Train Operating Data NA_NSP_02.14 R

Size: px
Start display at page:

Download "Train Operating Data NA_NSP_02.14 R"

Transcription

1 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Sprinter/ Vlocity SUNBURY and KYNETON WEST Line (Old Down Line) (See Special Speed Restrictions) SUNBURY and KYNETON EAST Line (Old Up Line) (See Special Speed Restrictions) KYNETON and TARADALE TARADALE and ELPHINSTONE WEST Line (Old Down Line) (See Special Speed Restrictions) TARADALE and ELPHINSTONE EAST Line (Old Up Line) (See Special Speed Restrictions) ELPHINSTONE and CASTLEMAINE CASTLEMAINE and HARCOURT HARCOURT and RAVENSWOOD WEST Line (Old Down Line) See Special Speed Restrictions HARCOURT and RAVENSWOOD EAST Line (Old Up Line) See Special Speed Restrictions RAVENSWOOD and KANGAROO FLAT KANGAROO FLAT and BENDIGO (KP ) West Line (Old Down Line) KANGAROO FLAT and BENDIGO (KP ) East Line (Old Up Line) KP to Myrtle Street Overbridge KP All Trains Between Myrtle Street Overbridge KP and Williamson Street PCR KP All Trains Up end of BENDIGO yard for Down entering yard A. VLOCITY RAIL CARS AUTHORISED 160KM/H PERMITTED SPEEDS REGIONAL FAST RAIL CORRIDOR VLOCITY WEST Line Metro Boundary down side of RUPERTSWOOD to KP approach to CLARKEFIELD WEST Line KP approach to CLARKEFIELD to KP down side of MACEDON 160 WEST Line KP down side of MACEDON to KP 75.3 up side of WOODEND WEST Line KP 75.3 Up side of WOODEND through KYNETON and TARADALE WEST 160 Line to KP UP side of ELPHINSTONE WEST Line KP UP side of ELPHINSTONE to KP HARCOURT WEST Line KP HARCOURT through RAVENSWOOD to KP down side of 160 BIG HILL TUNNEL WEST Line KP down side of BIG HILL TUNNEL to WEST line KP to KP down side of KANGAROO FLAT Platform 160 KP WEST line down side of KANGAROO FLAT Platform to BENDIGO Print Date: 24 August 2015; Printed copies are uncontrolled Page 1 of 5

2 2. SPECIAL SPEED RESTRICTIONS 1. The Speed of all trains when passing over Facing Points worked from an interlocking frame or wise securely fastened or over trailing points shall be as shown hereunder: MAXIMUM SPEED (KM/H) When running to or from lines diverging from the straight track When running on the straight track Over facing points held by hand Between GISBORNE and KYNETON (except at certain locations where the maximum speed is displayed in excess of 40 km/h for diverging movements) 40 Line Speed for train type 2. G locomotives are restricted to the below listed maximum speed when operating over the bridges, shown hereunder, between SUNBURY and CASTLEMAINE. MALMSBURY VIADUCT at km TARADALE VIADUCT at km PYRENEES HIGHWAY at km 3. All self propelled Rolling Stock (Locomotives etc) including Track Machines and Track Maintenance vehicles which are not fitted TPWS must be restricted to a Maximum Speed of (eighty) KMPH between Sunbury and Bendigo. SECTION DOWN Sunbury to KYNETON G, XR, BL N GM, S, X 3. RULING GRADE LOADS (TONNES) Mod A Class Non- Mod A solo or A CLASSES OF LOCOMOTIVES Non- B H solo Mod A or H, P, T or Y H T or P solo or H, P, T or Y T or P Y solo or T, Y, H or P Y CASTLEMAINE BENDIGO UP Bendigo to CASTLEMAINE KYNETON SUNBURY SAFEWORKING SYSTEMS Automatic and Track Control is in force on the EAST, WEST and SINGLE Lines between SUNBURY and KANGAROO FLAT in accordance the provisions of Section 36 of the Rules and Operating Procedures. The signalling at GISBORNE, KYNETON, TARADALE, ELPHINSTONE, CASTLEMAINE, HARCOURT, RAVENSWOOD and KANGAROO FLAT is controlled remotely using visual display units located at CENTROL. Station Yard Working is in force between KANGAROO FLAT and BENDIGO. All local signalling is controlled from a Visual Display Unit located at CENTROL. 5. SPECIAL NOTES No Special Notes. Print Date: 24 August 2015; Printed copies are uncontrolled Page 2 of 5

3 6. DISTANCES FROM MELBOURNE AND CLEAR LENGTH OF CROSSING ROADS MARKED DISTANCE FROM MELBOURNE (KM) CLEAR LENGTH OF CROSSING ROADS (LENGTH IN METRES) NO. 1 NO. 2 NO. 3 SIDINGS CLARKEFIELD RIDDELLS CREEK GISBORNE Refuge Siding 445 MACEDON WOODEND KYNETON Siding No Siding No Siding No Siding No (Siding A) Siding B 160 MALMSBURY TARADALE ELPHINSTONE CASTLEMAINE Thompson s Siding HARCOURT RAVENSWOOD KANGAROO FLAT GOLDEN SQUARE BENDIGO Siding No Siding No Siding No 3 Siding No 4 Siding No 5 Siding No 6 Siding No Siding No Siding No Print Date: 24 August 2015; Printed copies are uncontrolled Page 3 of 5

4 7. TRACK CLASS Track is maintained to the following standards. SECTION CLASS SUNBURY KYNETON West Track km 40.1 km CLASS 1 West Track 40.1 km km CLASS 2 West Track km km CLASS 2M West Track km km CLASS 2 West Track km km CLASS 1 West Track km km CLASS 2 West Track km km CLASS 2M West Track km 75.3 km CLASS 2 West Track 75.3 km km CLASS 1 East Track km km CLASS 2 KYNETON BENDIGO km km CLASS km km CLASS km km CLASS 2M km.163 km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km 124. km CLASS km km CLASS km km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km km CLASS km km CLASS 2M km km CLASS km km CLASS km km CLASS km km CLASS km km CLASS 2M km km CLASS 2 TARADALE LOOP km km CLASS 2 CASTLEMAINE LOOP 124. km km CLASS 2 RAVENSWOOD LOOP km km CLASS 2 KANGAROO FLAT GOLDEN SQUARE LOOP km km CLASS 2 Print Date: 24 August 2015; Printed copies are uncontrolled Page 4 of 5

5 NAME AND KMS OF NEAREST STATION 8. PROTECTED LEVEL CROSSINGS LEVEL CROSSING DISTANCE (KM) TYPE NUMBER VICROADS ID NO. SUNBURY * Raes Road FL M0421 CLARKEFIELD * Williamsons Road BB M0454 * Settlement Road BB M0488 * Pedestrian Crossing PG M0503 RIDDELLS CREEK * Stokes Lane West BB M0554 * Pedestrian Crossing PG M0569 * Occupation Crossing FL M0570 GISBORNE Station Road BB, PG M0642 MACEDON * Victoria Street PG M0698 WOODEND * Pedestrian Crossing PG M0781 * Tylden Woodend Road 79.8 BB M * Crows Lane BB M0829 * Carlsruhe Station Road BB M0848 KYNETON * Carlsruhe Central Road BB M0877 Mollison Street BB, PG M0914 * Harts Lane BB M0940 * Lauriston Road BB M0955 * Sebastapol Road BB M0966 * Ritches Road BB M0975 MALMSBURY * Breakneck Road BB M0993 * Malmsbury Station PG M1020 * Potts Road BB M1094 CASTLEMAINE * Urquart Street BB, PG M1131 Castlemaine Station PG M1255 Parker Street BB, PG M1262 * Harcourt Station PG M1330 KANGAROO FLAT * Ravenswood Avenue BB M1450 * Taylor Street PG M1563 * Kangaroo Flat Station PG M1573 BENDIGO * Oak Street BB, PG M1590 BB Boom Barriers CC Crib Crossing FL Flashing Lights IG Interlocked Gates NSW R.I.C. Distance from Sydney PB Pedestrian Barriers PG Pedestrian Gates SG Standard Gauge T Equipped Telephone Communication VIC Victorian Broad Gauge Note * Indicates those level crossings where an increase in speed may be permitted if the train is travelling at or above 50km/h upon passing the predictor indicator board. At these level crossings indicated above operated Level Crossing Predictors, the Predictor boards will be placed in accordance Rule 9 (Section 36) of the Book of Rules and Operating Procedures. Note Level crossing fitted VicRoads Active Advance Warning Signs. Warning sign faults are to be reported to the VicRoads Fault Centre on Print Date: 24 August 2015; Printed copies are uncontrolled Page 5 of 5

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Indicators Rule Number: 6009 Version 1.0, 31 March 2016 Indicators Rule Number: 6009 Document Control Identification Document title Number Version Date 6009 Indicators

More information

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 5.1 16 September 2018 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Pedestrian Level Crossings Design and Installation

Pedestrian Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Pedestrian Level Crossings Design and Installation ETD-16-03 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS

More information

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book GERT8000-HB12 Rule Book Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession Issue 6 September 2017 Comes into force 02 December 2017 Handbook 12 Uncontrolled when printed

More information

RAILWAY SAFETY. Please click on any of the links below to go directly to your specified topic within this document.

RAILWAY SAFETY. Please click on any of the links below to go directly to your specified topic within this document. RAILWAY SAFETY Please click on any of the links below to go directly to your specified topic within this document. Facts about Railway Property and Trains Railway Signs, Devices, and Warnings Railway Safety

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01 Discipline Engineering Specification Category Supplementary Appendix to ARTC Code of Practice Establishing Minimum Protective Measures at Level Crossings Applicability ARTC Network wide New South Wales

More information

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6 Operating Plan 8a Bruce County Rail Trail Section 8 to Saugeen Concession 6 To develop and open the section of Non-Motorized trail (Part of Section 8) which runs from the South boundary of the (west side

More information

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book GERT8000-S5 Rule Book Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) Issue 8 Module S5 September 2018 Comes into force 01 December 2018 Conventions used in the

More information

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 I, the undersigned, acknowledge receipt of this publication. I undertake to familiarise myself with any alterations which apply to me. FULL NAME (CAPITALS) STAFF

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study Elon Bicycle, Pedestrian and Lighting Plan Pedestrian Rail Crossings Study Project Overview The Town of Elon, Elon University and the Twin Lakes Retirement Community began a comprehensive bicycle, pedestrian

More information

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book GERT8000-TS10 Rule Book ERTMS level 2 train signalling s Issue 4 Module TS10 September 2018 Comes into force 01 December 2018 Conventions used in the Rule Book A black line in the margin indicates a change

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Rail Traffic Whistles Rule Number: 4007 Version 1.0, 31 March 2016 Rail Traffic Whistles Rule Number: 4007 Document Control Identification Document title Number

More information

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad.

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad. Glossary of Terms AAR/DOT CROSSING NUMBER A uniform numbering system in which a unique designation is assigned to every highway-rail grade crossing in the nation. It consists of a six digit number followed

More information

Uncontrolled When Printed Document comes into force 05/12/2015 Supersedes GERT8000-HB6 Iss 4 on 05/12/2015

Uncontrolled When Printed Document comes into force 05/12/2015 Supersedes GERT8000-HB6 Iss 4 on 05/12/2015 GE/RT8000/HB6 Rule Book Uncontrolled When Printed Handbook 6 Handbook 6 General duties of an individual working alone (IWA) Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The

More information

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book GERT8000-TS1 Rule Book Uncontrolled when printed General signalling regulations Issue 12.1 Module TS1 March 2018 Comes into force 03 March 2018 Conventions used in the Rule Book A black line in the margin

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Golden s Plan. For the Highway 6 & 93 Corridor

Golden s Plan. For the Highway 6 & 93 Corridor Golden s Plan For the Highway 6 & 93 Corridor Purpose of the Study Accommodate regional traffic needs on Highways 6 and 93, as defined by the Northwest Quadrant Feasibility Study. Find a solution that

More information

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018 Handbook RS521 Signals, Handsignals, Indicators and Signs Issue 5 RS521 December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Bylaw No SPEED BYLAW PAGE 1 Code 04/10

Bylaw No SPEED BYLAW PAGE 1 Code 04/10 PAGE 1 Code 04/10 A BYLAW OF THE CITY OF LEDUC IN THE PROVINCE OF ALBERTA, TO PRESCRIBE SPEED LIMITS ON HIGHWAYS OR ROADWAYS IN THE MUNICIPAL BOUNDARIES The Traffic Safety Act, R.S.A. 2000, Chapter T-6,

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Victorian Interstate Infrastructure Lease KPI Report 4th Quarter 2016/2017 (Apr-Jun)

Victorian Interstate Infrastructure Lease KPI Report 4th Quarter 2016/2017 (Apr-Jun) Victorian Interstate Infrastructure Lease KPI Report 4th Quarter 2016/2017 (Apr-Jun) Victorian Interstate Infrastructure Lease KPI Report 4th Quarter 2016/2017 (Apr-Jun) TABLE OF CONTENTS EXECUTIVE SUMMARY...

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Defective Fixed Signals - Rules 1 to 6

Defective Fixed Signals - Rules 1 to 6 Defective Fixed Signals - Rules 1 to 6 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation

More information

MOTOR WHEELS KVAS NEWSLETTER

MOTOR WHEELS KVAS NEWSLETTER MOTOR WHEELS KVAS NEWSLETTER VOLUME 25 NUMBER 2 Sepetember 2015 v.a.n.a 22745 b President: Peter Melick 0421 619 256 Vice President: Ben Hunter (03) 5422 1640 Secretary: Karen Bloomfield (03) 5422 1974

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

Signals, Handsignals, Indicators and Signs Handbook

Signals, Handsignals, Indicators and Signs Handbook Handbook RS521 Signals, Handsignals, Indicators and Signs Handbook Issue 4 RS521 December 2016 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved

More information

Infrastructure Works - Rules 1 to 26

Infrastructure Works - Rules 1 to 26 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 4.0 27 January 2013 5.0 04 October 2015 5.1 01 July 2018 Australian Rail Track Corporation Limited

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

History of the Gisborne and District Cricket Association

History of the Gisborne and District Cricket Association History of the Gisborne and District Cricket Association Compiled by Rob McIntyre Updated June 2011 Cricket in the Local Area: (1858 1919) Associations: Kyneton District Cricket Association Romsey District

More information

Road safety design standards and the Asian Highway Network. irap Asia Pacific Workshop Greg Smith 2016/05/26

Road safety design standards and the Asian Highway Network. irap Asia Pacific Workshop Greg Smith 2016/05/26 Road safety design standards and the Asian Highway Network irap Asia Pacific Workshop Greg Smith (greg.smith@irap.org) 2016/05/26 AH Standard Summary While developing the Asian Highway network, Parties

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D PASSING SIGNALS AT DANGER AND MAKING MOVEMENTS IN THE WRONG DIRECTION Page Date Index Page No. Latest Issue D.1/D.2 June 2003 D.3/D.4

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

Level Crossing Predictor Design Certification and Test

Level Crossing Predictor Design Certification and Test Discipline: Engineering (Signalling) Category: Standard Level Crossing Predictor Design Certification and Test ESD-03-02 Applicability ARTC Network Wide CRIA ( NSW CRN) Primary Source Document Status Version

More information

Improving Melbourne for wheels, paws and feet

Improving Melbourne for wheels, paws and feet Improving Melbourne for wheels, paws and feet September 208 Authorised and published by the Victorian Government, Treasury Place, Melbourne Greensborough Road walking and cycling paths. Artist impression

More information

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014 GE/RT8000/TS8 Rule Book Module TS8 One-train working s Issue 4 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved by Traffic

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

WORKSITE TRAFFIC MANAGEMENT

WORKSITE TRAFFIC MANAGEMENT SECTION 3 It is the intention of this section of the Fieldworkers Handbook to provide high level traffic management guidance to employees and contractors of Victorian electrical distributions companies

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

COMMUNITY MEETING August 23, 2018

COMMUNITY MEETING August 23, 2018 COMMUNITY MEETING August 23, 2018.. 1 Agenda Welcome & Introduction Project Background & Purpose Project Overview Q & A Stations Charleston / Meadow Palo Alto City-Wide Tunnel Ideas No Longer Considered

More information

Road Safety Facilities Implemented in Japan

Road Safety Facilities Implemented in Japan Road Safety Facilities Implemented in Japan 1 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety Facilities 2 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety

More information

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS BACKGROUND: This study is a collaboration between Urban Circus (Visualisation) and Ethos Urban (Urban Design) Ideas were workshopped

More information

From our (recycled) President

From our (recycled) President Reg. AOO27059N Newsletter of the Great Dividing Trail Association Volume 2013, Issue 1 http://www.gdt.org.au March 2013 From our (recycled) President Barry Golding Firstly a sincere thanks to Alison Lanigan

More information

WDA response to O'Brien summary of recommendations dated 4 September 2017

WDA response to O'Brien summary of recommendations dated 4 September 2017 WDA response to O'Brien summary of recommendations dated 4 September 2017 O'Brien recommendation 1. Incorporate sustainable solutions such as travel demand management, active traffic management, multimodal

More information

inclusive.

inclusive. AFL Goldfields STRATEGIC PLAN 2014 2018 inclusive. Author: AFL Goldfields Commission Date: June 2014 Version: FINAL 2 P a g e T u e s d a y, 4 F e b r u a r y 2 0 1 4 TABLE OF CONTENTS 1.0 Introduction...

More information

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757)

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757) EARLY WARNING CONTROL OPERATIONAL PRESENTATION Charles Dickens (757) 831-2626 Controls still continue to use the foundations of technologies that were developed in the 1970 s. Because of the perceived

More information

Meeting between British Transport Police and Kirknewton Residents 3 rd January

Meeting between British Transport Police and Kirknewton Residents 3 rd January Kirknewton Level Crossing EH27 8DE Meeting between British Transport Police and Kirknewton Residents 3 rd January 7 th February2017 1. Objective- To address concerns at the repeated obstruction of the

More information

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, 2016 Agenda Welcome & Introduction Project Background & Purpose Project Overview Small Group Breakouts / Reporting

More information

The Railway from Pill Junction to Portishead in March 2015

The Railway from Pill Junction to Portishead in March 2015 The Railway from Pill Junction to Portishead in March 2015 A series of pictures taken to record the status of the old line following the major clearance operation Never assume you are safe on or near old

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

Our Approach to Managing Level Crossing Safety Our Policy

Our Approach to Managing Level Crossing Safety Our Policy Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

AT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added

AT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added AT403.1 P666 P874 P1028.4 P2509.1 P5001.2 P500 P672 P875 P1032 P2511.1 P5010 P530A P673 P876 P1033 P2512.1 P5011 P530.1 P784.1 P877 P1050 P2601.1 P7005 P543 P786 P878 P2010.1 P2601.1A P7009.1 P563.1 P787

More information

THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER

THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER THE CORPORATION OF THE CITY OF BELLEVILLE BY-LAW NUMBER 2017-146 A BY-LAW TO REGULATE BICYCLES, SKATEBOARDS, IN-LINE SKATES, ROLLER SKATES, E- BIKES, SEGWAYS AND OTHER CONVEYANCES DRAWN, PROPELLED OR DRIVEN

More information

GUIDELINE: Roadside Worksites

GUIDELINE: Roadside Worksites Title: GUIDELINE: Roadside Worksites Version 1.0 Short description Relevant to Authority Responsible officer Responsible office A guideline on ensuring a safe method of works on or near roadways within

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Victoria Petanque Clubs Inc.

Victoria Petanque Clubs Inc. Victoria Petanque Clubs Inc. Registration No. A0056483K 4 Fairway Drive, Gisborne, Victoria 3437 www.petanquevictoria.com.au Secretary Peter Wells peter_wells@fastmail.com.au President Max Chaperon max.chaperon@rmit.edu.au

More information

Highway 1 Kamloops to Alberta Four-Laning Program

Highway 1 Kamloops to Alberta Four-Laning Program Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST

More information

NOW THEREFORE the Council of the Corporation of the County of Pdnce Edward enacts as follows: DEFINITIONS

NOW THEREFORE the Council of the Corporation of the County of Pdnce Edward enacts as follows: DEFINITIONS AUG-02-2005 09:55 PECounty Clerks Office 6134765727 P.01 THE CORPORATION OF THE COUNTY OF PRINCE EDWARD BY-LAW NO. 115 A BY-LAW TO RESTRICT THE USE OF SKATEBOARDS, INLINE SKATES AND BICYCLES IN CERTAIN

More information

Rail Profiling - Turnouts

Rail Profiling - Turnouts Discipline: Engineering (Track & Civil) Category: Standard Rail Profiling - Turnouts ETM-03-02 Applicability ARTC Network Wide Primary Source ARTC NSW Standard LMP 03 Document Status Version Date Reviewed

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

Fitting Light Rail through Well-established Communities

Fitting Light Rail through Well-established Communities Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway

More information

Traffic and Parking Surveys

Traffic and Parking Surveys Australian Institute of Traffic Planning and Management www.aitpm.com AITPM Victorian Branch Technical Forum Traffic and Parking Surveys Wednesday 14 th October 2009, 5:30pm 7:00pm www.aitpm.com VicRoads

More information

Train stopped by train failure

Train stopped by train failure GERT8000-M2 Rule Book Train stopped by train failure Issue 5 Module M2 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk

More information

MUTCD Part 6: Temporary Traffic Control

MUTCD Part 6: Temporary Traffic Control MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter

More information

RUNNERS INFORMATION GUIDE

RUNNERS INFORMATION GUIDE RUNNERS INFORMATION GUIDE 2016 1 EVENT SCHEDULE RACE DAY SUNDAY 20 MARCH 2016 5:15am 5:45am 5:45am 6:00am 6:45am 7:00am 9:45am 10:00am 11:30am 12:00pm 2:30pm 4:00pm 5:30pm Bib Pick-up Runners area opens

More information

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS STURT ST BALLARAT WATERGARDENS TAYLORS LAKES SIMPSON ST YARRAVILLE CHAPEL ST SOUTH YARRA RINGWOOD STATION MONASH FREEWAY SA NSW VIC

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE OVERALL DRAFT EXPENDITURE PLAN TRANSIT/Mode Shift Millions % BART to Downtown San Jose/Santa Clara* 1,400 23% Caltrain Capacity & Safety 1,014 17% Mass

More information

Australian Level Crossing Practices

Australian Level Crossing Practices Australian Level Crossing Practices Peter Symons F.I.R.S.E. Technical Director Tritun Pty Ltd Level crossing with Booms in Adelaide, South Australia. Photo P Symons 2009 Version 1.0 30-03-2016 Presentation

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY UNIT III 1. What are the various types of traffic signs? [N/D-13] Traffic signs give timely warning of hazardous situations when they are not self - evident. The various types of traffic signs are: a)

More information

Traffic and Transport Assessment

Traffic and Transport Assessment Traffic and Transport Assessment Section 96 Residential Subdivision, Davis Road Tarneit CG120370 Prepared for Stockland Pty Ltd 19 February 2013 Document Information Prepared for Stockland Pty Ltd Project

More information

ITE 2013 Annual Meeting Session 36. Utah Statewide Pedestrian Treatment Guidance Manual Standards for At-Grade Crossings F-ST99(180)

ITE 2013 Annual Meeting Session 36. Utah Statewide Pedestrian Treatment Guidance Manual Standards for At-Grade Crossings F-ST99(180) ITE 2013 Annual Meeting Session 36 Utah Statewide Pedestrian Treatment Guidance Manual Standards for At-Grade Crossings 10661 F-ST99(180) John G. Van Hoff, P.E. Travis Bailey, E.I.T. John.vanhoff@aecom.com

More information

Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks

Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks Slide 1 Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks Chen-Yu Lin Dr. M. Rapik Saat Dr. Christopher P.L. Barkan 4 th June 2015 NURail Annual Meeting, Chicago,

More information

VIII. Project Prioritization & Implementation

VIII. Project Prioritization & Implementation Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process

More information

Evaluation of Pavement Markings within the Dynamic Envelope

Evaluation of Pavement Markings within the Dynamic Envelope Evaluation of Pavement Markings within the Dynamic Envelope Sponsored by the FRA Office of Research & Development Train Control & Communications Division November 6, 2013 Volpe The National Transportation

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018: Veterans Boulevard (formerly Boundary Road) This two-year construction project will widen and pave all of Veterans Boulevard. In 2017, the first portion of the road from Highway 16A to 44 Avenue was completed.

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Status February Transportation Priority Projects in Chester County

Status February Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County February 2018 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.6 2017-2019 2 US 202 at PA 926

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Attachment 2 SAMPLE TEST

Attachment 2 SAMPLE TEST Attachment 2 SAMPLE TEST 1. As posted, you may not exceed 50 km or mph in urban areas. a. 31 mph b. 15 mph c. 25 mph d. 55 mph 2. Any government ID card holder, 21 and older, operating a four-wheeled vehicle

More information

Article All citizens shall, as human persons, be held equal before the law.

Article All citizens shall, as human persons, be held equal before the law. BUNREACHT NA héireann CONSTITUTION OF IRELAND Article 40 1. All citizens shall, as human persons, be held equal before the law. This shall not be held to mean that the State shall not in its enactments

More information

Quiet Zones: Silencing Train Horns at Railroad Crossings

Quiet Zones: Silencing Train Horns at Railroad Crossings Quiet Zones: Silencing Train Horns at Railroad Crossings Council Transportation and Environment Committee Prepared by Public Works and Transportation Transportation Programs - Planning January 12, 2009

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SMP 08 (RIC Standard: SC 00 52 00 08 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision

More information

McIvor Highway Junortoun road safety issues November 2017

McIvor Highway Junortoun road safety issues November 2017 McIvor Highway Junortoun road safety issues November 2017 Discussion paper, prepared by Junortoun Community Action Group Inc. for community meeting with VicRoads 16 November 2017 About this document This

More information

An evaluation of intersection characteristics associated with crashes at intersections in Melbourne CBD. Jim Scully, Brian Fildes 1

An evaluation of intersection characteristics associated with crashes at intersections in Melbourne CBD. Jim Scully, Brian Fildes 1 An evaluation of intersection characteristics associated with crashes at intersections in Melbourne CBD Jim Scully, Brian Fildes 1 ABSTRACT The contribution of crashes occurring at intersections to road

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS

PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS Part 10. Traffic Controls for Highway-Light Rail Transit Grade Crossings Page 10TC-1 PART 10. TRAFFIC CONTROLS FOR HIGHWAY-LIGHT RAIL TRANSIT GRADE CROSSINGS TABLE OF CONTENTS CHAPTER 10A. GENERAL..........................................

More information

Appendix V1c - Bute Park Access Bridge Bollard Control Guidance for Event Traffic

Appendix V1c - Bute Park Access Bridge Bollard Control Guidance for Event Traffic Appendix V1c - Bute Park Access Bridge Bollard Control Guidance for Event Traffic All vehicle entries in and out of Bute Park are via the Bute Park Access Bridge situated on North Rd, opposite Corbett

More information

TGSI Tactile Ground Surface Indicators

TGSI Tactile Ground Surface Indicators TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

Staying Safe. Around Trains

Staying Safe. Around Trains Staying Safe Around Trains Trains are fun to watch but walking and playing near them can be dangerous. Kids have been hurt when they have been hit by trains. Don t play on the tracks or walk on or beside

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information