Mueller DIY buildings are not engineered structures and do not meet any specific building code criteria.
|
|
- Hector Smith
- 5 years ago
- Views:
Transcription
1 877 2 MUELLER 18x21 (DIY) with Optional Center Girts and Floor Kit Instructions Mueller DIY buildings are not engineered structures and do not meet any specific building code criteria. Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 1 of 33
2 Parts List There is not an attached parts list included in these instructions. Due to continuing improvements, the parts list is the itemized invoice delivered with your building. All parts are stenciled on the inside of the channel, purlin, girts and rafters. Example of this is below: Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 2 of 33
3 Types of Screws TEK Screw Lap Screw Shorter Shaft Thicker Shaft Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 3 of 33
4 Base Layout (BC 1 and BP 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 4 of 33
5 Make sure the assembly is square Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 5 of 33
6 Floor Kit (Optional) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 6 of 33
7 Floor Kit (Optional) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 7 of 33
8 Erecting Columns (C 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 8 of 33
9 Rafters (R 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 9 of 33
10 Eave Channel (EC 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 10 of 33
11 Erecting Columns (C 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 11 of 33
12 Rafters (R 2) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 12 of 33
13 Rafters and Base Purlin (R 1 and BP 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 13 of 33
14 Make sure the assembly is square Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 14 of 33
15 Roof Purlin (RP 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 15 of 33
16 Roof Purlin (RP 1 and RP 2) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 16 of 33
17 Door (DC 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 17 of 33
18 Door Jambs(C 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 18 of 33
19 Door Header (DH 1) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 19 of 33
20 Mid Girts (Optional MG 1, and MG 2) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 20 of 33
21 Window (Optional) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 21 of 33
22 Sheeting Screw Placement Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 22 of 33
23 Sheeting with Door Trim Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 23 of 33
24 Sheeting (Note some sheets are longer) Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 24 of 33
25 Sheeting Endwall with RUD Door To install the RUD, see the RUD video and instructions Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 25 of 33
26 Sheeting Sidewall Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 26 of 33
27 Sheeting Endwall without Door Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 27 of 33
28 Corner Trim Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 28 of 33
29 Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 29 of 33
30 Sheeting the Roof Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 30 of 33
31 Roofing Trim Details Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 31 of 33
32 Skylight Ridge Roll Installation Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 32 of 33
33 Total Building Measurements Mueller Inc 18 x 21 DIY Back Yard Kit Instructions; For additional information, see the D.I.Y Installation Video Page 33 of 33
WallMaker System Pricing. Page 55. Column descriptions can be found on page seven of this book. Part Number Header
Stylmark WallMaker Glass Wall System includes versatile interior store front components that offer the quality you expect from Stylmark. Extrusions are designed for 1/2 or 3/8 glass and may be ordered
More informationSTOL CH 701. STOL CH 701 Bubble doors Rear view. Front view Right door. Revision 1.0 (10/03/2003) 2003 Zenith Aircraft Co
Bubble doors Rear view Front view Right door SECTION A - Page 1 of 12 7F19-12D Door Sill See Section 2 Door Final assembly The Door Sill is riveted to the sides of the Upper Tubes 7F12-2 with the wing
More informationZONING ORDINANCE UPDATE (ZOCO DRAFT ): ADMINISTRATIVE PRACTICES AND DETERMINATIONS RELATED TO BULK, COVERAGE AND PLACEMENT
3 Amendment to 3.2.6.A.1.(e) relating to encroachment of steps, stoops and porches into required setbacks 12-10-2013 ZOCO DRAFT- Page 1 3.2.6.A.1.(e) Permitted Setback Encroachments Issue The setback provisions
More informationCaterpillar Tunnel. a s s e m b l y a n d i n s t r u c t i o n m a n u a l. Watch the video! Scan the code or visit: fflc.
Caterpillar Tunnel a s s e m b l y a n d i n s t r u c t i o n m a n u a l Watch the video! Scan the code or visit: fflc.us/tunnel/s Tools needed: Assembling the Bows Tape measure (Preferably 100') Sledge
More informationRESIDENTIAL BUILDING PLAN REVIEW CHECKLIST
RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST PERMIT # THREE (3) SETS OF PLANS REQUIRED. ONE (1) SET OF DIGITAL PLANS REQUIRED FOR ALL NEW STRUCTURES Plans Examiner: Date: Owner: Permit #: Contractor: Phone
More informationLesson 1.1 Imperial Measures of Length Exercises (pages 11 12) a) Foot; because my desk is higher than 1 ft., but not as high as 1 yd.
Lesson 1.1 Imperial Measures of Length Exercises (pages 11 1) A 3. Answers may vary. For example: a) Foot; because my desk is higher than 1 ft., but not as high as 1 yd. b) Inch; because a mattress is
More informationTERMITE PROTECTION Material Description Qty Units Cost M/up Labor Total. Termite Control (Slab) 188 m Subtotal
Mr & Mrs Smith Page 1 of 7 PREPARATION PRELIMINARIES EXCAVATION & FOUNDATION TERMITE PROTECTION Termite Control (Slab) 188 m2 3.50 658.00 Subtotal 658.00 MAIN STRUCTURE STRUCTURAL STEEL Cyclone Rods 1800mm
More informationINSTALLATION AND USAGE HANDBOOK
INSTALLATION AND USAGE HANDBOOK TEMPORARY ANCHOR TEMPORARY ANCHOR PRODUCT CODE: AP145C / AP145S Recommended for single person use FALL ARREST USE - 15kN RATED READ ENTIRE HANDBOOK BEFORE INSTALLING OR
More informationDesigning Wave Energy Converting Device. Jaimie Minseo Lee. The Academy of Science and Technology The Woodlands College Park High School, Texas
Designing Wave Energy Converting Device Jaimie Minseo Lee The Academy of Science and Technology The Woodlands College Park High School, Texas Table of Contents Abstract... i 1.0 Introduction... 1 2.0 Test
More informationTour Links Pre-packaged Putting Green Program
Tour Links Pre-packaged Putting Green Program Contact: Charles Veeder CV Golf 942 Murray Road Middle Grove, NY 12850 518.421-1798 Custom Greens Standard Links Training Aids Designer Links Professional
More information3 in 1 Robot Gripper Assembly Guide
3 in 1 Robot Gripper Assembly Guide 1/ Content Part List 3 Assemble Guide of Two Finger Gripper 4 Assemble Guide of Four Cross Finger Gripper 12 Assemble Guide of Parallel Four Finger Gripper 15 2/ Part
More informationSkylight Rollers For Velux windows
For Velux windows Velux windows are identified by the Velux branded data plate on the sash of the window. No measuring required. page 13 features Steel barrel Extremely reliable, lightweight and strong.
More informationASSORTED FIXTURE TRIM
... ASSORTED FIXTURE TRIM RIGHT SHAPES RIGHT PRICE RIGHT NOW CHANNEL CAP ALUMINUM CHANNEL CAP FOR 3/4" MATERIAL EM 3197, BC, SS ALUMINUM CHANNEL CAP FOR 5/8" MATERIAL EM 3198, BC, SS VINYL CHANNEL CAP
More informationLPCorp.com
T R E A T E D E N G I N E E R E D W O O D C L A D D I N G E N G I N E E R E D F O R C O M M E R C I A L A P P L I C A T I O N S LPCorp.com 888.820.0325 1 LAP & SIDING CEDAR TEXTURE LAP The bold look of
More informationLife is better under a Shazeebo
Life is better under a Shazeebo A word from our founder. I love shade sails! A well-designed outdoor space with shade sails floating above can be very inviting. You get the feeling that you are supposed
More information64' - 4" +- 12' - 6" 124 RETAINING WALLS SEE CIVIL DWGS. LEVEL REAR YARD PROPOSED MAIN FLOOR F.F. 113' 18 3" +- (E) HOUSE TO BE REMOVED COV' PORCH
6 6.79 8. 6.0 7.0 8.0 0.07 6.8 ""7" TREE TOE.9.0.78 7. " TREE 0.67.7 " TREE.6.89.8.0 9" TREE.6.66.8.97.6 9" TREE.96.89.68 8" TREE " TREE.9.7 " TREE 9" TREE 9" TREE.7.9 9.86.8.6 8" TREE 7.89 6.7.. 7....9
More informationInstallation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No
Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Guide Cables No Guide Cables 1 August 4, 2011 Assembly Instructions: (Shown with a 2 board, 12 ft kit) ITEM NO. PART NUMBER DESCRIPTION
More informationMobile:
Date: 24/02/2014 Page 1 of 12 Department Height Safety Test: 15kN and 21kN fixed anchor point (Dynamic Drop Test) Ref: QSI 20140224-01 Client: Client Ref: Collins Corporation Ltd 27 Giddis Ave Napier Nick
More informationInstallation of 2 Tier In Line Greeting Card Rack
Installation of 2 Tier In Line Greeting Card Rack Material Sent to Store: Greeting Card Fixtures: 4ft Inline Tier Kit (1 per every 4ft based on planogram) 3ft endcap Tier Kit (will not receive if planogram
More informationEmergency Preparedness: Natural Disasters
Emergency Preparedness: Natural Disasters Natural disasters can strike anywhere and at any time, putting workers at risk for injuries and illnesses. Companies and workers may be required to deal with a
More informationInsulated Cabin Flat Roof
A L L P U R P O S E I N S U L A T E D C A B I N S Insulated Cabin Flat Roof OWNER S MANUAL / Instructions for Assembly Size 0 Ft x 3 Ft / 3. Mtr. x 4.0 Mtr. (Approx.) Ver. : 3.0 Customer Service Hotline
More informationINDUSTRY AND TECHNOLOGY Institutional (ILO), Program (PLO), and Course (SLO) Alignment
INDUSTRY AND TECHNOLOGY Institutional (ILO), Program (PLO), and Course (SLO) Program: Construction Technology Number of Courses: 22 Date Updated: 09.18.2014 Submitted by: SueEllen Warren, ext. 4519 Renee
More informationQRPGuys Single Lever Paddle w/base
QRPGuys Single Lever Paddle w/base First, familiarize yourself with the parts and check for all the components. If a part is missing, please contact us and we will send one. You must use qrpguys.parts@gmail.com
More information175 m2 (1,880 sq ft) Kit
175 m2 (1,880 sq ft) Kit Your Kit Components 1 x 50m 2 Complete Kit Tap Assembly 5 x Auto-flushing valve (spinlock) 2 x 50m 2 Extension Kit 3 x Straight joiner (spinlock) 4 x Tee joiner (spinlock) 1 x
More informationWall Bracing Examples: Building #1 One-Story
Wall Bracing Examples: Building #1 One-Story Front Elevation 2009-21-1 Continuously- sheathed per s. Comm 21.25(9)(c)5., Fig. 21.25-K, W/2 foot return. Four Feet of Wood Structural Panel Sheathing or Diagonal
More informationDifficulty Rating: Beginner. Designed by Elise Lea for RK Featuring. Finished quilt measures: 84 x 84
GIANTJust LOGKisses CABIN STAR Designed by Elise Lea for RK www.robertkaufman.com Featuring Finished quilt measures: 84 x 84 Difficulty Rating: Beginner For questions about this pattern, please email Patterns@RobertKaufman.com.
More informationWINSTAR CONVENTION CENTER -MEDIA KIT-
WINSTAR CONVENTION CENTER -MEDIA KIT- WINSTAR CONVENTION CENTER CONSTRUCTION TIMELINE Chickasaw Nation officials, WinStar World Casino and Resort officials, elected officials and community members broke
More informationInstructions for Fun Foam Critter 4/25/2007 BP Hobbies LLC 140 Ethel Road W Suite J Piscataway NJ,
Instructions for Fun Foam Critter 4/25/2007 BP Hobbies LLC 140 Ethel Road W Suite J Piscataway NJ, 08854 http://www.bphobbies.com Specifications: Wing Span: 20" Length: 20" Flying Weight: 5.5-7.0 oz Controls:
More informationDetails and Cost Analysis of a Five Stall Engine House
KU ScholarWorks The University of Kansas Pre-1923 Dissertations and Theses Collection http://kuscholarworks.ku.edu Details and Cost Analysis of a Five Stall Engine House by Roy A. Porterfield May 15th,
More informationFALL PROTECTION PLAN FALL PROTECTION PROGRAM
FALL PROTECTION PLAN IMPORTANT: This document is intended to provide guidance only for developing site-specific fall protection plans for working at heights. FALL PROTECTION PLAN IMPORTANT: This document
More informationExtension Platform. Base Platform. Crossover. Exit railing. Exit Railing
Base Platform Galvanized With metal grate and two brackets Railing on the long side and a face side Extension Platform Galvanized With metal grate and one bracket Railing on the long side with rail connection
More informationS110 Steel Level Panel Installation Instructions
S110 Steel Level Panel Installation Instructions NOTE: Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by installer. It is the installer s resposibility
More informationOYSAN U10/12 Course Techniques and Skills Circuit
OYSAN U10/12 Course Techniques and Skills Circuit Field Lay-out Who Won? Keep score after each round to turn training into a competition! Name Station 1 Station 2 Station 3 Station 4 Station 5 Station
More informationHome Tweet Home 9 Blocks Fabric Location 1 Kit
Home Tweet Home 9 Blocks Fabric Location 1 Kit 1384 Cream (33) 1, 2, 4, 6, 7, 8 1/8 yard 1895 Blacklight (537) 1, 2, 3, 4, 5, 6, 7, 8, 9 1/8 yard 1895 Blonde Ale (199) 1895 Chameleon (315) 8 1/8 yard 1895
More informationSpecial/No Mulch List
Special/No Mulch List 2 Pin Oak Trail No mulch around house please 4 Red Cedar Trail No mulch 8 Red Cedar Trail uses Cocoa Beans 1 White Pine Trail Flowers/perennials on all sides 1 Red Oak Trail Do not
More informationAMUSEMENT EMPORIUM TM. Rubber Rings And Parts
USA-Made Exclusively For AE AMUSEMENT EMPORIUM TM Rubber Rings And Parts USA-Made Exclusively For AE USA Made! W0693 Black Bumper Sleeve 23-6556 W0684 Yellow Bumper Sleeve 23-6552 Plunger Tips Black R0064
More informationKY Starter Bot Build Images and Coding Instructions from YouTube Videos
KY Starter Bot Build Images and Coding Instructions from YouTube Videos Acknowledgements Brentwood Academy (BA) gratefully acknowledges the work and generosity of the University of Kentucky (UK) Engineering,
More informationGilman Gear 2012 Price List Effective January 1, 2012
RP284 ADJUSTABLE CROSSBAR REPLACEMENT (EACH) 1,400.00 RP274 BLADDER-GIANT PUSHBACK 40.00 RP101 BLADDER-PNEUBACK TOP 135.00 RP102 BLADDER-ROLLBACK RING 70.00 RP103 BLADDER-ROLLBACK TOP 185.00 RP106 BULLSEYE
More information5. STRUCTURAL ANALYSIS
5. STRUCTURAL ANALYSIS The skeletal structure of the experiment casing is constructed from UNISTRUT with all experiment equipment mounted by UNISTRUT provided fasteners. All maximum loads for nuts, bolts,
More informationFor every inch of rain that falls on a catchment area of 1,000 square feet, you can expect to collect about 600 gallons of water.
REASONS TO HAVE A RAIN BARREL AT HOME: Rain Barrels: Keep water out of storm and combined sewer systems Protect our rivers, lakes, and streams from runoff pollution Control moisture levels around foundation
More informationYour kit contains the following items. Additional Items You May Need. Pre- cut parts Propeller rigging and rubber Sandpaper Covering sheet
Your kit contains the following items Pre- cut parts Propeller rigging and rubber Sandpaper Covering sheet The SkyFox offers great glide performance in a rubber powered plane due to its built up wing.
More informationespin - Bicycle Generator
espin - Bicycle Generator NO TOOLS REQUIRED Thanks for purchasing the Tesla Energy portable bicycle generator. We are excited for this product to help your energy needs. With lots of testing, we have come
More informationP STYLE 6 LH 5 RH 4 LRH
42" [1067] HARDWARE FOR 3/8"- 1.9 1.8 1.5 1.2 STANDARD WEDGE LOCK DOOR (HEIGHT) GUIDELINES 3/8" (10mm) TEMPERED = 84" RECOMENDED MAX HEIGHT 1/2" (12mm) TEMPERED = 108" RECOMENDED MAX HEIGHT OPP. 1.9 3
More informationBoat Boat Loader Fitting Instructions
Aerodynamic & Heavy Duty Roof Rack Systems Australian Made - Australian Owned www.rhinorack.com Boat Boat Loader Fitting Instructions CONTROLLED Balance point 3 Front eye nuts position 3 Transom eye nut
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationFar East Boat Optimist Rigging Instructions
Far East Boat Optimist Rigging Instructions These instructions are written specifically for Far East Boats Championship and Racing Optimist. Parts of the Optimist PAGE 1 Sprit Wind Indicator Sail Mast
More informationHARDWARE. Push / Pulls... A Pivots... A Hinges, Locks and Cylinders... A Handles, Locks and Accessories... A4...
front line Table of Contents A4 1 HARDWARE Section Page Push / Pulls... A4... 2 Pivots... A4... 3 Hinges, Locks and Cylinders... A4... 4 Handles, Locks and Accessies... A4... 5 Exit Devices... A4... 6
More informationClips. FA 180 $ /16x1-1/6" w/sealer. 17/32x3/4 w/sealer. FA 182 $0.75 wire Clip 7/8 x 7/8" Mr. G's Fasteners Fort Worth, Texas
FA 164 $0.55 1/2x1/2" FA 4322 $1.10 3/8x1/2" Wire 65 Mustang FA 4323 $1.15 FA 172 $0.60 Wire 3/8x3/4" Wire 3/4x15/16" FA 176 $0.75 Wire 1/2" FA 175 $0.60 Wire 1/2" FA 167 $0.60 Wire 5/8 X5/8" FA 166 $0.75
More informationI.H.S INSTALLATION INSTRUCTIONS
I.H.S INSTALLATION INSTRUCTIONS TOOLS REQUIRED The following tools will be required for installation of your I.H.S. system. Item Qty Needed 9/16 Open End Wrench 2 3/4 Open End Wrench 1 1/2 Open End Wrench
More informationInsulated Cabin Flat Roof
A L L P U R P O S E I N S U L A T E D C A B I N S Insulated Cabin Flat Roof OWNER S MANUAL / Instructions for Assembly Size 0 Ft x Ft with Extension Kits (0 Ft x 6 / Ft /. Mtr. x Mtr.) (Approx.) Ver. :
More informationInstant Garage 16' x 12' 3" x 8' 6"
Instant Garage 16' x 12' 3" x 8' 6" Assembly Instructions Door Height 1.8M A B DESRIPTION MODEL # A B IG 1216 Instant Garage 4.9 x 3.7 x 2.6 M - Grey 3503500 16' x 12' 3" x 8' 6" REOMMENDED TOOLS OR Please
More informationTurtle 102 Square Spiral
Turtle 101 Square See if you can make a bigger square. Change each angle to 45 degrees. What do you get? Can you add to the program to make it a complete shape? Turtle 102 Square Spiral Turtle Blocks Turtle
More informationMEDIA KIT Spring 2019
MEDIA KIT 2018-19 MAGAZINE ROOTS / ROCK / REGGAE / RESPECT When REGGAE MUSIC hits you, you FEEL no pain! MEDIA KIT 2018 - Spring 2019 MEDIA KIT / 2018 - SPRING 2019 When REGGAE MUSIC hits you, you FEEL
More informationCALLBOARD. Monroe in May for a Most. In this Edition. Report from PCR 2015 Modesto Convention See Page 5 for details. Front Office Page 3
REDWOOD EMPIRE DIVISION APRIL - JUNE 2016 CALLBOARD In this Edition Front Office Page 3 Directions to Event Page 4 Tips and Techniques Page 6 Coming Events Page 8 Monroe in May for a Most Our hard working
More informationWind and Fastener Calculation Report for property located at
Martinez Antonio Wind and Fastener Calculation Report for property located at Martinez Antonio Universal Engineering, Inc 12828 Buckland St., Wellington FL 33414 Tel: 561-204-5000, Fax:561-204-1050 e-mail:
More informationIAN BENNIE & ASSOCIATES PTY. LTD.
TEST CERTIFICATE No. 2009-098-C1 9 November 2010 FCM 4646 0004B AS 4285-2007 (refer below 9 November 2009 2009-098-S5 The system was nominally 1300mm x 1300mm OD secured to a metal base and metal flashing.
More informationFigure 1 Front elevation. Figure 2 Rear elevation with two wings, each with gambrel roofs intersecting the main roof, but at a lower level.
A private school in a picturesque New England town is the setting for our first case study in snow retention. This significant building (Figure 1), on the campus of a prestigious private school, houses
More informationTugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions
Z I P P M A N U FA C T U R I N G Tugster Tug Boat Competition or Sport Tug Kit A Zippkits R/C Boat Building Instructions 2016 JMP Hobby Group St. Paul, Indiana 47272 www.zippkits.com Toll Free (866) 922-ZIPP
More informationORIGINAL RANGE. 4 in 1 Veggie Bed CHOOSE A SHAPE TO SUIT YOUR AREA. Birdies Modular Veggie Bed
Birdies Modular Veggie Bed ORIGINAL RANGE 4 in 1 Veggie Bed CHOOSE A SHAPE TO SUIT YOUR AREA Bed heights available in: 400mm (16 ) 600mm (24 ) 820mm (32 ) GARDEN bed FEATURES 4 in 1 Veggie Bed Configure
More informationCRL COMMERCIAL PATCH HARDWARE WEDGE LOCK STYLE FOR 5/8"-3/4" GLASS TYPICAL HURCULITE WEDGE-LOCK GLASS DOOR ELEVATIONS P STYLE
42" [1067] HARDWARE FOR 5/8"- 1.5 1.9 1.8 1.2 OPP. 1.9 3 1/2" [88] 24 7/8" [632] DLO 1 11/16" [42] 84" [2134] 114" [2896] STANDARD WEDGE LOCK DOOR (HEIGHT) GUIDELINES 5/8" (15mm) TEMPERED = 84" RECOMENDED
More informationDEADBOLT SETS, MECHANICAL FEATURES
, MECHANICAL FEATURES 8000 SERIES LOW PROFILE CYLINDER DEADBOLT FOR 1 5 8 (41mm) DOOR PREP All deadbolts feature a ½ low-profile cylinder projection. CASE: Deadbolt case is formed of heavy gauge steel
More informationHighland Park Glengarry Court. Landscape design and Fencing rules
Highland Park Glengarry Court Landscape design and Fencing rules Introduction Glengarry Court is to be developed as a comprehensive precinct with its own identity within Highland Park. This includes the
More informationRhino Rack Side Rails Kayak Loader (SLH01)
Important: Rhino Rack Side Rails Kayak Loader (SLH01) Place these instructions in the vehicle s glove box after installation is complete. Please read these instructions carefully prior to installation.
More information822 Calibra Digital Single Channel Micropipette
Wheaton Science Products Non-Autoclavable Calibra 822 ITEM # DESCRIPTION 0.4-2uL 1-10uL 2-20uL 10-100uL 20-200uL 100-1000uL 1 Setting Wheel I053074 I053074 I054074 I053074 I053074 I053074 2 Circlip I053075
More informationConstitution Instructions
Constitution Instructions This kit will build a 1:48 scale hull for the USS Constitution frigate. The kit contains the following parts. 1/8 deck with laser etched deck lines 1/8 railing Ribs Center keel
More informationTraining Game U-10 Players 1V1 Four Gate Soccer
1V1 Four Gate Soccer Skill: Attacking and Defending Equipment: 8 or more cones to mark a grid (make additional grids as needed, avoid lines) and 5 or 6 soccer balls. Organization: Using cones layout a
More informationAdobe Canyon III. Oval Pool. Parts List the original portable pool
the original portable pool Adobe Canyon III Oval Pool Parts List 573-2948 Adobe Canyon III Oval Pool Parts List 20' x 12' x 48" 24' x 12' x 48" 28' x 12' x 48" 24' x 16' x 48" 28' x 16' x 48" ITEM # DESCRIPTION
More informationSARATOGA. 10-1/2" Top Rail Oval Pools. Parts List
SARATOGA 10-1/2" Top Rail Oval Pools Parts List 573-3495 Oval Pools Parts List 24' x 12' 24' x 16' 28' x 16' 32' x 16' 34' x 18' 41' x 21' ITEM # DESCRIPTION PART# QTY. PART# QTY. PART# QTY. PART# QTY.
More informationCHANNEL & SUPPORT SYSTEMS
Total Cable Management Solutions CHANNEL & SUPPORT SYSTEMS Unitrunk Intelok Channel is a strong, easy to erect support system, ideal for supporting cable trays, cable ladders, pipes and ducting and is
More information2 COUNTY OF SUFFOLK STATE OF NEW YORK X 4 HISTORIC PRESERVATION COMMISSION
1 1 VILLAGE OF GREENPORT 2 COUNTY OF SUFFOLK STATE OF NEW YORK 3 ----------------------------------------X 4 HISTORIC PRESERVATION COMMISSION 5 REGULAR SESSION 6 ----------------------------------------X
More informationResidential Garage Door WARNING
Residential Garage Door INFORMATION EZ-SET TORSION S TORSION S EXTENSION S Improper Installation or Door Position Can Result in Serious Injury or Death. Read and understand all instructions before you
More informationJOBS LANE BRIDGEHAMPTON
JOBS LANE BRIDGEHAMPTON N E W Y O R K Waterfront living in Bridgehampton with unobstructed views of the Atlantic Ocean, Mecox Bay, Sams Creek and beyond. JOBS LANE, BRIDGEHAMPTON, NY 1 JOBS LANE BRIDGEHAMPTON,
More informationSorcerer and Warlock
Sorcerer and Warlock Advanced Software for Roof and Wall Design and Estimating Tutorial - Crickets Revision: 1.1 12 August 2009 English Units / Feet-Inches AppliCad Tutorial Big Crickets Page 2 Tutorial
More informationDIY - PC - Interface for Suunto Cobra/Vyper/Mosquito
DIY - PC - Interface for Suunto Cobra/Vyper/Mosquito Summary This document is the distinct consequence of the Spyder/Stinger interface DIY. After having many e-mails concerning the application for the
More informationUser Manual V14.1 IP68 LED FLEX NEON
User Manual V14.1 IP68 LED FLEX NEON PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLATION LEAVE A COPY FOR THE END USER/MAINTENANCE ENGINEER FOR FUTURE REFERENCE 1/11 PRODUCT SPECIFICATION 1. Operating
More informationAdvancedTrak Rudder Kit AE4005. Assembly and Installation Instructions
AdvancedTrak Rudder Kit AE4005 Assembly and Installation Instructions Thank you for your purchase of the Advanced Elements AdvancedTrak Rudder Kit! A Kayak Rudder is a great way to enhance the tracking
More informationFALL PROTECTION
115500 FALL PROTECTION PART 1 GENERAL 1.01 General A. Cornell University seeks to prevent exposures to fall hazards whenever possible and protect personnel that may be exposed to fall hazards. Therefore,
More informationUSG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE
USG Ceiling Solutions LOGIX Integrated Ceiling Systems INSTALLATION GUIDE LOGIX Integrated Ceiling Systems INSTALLATION GUIDE Logix Brand Integrated Ceiling Systems integrated ceiling systems from USG
More informationSLAT & LOUVRE FENCING
SLAT & LOUVRE FENCING...make it your own! SLAT & LOUVRE FENCING...make it your own! COST-EFFECTIVE BelAire slat and louvre fencing is a great cost-effective option where a degree of privacy and security
More informationVariance Review Board City Council Chambers City Hall 315 E. Kennedy Blvd, Third Floor Tampa, Florida 33602
Variance Review Board City Council Chambers City Hall 315 E. Kennedy Blvd, Third Floor Tampa, Florida 33602 IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT AND SECTION 286.26, FLORIDA STATUTES,
More informationAreaFest Table of Contents. U12 Girls Skokie (Channel Park) U12 Boys Peterson Park U10 Girls - Deerfield (Clavey Park)...
Table of Contents General Instructions... 2 Tournament Format... 3 Typical Field Dimensions... 5 Additional Rules... 6 Directions to Fields... 6 U12 Girls Skokie (Channel Park)... 7 U12 Boys Peterson Park...
More informationPROVIDING QUALITY SOLUTIONS FOR THE AUDIOMETRIC INDUSTRY
PROVIDING QUALITY SOLUTIONS FOR THE AUDIOMETRIC INDUSTRY PRODUCT OPTIONS AMB Portable Series: Booths consist of 2 or 3 inch panels with integrated ventilation in the roof and floor. AMB 410: Consists
More informationRPS900W Redundant Power Supply. Installation Guide.
RPS900W Redundant Power Supply Installation Guide www.edge-core.com Installation Guide RPS900W Redundant Power Supply Single DC Output Port with Dual Output Voltages RPS900W E10013-CS-R01 1500000081A
More informationORNAMENTAL CANTILEVER GATE INSTRUCTIONS
U.S.A. Patent Number 5,36,83 ORNAMENTAL CANTILEVER GATE INSTRUCTIONS *NOTICE: Ornamental Cantilever Gates are supplied with rolls of 2 mesh safety screening in sufficient quantities to cover the entire
More informationBella Vista Corporate Advertising Program
Bella Vista Corporate Advertising Program At Bella Vista, we have been rated of the Top Daily fee golf courses in Montgomery County. Being a daily fee course, most of our customers are always new so what
More information[Title of the course]
As with non-metallic raceway, Hubbell metal raceway is available in a variety of styles. There are 13 metal raceway profiles 8 painted and 5 aluminum for customers to choose from! ALL Hubbell painted metal
More informationBOAT WINDOWS AND SHOWERS Price List June 2017 Tel/Fax:
DOUBLE LA ZED WINDOWSGW ITH A TH ERMAL BREA K BOAT WINDOWS AND SHOWERS Price List June 2017 Tel/Fax: 01636 704363 WESLEY MARINE WINDOWS LTD BOAT WINDOWS AND SHOWERS Tel/Fax: 01636 704363 INDEX Page 3-6
More informationSaturday, October 29, Halloween Costume Contest. Trunk or Treat
Fall 2016 Saturday, October 29, 2016 Halloween Costume Contest 5:00 pm Trick or Treat at the homes This event on Saturday does not affect the traditional Halloween trick or treat on Monday, October 31,
More informationRussell Hunter Roulette Zone Betting Video Guide Russell Hunter Publishing, Inc.
Russell Hunter Roulette Zone Betting Video Guide Russell Hunter Publishing, Inc. Roulette Zone Betting Video Guide 2016 Russell Hunter and Russell Hunter Publishing. All Rights Reserved All rights reserved.
More informationISOframe Trade Show Stands
IDEA BOOK ISOframe Trade Show Stands 3Self-build 3Modular 3Portable This booklet is created to give ideas and inspiration on how to build attractive and functional trade show stands with our unique ISOframe
More informationProduct Guide. Latitude Series High-Performance Exterior Metal Wall Panels for Horizontal and Vertical Concealed Clip Application
Product Guide Latitude Series High-Performance Exterior Metal Wall Panels for Horizontal and Vertical Concealed Clip Application Blank Text www.imetco.com (800) 646-3826 Page 2 Contents Standard Profile...
More informationOverhead Irrigation Installation Guide DOM Copyright First Tunnels Ltd 2012.
www.firsttunnels.co.uk/quality Overhead Irrigation Installation Guide DOM Copyright First Tunnels Ltd 2012. Warnings General Please keep children and pets away from the work area. If any holes are not
More informationKestrel Aluminium Systems Limited. Product Manual Section 10 Thermal Framing System. Manual Version
Kestrel luminium Systems Limited Product Manual Section 10 Manual Version 23.0.1 Kestrel luminium Systems Section 10.01 Product Specification 10.01.01 sheet 1 Product specification 10.01.01 sheet 2 Product
More informationMULTICHANNEL. Labnet International, Inc.
Labnet International, Inc. A B A1 A2 C F D H E 4A 4B 4C 4D G CONTENTS 1 - INTRODUCTION 2 - VOLUME SETTING 3 - METHOD OF PIPETTING 4 - RECOMMENDATIONS - RECALIBRATION 6 - CLEANING AND STERYLIZATION 7 -
More informationGLOBAL PREMIER SOCCER
GLOBAL PREMIER SOCCER SESSIONS 7v7 SESSIONS - Defending 1v1 situation Players work in pairs with one ball. One player has a the ball and dribbles around inside the area. Player 2 must follow player 1 and
More informationParts diagrams. Pick-up Roller Assembly (Figure 8-7) Pick-up Assembly (Figure 8-7) DC Controller (Figure 8-6)
Parts diagrams Pick-up Assembly (Figure 8-7) Pick-up Roller Assembly (Figure 8-7) DC Controller (Figure 8-6) Transfer Roller Guide Assembly (Figure 8-5) Feed Assembly (Figure 8-8) Delivery Assembly (Figure
More informationGemstone. Quilt 1. A Free Project Sheet NOT FOR RESALE. Skill Level: Intermediate A Free Project Sheet From. Quilt Design by Heidi Pridemore
A Free Project Sheet NOT FOR RESALE Gemstone Quilt Design by Heidi Pridemore Skill Level: Intermediate A Free Project Sheet From Finished Quilt Size: 70 x 76 49 West 37th Street, New York, NY 10018 tel:
More informationTrim Tab Wind Vane for boats with transom mounted rudders
Trim Tab Wind Vane for boats with transom mounted rudders If your boat has a transom mounted rudder, you can build this self-steering windvane for around $150, using regular wood working tools and some
More informationDrexel-SDP GK-12 ACTIVITY
Drexel-SDP GK-12 ACTIVITY Subject Area(s): Astronomy, Gravity, Friction, Momentum Associated Unit: None Lesson Title: Cars, Gravity, Momentum and Friction Header: Microsoft Word drawn image of a car consisting
More information1. Select a level area 10 feet by 20 feet for assembly and placement of the enclosure. 2. Assemble the roof frame of the multi-purpose canopy kit according to the manufacturer s instructions. 3. Measure
More information