FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

Size: px
Start display at page:

Download "FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009"

Transcription

1 FINAL FACILITY STUDY KV1C Transformer Addition at Badwater Substation 2009-T1 November 17, 2009

2 I. Introduction In October 2008, Western Area Power Administration (Western) received a Transmission Queue Request 2009-T1. On August 21, 2009, Western, the Customer, and the Customer s Member altered the scope of the Badwater Substation Transformer Addition Project. The proposed transformer rating increased from 50 MVA to 83 MVA. This modification is for additional loads, a future compression station and CO2 plant, to be served from the Badwater Substation. Badwater Substation resides in Fremont County, Wyoming and is presently owned, operated and maintained by Western. The new 69-kV loads will be served by modification and equipment additions in the Badwater Substation. Currently, the Badwater Substation has two 230/69/13.8-kV transformers: Transformer KV1A (18/24/30 MVA Western owned) and KV1B (30/40/50 MVA Customer owned). The Customer s Member requests replacement of KV1A with a third transformer which will be designated, KV1C. The in-service date for KV1C is expected to be within first calendar quarter of The rating of KV1C will be 50/67/83 MVA. The Customer s Member forecasts 23 MW of load, in addition to the existing 47 MW of load. The combination of the existing and new load gives a total of 70 MW load being served by Badwater Substation. Portions of the two existing 69-kV transmission lines serving Lost Cabin Gas Plant Phase III substation and Lost Cabin Gas Plant 1 & 2 may be rebuilt by the Customer s Member. The transmission line rebuild is not a part of this facility study or the Badwater Substation project. In October 2009, Western performed a second System Impact Study (SIS) to determine if there are any system criteria violations on the Wyoming power grid caused by the proposed 23 MW of additional load. The requested load increase presents no operating violations to voltages at Western s Badwater 230 kv bus 1. A switchyard expansion is not anticipated for this additional transformer and ancillary equipment. Modifications to the oil detention basin, part of the spill containment plan, may be modified as KV1C information becomes available. II. Project Description 230-kV Work: The addition of transformer KV1C at Badwater Substation will include, but is not limited to the construction of a new 230-kV transformer bus structure, additions and modifications of the 230-kV bus, a 230-kV interrupter with one fused disconnect switch, installation of associated instrument transformers, and associated protection and control equipment. 1 WAPA RMR Planning Engineering, " System Impact Study 2009-T1 Transformer Replacement at Badwater Substation," (October 2009): p.5. Page 1 of 5

3 69-kV Work: The addition of transformer KV1C at Badwater Substation will include, but not limited to additions and modifications to the 69-kV transformer bus structure, disconnect switch, associated protection, control equipment and boundary metering. (see Attachment A). The substation station service, currently served by the tertiary of KV1A, will be served by the KV1C tertiary. Transformer KV1C Work: Provision of a foundation, a metering structure for CT s, PT s, revenue metering, miscellaneous control cable and station service power through the cable trench. Operational Understanding: Construct the addition of transformer KV1C in such a manner that transformer KV1A remains in service until the cut over to transformer KV1C. Once transformer KV1C is energized, Western will decide whether to leave transformer KV1A in place as a backup or remove for use at another substation. (See Attachment B) III. Western s Requirements Western will provide project management, field data, design, construction contract administration, construction inspection, commissioning, lands, contracts, environmental and station equipment and installation of transformer KV1C and related equipment for the installation at Badwater Substation. The Customer will provide and install the 69-kV revenue metering for the new transformer. The Customer s Member will purchase the transformer KV1C at their cost. Western will install and commission KV1C. An agreement between Western and the Customer s Member will be required. Western will require funds equal to the estimated cost of the project scope as defined in Table 2 prior to the commencement of work. Western s project scope as described above will be confined to that work directly related to the Badwater Substation. All other work outside of the Badwater Substation including any construction or modification of additional 69kV transmission lines and distribution substations to serve the additional load will be the responsibility of the Customer s Member. Page 2 of 5

4 IV. Schedule The following preliminary project schedule is based on a one year manufacture and delivery time for transformer KV1C. The following schedule does not include delays due to not being able to take necessary outages to perform construction work when required. Please refer to Table 1. Table 1 Preliminary Project Schedule Activity Start Completion Facility Agreement August 2009 October 2009 Agreement Development October 2009 December 2009 Agreement Execution January 2010 Receipt of Funds January 2010 Planning/Field Data January 2010 March 2010 Design and Specifications February 2010 May 2010 Equipment Purchase/Manufacture/Delivery February 2010 April 2011 Construction Contract Development June 2010 July 2010 Award Construction Contract August 2010 Construction September 2010 March 2011 Commissioning March 2011 May 2011 In Service May 2011 Page 3 of 5

5 V. Cost Western s estimated cost for the addition of power transformer (KV1C) at Western s Badwater Substation is $2,630,000. Please refer to Table 2 for a cost estimate breakdown. This budgetary cost estimate includes project management, field data, design, construction inspection, construction, commissioning, lands, contracts, environmental, station equipment and 69-kV revenue metering for the addition of a new 230/69kV, 83 MVA power transformer (KV1C) at Western s Badwater Substation. Table 2 Badwater Substation Addition of 230/69kV, 83 MVA Transformer Cost Estimate TASK DESCRIPTION COST Project Management $25,000 Field Data $20,000 Design $225,000 Construction Inspection $155,000 Construction Contract $866,000 Commissioning $100,000 Miscellaneous 10% (Contingency) $139,100 Inflation(3%/year and late 2010 award = 4.5% $62,595 TOTAL: $1,592,695 Note: Cost in Table 2 does not include cost of the customer provided transformer KV1C or revenue metering equipment. Page 4 of 5

6 ATTACHMENT A Proposed Switching Diagram for Badwater Substation

7

8 ATTACHMENT B Proposed Arrangement Plan for Badwater Substation

9

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity as the legal

More information

STCP 01-1 Issue 005 Operational Switching

STCP 01-1 Issue 005 Operational Switching STCP 01-1 Issue 005 Operational Switching STC Procedure Document Authorisation Party National Grid Electricity Transmission plc Name of Party Representative Signature Date Formatted: Font: Arial Bold,

More information

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission SP Transmission Ltd Scottish

More information

Questions & Answers About the Operate within Operate within IROLs Standard

Questions & Answers About the Operate within Operate within IROLs Standard Index: Introduction to Standard...3 Expansion on Definitions...5 Questions and Answers...9 Who needs to comply with this standard?...9 When does compliance with this standard start?...10 For a System Operator

More information

STCP 01-1 Issue 008 Operational Switching

STCP 01-1 Issue 008 Operational Switching STCP 01-1 Issue 008 Operational Switching STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Interconnection Feasibility Study Report Request # BHCT-G5

Interconnection Feasibility Study Report Request # BHCT-G5 Interconnection Feasibility Study Report Request # BHCT-G5 100 MW Generator at Airport Tap in Pueblo, Colorado Executive Summary Black Hills Corporation Transmission Planning July 7, 2009 Black Hills Corporation

More information

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company < Reference > Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company Occurrence of Events in a Chronological Order At around 6:57 PM on March 18,

More information

PSSI 1 High Voltage Switching

PSSI 1 High Voltage Switching 1. SCOPE This Safety Instruction sets down the procedures to be adopted when carrying out High Voltage (HV) Switching operations on The Company s System and other System(s) operated by the Company other

More information

i) Filtration machine, measuring equipment and other related machinery

i) Filtration machine, measuring equipment and other related machinery 5 MVA TRANSFORMER SERVICE AND MAINTENANCE FOR TATA CHEMICALS MAGADI. SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved

More information

Kodiak Electric Renewable Energy Implementation. Colin Young System Engineer 4/26/2016

Kodiak Electric Renewable Energy Implementation. Colin Young System Engineer 4/26/2016 Kodiak Electric Renewable Energy Implementation Colin Young System Engineer 4/26/216 Kodiak Electric Territory 216 Grid Kodiak Board Members Create a Vision in 25 Endeavor to produce 95% of energy sales

More information

System Impact Study 2008 T1 Kelim Load at Airport Substation

System Impact Study 2008 T1 Kelim Load at Airport Substation System Impact Study 2008 T1 Kelim Load at Airport Substation Studies Performed by: Joseph Liberatore August 2009 Rocky Mountain Region Index Executive Summary...3 I. Introduction...4 II. Methodology...4

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS 1. AB Amber Grid Rules for Natural Gas Transmission System Balancing (hereinafter - the Rules) are designed to identify

More information

Power Unit 075. Maintain Substation Circuit Breakers

Power Unit 075. Maintain Substation Circuit Breakers Power Unit 075 Maintain Substation Circuit Breakers The specification details the required skills, knowledge and behaviours to establish competence to carry out the maintenance of high voltage power circuit

More information

Infrared Thermography Inspection Guidelines. Date Issued:

Infrared Thermography Inspection Guidelines. Date Issued: Infrared Thermography Inspection Guidelines Date Issued: 2002 01 29 Created By: Approved By: L. Henderson G. Durnford Table Of Contents Table Of Contents...i POLICY STATEMENT...1 APPLICABLE INTERNATIONAL

More information

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas 2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas David Le Senior Advisor - Regional Transmission Engineer Stakeholder Conference Call April 13, 2017 LA Basin Area Loads

More information

Why do I need to do an Arc-Flash Analysis?

Why do I need to do an Arc-Flash Analysis? Why do I need to do an Arc-Flash Analysis? Presented By Tom Norwood for Alexander Nizov, P.E. Principal/Manager Electrical Engineering Division TRAINING INSTITUTE, INC. A SUBSIDIARY OF MEGGER Hazards Analysis

More information

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS 1. AB Amber Grid Rules for Natural Gas Transmission System Balancing (hereinafter - the Rules) are designed to identify

More information

23.1 Functions, Basic Configuration, and Interfaces

23.1 Functions, Basic Configuration, and Interfaces 23 (6.6.D) SF 6 and Other Special Gases 23.1 Functions, Basic Configuration, and Interfaces 23.1.1 Functions The primary function performed by the SF 6 and other special gases system is to provide SF 6

More information

------CHUG POWERING ALASKA'S futulle

------CHUG POWERING ALASKA'S futulle ------CHUG POWERING ALASKA'S futulle March 15, 2018 ELECTRONICALLY FILED WITH RCA Regulatory Commission of Alaska 701 W. 8 th Avenue, Suite 300 Anchorage, AK 99501 Subject: Tariff Advice N. 454-8; Annual

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

Electrical Safety Program

Electrical Safety Program Electrical Safety Program For Adopted LC-1005 Rev. 06/16 Page 1 I. Introduction As part of Organization s overall safety and health program, an

More information

Schedule of Quantity and Rate for Annual Maintenance Rate Contract for Electrical Jobs for the year (Section-F) Cleaning Jobs.

Schedule of Quantity and Rate for Annual Maintenance Rate Contract for Electrical Jobs for the year (Section-F) Cleaning Jobs. Schedule of and for Annual Maintenance Contract for Electrical Jobs for the year 2017-18 (Section-F) Cleaning Jobs. 1.00 Cleaning of cable trenches of various sizes from 450 mm wide x 600 mm deep to 1000

More information

ICM Project Underground Infrastructure and Cable

ICM Project Underground Infrastructure and Cable EB 0 00 ( pages) ICM Project Underground Infrastructure and Cable Paper Insulated Lead Covered (PILC) Cable Piece Outs and Leakers Segment (THESL) EB 0 00 I EXECUTIVE SUMMARY. Project Description PILC

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

COOPER POWER SERIES. EL Bay-O-Net Current-Limiting Fuse Installation Instructions. Fusing Equipment MN132023EN

COOPER POWER SERIES. EL Bay-O-Net Current-Limiting Fuse Installation Instructions. Fusing Equipment MN132023EN Fusing Equipment MN132023EN Effective November 2016 Supersedes June 2010 (S240-70-1) EL Bay-O-Net Current-Limiting Fuse Installation Instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION

More information

COOPER POWER SERIES. 200 A 15, 25, and 35 KV class insulated standoff bushing installation instructions. Loadbreak Apparatus Connectors MN650039EN

COOPER POWER SERIES. 200 A 15, 25, and 35 KV class insulated standoff bushing installation instructions. Loadbreak Apparatus Connectors MN650039EN Loadbreak Apparatus Connectors MN650039EN Effective November 2016 Supersedes October 2013 (S500-22-1) COOPER POWER 200 A 15, 25, and 35 KV class insulated standoff bushing installation instructions SERIES

More information

Con Edison, Inc. New York, NY March 11, Shields & Company Berenson & Company Transmission Seminar

Con Edison, Inc. New York, NY March 11, Shields & Company Berenson & Company Transmission Seminar Con Edison, Inc. New York, NY March 11, 2009 Shields & Company Berenson & Company Transmission Seminar Forward-Looking Statements This presentation contains certain forward-looking statements of future

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 7. System Operations Under Normal And Emergency Conditions... 2 7.1 CAISO Control Center Operations... 2 7.1.1 Maintain CAISO Control Center... 2 7.1.2 Maintain Back-Up Control Facility...

More information

Stadium electricity supplies an assessment of the specification and readiness 2010 FIFA SOCCER WORLD CUP

Stadium electricity supplies an assessment of the specification and readiness 2010 FIFA SOCCER WORLD CUP Stadium electricity supplies an assessment of the specification and readiness 2010 FIFA SOCCER WORLD CUP Author & Presenter: T R Edmondson Eskom & member 2010 ESI forum Co-author: Dr. C G Carter-Brown

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

COOPER POWER SERIES. 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions. Deadbreak Apparatus Connectors MN650050EN

COOPER POWER SERIES. 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions. Deadbreak Apparatus Connectors MN650050EN Deadbreak Apparatus Connectors MN650050EN Effective May 2017 Supersedes January 2010 (S600-19-1) COOPER POWER 600 A 15, 25, and 35 kv class PUSH-OP bushing adapter cap installation instructions SERIES

More information

COOPER POWER SERIES. Under-oil arrester disconnector installation/operation instructions. OEM Equipment MN800010EN

COOPER POWER SERIES. Under-oil arrester disconnector installation/operation instructions. OEM Equipment MN800010EN OEM Equipment MN800010EN Effective February 2016 Supersedes S800-51-1 August 2012 COOPER POWER SERIES Under-oil arrester disconnector installation/operation instructions DISCLAIMER OF WARRANTIES AND LIMITATION

More information

Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs.

Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs. Recent changes in workplace safety regulations have heightened the awareness of hazards associated with electrical arcs. The hazard level must be quantified and workers properly protected before entering

More information

Safe Schools: A Health and Safety Check

Safe Schools: A Health and Safety Check Name of School: Optional Information Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Use of Electrical Equipment Self-Inspection Checklist Guidelines: This checklist covers

More information

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA 1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission,

More information

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting 37 Fox Den Road Kingston, MA 02364-2150 (508) 612-0382 Phone (781)936-8641 Fax Dave@PowerEngineersLLC.com

More information

" High Voltage Switch Yards & How Safe are these really" <Peter Rhodes> <Principal and High Voltage Solution. Com Ltd>

 High Voltage Switch Yards & How Safe are these really <Peter Rhodes> <Principal and High Voltage Solution. Com Ltd> " High Voltage Switch Yards & How Safe are these really" High Voltage Forum Brisbane 2013 Duty of Care As part of an asset owner Duty of care

More information

Selection of Electrical PPE Tables

Selection of Electrical PPE Tables Selection of Electrical PPE Tables Instructions Table 1 - Starting with Table 1, select the task you plan to do (right-hand column) and the condition of the equipment you will be working on, (center column).

More information

SERTP - 1 st Quarter Meeting

SERTP - 1 st Quarter Meeting 2018 SERTP SERTP - 1 st Quarter Meeting First RPSG Meeting & Interactive Training Session March 29 th, 2018 Associated Electric Cooperative, Inc. Corporate Headquarters Springfield, MO 1 2018 SERTP Process

More information

2017 NWHA TECHNICAL SEMINAR. Arc Flash Hazard Awareness MIKE BRENDLE LLC

2017 NWHA TECHNICAL SEMINAR. Arc Flash Hazard Awareness MIKE BRENDLE LLC 2017 NWHA TECHNICAL SEMINAR Arc Flash Hazard Awareness WHAT IS ARC FLASH Arc Flash is a short circuit that flashes from one exposed live part to another, or to ground The result is ionized air that creates

More information

2016 Electric Resource Plan Modeling Assumptions Update

2016 Electric Resource Plan Modeling Assumptions Update Page 1 of 16 Public Service Company of Colorado 2016 Electric Resource Plan Modeling Assumptions Update (CPUC ) August 2017 xcelenergy.com 2016 Xcel Energy Inc. Xcel Energy is a registered trademark of

More information

Appendix A: Energized Work Permit

Appendix A: Energized Work Permit Appendix A: Energized Work Permit Part I: To be completed by the Supervisor Description of Circuit & Equipment: Job Location: Description of Work to Be Done: Justification of why the circuit cannot be

More information

COOPER POWER SERIES. Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions. Tap-Changer Switch MN800015EN

COOPER POWER SERIES. Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions. Tap-Changer Switch MN800015EN Tap-Changer Switch MN800015EN Effective December 2017 Supersedes February 1987 (S800-58) COOPER POWER SERIES Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions DISCLAIMER

More information

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers g DEH 40050 Instructions Three-Phase, Platform-Mounted Distribution Transformers Introduction The equipment covered by these instructions should be operated and serviced only by competent technicians familiar

More information

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007 MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007 8.9 Bushing Subcommittee Fred Elliott, Chair 8.9.1 Introduction/Attendance Fred Elliott - Chair

More information

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN Loadbreak Apparatus Connectors MN650037EN Effective November 2016 Supersedes October 2013 (S500-14-1) 200 A 15, 25, and 35 kv class portable feedthru installation instructions COOPER POWER SERIES DISCLAIMER

More information

OPERATING CODE NO. 8 APPENDIX 2

OPERATING CODE NO. 8 APPENDIX 2 OPERATING CODE NO. 8 APPENDIX 2 (OC8B) SAFETY CO-ORDINATION IN RESPECT OF THE SCOTTISH TRANSMISSION SYSTEMS OR THE SYSTEMS OF SCOTTISH USERS Paragraph No/Title CONTENTS (This contents page does not form

More information

Project Single Points of Failure

Project Single Points of Failure Project 2015-10 Single Points of Failure Bill Harm, NERC & Regional Coordination RSCS meeting September 15, 2017 Agenda Drafting Team Members Project 2015 10 Background Proposed Revisions Implementation

More information

Innovative Techniques for Mitigating Arc Flash Exposure

Innovative Techniques for Mitigating Arc Flash Exposure Innovative Techniques for Mitigating Arc Flash Exposure Presented at MEMSA 2009 Annual Meeting & Technical Symposium 2007 Eaton Corporation. All rights reserved. INTRODUCTION. As more and more industries

More information

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.147 BASIS: Approximately three million workers in the United States face risks from uncontrolled energy when servicing machinery

More information

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014 DOCUMENT CONTROL Document Owner (May also be the Process Owner) Approved By * Authorisation ** Process Owner is hereby vested with authority and responsibility to manage the process end to end. Name: Mark

More information

Comments of the California Energy Storage Alliance (CESA) On Storage as a Transmission Asset (SATA) Straw Proposal

Comments of the California Energy Storage Alliance (CESA) On Storage as a Transmission Asset (SATA) Straw Proposal Comments of the California Energy Storage Alliance (CESA) On Storage as a Transmission Asset (SATA) Straw Proposal Submitted by Company Date Submitted Alex Morris amorris@storagealliance.org Jin Noh jnoh@storagealliance.org

More information

Hazardous Energy Control (Lockout-Tagout)

Hazardous Energy Control (Lockout-Tagout) Hazardous Energy Control (Lockout-Tagout) The purpose of this program is to prevent inadvertent operation or energization of machines, equipment, or processes in order to protect employees and establish

More information

The Statkraft Way. Switching Supervisor

The Statkraft Way. Switching Supervisor Innhold 1 PURPOSE... 1 2 SCOPE... 1 3 RESPONSIBILITY... 1 4 PROCEDURE... 1 4.1 Permanently appointed s.... 2 4.2 Emergency preparedness and locally connection authority for highvoltage equipment... 2 4.3

More information

ATTACHMENT 2 REQUIREMENTS MILLE LACS ENERGY COOPERATIVE S SCHEDULE 3 DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS.

ATTACHMENT 2 REQUIREMENTS MILLE LACS ENERGY COOPERATIVE S SCHEDULE 3 DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS. MILLE LACS ENERGY COOPERATIVE S SCHEDULE 3 DISTRIBUTED GENERATION INTERCONNECTION TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues

More information

Nordel GRID DISTURBANCE AND FAULT STATISTICS

Nordel GRID DISTURBANCE AND FAULT STATISTICS Nordel GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 Introduction... 3 1.1 Contact persons... 4 1.2 Guidelines the statistics... 4 1.3 Voltage levels in the Nordel network...

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014 NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2014 21.10.2015 REGIONAL GROUP NORDIC 1 INTRODUCTION... 4 1.1 DESCRIPTION OF THE REPORT... 4 1.2 CONTACT PERSONS... 5 1.3 VOLTAGE LEVELS IN THE NORDIC AND

More information

COOPER POWER SERIES. 600 Ampere Deadbreak Grounded Standoff Bushing 15 & 25 kv and 35 kv Class Installation Instructions. Bushings MN650045EN

COOPER POWER SERIES. 600 Ampere Deadbreak Grounded Standoff Bushing 15 & 25 kv and 35 kv Class Installation Instructions. Bushings MN650045EN Bushings MN650045EN Effective May 2017 Supersedes February 1987 (S600-24-2) COOPER POWER SERIES 600 Ampere Deadbreak Grounded Standoff Bushing 15 & 25 kv and 35 kv Class Installation Instructions DISCLAIMER

More information

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition NORTHERN POWERGRID Distribution Safety Rules 2015 Edition These rules shall be read in conjunction with the Operational Practice Manual and/or indicated Operational Guidance. Refer to the index for supplementary

More information

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power 2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power Special Reliability Assessments Deeper focus on issues identified in Long-Term Reliability Assessment

More information

USER S MANUAL BASIC HORIZONTAL OIL-LUBRICATED MICROCOMPRESSOR Reference: RCMPBH

USER S MANUAL BASIC HORIZONTAL OIL-LUBRICATED MICROCOMPRESSOR Reference: RCMPBH USER S MANUAL BASIC HORIZONTAL OIL-LUBRICATED MICROCOMPRESSOR Reference: RCMPBH THIS MANUAL IS INTENDED FOR TECHNICAL STAFF IN CHARGE OF THE INSTALLATION, THE OPERATION AND THE MAINTENANCE OF THIS PRODUCT

More information

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements 2.6 Wksite Clothing - Personal Protective Equipment (PPE) Requirements Purpose This Field Instruction describes the selection use maintenance of approved Personal Protective Equipment (PPE) f all Hizon

More information

Arc Flash 101. presented by Arc Flash Blaster LLC

Arc Flash 101. presented by Arc Flash Blaster LLC Arc Flash 101 presented by Arc Flash Blaster LLC ARC FLASH? ARC FLASH INCIDENT STANDARDS AND REGULATIONS Arc flash accidents... 35,000 F Molten Metal Pressure Waves Sound Waves Copper Vapour: (Solid to

More information

IWU PHYSICAL PLANT SAFETY PROGRAM. Revision: 1 ELECTRICAL SAFETY Section: 4

IWU PHYSICAL PLANT SAFETY PROGRAM. Revision: 1 ELECTRICAL SAFETY Section: 4 STANDARDS Title 29 Code of Federal Regulations (CFR) Part 1910 Subpart S 301-399; NFPA 70E 2012 1.0 INTRODUCTION Electricity is a serious workplace hazard, capable of causing both employee injury and property

More information

TESTIMONY OF ROBERT C. KOTT ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

TESTIMONY OF ROBERT C. KOTT ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION Application No.: 15-06-020 Exhibit No.: Witness: Robert C. Kott Application of Southern California Gas Company (U 904 G) and San Diego Gas & Electric Company (U 902 G) for Authority to Revise their Curtailment

More information

Lockout / Tagout Safety Program

Lockout / Tagout Safety Program Lockout / Tagout Safety Program Prepared by: The Ohio State University Environmental Health and Safety Occupational Safety & Industrial Hygiene 1314 Kinnear Road Columbus, OH 43212-1168 614-292-1284 Phone

More information

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements 2.6 Wksite Clothing - Personal Protective Equipment (PPE) Requirements Purpose This instruction describes the selection use maintenance of approved Personal Protective Equipment (PPE) f all Hizon Power

More information

STCP Amendment Proposal Form

STCP Amendment Proposal Form STCP Amendment Proposal Form PA025 1. Title of Amendment Proposal STCP 01-1 Incorporation of Outstanding Change Requests 2. Description of the Proposed Amendment (mandatory field) Incorporation of the

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance LOW VOLTAGE EQUIPMENT Copyright National Grid plc 2016, all rights reserved. No part of this publication may be reproduced,

More information

Electrical Safety. Hazard Awareness

Electrical Safety. Hazard Awareness Electrical Safety Hazard Awareness What does Hazard mean? Hazard means: any potential or actual threat to the wellbeing of people, machinery or environment Electrical hazard safety means: taking precautions

More information

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports URC Voltage Sensor SEN-VOLT 2013 Universal Remote Control, Inc. The information in this Owner s Manual is copyright protected.

More information

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES

HEALTH TECHNICAL MEMORANDUM Authorised persons logbook STATUS IN WALES APPLIES HEALTH TECHNICAL MEMORANDUM 06-03 Authorised persons logbook 2006 STATUS IN WALES APPLIES This document should be read in conjunction with HTM 00 Best practice guidance for healthcare engineering and HTM

More information

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN Surge Arresters MN235017EN Effective October 2016 Supersedes S235-16-1 November 2009 COOPER POWER VariSTAR Storm Trapper high energy MOV arrester installation instructions SERIES DISCLAIMER OF WARRANTIES

More information

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE 1. The certificate of compliance shall certify that operator has complied, or will comply, with applicable provisions of

More information

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Item 8 Program Management Project Budget and Schedule Status Transit Project Delivery Finance, Budget & Audit Committee February 20, 2013 Project Schedules Project 2012 2013 2014 2015 2016 2017 2018 2019

More information

Power System Safety Rules. Revision

Power System Safety Rules. Revision Power System Safety Rules Revision 5.3 2017 This page is intentionally left blank Title: Power System Safety Rules Revision No 5.3 Page 1 of 88 Power System Safety Rules Summary This document sets out

More information

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act APPENDIX 56 -- Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act Pursuant to the Inter-agency Memorandum of Agreement Regarding Oil Spill Planning and Response

More information

Meeting Notes Project Definition of Bulk Electric System Standard Drafting Team

Meeting Notes Project Definition of Bulk Electric System Standard Drafting Team Meeting Notes Project 2010-17 Definition of Bulk Electric System Standard Drafting Team February 21-23, 2012 Pacific Gas & Electric San Francisco, CA Administrative 1. Introductions The Chair brought the

More information

Operating Process Work on Low Voltage or Mechanical Apparatus

Operating Process Work on Low Voltage or Mechanical Apparatus or Mechanical Apparatus Summary: This document supports the Power System Safety Rules and its requirements assembled under Work on Low Voltage and Mechanical Apparatus Category 4. It applies to the operation

More information

2014 RNA: Preliminary Results

2014 RNA: Preliminary Results 2014 RNA: Preliminary Results Yachi Lin Kevin DePugh New York Independent System Operator ESPWG/TPAS June 20, 2014 KCC 2014 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION

More information

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions Loadbreak Apparatus Connectors Effective October 2013 Supersedes March 2011 200 A, 15 and 25 kv class loadbreak bushing insert installation instructions S500-12-1 DISCLAIMER OF WARRANTIES AND LIMITATION

More information

Golden Rule #8: Equipment Safeguarding

Golden Rule #8: Equipment Safeguarding Golden Rule #8: Equipment Safeguarding Only trained and qualified personnel may alter equipment safeguards after having. Equipment Safeguarding Physical Equipment Guarding Interlocked Equipment Safeguarding

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66139-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63203-E Schedule GS-APS-E Sheet 1 APPLICABILITY The General Service Automatic

More information

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A. APPENDIX F - RISK CONTROL PLAN FORMAT FOR CONTRACTORS OF THE PANAMA CANAL Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply,

More information

Monitoring of Real-Time SOL and IROL Exceedances

Monitoring of Real-Time SOL and IROL Exceedances APPLICABILITY: Reliability Coordinator I. Purpose Provide the Reliability Coordinator System Operators (RCSO) with established procedures for monitoring System Operating Limits (SOL) and Interconnection

More information

Lockout/Energy Control

Lockout/Energy Control Lockout/Energy Control Presented By: Sotaris, LLP 2000 Auburn Drive, Suite 200 Beachwood, Ohio 44122 P: 216-378-7650 F: 866-794-5756 W: www.sotaris.com E: awj@sotaris.com 1 About Me Andrew W. Johnson,

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

Effective March 2015 Supersedes S August 2002

Effective March 2015 Supersedes S August 2002 Reclosers MN280009EN Effective March 2015 Supersedes S280-40-11 August 2002 COOPER POWER SERIES Type R, RE, W, WE reclosers closing solenoid contactor replacement kit KA852R installation instructions DISCLAIMER

More information

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013 Switches MN008005EN Effective April 2016 Supersedes S328-120-1 June 2013 D-73P3 bypass switches installation instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,

More information

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic

More information

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager

Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager Procedure No.: BMEHS-002.033 Page: 1 of 10 Preparer: Owner: Approver: EHS Team Member TES Manager Site Manager Document Revision Change Table Revision Revision Description Revised Revision Number New By

More information

DT400/436 Tee Connector Installation Instructions

DT400/436 Tee Connector Installation Instructions Connectors Lorem ipsum and dolor Splices sit Amat Effective September 2014 Supersedes IS550-30-1 March 2011 MN650001EN DT400/436 Tee Connector Installation Instructions DISCLAIMER OF WARRANTIES AND LIMITATION

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Background As part of a broader study concerning safety issues on Santa Rosa Road, the firm of Katz Okitsu was requested

More information

Monitoring of Real-Time SOL and IROL Exceedances

Monitoring of Real-Time SOL and IROL Exceedances APPLICABILITY: Reliability Coordinator I. Purpose Provide the Reliability Coordinator System Operators (RCSO) with established procedures for monitoring System Operating Limits (SOL) and Interconnection

More information