Nauru: Sustainable and Climate-Resilient Connectivity Project Financed by the Asian Development Fund

Size: px
Start display at page:

Download "Nauru: Sustainable and Climate-Resilient Connectivity Project Financed by the Asian Development Fund"

Transcription

1 Technical Assistance Consultant s Report Project Number: 4848 December 217 Nauru: Sustainable and Climate-Resilient Connectivity Project Financed by the Asian Development Fund Prepared by Cardno Emerging Markets Fortitude Valley, QLD, Australia For Ministry of Finance Implementing agency This consultant s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project s design.

2 / 1 W E / W XREF's: Xref-AC862-CI-Existing Cadastral Survey; Xref-AC862-CI-Existing Topo Survey; Xref-AC862-CI-Bike Rack; Xref-AC862-CI-General Layout Plan (New); Xref-AC862-SB-Wharf Plan; Xref-AC862-SB-Break Water and Dredge Plan; Xref-AC862-CI-Proposed Fuel Line (New); Xref-AC862-GN-Titleblock A3 sht; Xref-AC862-SB-Vessel Plan; Xref-AC862-CI-Project Boundary; Xref-AC862-CI-Fence Line; Xref-AC862-CICAD File: V:\1824\AC862 Nauru Port Development Project - PDA\(3) Design and Documentation\(1) Acad\Drawings\Civil\AC862-CI-2.dwg DATE PLOTTED: 2 September 217 6:5 PM BY : ERWIN FRANCISCO NORTH B 15/9/217 ISSUED DRAFT TO CLIENT FOR DISCUSSION A 26/3/217 ISSUED DRAFT TO CLIENT FOR DISCUSSION Rev Date Description EF SK SK EF SK SK Des. Verif. Appd. Cardno Limited All Rights Reserved. This document is produced by Cardno Limited solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno Limited does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by third party on the content of this document. Cardno Emerging Markets (Australia) Pty Ltd Level 11, Green Square Nth Tower 515 St Paul's Terrace, Fortitude Valley QLD 46 Tel: Fax: Web: Drawn PM Checked IS Designed EF Verified SK Approved Date Client 15/9/217 Date Project 15/9/217 Date 15/9/217 Date 15/9/217 Title GOVERNMENT OF NAURU (MINISTRY OF FINANCE) Status SUSTAINABLE AND CLIMATE RESILIENT CONNECTIVITY IN NAURU Datum 15/9/217 Grid Scale WGS84 Z58 AS SHOWN NID GENERAL SITE LAYOUT SK FOR TENDER ONLY NOT TO BE USED FOR CONSTRUCTION PURPOSES Drawing Number AC862-CI-2 Size A3 Revision B

3 TA-99 NAU: Sustainable and Climate Resilient Connectivity in Nauru PPTA Consultants (4848-1) Final Report Feasibility Report Appendix D: Ship Simulation Report TA-99 NAU Final Report Feasibility Report.docx 15 December 217 Appendices

4 Australian Maritime College Cardno Nauru Port Development Project From 8 September 216 To 9 September 216 SUMMARY OF SIMULATION PROJECT NO. 16 / S / 2 AMC Search Ltd

5 Centre for Maritime Simulation - Simulation Summary Cardno Cardno Nauru Port Development Project From 8 September 216 To 9 September 216 PARTICIPANTS Name Scott Keane Nathan Burmeister Sam Green Kemp Detenamo Capt. Siosifa Tuangalu Position Manager - Ports and Maritime Senior Maritime Engineer Maritime Engineer Director - Ports Ministry of Transport Marine Pilot AMC PERSONNEL Name Matt Best Louis Lam Position Commercial Simulation Manager - AMC Search Simulation Technical Support

6 Centre for Maritime Simulation - Simulation Summary Cardno FORMAT OF REPORT The format of this report is in 5 sections: 1. Program Summary 2. Ship Details 3. Navigation Warning 4. Run Summary 5. Run Plots AIMS OF THE PROJECT To assess proposed berth arrangements and limiting operating parameters for the development of the port of Aiwo, Nauru

7

8 Centre for Maritime Simulation - Simulation Summary Cardno PROGRAM SUMMARY The total number of exercise runs conducted over the duration of the program was 21 AREA MODEL The following simulation area model(s) were used for this study. Nauru SHIP MODELS The following ship models were used during the study: Vessel Type of Ship Model Codes BBC Christina Container Ship GC13D Benguela Stream Container Ship GC15D Donnacona Handy Sized Bulk Carrier BK2BAL Wheelhouse posters and or pilot cards of the ship models are included in this report.

9 Centre for Maritime Simulation - Simulation Summary Cardno TUGS Tug powers deployed were implemented after consultation with the participants and a consensus agreed to. Adequate compensation and loss of tug power was deployed to account for winds, seas and ships speed. TUG NAME BOLLARD PULL [TON] ORDER FULL 3/4 1/2 1/4 WEIGHT Tug (Conventional) Pusher Barge

10 Centre for Maritime Simulation - Simulation Summary CSL Shipping INTRODUCTION TO THE SIMULATOR Before the commencement of the simulation exercise runs the participants were shown around the simulator and the bridge equipment. When requested by the participants, the simulator instructor gave look out distances from the vessel of required objects eg. Distance from bow to berth ahead etc. The simulator's ECDIS with docking mode was turned on as requested. A person was employed as a helmsman to steer the ship as ordered. LIMITATIONS SHIP MODEL: The behaviour of a vessel or vessels in the simulator may vary from that experienced in reality. This is due to a number of factors that are not able to be simulated, and/or data that is not available, or is sparse. AMC does not guarantee that the behaviour of a vessel or vessels in the simulator will be precisely that as experienced in reality. PORT AREA MODEL: AMC does not update the simulated area model, unless contracted to do so by the client. This may result in the ENC and Visual model differing from the actual area as seen by participants SIMULATIONS: Results of manoeuvres from simulations are meant as a guideline only and should not be considered to be an absolute. These results are meant to complement other studies and knowledge. DISCLAIMERS: This summary is prepared solely for the use of Cardno. No responsibility to any third party shall be accepted, as the report will not be prepared, and shall not be intended for any other purpose. Cardno acknowledges that it is, and will continue to be, solely responsible for making management decisions and functions when implementing any advice or recommendations in this summary. We believe the summary is accurate and precise, but no warranty is given for the accuracy or reliability of information given from Cardno that may affect the outcome in actual conditions.

11 Centre for Maritime Simulation - Simulation Summary Cardno EXPLANATION OF REPORT FORMAT [1) Ship Details] General information for each ship used during the program is given by the wheelhouse poster and or pilot card of the ship. [2) Run Summary] The Run Summary contains a list of runs conducted on each day of the program. The list gives the following information: Run number - The run number is allotted consecutively. Name of the participant conducting the run. The area model. Comments [3) Navigational Warning] The Hydrographic Office requires this because we change the Hydrographic Office chart data to include engineering data and other external data to create a simulated area model. [4) Run Plots] During the exercise, the simulator records the information compiled into this summary of simulations. The Run Plot can be divided into two sections : Situation Plot The Situation Plot typically spans two pages. At the top of the first page, details of the senario are outlined, including the ship model used and and environmental conditions in effect. A description of the exersice and any comments are also provided. Three plan views are then presented. The first and second show the ship and surrounds at the start and the end of the run respectivly. The third plan view shows the full run including breakout boxes detailing time, heading, turnrate & speed. Each plan view shows the swept path of the ship and a shipshape indicator spaced at 3 minute intervals. Parameter Graphs Several pages show graphs of ship and environmental parameters as they vary with time over the course of the run. Various parameters can be plotted, and the choice of the parameters is set after consultation with the participants, and relevance to the program. Vertical lines (light red) are shown on the graph at 3 minute intervals that match the shipshape positions found on the situation plots.

12 Section 2 Ship Details

13 Centre for Maritime Simulations Vessel Data Container Ship BBC Christina GC13LD Ship Details Drafts Length: 13.3 m Draft Fwd: 7. m Breadth: 16.5 m Draft Aft : 7. m Displacement: 11,49 t Mean Draft: 7. m AMC - Centre for Maritime Simulations Thu 8 September 216

14 PILOT CARD GC13LD1 Version 1 Ship s name BBC Christina Date Call Sign V2FI6 Deadweight 799 tonnes Year built 211 Draught aft 7 m / 22 ft 12 in Forward 7 m / 22 ft 12 in Displacement 1149 tonnes SHIP S PARTICULARS Length overall Breadth 13.3 m Anchor chain: Port 18. shackles Starboard 18. shackles 16.5 m Stern 18. shackles Bulbous bow Yes (1 shackle = m = 15 fathoms) m m Air draught 28.9 m m 16.5 m view point 98.6 m PROPULSION PARTICULARS Type of engine Diesel Maximum power 435 kw ( 5833 hp) Manoeuvring engine RPM Pitch Speed (knots) order Loaded Ballast Full sea speed Full Ahead Half Ahead Slow Ahead Dead Slow Ahead Dead Slow Astern Slow Astern Time limit astern min:sec Half Astern Full ahead to full astern min:sec Full Astern Max. No. of consecutive starts Minimum RPM Astern power knots % ahead

15 STEERING PARTICULARS Type of rudder Normal Maximum angle 35 Hard-over to hard-over Rudder angle for neutral effect 14 Thruster: Bow 5 kw ( 671 hp) Stern kw ( hp) s CHECKED IF ABOARD AND READY Anchors Whistle Indicators: Rudder Radar 3 cm cm Rpm/pitch ARPA Rate of turn Speed log Doppler: Yes / No Compass system Water speed Constant gyro error ± Ground speed Dual-axis Engine telegraphs VHF Elec. pos. fix. system Type Steering gear Number of power units operating OTHER INFORMATION:

16 WHEELHOUSE POSTER GC13LD1 Version 1 Ship s name BBC Christina Call Sign V2FI6 Gross tonnage 7138 Net tonnage Max. Displacement 1149 tonnes, and Deadweight 799 tonnes, and Block coefficient.79 at summer full load draught Draught at which the manoeuvring data were obtained Loaded Trial / Estimated Ballast Trial / Estimated 7 m forward m forward 7 m aft m aft Type of rudder(s) STEERING PARTICULARS Normal Maximum rudder angle 35 Time hard-over to hard-over with one power unit with two power units Min. speed to maintain course propeller stopped s s knots Rudder angle for neutral effect ANCHOR CHAIN Chain length Max. rate of heaving shackles min / shackle Port Starboard Stern (1 shackle = m = 15 fathoms) PROPULSION PARTICULARS Type of engine Diesel, 435 kw ( 5833 hp) Type of propeller Propeller Engine order RPM Pitch Speed (knots) Loaded Full sea speed Full Ahead Half Ahead Slow Ahead Dead Slow Ahead Dead Slow Astern Critical revolutions 31 Ballast Slow Astern Minimum RPM knots Time limit astern rpm min:sec Half Astern Time limit at min. revs. min:sec Emergency Full Astern full ahead to full astern s Astern power stop to full astern Max. No. of consecutive starts s % ahead THRUSTER EFFECT at trial conditions Thruster kw hp Time delay Turning rate Time delay to Not effective for full thrust at zero speed reverse full thrust above speed Bow s 31 /min 2 s Stern Combined s 31 /min 2 s DRAUGHT INCREASE (LOADED) Estimated squat effect Heel Effect Under keel Ship s speed Max bow squat Heel angle Draft increase clearance (m) (knots) estimated (m) (degree) (m)

17 TURNING CIRCLES AT MAX. RUDDER ANGLE (35 ) : kn 2. 1:42 9 kn :. kn : 12.2 kn : kn Distance (cables) Deep Water :. kn : 11.7 kn : kn Distance (cables) Shallow Water (Depth =.5 m) WILLIAMSON TURN Distance(cables) Rudder = 35. deg Committed heading = 18.3 deg TRACK REACH cables Head Reach hh:mm:ss knots 1:31:13. 1::.8 5: 1.1 4: 1.4 3: 1.9 2: 2.8 : 4.8 : 15.2 Full Sea Ahead -- Stop STOPPING CHARACTERISTICS 1:3:41. 1::.8 5: 1.1 4: 1.4 3: 1.9 2: 2.6 : 4.4 : 12.2 Full Ahead -- Stop LOADED 1:3:25. 1::.8 5: 1.1 4: 1.4 3: 1.8 2: 2.6 : 4.2 : 11. Half Ahead -- Stop 1:29:16. 1::.7 5: 1. 4: 1.3 3: 1.7 2: 2.4 : 3.8 : 8.5 Slow Ahead -- Stop 5:5. : 15.2 Full Sea Ahead -- Full Astern PERFORMANCE MAY DIFFER FROM THIS RECORD DUE TO ENVIROMENTAL, HULL AND LOADING CONDITIONS

18 BLIND ZONE 24.36m m ( 4.9 L) 16.5m 18.39m m 35.23m This drawing has been generated from actual visual model

19 Centre for Maritime Simulations Vessel Data Container Ship Benguela Stream GC15LD Ship Details Drafts Length: 15. m Draft Fwd: 9. m Breadth: 22. m Draft Aft : 9. m Displacement: 16,537 t Mean Draft: 9. m Capacity: 343 AMC - Centre for Maritime Simulations Thu 8 September 216

20 PILOT CARD GC15LD2 Version 2 Ship s name Benguela Stream Date Call Sign PENA Deadweight 117 tonnes Year built 1998 Draught aft 9 m / 29 ft 6 in Forward 9 m / 29 ft 6 in Displacement tonnes SHIP S PARTICULARS Length overall Breadth 15 m Anchor chain: Port 12. shackles Starboard 12. shackles 22 m Stern shackles Bulbous bow Yes (1 shackle = m = 15 fathoms) m m Air draught 3.52 m m 22 m view point 1.59 m PROPULSION PARTICULARS Type of engine Diesel Maximum power kw ( hp) Manoeuvring engine RPM Pitch Speed (knots) order Loaded Ballast Full sea speed Full Ahead Half Ahead Slow Ahead Dead Slow Ahead Dead Slow Astern Slow Astern Time limit astern min:sec Half Astern Full ahead to full astern min:sec Full Astern Max. No. of consecutive starts Minimum RPM Astern power knots % ahead

21 STEERING PARTICULARS Type of rudder Normal Maximum angle 35 Hard-over to hard-over Rudder angle for neutral effect 14 Thruster: Bow 9 kw ( 127 hp) Stern kw ( hp) s CHECKED IF ABOARD AND READY Anchors Whistle Indicators: Rudder Radar 3 cm cm Rpm/pitch ARPA Rate of turn Speed log Doppler: Yes / No Compass system Water speed Constant gyro error ± Ground speed Dual-axis Engine telegraphs VHF Elec. pos. fix. system Type Steering gear Number of power units operating OTHER INFORMATION:

22 WHEELHOUSE POSTER GC15LD2 Version 2 Ship s name Benguela Stream Call Sign PENA Gross tonnage 9298 Net tonnage 4983 Max. Displacement tonnes, and Deadweight 117 tonnes, and Block coefficient.588 at summer full load draught Draught at which the manoeuvring data were obtained Loaded Trial / Estimated Ballast Trial / Estimated 9 m forward m forward 9 m aft m aft Type of rudder(s) STEERING PARTICULARS Normal Maximum rudder angle 35 Time hard-over to hard-over with one power unit with two power units Min. speed to maintain course propeller stopped s s knots Rudder angle for neutral effect ANCHOR CHAIN Chain length Max. rate of heaving shackles min / shackle Port Starboard Stern (1 shackle = m = 15 fathoms) PROPULSION PARTICULARS Type of engine Diesel, kw ( hp) Type of propeller Propeller Engine order RPM Pitch Speed (knots) Loaded Full sea speed Full Ahead Half Ahead Slow Ahead Dead Slow Ahead Dead Slow Astern Critical revolutions 24 Ballast Slow Astern Minimum RPM knots Time limit astern rpm min:sec Half Astern Time limit at min. revs. min:sec Emergency Full Astern full ahead to full astern s Astern power stop to full astern Max. No. of consecutive starts s % ahead THRUSTER EFFECT at trial conditions Thruster kw hp Time delay Turning rate Time delay to Not effective for full thrust at zero speed reverse full thrust above speed Bow s 34 /min 2 s Stern Combined s 34 /min 2 s DRAUGHT INCREASE (LOADED) Estimated squat effect Heel Effect Under keel Ship s speed Max bow squat Heel angle Draft increase clearance (m) (knots) estimated (m) (degree) (m)

23 TURNING CIRCLES AT MAX. RUDDER ANGLE (35 ) : kn 2. 1: kn :. kn : 17.9 kn : kn Distance (cables) Deep Water :. kn : 16.2 kn : kn Distance (cables) Shallow Water (Depth = 13.5 m) WILLIAMSON TURN Distance(cables) Rudder = 35. deg Committed heading = 2. deg TRACK REACH cables Head Reach hh:mm:ss knots 1:29:24. 4: 1. 3: 1.5 2: 2.4 : 5.1 : 21. Full Sea Ahead -- Stop STOPPING CHARACTERISTICS 1:29:24. 4: 1. 3: 1.5 2: 2.3 : 4.8 : 17.9 Full Ahead -- Stop LOADED 1:29:24. 4:.9 3: 1.3 2: 2.1 : 3.9 : 12.4 Half Ahead -- Stop 1:29:24. 4:.7 3: 1.1 2: 1.7 : 2.9 : 7.4 Slow Ahead -- Stop 6:29. : 21. Full Sea Ahead -- Full Astern PERFORMANCE MAY DIFFER FROM THIS RECORD DUE TO ENVIROMENTAL, HULL AND LOADING CONDITIONS

24 BLIND ZONE 24.9m 588.7m ( 3.91 L) 22.9m 18.63m 132.1m 39.52m This drawing has been generated from actual visual model

25 Centre for Maritime Simulations Vessel Data Bulk Carrier Donnaconna BK2BAL Ship Details Drafts Length: m Draft Fwd: m Breadth: 24.5 m Draft Aft : 6.84 m Displacement: 16,379 t Mean Draft: m AMC - Centre for Maritime Simulations Wed 13 July 216

26 PILOT CARD BK2BAL Version 1 Ship s name Donnaconna Date Call Sign V2OG9 Deadweight tonnes Year built 21 Draught aft 6.84 m / 19 ft 12 in Forward m / 14 ft 8 in Displacement tonnes SHIP S PARTICULARS Length overall Breadth m Anchor chain: Port 2. shackles Starboard 2. shackles 24.5 m Stern shackles Bulbous bow Yes (1 shackle = m = 15 fathoms) m m Air draught m 24.5 m view point m m PROPULSION PARTICULARS Type of engine Diesel Maximum power 7299 kw ( 9923 hp) Manoeuvring engine RPM Pitch Speed (knots) order Loaded Ballast Full sea speed % 15.6 Full Ahead % 14.8 Half Ahead % 11.8 Slow Ahead % 7.2 Dead Slow Ahead % 3.7 Stop 3.3.%. Dead Slow Astern % Time limit astern min:sec Slow Astern % Full ahead to full astern min:sec Half Astern % Max. No. of consecutive starts Full Astern % Minimum RPM knots Astern power % ahead

27 STEERING PARTICULARS Type of rudder Normal Maximum angle 45 Hard-over to hard-over 16.7 Rudder angle for neutral effect Thruster: Bow 15 kw ( 239 hp) Stern kw ( 136 hp) s CHECKED IF ABOARD AND READY Anchors Whistle Indicators: Rudder Radar 3 cm cm Rpm/pitch ARPA Rate of turn Speed log Doppler: Yes / No Compass system Water speed Constant gyro error ± Ground speed Dual-axis Engine telegraphs VHF Elec. pos. fix. system Type Steering gear Number of power units operating OTHER INFORMATION:

28 WHEELHOUSE POSTER BK2BAL Version 1 Ship s name Donnaconna Call Sign V2OG9 Gross tonnage Net tonnage 5758 Max. Displacement tonnes, and Deadweight tonnes, and Block coefficient.766 at summer full load draught Draught at which the manoeuvring data were obtained STEERING PARTICULARS ANCHOR CHAIN Loaded Ballast Type of rudder(s) Normal Chain length Max. rate of heaving Trial / Estimated Trial / Estimated Maximum rudder angle 45 shackles min / shackle m forward m aft m forward m aft Time hard-over to hard-over with one power unit with two power units s s Port Starboard Stern Min. speed to maintain course propeller stopped knots (1 shackle = m = 15 fathoms) Rudder angle for neutral effect PROPULSION PARTICULARS Type of engine Diesel, 7299 kw ( 9923 hp) Type of propeller Propeller Engine order RPM Pitch Speed (knots) Loaded Ballast Full sea speed % 15.6 Full Ahead % 14.8 Half Ahead % 11.8 Slow Ahead % 7.2 Dead Slow Ahead % 3.7 Stop 3.3.%. Critical revolutions Dead Slow Astern % Minimum RPM knots Time limit astern 3.4 rpm min:sec Slow Astern % Time limit at min. revs. min:sec Emergency Half Astern % full ahead to full astern s stop to full astern Full Astern % Astern power % ahead Max. No. of consecutive starts s THRUSTER EFFECT at trial conditions Thruster kw hp Time delay Turning rate Time delay to Not effective for full thrust at zero speed reverse full thrust above speed Bow s 32 /min 32 s Stern s 3 /min 22.9 s Combined s 45 /min 32 s DRAUGHT INCREASE (LOADED) Estimated squat effect Heel Effect Under keel Ship s speed Max bow squat Heel angle Draft increase clearance (m) (knots) estimated (m) (degree) (m)

29 TURNING CIRCLES AT MAX. RUDDER ANGLE (45 ) : kn 2.5 1:52 11 kn : 14.8 kn..5 Distance 1. (cables) Deep Water. : 12.8 kn Distance (cables) Shallow Water (Depth = 7.9 m) WILLIAMSON TURN TRACK REACH cables hh:mm:ss knots 4::.1 2:3:.2 2::.3 1:3:.4 1::.5 3: 1.1 STOPPING CHARACTERISTICS 4::.1 2:3:.2 2::.3 1:3:.4 1::.5 3: 1.1 BALLAST 4::.1 2:3:.2 2::.3 1:3:.4 1::.5 3: 1. 4::.1 2:3:.2 2::.3 1:3:.3 1::.5 3: Distance(cables) Rudder = 45. deg Committed heading = 32.3 deg 5 Head Reach : 15.6 Full Sea Ahead -- Stop : 14.8 Full Ahead -- Stop : 11.8 Half Ahead -- Stop : 7.2 Slow Ahead -- Stop 4:2 -.1 : 15.6 Full Sea Ahead -- Full Astern PERFORMANCE MAY DIFFER FROM THIS RECORD DUE TO ENVIRONMENTAL, HULL AND LOADING CONDITIONS

30 BLIND ZONE 42.36m m ( 1.95 L) 26.32m 27.96m m 47.37m

31 Section 3 Navigation Warning

32 COPYRIGHT Certain hydrographic information in this product is Commonwealth of Australia; and is used under licence with the permission of The Australian Hydrographic Office. All rights reserved. [*Warn] WARNING: Not to be used for navigation The Australian Hydrographic Office does not check the information in this product and the Commonwealth accepts no liability for the accuracy of copying or for any modifications that may have been made to the material which it has supplied. Furthermore, the Commonwealth does not warrant that this product meets any regulations as an appropriate product for navigation or that it contains the latest hydrographic information available.

33 Section 4 Run Summary

34 AMC Simulation Schedule for Cardno Summary of Runs: Day 1, 8 September 216 Run Pilot Wind Tide Current Capt. Siosifa Tuangalu kts from m 1.kts to 1 BBC Christina Inbound from North to Berth Port Side To Option 1 Wind: 75(T) x kts. Swell: 22(T) x 5.5s. Current: (T) x 1.kts. Capt. Siosifa Tuangalu kts from m 1.kts to 2 BBC Christina Inbound from South to Berth Starboard Side To Option 1 Wind: 75(T) x kts. Swell: 22(T) x 5.5s. Current: (T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m 1.5kts to 3 BBC Christina Inbound from North to Berth Port Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Current: (T) x 1.5kts. Capt. Siosifa Tuangalu 2kts from m 1.5kts to 18 4 BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Capt. Siosifa Tuangalu 2kts from m 1.5kts to 18 5 BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Capt. Siosifa Tuangalu 2kts from m 1.5kts to 18 6 BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Use of 18 tonne Tug on Port Quarter. Capt. Siosifa Tuangalu kts from m 1.kts to 18 7 Donnacona Inbound from South to Berth Starbaord Side To Option 1 Wind: 75(T) x kts. Swell: 27(T) x 8.5s. Tide:.m. Current:18(T) x 1.kts. Use of 18 tonne Tug on Port Shoulder Capt. Siosifa Tuangalu 2kts from m 1.5kts to 18 8 Donnacona Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Use of 18 tonne Tug on Port Shoulder Capt. Siosifa Tuangalu kts from m 1.kts to 18 9 BBC Christina Inbound from North West to Berth Port Side To Option 2. Wind: 75(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu kts from m 1.kts to 18 BBC Christina Inbound from North West to Berth Port Side To Option 2. Wind:27(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts.

35 AMC Simulation Schedule for Cardno Summary of Runs: Day 2, 9 September 216 Run Pilot Wind Tide Current Capt. Siosifa Tuangalu kts from m (HW -4:) 1.kts to Donnacona Inbound from North West to Berth Port Side To Option 2. Breakwater Aligned 25(T) Wind:75(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu kts from m (HW -4:) 1.kts to Benguela Stream Inbound from North West to Berth Port Side To Option 2. Breakwater Aligned 25(T) Wind:75(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu kts from m (HW -4:) 1.kts to Donnacona Inbound from South West to Berth Starboard Side To Option 2. Breakwater Aligned 25(T) Wind:75(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu kts from m (HW -4:) 1.kts to Donnacona Depart Starboard Side To Option 2. Wind:75(T) x kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m (HW -4:) 1.kts to Donnacona Depart Starboard Side To Option 2. Breakwater aligned to 248(T) to give additonal m clearance midships Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m (HW -4:) 1.kts to Donnacona Depart Starboard Side To Option 2. Breakwater aligned to 248(T) to give additonal m clearance midships Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 13kts from m (HW -4:) 1.kts to Donnacona Depart Starboard Side To Option 2. Breakwater aligned to 248(T) to give additonal m clearance midships Wind:27(T) x 13 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m (HW -4:) 1.kts to Donnacona Depart Port Side To Option 2. Breakwater aligned to 248(T) to give additonal m clearance midships Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m (HW -4:) 1.kts to Donnacona Depart Port Side To Option 2. Breakwater aligned to 248(T) to give additonal m clearance midships Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m (HW -4:) 1.kts to 18 2 Donnacona Depart Starboard Side To Option 1. Assumed larger tug - 4 tonne ASD Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. Capt. Siosifa Tuangalu 2kts from m 1.kts to Donnacona Depart Starboard Side To Option 1. Wind:27(T) x 2 kts. Swell: 27(T) x 9.s. Tide:.m. Current:18(T) x 1.kts. 14 tonne Conventional Tug used, and vessel rotated around southern dophin.

36 Section 5 Run Plots

37 DAY 1 8 September 216

38 Cardno Nauru Port Development Project - Run 1 - Capt. Siosifa Tuangalu 8 September 216 9:16:55 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : kts from 75 Dimension : 13.3m x 16.5m x 7.m Swell : 1.5m from 22 Displacement : 11,49 tonnes Current : 1.kts to Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port Initial Condition E Comments BBC Christina Inbound from North to Berth Port Side To Option 1 Wind: 75(T) x kts. Swell: 22(T) x 5.5s. Current: (T) x 1.kts. Familiarisation Run. Start position 3 cables from Berth Once way taken off vessel, effect of wind was evident, pushing vessel away from the berth. Exercise Duration: 28 minutes. Forward Spring and Sternline Fast E Time : m s Heading : 18 COG : 18 SOG : 2.1kts Swell 1.5m 31 3 S Wind kts 31 3 S Current 1.kts E E Final Condition E E Time : 27m 5s Heading : 193 COG : 7 SOG :.2kts Swell 1.5m Wind kts 32 S 32 S Current 1.kts E E Centre for Maritime Simulations Australian Maritime College

39 Cardno Nauru Port Development Project - Run 1 - Capt. Siosifa Tuangalu 8 September 216 9:16: E BBC Christina Start : HW -4: Elapsed : 27m 5s E 32 3 S 32 S 32 3 S 31 3 S 31 3 S 31 S 31 S Time : m s Heading : 18 (18 ) Turnrate : s.1 /min Speed : 2.1kts Time : 3m s Heading : 176 (179 ) Turnrate : p1.8 /min Speed : 2.3kts Time : 6m s Heading : 167 (177 ) Turnrate : p2.3 /min Speed : 1.3kts Time : 12m s Heading : 17 (183 ) Turnrate : p2.1 /min Speed :.6kts 32 S Time : 27m 5s Heading : 193 (7 ) Turnrate : p1.9 /min Speed :.2kts Centre for Maritime Simulations E E Australian Maritime College

40 Cardno Nauru Port Development Project - Run 1 - Capt. Siosifa Tuangalu 8 September 216 9:16: Speed (SOG) (kts) Heading (deg) COG (deg) Dead Slow Ahead 5 Propeller Revs (rpm) -5 Stop Dead Slow Astern -5 Order Revs (rpm) Slow Astern - - Port Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) Centre for Maritime Simulations Australian Maritime College

41 Cardno Nauru Port Development Project - Run 1 - Capt. Siosifa Tuangalu 8 September 216 9:16: Wind Speed (kts) Wind Direction (deg) Swell Height (m) Swell Direction (deg) Current Speed (kts) Current Direction (deg) Line Force (tonnes) Line Force (tonnes) Centre for Maritime Simulations Australian Maritime College

42 Cardno Nauru Port Development Project - Run 1 - Capt. Siosifa Tuangalu 8 September 216 9:16:55 Port Stdb Bow Thruster Power (%) Stern Thruster Power (%) Centre for Maritime Simulations ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz ,/\<>'[](){}+-=_!@#$%^&* Australian Maritime College

43 Cardno Nauru Port Development Project - Run 2 - Capt. Siosifa Tuangalu 8 September 216 :7:53 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : kts from 75 Dimension : 13.3m x 16.5m x 7.m Swell : 1.5m from 22 Displacement : 11,49 tonnes Current : 1.kts to Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port E Initial Condition E Comments BBC Christina Inbound from South to Berth Starboard Side To Option 1 Wind: 75(T) x kts. Swell: 22(T) x 5.5s. Current: (T) x 1.kts. Start position 3 cables from Berth Significant effect of current coming from astern requiring careful consideration of approach speed. Important to get lines ashore quickly Exercise Duration: 21 minutes. Forward Spring and Sternline Fast E Time : m s Heading : 35 COG : 18 SOG : 1.9kts 32 3 S 32 3 S 32 S Swell 1.5m 32 S Wind kts Current 1.kts E E E Final Condition E E Time : 21m 14s Heading : 3 COG : 21 SOG :.6kts Swell 1.5m Wind kts 32 S 32 S Current 1.kts E E Centre for Maritime Simulations Australian Maritime College

44 Cardno Nauru Port Development Project - Run 2 - Capt. Siosifa Tuangalu 8 September 216 :7: E BBC Christina Start : HW -4: Elapsed : 21m 14s E 32 3 S 32 S 32 S 32 3 S 31 3 S 31 3 S Time : 9m s Heading : 27 (268 ) Turnrate : p21.1 /min Speed : 1.3kts Time : 3m s Heading : 4 (31 ) Turnrate : s1. /min Speed : 4.2kts Time : 21m 14s Heading : 3 (21 ) Turnrate : s.4 /min Speed :.6kts Time : m s Heading : 35 (18 ) Turnrate : s. /min Speed : 1.9kts E E Centre for Maritime Simulations Australian Maritime College

45 Cardno Nauru Port Development Project - Run 2 - Capt. Siosifa Tuangalu 8 September 216 :7: Speed (SOG) (kts) Heading (deg) COG (deg) Full Sea Ahead 15 Full Ahead Half Ahead 15 Slow Ahead Propeller Revs (rpm) 5-5 Dead Slow Ahead Stop Dead Slow Astern 5-5 Order Revs (rpm) Slow Astern Half Astern Full Astern Port 4 4 Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) Centre for Maritime Simulations Australian Maritime College

46 Cardno Nauru Port Development Project - Run 2 - Capt. Siosifa Tuangalu 8 September 216 :7: Wind Speed (kts) Wind Direction (deg) Swell Height (m) Swell Direction (deg) Current Speed (kts) Current Direction (deg) Line Force (tonnes) Line Force (tonnes) Centre for Maritime Simulations Australian Maritime College

47 Cardno Nauru Port Development Project - Run 2 - Capt. Siosifa Tuangalu 8 September 216 :7:53 Port Stdb Bow Thruster Power (%) Stern Thruster Power (%) Centre for Maritime Simulations ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz ,/\<>'[](){}+-=_!@#$%^&* Australian Maritime College

48 Cardno Nauru Port Development Project - Run 3 - Capt. Siosifa Tuangalu 8 September 216 :47:4 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : 2kts from 27 Dimension : 13.3m x 16.5m x 7.m Swell : 2.5m from 27 Displacement : 11,49 tonnes Current : 1.5kts to Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port Initial Condition E Comments BBC Christina Inbound from North to Berth Port Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Current: (T) x 1.5kts. Start position 3 cables from Berth Significant wind effect, coupled with northerly set made initial approach to berth challenging, with vessel being set to starboard. Once current was across the bow, vessel became more manageable. Exercise Duration: 21 minutes. Headline and Sternline Fast E Time : m s Heading : 18 COG : 165 SOG : 1.8kts 31 3 S 31 3 S Wind 2kts Swell 2.5m Current 1.5kts E E Final Condition E E Time : 21m 36s Heading : 194 COG : 33 SOG :.9kts Wind 2kts Swell 2.5m 32 S 32 S Current 1.5kts E E Centre for Maritime Simulations Australian Maritime College

49 Cardno Nauru Port Development Project - Run 3 - Capt. Siosifa Tuangalu 8 September 216 :47: E BBC Christina Start : HW -4: Elapsed : 21m 36s E 32 3 S 32 S 32 3 S 31 3 S 31 3 S 31 S 31 S Time : m s Heading : 18 (165 ) Turnrate : s3.3 /min Speed : 1.8kts Time : 6m s Heading : 19 (181 ) Turnrate : p.5 /min Speed : 1.6kts Time : 3m s Heading : 28 (218 ) Turnrate : p5.7 /min Speed : 2.7kts Time : 15m s Heading : 2 (24 ) Turnrate : s8.3 /min Speed : 1.4kts 32 S Time : 21m 36s Heading : 194 (33 ) Turnrate : p9.4 /min Speed :.9kts Centre for Maritime Simulations E E Australian Maritime College

50 Cardno Nauru Port Development Project - Run 3 - Capt. Siosifa Tuangalu 8 September 216 :47: Speed (SOG) (kts) Heading (deg) COG (deg) Full Sea Ahead 15 Full Ahead Half Ahead 15 Slow Ahead Propeller Revs (rpm) 5-5 Dead Slow Ahead Stop Dead Slow Astern 5-5 Order Revs (rpm) Slow Astern - Half Astern Full Astern Port Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) Centre for Maritime Simulations Australian Maritime College

51 Cardno Nauru Port Development Project - Run 3 - Capt. Siosifa Tuangalu 8 September 216 :47: Wind Speed (kts) Wind Direction (deg) Swell Height (m) Swell Direction (deg) Current Speed (kts) Current Direction (deg) Line Force (tonnes) Line Force (tonnes) Centre for Maritime Simulations Australian Maritime College

52 Cardno Nauru Port Development Project - Run 3 - Capt. Siosifa Tuangalu 8 September 216 :47:4 Port Stdb Bow Thruster Power (%) Stern Thruster Power (%) Centre for Maritime Simulations ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz ,/\<>'[](){}+-=_!@#$%^&* Australian Maritime College

53 Cardno Nauru Port Development Project - Run 4 - Capt. Siosifa Tuangalu 8 September :26:1 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : 2kts from 27 Dimension : 13.3m x 16.5m x 7.m Swell : 2.5m from 27 Displacement : 11,49 tonnes Current : 1.5kts to 18 Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port E Initial Condition E Comments BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Start position 3 cables from Berth Vessel experiencing greater environmental effects due to slow approach speed. Exercise Duration: 18 minutes. Headline and Sternline Fast E Time : m s Heading : 34 COG : 43 SOG : 2.kts 32 3 S 32 3 S 32 S Current 1.5kts 32 S Wind 2kts Swell 2.5m E E E Final Condition E E Time : 17m 58s Heading : 11 COG : 129 SOG :.8kts Wind 2kts Swell 2.5m 32 S 32 S Current 1.5kts E E Centre for Maritime Simulations Australian Maritime College

54 Cardno Nauru Port Development Project - Run 4 - Capt. Siosifa Tuangalu 8 September :26: E BBC Christina Start : HW -4: Elapsed : 17m 58s E 32 3 S 32 S 32 S 32 3 S 31 3 S 31 3 S Time : 17m 58s Heading : 11 (129 ) Turnrate : s22.3 /min Speed :.8kts Time : 6m s Heading : 39 (43 ) Turnrate : s27.8 /min Speed : 3.2kts Time : 12m s Heading : 21 (66 ) Turnrate : p4.8 /min Speed : 1.1kts Time : 9m s Heading : 93 (189 ) Turnrate : p3.5 /min Speed :.8kts Time : m s Heading : 34 (43 ) Turnrate : p1.4 /min Speed : 2.kts Centre for Maritime Simulations E E Australian Maritime College

55 Cardno Nauru Port Development Project - Run 4 - Capt. Siosifa Tuangalu 8 September :26: Speed (SOG) (kts) Heading (deg) COG (deg) Full Sea Ahead 15 Full Ahead Half Ahead 15 Slow Ahead Propeller Revs (rpm) 5-5 Dead Slow Ahead Stop Dead Slow Astern 5-5 Order Revs (rpm) Slow Astern - Half Astern Full Astern Port Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) 5 15 Centre for Maritime Simulations Australian Maritime College

56 Cardno Nauru Port Development Project - Run 4 - Capt. Siosifa Tuangalu 8 September :26: Wind Speed (kts) Wind Direction (deg) Swell Height (m) Swell Direction (deg) Current Speed (kts) Current Direction (deg) Line Force (tonnes) 2 2 Line Force (tonnes) 5 15 Centre for Maritime Simulations Australian Maritime College

57 Cardno Nauru Port Development Project - Run 4 - Capt. Siosifa Tuangalu 8 September :26:1 Port Stdb Bow Thruster Power (%) Stern Thruster Power (%) 5 15 Centre for Maritime Simulations ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz ,/\<>'[](){}+-=_!@#$%^&* Australian Maritime College

58 Cardno Nauru Port Development Project - Run 5 - Capt. Siosifa Tuangalu 8 September :56:16 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : 2kts from 27 Dimension : 13.3m x 16.5m x 7.m Swell : 2.5m from 27 Displacement : 11,49 tonnes Current : 1.5kts to 18 Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port 32 S Initial Condition E Comments BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Start position 5 cables from Berth - Start speed 5 knots Vessel commences rotating to port as soon as engine stopped. Faster approach speed attempted to stabilise approach. Steeper approach to Berth may be required for these conditions. Exercise Duration: 3 E 26 minutes E Time : m s Heading : 32 COG : 41 SOG : 5.kts 32 3 S 32 3 S Current 1.5kts 32 S Wind 2kts Swell 2.5m E E E Final Condition E E Time : 26m 2s Heading : 18 COG : 12 SOG :.8kts Wind 2kts Swell 2.5m 32 S 32 S Current 1.5kts E E Centre for Maritime Simulations Australian Maritime College

59 Cardno Nauru Port Development Project - Run 5 - Capt. Siosifa Tuangalu 8 September :56: E E BBC Christina Start : HW -4: Elapsed : 26m 2s E 32 S 32 S 32 3 S 31 3 S 31 3 S Time : 9m s Heading : 27 (21 ) Turnrate : p6.1 /min Speed : 5.6kts Time : 21m s Heading : 345 (147 ) Turnrate : s17.7 /min Speed : 1.2kts Time : 15m s Heading : 51 (62 ) Turnrate : p1.7 /min Speed : 5.1kts Time : 26m 2s Heading : 18 (12 ) Turnrate : p3.2 /min Speed :.8kts Time : 24m s Heading : 32 (8 ) Turnrate : p13.1 /min Speed : 1.6kts Time : 3m s Heading : 28 (35 ) Turnrate : s4.8 /min Speed : 5.7kts Time : 12m s Heading : 37 (273 ) Turnrate : s73.4 /min Speed : 5.kts Time : m s Heading : 32 (41 ) Turnrate : p2.7 /min Speed : 5.kts 32 3 S 33 S E E E 33 S Centre for Maritime Simulations Australian Maritime College

60 Cardno Nauru Port Development Project - Run 5 - Capt. Siosifa Tuangalu 8 September :56: Speed (SOG) (kts) Heading (deg) COG (deg) Full Sea Ahead 15 Full Ahead Half Ahead 15 Slow Ahead Propeller Revs (rpm) 5-5 Dead Slow Ahead Stop Dead Slow Astern 5-5 Order Revs (rpm) Slow Astern - Half Astern Full Astern Port Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) Centre for Maritime Simulations Australian Maritime College

61 Cardno Nauru Port Development Project - Run 5 - Capt. Siosifa Tuangalu 8 September :56: Wind Speed (kts) Wind Direction (deg) Swell Height (m) Swell Direction (deg) Current Speed (kts) Current Direction (deg) Line Force (tonnes) Line Force (tonnes) Centre for Maritime Simulations Australian Maritime College

62 Cardno Nauru Port Development Project - Run 5 - Capt. Siosifa Tuangalu 8 September :56:16 Port Stdb Bow Thruster Power (%) Stern Thruster Power (%) Centre for Maritime Simulations ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz ,/\<>'[](){}+-=_!@#$%^&* Australian Maritime College

63 Cardno Nauru Port Development Project - Run 6 - Capt. Siosifa Tuangalu 8 September :31:45 Details Model : GC13LD Area : nauru Model Name : BBC Christina Wind : 2kts from 27 Dimension : 13.3m x 16.5m x 7.m Swell : 2.5m from 27 Displacement : 11,49 tonnes Current : 1.5kts to 18 Tide : 5.8m * Wind, Swell & Current max effect during run, Tide at Reference Port 32 S Initial Condition E Comments BBC Christina Inbound from South to Berth Starbaord Side To Option 1 Wind: 27(T) x 2 kts. Swell: 27(T) x 9.5s. Tide:.m. Current:18(T) x 1.5kts. Use of 18 tonne Tug on Port Quarter. Start position 5 cables from Berth - Start speed 5 knots Vessel continues to struggle to overcome environmental forces Effectiveness of tug on Port Quarter minimal due to speed of vessel and design of tug (Conventional) E Exercise Duration: 31 minutes E Time : m s Heading : 32 COG : 41 SOG : 5.kts 32 3 S 32 3 S Current 1.5kts 32 S Wind 2kts Swell 2.5m E E E Final Condition E E Time : 3m 46s Heading : 18 COG : 6 SOG :.1kts Wind 2kts Swell 2.5m 32 S 32 S Current 1.5kts E E Centre for Maritime Simulations Australian Maritime College

64 Cardno Nauru Port Development Project - Run 6 - Capt. Siosifa Tuangalu 8 September :31: E E BBC Christina Start : HW -4: Elapsed : 3m 46s E 33 S 33 S 32 3 S 32 S 32 S 32 3 S 31 3 S 31 3 S Time : 9m s Heading : 9 ( ) Turnrate : s26.4 /min Speed : 5.kts Time : 6m s Heading : 35 (26 ) Turnrate : s47.8 /min Speed : 3.6kts Time : 18m s Heading : 41 (8 ) Turnrate : s9. /min Speed : 1.kts Time : 3m 46s Heading : 18 (6 ) Turnrate : s12.8 /min Speed :.1kts Time : 3m s Heading : 333 (336 ) Turnrate : p19.9 /min Speed : 3.9kts Time : 15m s Heading : 78 (245 ) Turnrate : p25.5 /min Speed : 2.8kts Time : m s Heading : 32 (41 ) Turnrate : p2. /min Speed : 5.kts E Centre for Maritime Simulations E E Australian Maritime College

65 Cardno Nauru Port Development Project - Run 6 - Capt. Siosifa Tuangalu 8 September :31: Speed (SOG) (kts) Heading (deg) COG (deg) Full Sea Ahead 15 Full Ahead Half Ahead 15 Slow Ahead Propeller Revs (rpm) 5-5 Dead Slow Ahead Stop Dead Slow Astern 5-5 Order Revs (rpm) Slow Astern - Half Astern Full Astern Port Stdb Rate of Turn (deg/min) Rate of Turn (deg/min) Port Stdb Rudder Angle (deg) Rudder Angle (deg) Centre for Maritime Simulations Australian Maritime College

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary MARINE GUIDANCE NOTE MGN 301 (M+F) Manoeuvring Information on Board Ships Note to Shipbuilders, shipowners, ship Managers and Masters This note supersedes Marine Guidance Note MGN 201 (M+F) Summary The

More information

MANOEUVRING BOOKLET V1.06

MANOEUVRING BOOKLET V1.06 MANOEUVRING BOOKLET V.6 Mathematical model of VLCC (Dis.769t) bl. Version: v Dll Version:.3.558 According : Solas II-, regulation 8.3 St. Petersburg 6 . GENERAL DESCRIPTION.. Ships particulars... Ships

More information

MANOEUVRING BOOKLET V1.06

MANOEUVRING BOOKLET V1.06 MANOEUVRING BOOKLET V1.6 Mathematical model of Integrated Tug Barge 45 Version: v9 Dll Version: 2.31.558 According to: Solas II-1, regulation 28.3 St. Petersburg 26 1. GENERAL DESCRIPTION 1.1. Ships particulars

More information

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX

Preventing Damage to Harbour Facilities and. Ship Handling in Harbours PART 2 INDEX Preventing Damage to Harbour Facilities and Ship Handling in Harbours PART 2 INDEX 1 Vessel handling is based on the basic knowledge that a vessel floats in the water and returns to its original position

More information

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B

Assessment Simulation study, Phase 2. Port of Roenne. FORCE / Rev. B / Rev. B i LIST OF CONTENTS: PAGE: 0. EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 1.1. General... 2 1.2. Objectives... 3 2. SUMMARY... 4 2.1. Observations... 5 2.2.1 General... 5 2.2.2 Weather conditions...

More information

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) This Code Covers The Use Of Tugs And Towage In The Port Of St Helier Page number Contents 2 Introduction 3 Communication

More information

SIMULATED PROPELLER WALK ON A TEU CONTAINER SHIP

SIMULATED PROPELLER WALK ON A TEU CONTAINER SHIP SIMULATED PROPELLER WALK ON A 13.300 TEU CONTAINER SHIP Andrei POCORA 1 Sergiu LUPU 2 Cosmin KATONA 3 1 Assistant Professor eng. PhD student, Mircea cel Batran Naval Academy, Constanta, Romania 2 Lecturer

More information

MANAGEMENT SYSTEM MANUAL

MANAGEMENT SYSTEM MANUAL 1. Purpose The purpose of this procedure is to establish routine check-off lists to be used in preparation for arrival and departure aboard the R/V Oceanus. 2. Responsibility The Master is responsible

More information

MARINE INVESTIGATION REPORT M00L0039 STRIKING

MARINE INVESTIGATION REPORT M00L0039 STRIKING MARINE INVESTIGATION REPORT M00L0039 STRIKING OF THE BULK CARRIER TECAM SEA BY THE BULK CARRIER FEDERAL FUJI PORT OF SOREL, QUEBEC 27 APRIL 2000 The Transportation Safety Board of Canada (TSB) investigated

More information

Effect of the Minimum Ballast Condition on Bulk Carrier Manoeuvrability

Effect of the Minimum Ballast Condition on Bulk Carrier Manoeuvrability A part of BMT in Maritime Transport Effect of the Minimum Ballast Condition on for INTERCARGO ADDITIONAL SCENARIOS ISSUE DATE: 17 th December 2008 REPORT NO: C12145.1RA CONTENTS 1 TERMS OF REFERENCE...

More information

Abstract. Introduction

Abstract. Introduction Computer assisted analysis of Aviles Port extension: hydraulic conditions, navigation and training of pilots J.R. Iribarren & J.M. Montero Port Research Program, CEPYC-CEDEX, Antonio Lopez, 81. 28026 Madrid,

More information

Unit 18 LEAVING THE DOCK

Unit 18 LEAVING THE DOCK Unit 18 LEAVING THE DOCK Basic terms - Dock Pilot - River Pilot - tug-boat - transverse thrust - effect of the screw - singling up - mooring ropes - skipper - handling of ships - buoys - dolphins - slack

More information

APPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC)

APPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC) APPLICATION FOR PILOT EXEMPTION CERTIFICATE (PEC) according to the Swedish Transport Agency s Regulations and General Advice (TSFS 2017:88) on Pilotage New application Renewal of PEC No: Supplement to

More information

Uncontrolled document if printed.

Uncontrolled document if printed. APPENDIX 3 APPRENTICE PILOT S TRAINING SYLLABUS Issue Date: 16 th March, 2010 Date of Revision: 22nd May, 2013 Revision #2 i THE PURPOSE OF THIS SYLLABUS The purpose of this training syllabus is to ensure

More information

Influence of Marine Operations on Site Selection & Design of Marine Terminals

Influence of Marine Operations on Site Selection & Design of Marine Terminals SOCIEDAD CHILENA DE INGENIERIA HIDRÁULICA V SEMINARIO INTERNACIONAL DE INGENIERÍA Y OPERACIONES PORTUARIAS OCTUBRE 2008, CONCEPCIÓN, CHILE Influence of Marine Operations on Site Selection & Design of Marine

More information

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MARINE ACCIDENT INVESTIGATION REPORT December 8th,2016 Adopted by the Japan Transport Safety Board Member Kuniaki Shoji Member Satoshi Kosuda Member Mina Nemoto Accident Type Contact (light buoy) Date

More information

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines

ABP South Wales Towage Guidelines. Date of issue: January ABP South Wales and River Usk Towage Guidelines Date of issue: January 2017 ABP South Wales and River Usk wage January 2017 Date of issue: January 2017 AMENDMENTS Amendment issue number Page Amendment made by (Initials) Date of amendment One 15 & 16

More information

APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16.

APPROACH DEPTH(m) From East 15.0 From West From East 15.0 From West From East 15.0 From West ) ) From East 15.0 ) From West 16. UNIVERSAL TERMINAL (OMU) JETTY DEPTH A/S (m) APPROACH DEPTH(m) MAX LOA (m) MAX DISPL. (tonnes) REMARKS OMU1 23.0 From East 15.0 From West 22.5 346 384,604 VLCC berth OMU2 23.0 From East 15.0 From West

More information

TECHNICAL INFORMATION BOLLARDPULL TRIALCODE. ForTugs with SteerpropPropulsion. Steerprop

TECHNICAL INFORMATION BOLLARDPULL TRIALCODE. ForTugs with SteerpropPropulsion. Steerprop TECHNICAL INFORMATION BOLLARDPULL TRIALCODE ForTugs with SteerpropPropulsion Steerprop A Skogman / 22 March 2001 BOLLARD PULL TRIAL CODE FOR TUGS This Bollard Pull Trial Code is established to define the

More information

Incident Reporting for Pilots, PEC Holders and Masters

Incident Reporting for Pilots, PEC Holders and Masters Incident Reporting for Pilots, PEC Holders and Masters It is a requirement that all Incidents or near misses are reported to the Harbour Master. This is a necessary requirement to allow a full investigation

More information

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE LIST OF TOPICS A B C D E F G H I J Hydrostatics Simpson's Rule Ship Stability Ship Resistance Admiralty Coefficients Fuel Consumption Ship Terminology Ship

More information

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs.

Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. Accommodating Larger Vessels: Ship Maneuverability and Channel Depth; A discussion of vessel motion in shallow water and future research needs. PANELISTS: Paul Amos: President, Columbia River Pilots. Larry

More information

Forth Ports Limited. Port of Dundee. Rig Move Guidelines

Forth Ports Limited. Port of Dundee. Rig Move Guidelines Forth Ports Limited Port of Dundee Contents 1 Introduction... 4 2 Pre-Arrival... 4 2.1 Planning Meetings... 4 2.2 Priority of Movements... 4 2.3 Confirmation/Cancellations... 5 2.4 Weather Parameters...

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 16 Choose the best answer to the following Multiple Choice Questions. 1. Which term applies to the angle between

More information

Experience and Future Potential of the Oblique Icebreaker

Experience and Future Potential of the Oblique Icebreaker SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager

More information

Maneuverability characteristics of ships with a single-cpp and their control

Maneuverability characteristics of ships with a single-cpp and their control Maneuverability characteristics of ships with a single-cpp and their control during in-harbor ship-handlinghandling Hideo YABUKI Professor, Ph.D., Master Mariner Tokyo University of Marine Science and

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines Page 1 of 10 Table of Contents Speed/Power Trials... 2 1. PURPOSE... 2 2. DEFINITIONS... 2 3. RESPONSIBILITIES... 3 3.1 Shipbuilders Responsibilities... 3 3.2 The Trial Team... 4 4. PROCEDURES... 4 4.1

More information

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B Incident Report Close Quarters Pegasus II & Distraction 26 April 2006 Class B NARRATIVE Pegasus II (See Photograph 1 Pegasus II) is a 15.46 metre commercial fishing vessel with a gross tonnage of 40. She

More information

Technical Information

Technical Information Subject Preparation, conduct and analysis method of speed trial for EEDI verification To whom it may concern Technical Information No. TEC-1030 Date 29 May 2015 In order to determine the ship's attained

More information

DUKC DYNAMIC UNDER KEEL CLEARANCE

DUKC DYNAMIC UNDER KEEL CLEARANCE DUKC DYNAMIC UNDER KEEL CLEARANCE Information Booklet Prepared in association with Marine Services Department 10/10/2005 Dynamic Under Keel Clearance (DUKC) integrates real time measurement of tides and

More information

Minimum standard of competence for Master (STCW Reg II/2)

Minimum standard of competence for Master (STCW Reg II/2) Minimum standard of for Master (STCW Reg II/2) Function: Navigation at the management level Column 1 Column 2 Column 3 Column 4 Plan a voyage and Voyage planning and Examination and The equipment, charts

More information

COURSE OBJECTIVES CHAPTER 9

COURSE OBJECTIVES CHAPTER 9 COURSE OBJECTIVES CHAPTER 9 9. SHIP MANEUVERABILITY 1. Be qualitatively familiar with the 3 broad requirements for ship maneuverability: a. Controls fixed straightline stability b. Response c. Slow speed

More information

Model of ferry captain s manoeuvres decision

Model of ferry captain s manoeuvres decision Scientific Journals Maritime University of Szczecin Zeszyty Naukowe Akademia Morska w Szczecinie 212, 32(4) z. 2 pp. 98 2 212, 32(4) z. 2 s. 98 2 Model of ferry captain s manoeuvres decision Adam Kowalski

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 95 CHIEF

More information

Fundamental Study of Evaluation at Berthing Training for Pilot Trainees Using a Ship Maneuvering Simulator

Fundamental Study of Evaluation at Berthing Training for Pilot Trainees Using a Ship Maneuvering Simulator http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 7 Number 1 March 2013 DOI: 10.12716/1001.07.01.18 Fundamental Study of Evaluation at Berthing

More information

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route 1.0 Introduction This work instruction outlines the passage plan to be used by vessels transiting from the Port of Barrow Island PBG to the Gorgon Marine Terminal, via the alternative route, with a Pilot

More information

Features of the simulator for inland navigation

Features of the simulator for inland navigation CENTRAL COMMISSION FOR THE NAVIGATION OF THE RHINE STF (12) 21 rev. 4 STF/G (12) 19 rev. 5 MQ/G (13) 16 16 October 2013 Or. fr fr/de/nl/en COMMITTEE ON SOCIAL ISSUES, EMPLOYMENT AND PROFESSIONAL TRAINING

More information

S2 11.0A Freida. Number:

S2 11.0A Freida. Number: S2 11.0A Freida Make: S2 Model: 11.0A Length: 36 ft Price: $ 34,995 Year: 1979 Condition: Used Location: League City, TX, United States Boat Name: Hull Material: Draft: Number of Engines: 1 Fuel Type:

More information

Enclosure (5) to NVIC 03-16

Enclosure (5) to NVIC 03-16 TOWING OFFICER ASSESSMENT RECORD LIMITED LOCAL AREA LOCAL LIMITED AREA (LLA) TOAR INSTRUCTIONS FOR USE The following Towing Officer Assessment Record (TOAR) is intended as a model for endorsements as Limited

More information

TOWAGE GUIDELINES FOR THE GLOUCESTER HARBOUR. August 2018

TOWAGE GUIDELINES FOR THE GLOUCESTER HARBOUR. August 2018 TOWAGE GUIDELINES FOR THE GLOUCESTER HARBOUR August 2018 Version History Version Reason for Change Date 1.0 Original Document 1 December 2011 1.1 Revised small craft requirements 3 February 2016 1.2 Revised

More information

RESOLUTION A.751(18) adopted on 4 November 1993 INTERIM STANDARDS FOR SHIP MANOEUVRABILITY

RESOLUTION A.751(18) adopted on 4 November 1993 INTERIM STANDARDS FOR SHIP MANOEUVRABILITY INTERNATIONAL MARITIME ORGANIZATION A 18/Res.751 22 November 1993 Original: ENGLISH ASSEMBLY - 18th session Agenda item 11 RESOLUTION A.751(18) adopted on 4 November 1993 THE ASSEMBLY, RECALLING Article

More information

IACS History File + TB

IACS History File + TB IACS History File + TB Part A UI SC246 Steering gear test with the vessel not at the deepest seagoing draught Part A. Revision History Version no. Approval date Implementation date when applicable New

More information

Port Sections Guide Section 01

Port Sections Guide Section 01 s Guide 01 Cow Bay Marina Date 10/1/2016 Position (lat / lon) Minimum controlled water depth Chart datum Range of water densities Tidal range alongside Bottom type Dredging regime Distance pilot station

More information

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY

RESOLUTION MSC.137(76) (adopted on 4 December 2002) STANDARDS FOR SHIP MANOEUVRABILITY MSC 76/23/Add.1 RESOLUTION MSC.137(76) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, RECALLING

More information

ITTC Recommended Procedures and Guidelines

ITTC Recommended Procedures and Guidelines 02 - Page 1 of 17 Table of Contents.....2 1. PURPOSE OF PROCEDURE... 2 2. RECOMMENDED PROCEDURES FOR MANOEUVRING TRIAL... 2 2.1 Trial Conditions... 2 2.1.1 Environmental Restrictions... 2 2.1.2 Loading

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners Q301 Rules of the Road-Inland (Sample Examination) Page 1 of 19 Choose the best answer to the following Multiple Choice Questions. NO reference

More information

applied to Port Development and Inland Waterway Transport

applied to Port Development and Inland Waterway Transport applied to Port Development and Inland Waterway Transport Wytze de Boer March 12, 2018 w.d.boer@marin.nl CHALLINGING WIND AND WAVES applied to port development and inland waterway transport AGENDA 1. Introduction

More information

Rule 8 - Action to avoid collision

Rule 8 - Action to avoid collision a) Any action to avoid collision shall be taken in accordance with the Rules of this Part and shall, if the circumstances of the case admit, be positive, made in ample time and with due regard to the observance

More information

ANCHORING PRACTICE. By: Capt. Jerzy T. Idzikowski BSc, Master Mariner. Copyright Capt. Jerzy T. Idzikowski, 2001

ANCHORING PRACTICE. By: Capt. Jerzy T. Idzikowski BSc, Master Mariner. Copyright Capt. Jerzy T. Idzikowski, 2001 ANCHORING PRACTICE By: Capt. Jerzy T. Idzikowski BSc, Master Mariner Copyright Capt. Jerzy T. Idzikowski, 2001 Atlantic Ocean, Parana River, June - August 2001 M/V Rixta Oldendorff PLANNING Before arrival

More information

Bavaria 36 Vela. Partnership Yacht Brokers - Jacqui Bugden

Bavaria 36 Vela. Partnership Yacht Brokers - Jacqui Bugden Bavaria 36 Vela Make: Model: 36 Length: Bavaria 11.4 m Price: GBP 47,500 Year: 2003 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 1 Fuel Type: Vela Fibreglass (GRP) 1.65 m Diesel

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information

Potential of Fast Time Simulation for Training in Ship Handling Simulators and for Decision Making On-Board Ships

Potential of Fast Time Simulation for Training in Ship Handling Simulators and for Decision Making On-Board Ships International Association of Maritime Universities AGA11 Potential of Fast Time Simulation for Training in Ship Handling Simulators and for Decision Making On-Board Ships Knud Benedict Professor, Hochschule

More information

MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING

MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING GENERAL CARGO SHIP CLAUDE A. DESGAGNES IROQUOIS, ONTARIO 06 NOVEMBER 2013 The Transportation Safety Board of Canada (TSB) investigated

More information

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric

More information

Cornish Crabbers Shrimper 19 Curlew

Cornish Crabbers Shrimper 19 Curlew Cornish Crabbers Shrimper 19 Curlew Make: Cornish Crabbers Model: Shrimper 19 Length: 5.87 m Price: EUR 15,900 Year: 1989 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 1 Fuel Type:

More information

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018) RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 AMENDED EFFECTIVE JANUARY

More information

MAC Transit Advisories as of April 30, 2018

MAC Transit Advisories as of April 30, 2018 MAC Transit Advisories as of April 30, 2018 The Mariners Advisory Committee for the Bay and River Delaware was established in October 1964. Its members and associate members are mainly comprised of master

More information

Conventional Ship Testing

Conventional Ship Testing Conventional Ship Testing Experimental Methods in Marine Hydrodynamics Lecture in week 34 Chapter 6 in the lecture notes 1 Conventional Ship Testing - Topics: Resistance tests Propeller open water tests

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 19 Choose the best answer to the following multiple choice questions. NO reference materials are authorized for

More information

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014

HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 HELSINKI COMMISSION HELCOM SAFE NAV 4/2014 Group of Experts on Safety of Navigation Fourth Meeting Helsinki, Finland, 4 February 2014 Agenda Item 3 Accidents and ship traffic in the Baltic Sea Document

More information

MARINE ACCIDENT REPORT April 2013

MARINE ACCIDENT REPORT April 2013 MARINE ACCIDENT REPORT April 2013 SKULD Contact damage on 28 June 2012 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Tel. +45 91 37 63 00 E-mail: dmaib@dmaib.dk Website:

More information

Emergency Response Plan

Emergency Response Plan Emergency Response Plan 1. Emergency Steering Gear Failure at sea 2. Application Shorebased Organisation All ships prepared: approved: released: Revision 0 HLS Management 2006-11-27 Emergency Response

More information

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 DUKC Chart Overlay Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 Outline Who is OMC? DUKC description & methodology. DUKC Chart Overlay concept. Chart Overlay application example.

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners U.S.C.G. Merchant Marine Exam (Sample Examination) Page 1 of 22 U.S.C.G. Merchant Marine Exam: Illustrations: 10 Choose the best answer to the

More information

ClassNK Technical Information No. TEC Required minimum propulsion power In principle, the installed propulsion power (total main engine output

ClassNK Technical Information No. TEC Required minimum propulsion power In principle, the installed propulsion power (total main engine output Subject Minimum Propulsion Power required by the Amendments to ANNEX VI of MARPOL 73/78 (EEDI related Requirements) To whom it may concern Technical Information No. TEC-0938 Date 18 December 01 Amendments

More information

Towing Officers' Assessment Record: Near Coastal/Oceans

Towing Officers' Assessment Record: Near Coastal/Oceans Towing Officers' Assessment Record: Near Coastal/Oceans NAME: LICENSE NO.: Task No. Considered Proficient Common Element Task or Duty DE's Initials Date A. Vessel Familiarization A.1. X Locate and demonstrate

More information

Make Model Length Price Year Condition. Mainship Motor Yacht 47 ft $ 139, Used. Boat Name Hull Material Draft Number of Engines Fuel Type

Make Model Length Price Year Condition. Mainship Motor Yacht 47 ft $ 139, Used. Boat Name Hull Material Draft Number of Engines Fuel Type Mainship Motor Yacht Make Model Length Price Year Condition Mainship Motor Yacht 47 ft $ 139,900 1995 Used Boat Name Hull Material Draft Number of Engines Fuel Type Isla Kay Fiberglass 3 ft 10 in 2 Diesel

More information

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI v. 3-2-2011 AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-20-2013 August 2, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT:

More information

Southerly 105 Kestrel of Poole

Southerly 105 Kestrel of Poole Southerly 105 Kestrel of Poole Make: Model: 105 Length: Southerly 9.98 m Price: GBP 35,000 Year: 1981 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 1 Fuel Type: Kestrel of Poole Fibreglass

More information

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route 1.0 Introduction Vessels transiting within port limits from the Barrow Island Outer Pilot Boarding Ground (PBG) to the Gorgon

More information

Measurement of vertical motions of bulk carriers navigating in port entrance channels

Measurement of vertical motions of bulk carriers navigating in port entrance channels HYDROGRAPHIC CONFERENCE Technical Awareness Seminar 2007 Cape Town, 19 21 June 2007 Measurement of vertical motions of bulk carriers navigating in port entrance channels J Moes CSIR, PO Box 320, Stellenbosch,

More information

NAEST(M) training Course Structure and Session Objectives. Day Introduction and enrolment

NAEST(M) training Course Structure and Session Objectives. Day Introduction and enrolment NAEST(M) training Course Structure and Session Objectives Day 1 0830-0930 Introduction and enrolment 0930-1330 Effective Bridge Procedures & Rule of the Road Lecturer will go through the PowerPoint on

More information

Sunseeker Sunseeker BOAT DETAILS. Model: 70 Year: 2008 Hull Material: Fresh water Capacity: 1200 Liters PRICE: 990,000 EURO

Sunseeker Sunseeker BOAT DETAILS. Model: 70 Year: 2008 Hull Material: Fresh water Capacity: 1200 Liters PRICE: 990,000 EURO BOAT DETAILS Type of Boat: Fly Bridge Boat Builder: Sunseeker Model: 70 Year: 2008 Hull Material: GRP Length Overall: 22.25 Meters Beam: 5.67 Meters Draft: 1.62 Meters Displacement: 60 Ton Fuel Capacity

More information

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) Vessel VLCC Date 11/05/2016 Draft Fwd 21.0 D Draft Midship 21.0 Draft Aft 21.0 Max Allowed arrival draft by the port: 21.0

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 8 Choose the best answer to the following Multiple Choice questions. 1. On 1 September your 1115 zone time DR position

More information

NavRule Practice Exam, 70 Series Practice April 24, Labeled F (I received a reply from the testing service that all these answers were

NavRule Practice Exam, 70 Series Practice April 24, Labeled F (I received a reply from the testing service that all these answers were 1. INTERNATIONAL & INLAND An all-round flashing yellow light may be exhibited by a(n)? a. vessel laying cable b. vessel towing a submerged object c. vessel not under command d. air cushion vessel 2. INTERNATIONAL

More information

ON SHIPS OF 200 GRT/500 GT OR MORE Assessment Sheets Enclosure (1) to CG-543 Policy Letter 11-07 ASSESSMENT NO. OICNW-1-1A COMPETENCE: Plan and conduct a passage and determine position KNOWLEDGE, UNDERSTANDING

More information

Bayliner 3888 Motor Yacht Dock Holiday

Bayliner 3888 Motor Yacht Dock Holiday Bayliner 3888 Motor Yacht Dock Holiday Make: Model: Length: Bayliner 3888 Motor Yacht 38 ft Price: CAD 119,000 Year: 1992 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 2 Fuel Type:

More information

05 Boat Handling. Captain

05 Boat Handling. Captain 05 Boat Handling Competence (Skills) Knowledge, Understanding and Proficiency Level Required Boat handling theory and techniques Coxswain Crew RQ RQ Describe the forces acting on a vessel while manoeuvering

More information

ACCIDENT AND INCIDENT SAFETY INVESTIGATIONS

ACCIDENT AND INCIDENT SAFETY INVESTIGATIONS Merchant Shipping Directorate ACCIDENT AND INCIDENT SAFETY INVESTIGATIONS tice to Shipowners, Ship Operators and Managers, Masters, Owners' representatives and recognised organisations Merchant Shipping

More information

ABP South Wales and River Usk Towage Guidelines

ABP South Wales and River Usk Towage Guidelines Date of issue: Jan 2012 ABP South Wales and River Usk wage January 2012 Page 1 of 17 Approved by: Deputy Harbour Master South Wales Issue 1.0 Date of issue: Jan 2012 AMENDMENTS Amendment issue number Page

More information

Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn.

Bollard Pull. Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn. Bollard Pull (Capt. P. Zahalka, Association of Hanseatic Marine Underwriters) Bollard Pull is, the tractive force of a tug, expressed in metric tonnes (t) or kn. This figure is not accurately determinable

More information

Californian Sea Rhapsody

Californian Sea Rhapsody Californian Sea Rhapsody Make: Length: Californian 56 ft Price: $ 175,000 Year: 1986 Condition: Used Boat Name: Hull Material: Number of Engines: 2 Fuel Type: Sea Rhapsody Fiberglass Diesel 2515 Shelter

More information

Navigation with Leeway

Navigation with Leeway Navigation with Leeway Leeway, as we shall use the term, means how much a vessel is pushed downwind of its intended course when navigating in the presence of wind. To varying extents, knowledge of this

More information

MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING

MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING MARINE INVESTIGATION REPORT M13C0071 STRIKING AND SUBSEQUENT GROUNDING GENERAL CARGO SHIP CLAUDE A. DESGAGNES IROQUOIS, ONTARIO 06 NOVEMBER 2013 Marine Investigation Report M13C0071 1 The Transportation

More information

SIMMAN 2014 Systems based methods page 1 Instructions for submitting of manoeuvring predictions

SIMMAN 2014 Systems based methods page 1 Instructions for submitting of manoeuvring predictions SIMMAN 2014 Systems based methods page 1 CONTENTS 1 INTRODUCTION AND OBJECTIVE... 2 2 SHIPS AND MANOEUVRES... 4 2.1 Selectable ships... 4 2.2 Manoeuvres to be simulated... 5 3 SUBMISSION PROCEDURES...

More information

34,000 Tax Paid. E: T: over 700 boats listed

34,000 Tax Paid. E: T: over 700 boats listed DARTMOUTH OFFICE OFFICES THROUGHOUT THE UK AND EUROPE Arvor 250 AS Year: 2008 Heads: 1 Location: Salcombe Cabins: 1 LOA: 27' 0" (8.23m) Berths: 2 Beam: 9' 7" (2.93m) Keel: Semi Displacement Min Draft:

More information

A methodology for evaluating the controllability of a ship navigating in a restricted channel

A methodology for evaluating the controllability of a ship navigating in a restricted channel A methodology for evaluating the controllability of a ship navigating in a restricted channel K. ELOOT A, J. VERWILLIGEN B AND M. VANTORRE B a Flanders Hydraulics Research (FHR), Flemish Government, Antwerp,

More information

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF) 1.0 Introduction Vessels transiting within port limits from the Barrow Island Pilot Boarding Ground (PBG) to the require an approved passage plan which can be shared between Pilots and vessel Masters.

More information

Californian Sea Rhapsody

Californian Sea Rhapsody Californian Sea Rhapsody Make: Length: Californian 56 ft Price: $ 168,500 Year: 1986 Condition: Used Boat Name: Hull Material: Number of Engines: 2 Fuel Type: Sea Rhapsody Fiberglass Diesel 2515 Shelter

More information

J Boats 34 TrouBlemaker

J Boats 34 TrouBlemaker J Boats 34 TrouBlemaker Make: Model: 34 Length: J Boats 34 ft Price: $ 29,990 Year: 1986 Condition: Used Location: Kemah, TX, United States Boat Name: Hull Material: Number of Engines: 1 Fuel Type: TrouBlemaker

More information

.3 the correct operation of the communications medium between the navigation bridge and the steering gear compartment.

.3 the correct operation of the communications medium between the navigation bridge and the steering gear compartment. 221-389.2 a visual inspection of the steering gear and its associated links; and.3 the correct operation of the communications medium between the navigation bridge and the steering gear compartment. 3.1

More information

All comments received will be taken into consideration before the proposed amendments are implemented.

All comments received will be taken into consideration before the proposed amendments are implemented. Notice of Amendment Port Information Guide Notification date: February 13 th, 2018 Preamble In accordance with the Canada Marine Act, 1998, Section 57 Notice, the Vancouver Fraser Port Authority is proposing

More information

GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS

GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS GENERAL GUIDELINES FOR VESSELS TRANSITING RESTRICTED WATERWAYS OR PORTS Revised: March 5, 2018 TABLE OF CONTENTS GENERAL DEFINITIONS... 2 VESSEL SPACING... 3 HORIZONTAL CLEARANCE... 3 UNDER-KEEL CLEARANCE

More information

NEW BUILD - SB-ST 19 Steel Trawler Listing ID:

NEW BUILD - SB-ST 19 Steel Trawler Listing ID: Australia - Great Britain - Indonesia - New Zealand - Philippines - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) NEW BUILD - SB-ST 19 Steel Trawler Listing ID: 411473

More information

Jefferson Rivanna 53 Prop 23

Jefferson Rivanna 53 Prop 23 Jefferson Rivanna 53 Prop 23 Year: 1998 Make: Jefferson Model: Rivanna 53 Price: $ 299,000 Location: Engine Make: Snead Island, FL, United States Detroit Diesel Engine Model: 6V-92TA Hull Material: Fiberglass

More information

Light draught m

Light draught m Tugboats 900hp tugboat 1200hp tugboat 2400hp ABS ocean going tugboat Built in 2010, brand-new LOA 30.00 m Length 27.76 m Length of waterline 28.75 m Breadth 7.50 m Depth 3.20 m Light draught 1.450 m Full-load

More information

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters

Transport Infrastructure Act 1994 Gladstone Ports Corporation. Port Notice 04/17 LNG Vessel Operating Parameters Transport Infrastructure Act 1994 Gladstone Ports Corporation Port Notice 04/17 LNG Vessel Operating Parameters 1. These operating parameters have been developed based on navigation simulations with LNG

More information

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL

BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL BIBBY POLARIS MULTI PURPOSE DIVE SUPPORT & OFFSHORE CONSTRUCTION VESSEL Saturation & Air Diving Support Structure Installation Flexible, Flowline & Umbilical Installation Inspection, Repair & Maintenance

More information