1 CHAPTER-4 UTILITY SYSTEM DESCRIPTIION The different utility systems provided in Hydrogen Generation Unit for its smooth operation are described in this chapter. They include 1. Service water 2. Cooling water 3. DM water 4. Boiler feed water 5. Plant air 6. Instrument air 7. HP steam 8. MP steam 9. LP steam 10. Reformer fuel 11. Nitrogen 12. Closed blowdown 13. Flare 14. Chemical injection i. Hydrazine ii. Amine iii. TSP 4.1 SERVICE WATER (REFER P & ID : U-10) Service water is received through a 3 header into the unit through hydrocracker unit from Raw Water Treatment Plant. Block valves with a spectacle blind and ¾ drain have been provided at the battery limit in service water header. Local pressure gauge has been provided in service water header. 4.2 COOLING WATER (REFER P & ID : U-6) Cooling water to the unit is supplied from the process-cooling tower. A 18 tap off from the hydrocracker header feeds the unit header. Block valves with spectacle blind and a ¾ drain is provided at the unit battery limit. Pressure (PI-3601), temperature (TI-3601) and flow indicators (FI-3601) are provided in the DCS control panel. Local pressure and local temperature gauges have also been provided on the cooling water supply header. In case of low pressure in the header an alarm sounds in the control room. Cooling water return header 18 is also provided with block valves with spectacle blind and a ¾ drain at the battery limit. Pressure (PI-3602) and temperature (TI-3602) indications are provided on the cooling water return header in the control room. Local pressure and temperature gauges are provided on the cooling water return header. CHAPTER-4 1/10

2 4.3 DM WATER ( REFER P & ID : P-9 ) DM water is supplied from DM Water Plant. A 8 header feeds the DM water to the hydrocarbon unit. Block valves with a spectacle blind and ¾ drain is provided at the battery limit. Flow indicator (FIC-0902) indicates the total quantity of DM water flow to the unit. Pressure (PI-0909) and temperature (TI-0901) indicators are provided on the DCS control panel. Local pressure and temperature gauges are also provided on the DM water header. A ½ line at the downstream of flow meter is taken for routing DM water for chemical preparation. 4.4 BOILER FEED WATER SYSTEM The entire boiler feed water requirement of all the process units will be met from the deaerator located in Hydrogen Unit and FCC units. In the event of any unit under shut down the other deaerator will cater to the total BFW requirement of all the process units. A 4 line from HP BFW pump discharge charges the HP BFW header. Block valve with spectacle blind and a ¾ drains are provided on the HP BFW header at the unit battery limit. Flow control (FIC-0905) indicates the quantity of HP BFW export to the HP BFW header. A 6 line from MP BFW pump discharge is routed to the MP BFW header. Block valves with spectacle blind and a ¾ drain is provided on the MP BFW header at the unit battery limit. Flow meter (FI-0901) indicates the quantity of MP BFW header. 4.5 PLANT AIR (REFER P & ID : U-10) Plant air header is charged from the utilities section. A 3 line from this header is provided for meeting the plant air requirement of the hydrogen unit. Block valves with spectacle blind and a ¾ bleeders are provided on the plant airline at the battery limit. Local pressure gauge is provided in the plant air header. 4.6 INSTRUMENT AIR (REFER P & ID : U-10) The instrument air header is charged from the air compressor house of the utilities section. A 3 line from the main header is provided for receiving instrument air into the hydrogen unit. Block valves with spectacle blind and ¾ drain is provided on the instrument air header at the battery limit. Local pressure gauge is provided on the instrument header at the battery limit. 4.7 HP STEAM (REFER P & ID : U-1) Hydrogen unit is a net exporter of HP steam during operation. 10 line is laid from the unit to the HP steam header. Block valves with spectacle blind and a ¾ drain are CHAPTER-4 2/10

3 provided at the unit battery limit. Pressure (PI-3103), temperature (TI-3102) indicators are provided on the HP steam header. Flow meter FI-3102 indicates the quantity of steam export/import from to the unit. The saturated HP steam from steam drum is used for 1. Vaporization/pre heating of feed Naphtha in E-214A/B 2. Vaporization of fuel naphtha in E Pre heating of fuel gas in E-221 During start up of the unit, saturated HP steam is also used for heating nitrogen in Hydro-Desulphurisation section (in E-230) and in reformer and shift section (in E-232). The balance saturated HP steam is superheated in the waste heat coil (E-203). Major part of super heated HP steam is consumed for reaction purpose in the reformer. The surplus HP steam after quenching with BFW is exported into the refinery HP steam header. 4.8 MP STEAM (REFER P & ID : U-1) MP steam is consumed for tracing and steams jacketing of reformer fuel lines, for maintaining the necessary superheat of reformer fuel and prevent condensation of naphtha. A 4 line is laid from the MP steam header. Block valves with spectacle blind and a ¾ drain is provided on the MP steam header at battery limit. A flow meter (FI- 3103) is provided with a totaliser on the MP steam line in the unit. 4.9 LP STEAM (REFER P & ID : U-1) LP steam is used in deaerator, preheating the combustion air during winter, for process vents, purging of equipment and lines carrying liquid and hose stations. A 8 line is laid from the refinery LP steam header into the hydrogen unit. Block valves with a spectacle blind and a ¾ drain is provided at the unit battery limit. Pressure (PI- 3105) and temperature (TI-3105) indicators on the LP steam are provided in the control room. Local pressure gauge is also provided on the LP steam line at the battery limit REFORMER FUEL (REFER P & ID: U-4) The reformer furnace fuel consists of 1. PSA purge gas 2. Vaporized Naphtha 3. Refinery fuel gas About 60% of reformer furnace fuel requirement is met from the low pressure PSA purge gas or synthesis gas. Balance heat requirement is met from vaporized Naphtha CHAPTER-4 3/10

4 and Refinery fuel gas. Reformer burners are of dual gas firing type. Burners can perform on 100% vaporized Naphtha also. Vaporized Naphtha and fuel gas mixture is routed through central pipe to the burner tip and the PSA purge gas through annular space to the burner tip. The fuel gas systems are discussed separately PSA PURGE GAS/SYNTHESIS GAS (REFER P & ID:P-10 & P-6) PSA purge gas generated during regeneration of PSA adsorption system is the primary fuel to the Reformer furnace. During regeneration of PSA adsorber the caloric value of PSA purge gas generated is varying. The PSA purge gas is routed to the PSA purge gas vessel V-320, where it is uniformity mixed in the vessel through the inlet pipe to minimize variations in flow and composition. The PSA purge gas from the vessel is routed to the reformer through a 30 line. The PSA off gas is routed to the burners through branch lines from the main header through 16 purge gas headers on both sides of the reformer twin cells. The purge gas vessel pressure is maintained at 0.25 KG/CM 2 G by PIC-1007, which releases excess pressure to flare or high point vent. A 6 /16 synthesis gas header from vessel V-203 also meets the PSA purge gas header at the downstream of FIC-1005 to supply the synthesis gas as fuel during shutdown of the PSA unit. Synthesis gas flow to the reformer is controlled by FIC Double block (UV- 0601, PV-0602) and bleed valves (UV-0603) are provided on the PSA purge gas supply line to the reformer which will cut off PSA purge gas in the event of reformer trip activated by interlocks and shut down system. In case of low pressure in the PSA purge gas, PIC-0602 sounds an alarm in the control room and in case of low low pressure, cuts off the PSA off gas to the burners. The PSA off gas is distributed to the 216 burners through 16 branch lines on both sides of the twin cell reformer. From the 16 branch line PSA off gas is supplied to the burners in all 6 rows through 3 /2 lines. Pressure gauges are provided on the branch lines to the burners in each row to check the PSA off gas pressure locally FUEL GAS AND VAPORIZED NAPHTHA FUEL (REFER P & ID : U-3) The balance fuel requirement of the reformer after burning PSA off gas shall be met from fuel gas and vaporized naphtha. Over and above the PSA off gas and available fuel, the heat requirement of the reformer furnace shall be met from vaporized naphtha FUEL GAS (REFER P & ID : U-3) Refinery fuel gas pressure is maintained by AVU. A 6 line from the header supplies fuel gas to hydrogen unit. Block valves with spectacle blind and a ¾ drain is provided at the unit battery limit. A pressure (PI-3304) indicator is provided on the fuel gas header to indicate the fuel gas supply pressure to the unit. A knock out pot is provided to separate any liquid/condensate carry over along with the fuel gas. Pressure controller (PIC-3303) maintains the fuel gas pressure at the outlet of fuel CHAPTER-4 4/10

5 gas knock out pot. The flow of fuel gas to the reformer is controlled by FIC The set point of FIC-3301 is calculated after deducting the heat duty of PSA off gas from total heat input HIC-3302 and the calorific value of fuel gas given by HIC The maximum limit of set point to FIC-3301 corresponds to 3000 KG/HR fuel gas. The fuel gas is preheated to 200 C in E-221 against saturated HP steam. The pressure (PI-3301) and temperature (TI-3301) indications at the outlet of fuel gas pre heater E-221 are indicated in the control room. In case of pressure and temperature at the outlet of E-221 being high or low, corresponding alarm sounds in the control room. In the event of trip of reformer or low pressure in vaporized naphtha fuel gas mixture shut down circuit activates the control valve FV-3301 to close and isolates the fuel gas NAPHTHA FUEL (REFER P & ID : U-3) The liquid naphtha is received in the naphtha feed surge drum V-205 from off sites under level control. The feed surge drum pressure is maintained by nitrogen at 3.0 KG/CM 2 G. A 2 line from the feed naphtha line with isolation with block valves and a spectacle blind routes the fuel naphtha to the evaporator E-220. The fuel naphtha is vaporized and heated to 200 C in E-220 fuel naphtha evaporator against saturated HP steam. The vapor naphtha is routed through a fuel naphtha knock vessel before routing to the reformer along with the hot fuel gas. The pressure controller (PIC-3305) at fuel naphtha knock out pot maintains the pressure by controlling the liquid naphtha flow to the evaporator. The flow of liquid naphtha to evaporator E-220 is indicated by FI In the event of pressure, temperature fluctuation at fuel naphtha knock out drum, it sounds corresponding low/high alarm in the control room. The outlet line from the fuel naphtha and fuel gas vaporizer are MP steam traced up to the first floor of the reformer and from there they are jacketed with MP steam. The set point in the vaporized naphtha flow controller FIC-3302 is calculated after subtracting the heat duty of PSA off gas to reformer and fuel gas to reformer from the reformer heat duty HIC In the event of low or no vaporized naphtha consumption in the reformer, the vaporized naphtha is cooled in fuel naphtha cooler E-222 and recycled back to feed surge drum V-205. The recycle flow of vapor naphtha is controlled by FIC Fuel naphtha circulation shall be continued in order to maintain the stand by fuel to the reformer furnace NITROGEN (REFER P & ID : U-7) Nitrogen is used as inert gas in hydrogen unit for purging of lines and equipment and during start up. Nitrogen is supplied from the Nitrogen Plant through a 4 line. Block valves with spectacle blind and a ¾ drain is provided on the nitrogen line at the battery limit. A flow meter (FI-3701) with totaliser is provided on the header to indicate the nitrogen consumption in the unit control room. CHAPTER-4 5/10

6 Nitrogen connections are provided from the 4 nitrogen header at the following. To Naphtha feed surge drum V-205 for continuous purging through 1½ line. To DMDS vessel V-211 and DMDS barrel through ¾ line. To hose station near V-214 through 1 line. To compressor KA-203-A through 1 line. To compressor KA-203-B through 1 line. To hose station near KA-203A/B through 1 line. To compressor KA-207 through 1 line. To hose station near RB-201 and RB-202A through 1 line. To hose station near RB-204 and RB-205 through 1 line. To fuel naphtha recycle pot V-224 through 1½ line. To start up knock out pot for HDS V-206 through 1½ line. To suction of start up nitrogen compressor for shift section KA-205 through 1½ line. Near compressor KA-205 through 1 line. To hose station near pre-reformer through 1 line. To pre-reformer feed pre-heater E-202 inlet through 3 for purging. To PSA vessels through 2 line for purging of PSA vessels CLOSED BLOW DOWN SYSTEM (REFER P & ID : U-9) An underground closed blow down system has been provided in the hydrogen system for draining light liquid hydrocarbons from different equipment and lines. The drains of the following equipment and lines are connected to the under ground 6 CBD header. P-208 fuel naphtha recycle pump casing. P-201A/B naphtha feed pump casing. V-205 feed naphtha surge drum outlet line. Suction lines of naphtha feed pumps P-201A/B. Feed naphtha supply line from off sites at battery limit. Feed naphtha pumps discharge line. Outlet of DMDS vessel V-211. Shell side of feed naphtha evaporator E-214A/B. Shell side of feed naphtha super heater E-215. Drain of naphtha circulation line from start up knock out pot for HDS, V- 206 to V-205. Drain from boot of vessel V-205. Outlet of fuel naphtha recycle pot V-224. Outlet of fuel naphtha evaporator E-220. CHAPTER-4 6/10

7 All the liquid drains from the above sources are collected in an under ground CBD header and is sent to the underground CBD vessel V-239. The liquid level in CBD vessel is indicated (LI-3901) in the control room. In case the level increases highlevel alarm LAH-3902 sounds in the control room and the CBD pump P-209 starts and the liquid is pumped out to one of the stop tanks. The pump stops when the liquid level falls to low level and an alarm LAL-3902 sounds in the control room. The CBD vessel is provided with fuel gas purge. Utility connection is also provided with fuel gas purge. Utility connection is also provided for flushing purpose FLARE (REFER P & ID : U-8) The Hydrogen unit is provided with a 30 flare header to collect all the inflammable gases from different sources through separate lines. All the gases are collected into the flare header and sent to the flare knock out drum V- 238 before routing to the outlet, OHCU flare knock out drum and from there to the 54 main flare for dispersing them to the main flare. Any liquid/condensate entering the drum is separated in the knock out drum. The following are the various sources of gases into the flare header. SAFETY VALVE DISCHARGE TAG NO. LOCATION PSV-0155 Naphtha feed surge drum V-205 PSV-0253 Naphtha feed evaporator E-214B outlet line. PSV-0254 Naphtha feed evaporator E-214A outlet line. PSV-0351 HDS start up compressor KA-204 outlet line. PSV-0353 Hydrogenerator reactor RB-201 PSV-0362 Sulfur absorber RB-202A PSV-0363 Sulfur absorber RB-202B PSV-0359/0360 HDS start up knock out pot V-206 outlet line. PSV-0757/0758/0759 Shell side outlet of waste heat boiler E-206 PSV-0852 MT shift reactor RB-204 PSV-0856 LT shift reactor RB-205 PSV st process condensate separator V-202 PSE-0963 DM water pre heater E-211 shell side. PSV-1053/1054 Synthesis gas inlet to PSA unit. PSV-1056/1057 PSA off gas surge drum V-320 outlet. PSV-1060 Hydrogen rich gas from catalytic reformer knock out pot PSV-1061/1062 Synthesis gas header to PSA off gas fuel line. PSV-3354 Fuel gas preheat coil E-221. PSV-3357 Fuel gas knock out pot V-223. PSV-3358 Fuel naphtha knock out drum V-222. PSV-3370 Fuel naphtha recycle pot V-224. PSV-3451 Hydrogen emergency buffer vessel V-232. PSV-3453 Recycle hydrogen compressor KA-203A discharge line. PSV-3454 Recycle hydrogen compressor KA-203B discharge line. CHAPTER-4 7/10

8 PSV-3455/3456 Emergency hydrogen line to E-202, pre-reformer feed preheat coil. PSV-3464/3465 Hydrogen compressor KA-206 discharge line. PSV-3469/3470/3471/3472 Hydrogen compressors suction header. PSV-3473/3474 Hydrogen recycle compressor for reformer and shift KA-207 discharge line. PSV-2103 to 3003 PSA absorber vessel V-320 to V-330 Excess gas released from the system through pressure control valves for maintaining the system pressure as well routing to the flare. The following are the list of control valves releasing gases to flare. PIC-0102 Naphtha feed surge drum V-205 PIC-0304 Start up knock out pot for HDS V-206 PIC-1005 Hydrogen product header from PSA vessels PIC-1008/PIC-1001 Synthesis gas header to PSA inlet PIC-1007 PSA off gas to reformer fuel ex. V-320 System depressurization/purging will be done during startup/shut down/equipment handing over through the above control valves. In some cases the depressurization is done through PSV bye- pass lines. There is provision to purge the 30 flare header continuously with fuel gas at both the extreme ends in the unit. For purging there is also provision for LP steam/n2 purging of flare header at both the extreme ends. A high level alarm LAH-3601 sounds in the control in case of high level in the flare knock out drum V CHEMICAL INJECTION ( REFER P & ID : U-2) The chemical injection system in hydrogen unit consists of chemicals required for preparation of boiler feed water and for maintaining the residual phosphate level in steam drum water. The chemicals used in preparation of boiler feed water are to maintain ph and oxygen content. The chemicals used for BFW treatment are 1) Amine/Moropholine to maintain the ph of the boiler feed water in deaerator. 2) Hydrazine to remove the residual oxygen in the deaerator. 3)... Tri-Sodium Phosphate to maintain the residual phosphate level in boiler feed water with in a range to avoid scaling on the surface of the steam generation system AMINE/MOROPHOLINE INJECTION Amine/Moropholine solution is received in drums as 100% solution. It is unloaded from the drum to the Amine/Moropholine dozing vessel through a hand operated loading pump. Amine/Moropholine solution is prepared by adding DM water through 1½ in line from DM water supply line into Amine/Moropholine dozing vessel V-209. Dosing vessel is provided with a level gauge for verifying the level CHAPTER-4 8/10

9 locally and a vent line. Dosing vessel is also provided with a mixer for uniform mixing of the solution. About 1 to 2 % of Amine/Moropholine solution in DM water is prepared. The total capacity of the vessel is 950 Liters. The capacity of pumps can be adjusted from 0 to 100%. The rated capacity of the pump is 20 litre/hr. The Amine/Moropholine solution is pumped by the reciprocating pumps P- 205A/B into the deaerator through 1½ line. In the pumps discharge line PSV-3253 and PSV-3254 are provided to protect the pumps against high discharge pressure. Based on the continuous production of M 3 /HR of boiler feed water, the consumption of Amine/Moropholine shall be 6300 KG/HR as 100% solution. The dosing rate work out to be approximately 4.4 PPM as 100% Amine/Moropholine. The amount of Amine/Moropholine required to prepare the given concentration of solution can be calculated by the following equations H= (WXR)/(A-R) H= Quantity of Amine/Moropholine to be diluted with DM water. W= Quantity of DM water R= Concentration of Amine/Moropholine required. A= Concentration of available Amine/Moropholine HYDRAZINE INJECTION Hydrazine injection solution is available in 200 litre drums as solution of 50% strength. It is also available in 5/10 litre containers. Hydrazine is unloaded from the drums/containers using hand operated unloading pump into hydrazine solution vessel V-210. It is diluted with DM water through a 1½ line tapped off from DM water supply line. The amount of DM water required for dilution of hydrazine hydrate depends on the concentration of hydrazine and the concentration of the hydrazine solution to be prepared for injection into deaerator. Generally a 1 to 2% concentration of hydrazine is prepared in DM water. The hydrazine solution vessel is provided with a gauge glass for verifying the level locally and also an atmospheric vent. An agitator is provided for uniform mixing of the solution during preparation. Hydrazine dosing pumps P-206A/B takes suction from vessel V-210 and discharges into deaerator V-204 through a 1½ in line. The capacity of the hydrazine solution vessel in 950 litre. The rated capacity of the hydrazine dosing pump is 10 litre/hr. The dosing rate can be varied from 0 to 100% of the rated capacity. Based on the continuous production of 180 M 3 /HR of boiler feed water, the consumption of hydrazine as N2H4 shall be 180 KG/Year. The dosing rate of hydrazine works out to be approximately PPM as N2H4. Safety valves PSV and PSV-3256 are provided in the discharge lines of the pumps for protecting the pumps against high discharge pressure. The amount of hydrazine required to prepare the given concentration of hydrazine solution can be calculated by the following equation. H= (WXR)/(A-R) CHAPTER-4 9/10

10 H= Quantity of Hydrazine to be diluted with DM water. W= Quantity of DM water R= Concentration of Hydrazine required. A= Concentration of available Hydrazine PHOSPHATE INJECTION Trisodium phosphate is available in solid powder from in 50 KGS. Bags. TSP dosing varies as per quantity of water in steam drum and the residual phosphate content as PO4 and alkalinity. A solution of 1 to 2% of PO4 strength in DM water is prepared in vessel V-208. The vessel is provided with an agitator for uniform mixing of the solution during preparation. The DM water is supplied through 1½ tap off line from DM water supply line to the vessel V-208. A gauge glass is provided in the vessel for verifying the level locally. The phosphate dosing pumps P-204A/B takes the suction from vessel V-208 and discharge into steam drum V-201. Safety valves PSV-3251 and PSV-3252 are provided in the discharge lines of pumps to protect against high discharge pressure. The rated capacity of phosphate dosing pumps P-204A/B is 10 litre/hr. The phosphate-dosing rate can be varied from 0 to 100% of the rated capacity. Based on the continuous production of 85 MT/HR of HP steam the consumption of phosphate, as PO4 would be 240 KG/HR. The dosing rate of phosphate as PO4 works out to be approximately 0.19 PPM. CHAPTER-4 10/10

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE... Page 1 of 11 TABLE OF CONTENTS 1. INTRODUCTION... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4.... 3 5. RESPONSIBILTIES... 10 6. REFERENCES... 10 7. ATTACHMENTS... 11 8. APPENDICES... 11 Rev. Issue Date Amendment

More information

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Jim Woodard Vice President of Sales Bryant Woods Lead Project Engineer 4/3/18 Page 1 Objectives Impact

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

Operating Instructions

Operating Instructions Operating Instructions Before operating the thin film evaporator, please be aware of all safety concerns associated with this experiment: Burn hazard from the column and steam lines, Chemical hazards associated

More information

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Why - Dry Gas Seal??? M&I shutdown and Catalyst replacement

More information

FlashCO2, CO2 at 23 $/ton

FlashCO2, CO2 at 23 $/ton FlashCO2, CO2 at 23 $/ton A cost effective solution of capturing CO2 from Steam Methane Reforming (SMR) Hydrogen production plants by the FlashCO2 process Introduction to a cost effective solution Driven

More information

Low Coking Temperatures & Recent Site Experience

Low Coking Temperatures & Recent Site Experience Delayed Coker Low Coking Temperatures & Recent Site Experience Presented by Mitch Moloney of ExxonMobil mitchell.j.moloney@exxonmobil.com @ Coking.com April-2010 MJ a Moloney - ExxonMobil April-2010 coking.com

More information

GAS COMPRESSION SYSTEM

GAS COMPRESSION SYSTEM GAS COMPRESSION SYSTEM The gas compression system at HI 376 A consists of two natural gas turbine-driven Compressors (CBA-4020/4070). Both Compressors are needed for the volume of gas being compressed.

More information

nert Gas: Inert gas systems on ships

nert Gas: Inert gas systems on ships Inert Gas: Inert gas systems on ships Inert gas is produced on board of mainly crude of oil carriers, gas carriers and Chemical carriers, and in Bulk carriers when carrying fish flower, and in refrigerating

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow to the Glycol Contactor (MAF-3110). In the Contactor, gas flows through trays, contacting the lean glycol that is flowing across the trays

More information

From the Choke KO drum, the gas passes through another gas/gas exchanger - the 'LTS Pre-cooler'.

From the Choke KO drum, the gas passes through another gas/gas exchanger - the 'LTS Pre-cooler'. Refer to Figures: 16 & 17 as you read on. Wet, natural gas direct from the wellstreams, at about 1600 Psi, is first pre-cooled and separated from liquids in an 'Intermediate Separator' and cooled in a

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure gases from the Gas Compressors (CBA-4070/4020) flow to the Glycol Contactor (MAF-1150). In the Contactor, gas flows through trays, contacting the lean glycol that is

More information

Start up XXX from normal shutdown Introduction

Start up XXX from normal shutdown Introduction Start up XXX from normal shutdown Introduction This procedure describes how to start a XXX after it has been shutdown normally, meaning there is a liquid and gas inventory in the unit. Task Criticality

More information

Relief Systems. 11/6/ Fall

Relief Systems. 11/6/ Fall Relief Systems 1 Relief Scenarios o A single relief event requires a particulate vent area and valve size o Relief scenarios are determined based on a PHA o For each scenario, a vent area is calculated

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

Natural Gas Conditioning Skids & Equipments

Natural Gas Conditioning Skids & Equipments Natural Gas Conditioning Skids & Equipments NATURAL GAS CONDITIONING SKIDS NIRMAL has rich experience of supplying complete package of Natural Gas conditioning skids consisting of emergency shut down,

More information

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels Inerting Control Systems by NTRON PROCESS ANALYZER DIVISION of NEUTRONICS INC. EXTON. PA. 19341 RJN Rev. A June 2001 Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert

More information

NGN Series nitrogen generator

NGN Series nitrogen generator NGN Series 8-64 nitrogen generator Applications how it works RK series 5-40 F Blanketing of Chemicals and Pharmaceuticals Gas Assisted Injection Moulding (GAIM) Laser Cutting Food Heat Treament of Ferrous

More information

APPENDIX WORKED EXAMPLES

APPENDIX WORKED EXAMPLES Sufe Design and Optvation ofpi-oc.ess Vents and Emission Contid $wteins by Center for Chemical Process Safety Copyright 0 2006 John Wiley & Sons, Tnc. APPENDIX G WORKED EXAMPLES This appendix provides

More information

EXAM # 2. First Name Last Name CIRCLE YOUR LECTURE BELOW: INSTRUCTIONS

EXAM # 2. First Name Last Name CIRCLE YOUR LECTURE BELOW: INSTRUCTIONS CIRCLE YOUR LECTURE BELOW: First Name Last Name Div. 1 08:30 am Prof. Chen Div. 2 11:30 am Prof. Braun EXAM # 2 INSTRUCTIONS 1. This is a closed book examination. You are allowed to have two single sheets

More information

2 Sentry MCL Installation, Operation & Maintenance

2 Sentry MCL Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-GA-IOM-00249-7 11-17 Sentry MCL 966 Blue

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

PTRT 2470: Petroleum Data Management 3 - Facilities Test 4 (Spring 2017)

PTRT 2470: Petroleum Data Management 3 - Facilities Test 4 (Spring 2017) Use scantron to answer all questions PTRT 2470: Petroleum Data Management 3 - Facilities Test 4 (Spring 2017) 1. The term dehydration of natural gas means A. addition of water vapor B. removal of water

More information

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon Background Safety Concerns Description of the Unit Switching the Unit On Preparation of the Unit Configuration of the Unit for

More information

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype (R744) Service Station Presentation Contents Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype Page 1 (R744) Service Station Goals Usability Full automatic

More information

Mechanical Seal Piping Plans

Mechanical Seal Piping Plans Mechanical Seal Piping Plans Companion Booklet Single Seals Dual Seals Quench Seals Second. Cont. Dual Gas Introduction A primary factor in achieving highly reliable, effective sealing performance is to

More information

BLOCK II HYDROGENATION (COMPRESSORS) OUTSIDE LOGSHEETS C-200A TIME: NORM COND PSV SET DIVIDER BLOCK (DB) RESERVOIR LEVEL

BLOCK II HYDROGENATION (COMPRESSORS) OUTSIDE LOGSHEETS C-200A TIME: NORM COND PSV SET DIVIDER BLOCK (DB) RESERVOIR LEVEL BLOCK II HYDROGENATION (COMORS) DATE: C-200A DIVIDER BLOCK (DB) RESERVOIR TIME: NORM SET DB RESERVOIR TEMP (Range 80-105ºF) DB PROFLOW DISPLAY (ALARM OR NORMAL?) DB NEOMAG INDICATORS (CYCLING?) DB PIN

More information

Pressurised Deaerators

Pressurised Deaerators Pressurised Deaerators Pressurised Deaerators Why gases need to be removed from boiler feedwater Oxygen is the main cause of corrosion in hotwell tanks, feedlines, feedpumps and boilers. If carbon dioxide

More information

www.ompressedairsystems.com ultra-high purity nitrogen generators nitrogen purity: 95% to 99.999% www.ompressedairsystems.com ultra-high purity nitrogen generators nitrogen purity: 95% to 99.999% Leading

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow through the Gas Scrubber (MBF-4540) to the Glycol Contactor (MAF-0900). In the Contactor, gas flows through trays, contacting the lean glycol

More information

Highest Quality. Gas Chlorination Systems

Highest Quality. Gas Chlorination Systems Highest Quality Gas Chlorination Systems Application: Gas chlorination systems are used for water disinfection and other purposes in a variety of applications. Compared to other disinfection methods, chlorine

More information

BASIC OXYGEN FURNACES

BASIC OXYGEN FURNACES GAP.17.4.1 A Publication of Global Asset Protection Services LLC BASIC OXYGEN FURNACES INTRODUCTION Most steelmaking facilities use basic oxygen furnaces (BOFs) to produce molten steel. GAP.17.4.0 describes

More information

Technical Information

Technical Information Technical Information Installation, Operation, Installation, Operation and Maintenance and Maintenance Manual Manual Balston Model 75700-K728 Nitrogen Generator Figure 1-75700-K728 Overall Dimensions These

More information

Safety in Petroleum Industry

Safety in Petroleum Industry Chemical ( Industrial ) Disaster Management Conference, Bangalore 30 January 2014 Safety in Petroleum Industry Refineries and Petrochemical plants are highly energyintensive Handle highly inflammable and

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The #1 Separator, MBD-0100 is a 3-phase separator which receives flow from the Incoming Pipeline, KAQ 0290. Gas from the Separator is directed to Fuel Gas Scrubber, and Gas Compressor

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times Tseries Series AB AB Air Air Boosters Boosters The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times.01/1 MANIFOLD MOUNTED VALVES FOR EASY SERVICING

More information

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS Training Duration 5 days Training Venue and Dates Identify Operational Upsets, Review & Validate in Oil & Chemical

More information

Offshore Equipment. Yutaek Seo

Offshore Equipment. Yutaek Seo Offshore Equipment Yutaek Seo Flash Gas Compressor (East spar) Dehydration NGL recovery Slug catcher Separator Stabilization Booster compressor Gas export compression (Donghae-1 Platform) May 7 th Gas

More information

The Ultimate Way To Degasify Compressor Seal Oils

The Ultimate Way To Degasify Compressor Seal Oils THERMOJET G 3000 SERIES The Ultimate Way To Degasify Compressor Seal Oils BENEFITS FEATURES Electric Heater Type 300 Series Stainless Steel Construction Proprietary Dual-Stage Jet Mixer Particulate Filtration

More information

CompAir provide high quality and reliable Nitrogen solutions

CompAir provide high quality and reliable Nitrogen solutions Nitrogen Compressor Guide CompAir provide high quality and reliable Nitrogen solutions Technical Data Model Typical Inlet Pressure Max Pressure Typical FAD Drive Bar PSI Bar PSI m³/hr CFM kw HP 5209 B

More information

SULPHUR PLANT and TAIL GAS TREATING UNIT - STARTUP and SHUTDOWN

SULPHUR PLANT and TAIL GAS TREATING UNIT - STARTUP and SHUTDOWN SULPHUR PLANT and TAIL GAS TREATING UNIT - STARTUP and SHUTDOWN ABSTRACT By Paul E. d Haêne, DANA Technical Services Ltd., Doug Cicerone, Cicerone & Associates, LLC, and Greg Hanlon, Treating and Sulfur

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

Lab Assessments Workshop

Lab Assessments Workshop Lab Assessments Workshop Gary Hicks Brazosport Jeff Laube Kenai Peninsula College Dorothy Ortego - Sasol plus Materials from University of Alaska Brian Ellington Why Assess? Improve knowledge and skill

More information

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008

Permitted MSS Emissions Tracking, Recordkeeping, and Reporting. Presented by ACES April 24, 2008 Permitted MSS Emissions Tracking, Recordkeeping, and Reporting Presented by ACES April 24, 2008 1 Agenda Introductions Overview of Current MSS Permitting Program Status Discussion of Model MSS Permit Requirements

More information

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300 Exhibit #5 X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300 Recommended System Cleaning and Flushing program Acceptance criteria: Total suspended solids: 0.005%

More information

Gas Absorption Draft Standard Operating Procedure

Gas Absorption Draft Standard Operating Procedure Gas Absorption Draft Standard Operating Procedure R.C. 9-14 Scope Page 1 Equipment Overview Page 1 Safety Page 2 Operating Procedure Page 4 Equipment Description Page 16 Gas Absorption Experiment Draft

More information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING

More information

Cryogenic Storage of Ammonia

Cryogenic Storage of Ammonia Cryogenic Storage of Sachin D Chavan Abstract Gases such as ammonia, chlorine, LPG, propane, propylene, ethane, ethylene etc need to be stored at low temperatures. Cryogenic storage of such fluids is a

More information

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). SEPARATION SYSTEMS The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). The Header System is designed to collect and direct the well stream to the corresponding

More information

High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption

High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption High Efficiency SO2 Scrubber Design to Reduce Caustic Consumption Paper # 35 Andrew C. Bartocci Envitech, Inc. 2924 Emerson Street- Suite 320 San Diego, CA 92106 Ph: 619-223-9925, ext. 203 ABSTRACT An

More information

ENGINEERING STANDARD FOR INSTRUMENTS AIR SYSTEM

ENGINEERING STANDARD FOR INSTRUMENTS AIR SYSTEM ENGINEERING STANDARD FOR INSTRUMENTS AIR SYSTEM CONTENTS : PAGE No. 1. SCOPE... 3 2. REFERENCES... 3 3. UNITS... 3 4. SERVICE CONDITIONS... 4 4.1 Arrangement... 4 4.2 Instrument Air Quality and Quantity...

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The H.P. Separation System begins with the H.P. Production Header (GAY-1000). This header directs flow to the H.P. Production Separator (MBD-1000). Gases from the H.P. Production Separator

More information

Transferring and Storage

Transferring and Storage Organometallics Transferring and Storage A dip tube is available for Container 2 which can be screwed into the neck to permit safe transfer of product. Small quantities of metal alkyl can be withdrawn

More information

Structured packing use in fluid catalytic cracker (FCC)

Structured packing use in fluid catalytic cracker (FCC) Reprinted from: March 1993 issue, p. 77-81. Used with permission. FCC main fractionator revamps Structured packing can influence unit pressure profiles and increase capacity Differential pressure S. W.

More information

New Developments and Special Experiences in Geoinform s Well Testing Services

New Developments and Special Experiences in Geoinform s Well Testing Services New Developments and Special Experiences in Geoinform s Well Testing Services Peter Baranyi Chief Engineer, GEOINFORM Ltd. Services provided by Geoinform, Well Testing Technologies Surface WT: standard

More information

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb Subparts AA and BB - The Other RCRA Air Rules Beginners aabb 1 Background Subpart AA - Process vents Subpart BB - Equipment leaks Subpart CC - Tanks, surface impoundments, containers. Also includes Subpart

More information

Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology

Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology Flare Gas Recovery A consideration of the benefits and issues associated with sizing, installation and selection of the most appropriate technology Peter Angwin, Principal Consultant Process Engineer Stuart

More information

Reclaim Basic Set Up

Reclaim Basic Set Up This purpose of the document is to simplify the set up and understand the Gas Services reclaim system functions. The Gas Services Reclaim Manual is to be used for reference, maintenance, and servicing.

More information

OIL AND GAS PROCESSES AND EMISSIONS

OIL AND GAS PROCESSES AND EMISSIONS OIL AND GAS PROCESSES AND EMISSIONS This document provides a brief description of oil and gas activities, equipment and expected pollutants from those equipment types. The emissions processes are discussed

More information

R-410A 50% R-32 50% R-125.

R-410A 50% R-32 50% R-125. R-410A R-410A Facts Ozone friendly- No Chlorine Replacement for R-22, NOT a drop in! Higher Pressure Range-50 to 75% higher than R-22 Requires Special Lubricants R-410A It s a Blended Refrigerant. 50%

More information

Fire in an isomerisation unit and domino effects on a benzene saturation unit, in a refinery December, 2002 Rome Italy

Fire in an isomerisation unit and domino effects on a benzene saturation unit, in a refinery December, 2002 Rome Italy French ministry of the Environment - DPPR / SEI / BARPI Registered Installations Inspectorate N ARIA 26983 Fire in an isomerisation unit and domino effects on a benzene saturation unit, in a refinery December,

More information

Precautions and safe practices. UOP handling guidelines for ADS-120/ADS-130 adsorbents

Precautions and safe practices. UOP handling guidelines for ADS-120/ADS-130 adsorbents Precautions and safe practices UOP handling guidelines for ADS-120/ADS-130 adsorbents Table of contents The nature of adsorbents and their operations 1 Loading fresh adsorbent 1 Preparation 1 Loading 3

More information

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM Faculty of Chemical Engineering CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM SUBMISSION DATE: 1 OCT. 2012 Question 1 Name the following equipments based on standard P&ID

More information

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions

More information

Helium Leak Detection in High Pressure Urea Reactor

Helium Leak Detection in High Pressure Urea Reactor Helium Leak Detection in High Pressure Urea Reactor ALI AL SIYABI & ANKIT NIRANJAN OMAN INDIA FERTILIZER COMPANY OMAN Oman India Fertilizer Company was commissioned in April 2005. The performance in the

More information

TSS21 Sealed Thermostatic Steam Tracer Trap

TSS21 Sealed Thermostatic Steam Tracer Trap 1255050/4 IM-P125-10 ST Issue 4 TSS21 Sealed Thermostatic Steam Tracer Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications 1800350/6 IM-P180-12 ST Issue 6 BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications Installation and Maintenance Instructions 1. Safety information 2. General

More information

THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y Copyright 1984 by ASME

THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y Copyright 1984 by ASME THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y. 10017 84-GT-214 The Society shall not be responsible for statements or opinions advanced in papers or in G discussion at meetings

More information

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION DUAL FUEL EXCESS AIR BURNER MODEL: 3610, 3651 Revision: 0 FEATURES Burns all fuel gases or light oils Nozzle mix design for on ratio control or excess air 350% excess air all sizes on gas or oil Turndown

More information

USE A RELIABLE A INNOVATIVE A COST EFFICIENT GAS EQUIPMENTS AND GAS SYSTEMS

USE A RELIABLE A INNOVATIVE A COST EFFICIENT GAS EQUIPMENTS AND GAS SYSTEMS USE A RELIABLE A INNOVATIVE A COST EFFICIENT GAS EQUIPMENTS AND GAS SYSTEMS Air & Opp. Pudumjee Paper Mills, Thergaon, Chinchwad, Pune, Maharashtra State, India-411033 Telephone. ++91 20 27273809 Telefax

More information

Heat Pump Connections and Interior Piping

Heat Pump Connections and Interior Piping Job Sheet 3 Heat Pump Connections and Interior Piping OBJECTIVES In this job sheet, you will observe how the presence of air in the ground loop affects the geothermal heat pump performance. You will also

More information

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE Page 1 of 6 A. PURPOSE AND SCOPE This procedure establishes safe working practices for handling sulfur hexafluoride (SF 6 ) gas and release minimization practices. This document also specifies methods

More information

Fundamentals of Compressed Air Systems. Pre-Workshop Assignment

Fundamentals of Compressed Air Systems. Pre-Workshop Assignment Page 1 In order to ensure that the Compressed Air Challenge Fundamentals of Compressed Air Systems Training is most useful to you, it will be important for you to bring information about your plant s compressed

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

PROCESS SAFETY FUNDAMENTAL #1 Always use two barriers for hydrocarbon and chemical drains & vents

PROCESS SAFETY FUNDAMENTAL #1 Always use two barriers for hydrocarbon and chemical drains & vents #1 Always use two barriers for hydrocarbon and chemical drains & vents This applies to vents and drains, not every isolation. Continue to follow current Permit to Work process and guidance from PtW focal

More information

ProMinent Gas Chlorination

ProMinent Gas Chlorination ProMinent Gas Chlorination ProMinent Australia Head Office - Sydney Unit 4, 4 Narabang Way BELROSE NSW 2085 PO Box 85, BELROSE WEST NSW 2085 Ph: (02) 9450 0995 Fax: (02) 9450 0996 Fax (02) 9450 0994 -

More information

Chapter 2 Preparations for Tank Cleaning Work

Chapter 2 Preparations for Tank Cleaning Work Chapter 2 Preparations for Tank Cleaning Work Preparatory Procedures for Tank Cleaning Work Make preparations for tank cleaning work according to the procedures given below. 1. Formulating the tank cleaning

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information

Advanced Management of Compressed Air Systems Pre-Workshop Assignment

Advanced Management of Compressed Air Systems Pre-Workshop Assignment Advanced Management of Compressed Air Systems Page 1 In order to ensure that the Compressed Air Challenge Level II Training is most useful to you, it will be important for you to bring information about

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 11 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Absorption - The process of contacting a vapor and gas stream with an absorbing liquid to remove specific materials from the gas stream.

Absorption - The process of contacting a vapor and gas stream with an absorbing liquid to remove specific materials from the gas stream. Sufe Design and Optvation ofpi-oc.ess Vents and Emission Contid $wteins by Center for Chemical Process Safety Copyright 0 2006 John Wiley & Sons, Tnc. APPENDIX B GLOSSARY Absorption - The process of contacting

More information

PHA and What-If Checklist Questions

PHA and What-If Checklist Questions D APPENDIX PHA and What-If Checklist Questions A compilation of typical What-If questions used in process facility has been made to facilitate a for typical petroleum, petrochemical, or chemical facilities.

More information

Brimstone Symposium September 11, 2014 Vail Colorado SRU WHB Tube Rupture Modeling Insights BP Cherry Point

Brimstone Symposium September 11, 2014 Vail Colorado SRU WHB Tube Rupture Modeling Insights BP Cherry Point Brimstone Symposium September 11, 2014 Vail Colorado SRU WHB Tube Rupture Modeling Insights Learned @ BP Cherry Point by Steve Crockett BP Andy Moore Windward Engineering Gerald Jacobs VMG Abstract Conceptualizing

More information

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR GAS ANALYSER WITH SAMPLE HANDLING SYSTEM IPSS:

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR GAS ANALYSER WITH SAMPLE HANDLING SYSTEM IPSS: INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR GAS ANALYSER WITH SAMPLE HANDLING SYSTEM IPSS: 2-07-099-14 No Corresponding IS IPSS 0. FORWORD Equipment sketch/layout with component details.

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

High Pressure Chem-SCAN Operating Manual

High Pressure Chem-SCAN Operating Manual GAS INLET VALVES REACTIVE GAS PRESSURE RELIEF VALVE INERT GAS VENT VENT VALVE REACTOR INLET VALVES PRESSURE TRANSDUCERS REACTORS STIRRER & THERMOWELL HEATING JACKET STIRRER MOTORS High Pressure Chem-SCAN

More information

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail:

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail: Dry Gas Seal Rack CH-3185 Schmitten Tel. +41 26 497 55 66 Mail: info@felcon.ch Usually, compressor modifications are carried out because of adaptations to new operating parameters. However, in cases of

More information

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ]

+Port: LOADPORT Voyage No.: 03 Date: 01-Aug-2016 No. Description Remarks [ ] ARRIVAL Cargo loading &de-ballasting plan prepared & signed by all Deck and Engine officers and approved by Master Cargo operation monitoring record sheets printed out and available Vessel s liquid header

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 22 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia S) TABLE OF CONTENT SCOPE 2 VESSELS

More information

NITROGEN GENERATION FOR INDUSTRIAL APPLICATIONS

NITROGEN GENERATION FOR INDUSTRIAL APPLICATIONS TRIDENT NOTES: NUMBER 5 DECEMBER 2017 NITROGEN GENERATION FOR INDUSTRIAL APPLICATIONS Industry requires nitrogen Dozens of gases are used by industry. First among these in terms of quantity consumed is

More information

Unique solutions for Oxygen and Nitrogen supply

Unique solutions for Oxygen and Nitrogen supply Unique solutions for Oxygen and Nitrogen supply SHAPING THE FUTURE Index Competence and Trust 3 Modular PSA 4 Superior PSA generator Technology 5 NOXERIOR Competence and Trust NOXERIOR focuses on all aspects

More information

GAS FORM-C. LOA LBP Breadth Depth Air draft (fm Summer LL) Draft (m)

GAS FORM-C. LOA LBP Breadth Depth Air draft (fm Summer LL) Draft (m) 1. PREAMBLE Ship s name LPG/C MISR GAS Owners STERLING SHIP HOLDING S.A. Flag Registry ST. VINCENT & THE GRINADINES - KINGSTOWN Builder JOHN L. MEYER, PAPENBURG, GERMANY Delivery 02.06.1976 Class RUSSIAN

More information

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system Bulletin 061013 TCR-104 & 109 Filling and adding to the Glycol pressure system 1. Glycol System and air On this model the glycol system is a closed system, the glycol is not exposed to the air. No external

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston Model 75-77 Nitrogen Generator Figure 1-75-77 Overall Dimensions These instructions must be thoroughly read and understood before

More information

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 Cal/OSHA Gas Systems for Welding GAS WELDING Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848 When performing gas welding, the following precautions, work procedures,

More information

Optimizing Gas Supply for Industrial Lasers

Optimizing Gas Supply for Industrial Lasers Optimizing Gas Supply for Industrial Lasers Laser cutting of metals and other materials has grown rapidly due to developments in laser power, advancements in CNC automation, and decreasing costs. The industrial

More information