guide Kystverket Vest Flathauggata 12 5525 Haugesund Telephone: +47 52 73 32 00 Telefax: +47 52 73 32 01 E-post: vest@kystverket.no Web: http://www.kystverket.no Table
More informationFrom: Commanding Officer, USS Devastator (MCM 6) To: Chief of Naval Operations (NOgBH), 2000 Navy Pentagon, Washington, DC
DEPARTMENT OF THE NAVY USS DEVASTATOR (MCM-6) F W AA 34090-1 926 5757 er OO/ Q 1 3 From: Commanding Officer, USS Devastator (MCM 6) To: Chief of Naval Operations (NOgBH), 2000 Navy Pentagon, Washington,
More informationThe Berggren Plan Nebraska s Plan to Improve Pheasant Hunting. John Laux, NGPC RWBJV Informational Seminar February 2, 2017
The Berggren Plan Nebraska s Plan to Improve Pheasant Hunting John Laux, NGPC RWBJV Informational Seminar February 2, 2017 Long-Term Pheasant Decline in Nebraska Changes in Agricultural Land-Use *Source:
More informationResources Update 2018 Tri-RAC
Resources Update 2018 Tri-RAC National Monuments Basin and Range 704,000 acres Gold Butte 300,000 acres National Monuments, National Conservation Areas and Wilderness National Conservation Areas Red Rock
More informationReview of the Changes to the Fisheries Act Process Overview
Review of the Changes to the Fisheries Act Process Overview DFO Quebec Region September 20, 2016 Background of Review Changes to the Fisheries Act were made through Bill C-38, the Jobs Growth and Long-Term
More informationKetchikan Harbors Thomas Basin and Bar Point Harbor
Ketchikan Harbors Thomas Basin and Bar Point Harbor Condition of Improvements 30 December 2014 Thomas Basin & Bar Point Harbors Ketchikan, Alaska (CWIS No. 000631 & 087071) Authorization (1) Rivers and
More informationMDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida
MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida Citizens Advisory Committee Meeting March 13, 2018 ETDM NUMBER: 11482 MDX WORK
More informationCode for the Provision of Chargeable Mobile Content Services
Code for the Provision of Chargeable Mobile Content Services 1. Preamble 1.1 The Office of the Telecommunications Authority (OFTA) and the Consumer Council received a number of complaints in 2009 regarding
More informationBureau of Ocean Energy Management
Bureau of Ocean Energy Management Offshore Energy Opportunities Mike Celata Regional Director Gulf of Mexico Region 1 March 9, 2017 Outer Continental Shelf Lands Act (T)he outer Continental Shelf is a
More informationWhy We do Preventive Maintenance
Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive
More informationMISSOURI-MADISON RIVER FUND RECREATION PROJECT APPLICATION FORM FY2019
Project Name: White Sandy Pipe Pile Removal MISSOURI-MADISON RIVER FUND RECREATION PROJECT APPLICATION FORM FY2019 Reservoir or River Segment: Hauser Reservoir_ County(ies): Lewis and Clark Site Name (or
More informationSECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST,
CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, 2011 *10450 360 MARBLEHEAD LIGHT 42-30-19.45N 70-50-01.47W 11760 - Channel Lighted Buoy 28 42-14-53.10N 70-57-43.11W 20410 Gavitt Point Outfall
More informationRESULTS OF THE 2017 INDUSTRY DATA SURVEY
RESULTS OF THE 2017 INDUSTRY DATA SURVEY 2017 Survey (2016 DATA) 187 Companies 2017 Survey 36% of US Ready Mixed (2016 Concrete DATA) Production 187 Companies 36% of US Ready Mixed Concrete Production
More informationCITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division
CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:
More informationWILDLIFE HERITAGE TRUST ACCOUNT PROJECT PROPOSAL FORM
APPLICANT INFORMATION WILDLIFE HERITAGE TRUST ACCOUNT PROJECT PROPOSAL FORM Person/Organization/Agency Nevada Department Of Wildlife (NDOW) Name Mike Cox Title Big Game Staff Biologist Address 1 4600 Kietzke
More informationLegacy Funding 2011 Special Session
- Special Session FY2012 FY2013 Total FY2012 FY2013 Total Senate FY2012 FY2013 Total Senate 1 Art 1 - Outdoor Heritage Fund 2 3 Prairies 4 WMA, SNA, & Prairie Bank Easement Acq. Phase III 3,931-3,931 4,690-4,690
More informationSAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS
SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes
More informationR & E Grant Application 13 Biennium
R & E Grant Application 13 Biennium Project #: 13-068 Project Information R&E Project $68,220.00 Request: Match Funding: $185,400.00 Total Project: $253,620.00 Start Date: 8/2/2014 End Date: 6/30/2015
More informationTEACHER VERSION: Suggested Student Responses Included. Upwelling and Phytoplankton Productivity
Name: Date: TEACHER VERSION: Suggested Student Responses Included Guiding Questions: Upwelling and Phytoplankton Productivity How does nutrient concentration influence phytoplankton growth in coastal and
More informationBlack Sturgeon Regional Plan
Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by
More information(a) Operating and Instruction Manual for the Pools. Encl: (1) Sodium Hypochlorite (Bleach - 15 Percent) (2) Carbon Dioxide, Dry Ice
UNITED STATES MARINE CORPS MARINE CORPS BASE QUANTICO, VIRGINIA 22134-5001 MCBO 6240.3B B 04 MARINE CORPS BASE ORDER 6240.3B From: Commanding General To: Distribution List Subj: SWIMMING POOL WATER TREATMENT
More informationGreen Dot Awards Submission: Sandwichbike
Green Dot Awards Submission: Sandwichbike Company: Bleijh Industrial Design Contact: Basten Leijh Address: Panamalaan 3P 1019AS Amsterdam The Netherlands Telephone: +31 020 770 299 About the company Bleijh
More informationBicycling Perceptions and Experiences in Oregon and Southwest Washington. Presented to: The Bicycle Transportation Alliance September 8, 2009
Bicycling Perceptions and Experiences in Oregon and Southwest Washington Presented to: The Bicycle Transportation Alliance September 8, 2009 404 NW 10th Ave Suite 201 Portland, OR 97209 P 800.921.2640
More informationAll TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)
All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity
More information6/19/2014. Children s Hospital of Philadelphia: Recent Changes. Recent Changes in CHOP IRB Procedures
Children s Hospital of Philadelphia: Recent Changes Mark S. Schreiner, MD Chair, Committees for the Protection of Human Subjects (IRB) Recent Changes in CHOP IRB Procedures Unchecked the box 2012 Expanded
More informationTIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018
TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018 Purpose: Establish a workgroup of Bureau of Indian Affairs and TIBC members to analyze, record,
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationBeach Renourishment in Jacksonville
Beach Renourishment in Jacksonville Kevin Bodge, PhD, P.E. - Olsen Associates, Inc. 1978 Oct 2004 2000 2016 2011 Oct 2016 Coastal Duval County, FL Nassau Sound Blount Island Ft. George Inlet St. Johns
More informationAutomated External Defibrillator Program. Developed by: The Office of Environmental Health and Safety
Automated External Defibrillator Program Developed by: The Office of Environmental Health and Safety Revised July 2018 I. Purpose and Scope This document serves to set forth responsibilities, inspections,
More informationTECHNICAL MEMORANDUM. Introduction. Neighborhood Traffic Analysis. Vehicular Travel Times. Mitch Bonanno. Vornado/Charles E. Smith.
1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 202.296.8625 TECHNICAL MEMORANDUM To: From: Mitch Bonanno Michael Novotny Christopher Tacinelli, P.E. Felice Brychta, P.E. Peter Kauffmann, EIT
More informationSR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More information101 Corridor Managed Lanes
101 Corridor Managed Lanes TA BOD Meeting May 5, 2016 Agenda Item 11a Presentation Outline 101 Corridor Profile System Deficiencies Background Managed Lanes Proposed Purpose and Need Alternatives Under
More informationFACT SHEET NAVY CORAL REEF PROTECTION
FACT SHEET NAVY CORAL REEF PROTECTION 1. MAPPING ASSESSING AND MONITORING OF CORAL REEFS DoD Coral Reef Assessment. DoD Legacy Resource Management Program funding was received in FY-01 to support an overall
More information2016 Volunteer Program Annual Report
The mission of the Oregon Department of Fish & Wildlife Volunteer Program is to actively involve citizens as volunteers in the protection and enhancement of Oregon s fish and wildlife resources for the
More informationAutomated External Defibrillator Program. Developed by: The Department of Environmental Health and Safety
Automated External Defibrillator Program Developed by: The Department of Environmental Health and Safety Revised May 2017 I. Purpose and Scope This document serves to set forth responsibilities, inspections,
More informationB O N N E V I L L E P O W E R A D M I N I S T R A T I O N White Book
Steve Bellcoff BONNEVILLE POWER ADMINISTRATION Long Term Power Planning srbellcoff@bpa.gov P 503-230-3319 What is the White Book Presentation Outline Major Changes since 2015 White Book Federal System
More informationGDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page
GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation
More informationCanoe Kayak Saskatchewan (CKS) Strategic / Operations Plan Update September 29 / October 03, 2018 Summary
2018 Canoe Kayak Saskatchewan (CKS) Strategic / Operations Plan Update September 29 / October 03, 2018 Summary October 04, 2018 www.hmcmanagement.net Page 1 CANOE KAYAK SASKATCHEWAN STRATEGIC/ OPERATIONS
More informationFigure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN
Figure 2-1 City Of Boynton Beach, Florida EXISTING SITE PLAN N Figure 2-2 City Of Boynton Beach, Florida PROPOSED SITE HORIZONTAL CONTROL PLAN N Figure 4-1 City of Boynton Beach, Florida EAST WTP EXISTING
More informationLong-Range Financial Plan Implications of Revised Sales Tax Projections for DART
Long-Range Financial Plan Implications of Revised Sales Tax Projections for DART City of Dallas Transportation and Environment Committee May 10, 2010 1 Comprehensive Sales Tax Forecast Review was Required
More information1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007
KETCHIKAN HARBOR 1-22 KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS. 00631 & 87071) Condition of Improvement 30 September 2007 AUTHORIZATION: (1) Rivers and Harbors Act, 3 July 1930 (House
More informationCountry report. Czech bathing water quality in Czech Republic. May Photo: Peter Kristensen
Country report Czech bathing water quality in 2016 Czech Republic May 2017 Photo: Peter Kristensen BWD Report For the Bathing Season 2016 The Czech Republic The report gives a general overview of information
More informationDEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C2I 13 Mar 92
DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MARINE CORPS ORDER 1543.7 MCO 1543.7 C2I From: Commandant of the Marine Corps To: Distribution List Subj: MATERIEL
More informationCompany presentation
Company presentation Problem definition Creative thinking Introduction Miko Marine was founded in 1996 based on the magnetic patch to stop water ingress and oil spill. Miko Plaster solutions have since
More information2016 MOBILITY BOND PROGRAM
February 22, 2017 2016 MOBILITY BOND PROGRAM $720 million bond proposition for transportation and mobility improvements including planning, designing, engineering, constructing, reconstructing, renovating
More informationNinilchik Harbor Page 2 of 11
Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500
More information