GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

Size: px
Start display at page:

Download "GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four"

Transcription

1 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GM/GN2646 Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

2 Issue Record Issue Date Comments One 5 March 2011 Supersedes GM/RT2030 issue two (All except Parts C1.1 and C3.1 first paragraph, (no bullets)) and GM/RC2516 issue two Superseded documents Supply The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents GM/RT2030 issue two October 2002 Axle Bearing Maintenance GM/RC2516 issue two October 2002 Approved Code of Practice - Training Requirements for Personnel who Undertake Maintenance and Overhaul of Axle Bearings Sections superseded All except Parts C1.1 and C3.1 first paragraph, (no bullets) Date when sections are superseded 4 June 2011 All 4 June 2011 GM/RT2030 issue two (All except Parts C1.1 and C3.1 first paragraph, (no bullets)) and GM/RC2516 issue two cease to be in force and are withdrawn as of 4 June The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications,, Block 2, Angel Square, 1 Torrens Street, London EC1V 1NY, telephone or enquirydesk@rssb.co.uk. Other Standards and associated documents can also be viewed at Page 2 of 21

3 Contents Uncontrolled When Printed Section Description Page Part 1 Introduction Purpose of this document Copyright Approval and authorisation of this document 4 Part General recommendations Axle bearing maintenance policy Rail vehicle maintenance plan 6 Part 3 Competence of Personnel Involved in Axle Bearing Maintenance Competence Records Competence assessors 14 Appendices 15 Appendix A Competence for Personnel and Supervisors Responsible for the Overhaul of Axle Bearings 15 Appendix B Competence for Personnel and Supervisors Responsible for the Maintenance of Axle Bearings or any Activities which may Disturb the Axlebox / Axle Bearing Assembly 17 Appendix C Competence for Personnel and Supervisors Responsible for Work Activities which may Influence the Condition of Axle Bearings 18 Appendix D Multiple Training Modules 19 Definitions 20 References 21 Tables Table D.1 Duration for multiple training modules 19 Page 3 of 21

4 Part 1 Introduction 1.1 Purpose of this document This document gives guidance for the maintenance of rail vehicle axle bearings. There is also detailed guidance for the training and competence assessments of personnel and supervisors, who influence, maintain or overhaul axle bearings Relevant requirements in GM/RT2004 are reproduced in the sections that follow. Guidance is provided as a series of sequentially numbered clauses prefixed GN immediately below the text to which it relates. Where there is no guidance given, this is stated Specific responsibilities and compliance requirements are laid down in the Railway Group Standard itself. 1.2 Copyright Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. 1.3 Approval and authorisation of this document The content of this document was approved by Rolling Stock Standards Committee on 21 January This document was authorised by on 27 January Page 4 of 21

5 Part 2 GM/RT2004 issue four Axle bearings The maintenance plan shall contain maintenance and overhaul instructions for axle bearings The maintenance plan shall, as a minimum, set out the requirements for: a) Floats, clearances. b) Grease (if applicable) Further guidance for axle bearing maintenance is given in GM/GN General recommendations GN01 To assist in meeting the requirements of GM/RT2004, a railway undertaking should have an axle bearing maintenance policy. Axle bearings should be maintained and overhauled in accordance with that policy. GN02 Where the maintenance and / or overhaul of axle bearings is contracted to a third party, the railway undertaking should ensure that they are qualified suppliers. Axle bearings are safety-critical equipment. Incorrect maintenance or overhaul can introduce faults which have the potential to cause wheelset seizure and possible derailment. 2.2 Axle bearing maintenance policy GN03 The purpose of the axle bearing maintenance policy is to ensure that the axle bearings remain in a safe and reliable operating condition at all times whilst in use. The objective is to ensure that the axle bearings remain in a safe and reliable operating condition. This should be identified by means of a structured process and should be stated in the maintenance policy. The policy should also define each of the following and state how it is to be implemented: a) Objectives and targets for the safety performance of all axle bearings fitted to all rail vehicles used by the railway undertaking should be developed from a safety assessment of the vehicles and axle bearings used by the railway undertaking. b) A procedure defining how the safety performance of the axle bearings should be monitored. This should identify: i) The information that is to be recorded and kept, including the information which defines the performance of the assembly in service and the condition of the axle bearing parts when they are overhauled. ii) iii) How the information on the axle bearings and parts is to be processed and analysed. The actions to be taken if the axle bearings fail to operate within the target level set. c) The maintenance policy for determining and reviewing: i) The criteria (bearing age, mileage or distance) at which the axle bearings should be scrapped. ii) iii) The periodicity of maintenance attention. The periodicity of overhaul. Page 5 of 21

6 d) Where applicable, the procedures for assuring continued safe operation of axle bearings which are condition monitored by rail vehicle mounted equipment. e) The involvement of any third parties carrying out work associated with axle bearing maintenance activities covered by the maintenance policy and how they are qualified and controlled. f) Measures to maintain the axle bearings in a safe condition if they are stored unfitted, or are fitted to a wheelset which is unused for an extended period of time. g) States the maximum time before the maintenance policy is reviewed and updated and any specific circumstances which will trigger an early review. h) The basis on which a review of the maintenance policy will be undertaken. i) Identify the maintenance plan for each type or family of axle bearings covered by the maintenance policy. j) Identify the procedure for review and updating the maintenance plan(s). k) State the maximum time before the maintenance plan(s) are normally reviewed and updated and any specific circumstances which will trigger an early review. GN04 The axle bearing maintenance policy should be produced by competent personnel and identify the manager(s) or representative responsible for executing the policy. 2.3 Rail vehicle maintenance plan GN05 Rail vehicle maintenance plans, approved in accordance with the requirements set out in GM/RT2004, should contain specific axle bearing maintenance and overhaul requirements applicable to each individual type or family of axle bearings used by the railway undertaking. The purpose of the rail vehicle maintenance plan is to state all the actions and standards that are necessary to meet the requirements of the maintenance policy, for that type of bearing fitted to a particular rail vehicle type. GN06 Each rail vehicle maintenance plan should identify the following: a) The maximum time or distance between visual examinations of the complete assembly on the wheelset. b) Where applicable, the maximum time or distance between rotational and end float checks. c) The method to be used and the maximum interval between the injection of a measured quantity of new grease into a cartridge bearing, or introduction of new grease into an axlebox bearing. d) The maximum time or distance at which the axle bearings should be overhauled. e) The grease type to be used. f) The criteria (if any) at which the axle bearings should be scrapped. g) The documents specifying the relevant standards for examination and acceptance at overhaul. h) Where applicable, the documents specifying the working instructions for each action in the maintenance plan. i) The minimum engineering maintenance facilities required for the specified maintenance and overhaul of the axle bearings. j) The minimum level of competence for staff engaged in the execution of the specified maintenance and overhaul of axle bearings. Page 6 of 21

7 Part 3 Competence of Personnel Involved in Axle Bearing Maintenance 3.1 Competence Levels of competence GN07 Personnel should be competent for the duties in which they are employed when maintaining or overhauling axle bearings. This should be done in accordance with the following: Level 1 Level 2 Level 3 Competence for personnel and supervisors responsible for the overhaul of axle bearings (see Appendix A). Competence for personnel and supervisors responsible for the maintenance of axle bearings or any activities which may disturb the axlebox / axle bearing assembly (see Appendix B). Competence for personnel and supervisors responsible for work activities which may influence the condition of axle bearings (see Appendix C). GN08 To provide appropriate training to those who influence, maintain or overhaul axle bearings and to cover all needs, it is recommended that the persons covered by this document are identified against the most appropriate category shown in to and receive the training recommended for that level Training - general GN09 Classroom and workshop training modules should be developed which are appropriate to the tasks to be performed. The content and duration of the training may be scaled to match the competence requirements and the specific needs of individual candidates. The training need should include, as a minimum, only those axle bearing type(s) and manufacturer(s) which are part of the work carried out. GN10 GN11 Competence gained in this way should be limited to the axle bearing type(s) and manufacturer(s) for which there has been training and assessment. Personnel should only be permitted to work on the axle bearing type(s) and manufacturer(s) for which they are competent, except as part of further training. Level 1 and level 2 training should: a) Be split into classroom and workshop sessions. b) Be in modules to cover each axle bearing type and level of attention. c) Give both general and specific instructions. GN12 GN13 GN14 Practical training may be carried out between classroom sessions, if appropriate. All classroom and workshop training should be given by a competent trainer. Level 1 and level 2 classroom training should be made effective by use of the following aids and teaching techniques, where appropriate: a) Axle bearing models and specimens. b) Films and video. c) Visual aids. d) Question and answer sessions. e) Expert descriptions of axle bearing topics. Page 7 of 21

8 GN15 It is assumed that supervisors are already competent in the supervision of workshop personnel and it is not the purpose of this document to cover training for those general aspects Extent and duration of training GN16 Level 1 personnel and their supervisors should be given: a) A recommended minimum of eight hours of technical / classroom training. b) Practical demonstrations in the workshop. The trainer should demonstrate the correct practices for all the activities to be undertaken. GN17 GN18 For level 1 supervisors, no further training is required. For other level 1 personnel, a period of monitored workshop activity is required to complete the training. For the first axle bearing type, this should include: a) A minimum of one week under direct supervision. b) Three weeks where the quality of the trainees work on axle bearings is monitored. c) Two months under occasional supervision, with quality checks on work performed on axle bearings, as appropriate. GN19 GN20 GN21 For subsequent new axle bearing types, the training may be of reduced duration, as set out in Appendix D. The three periods set out in GN18 may be reduced on a pro-rata basis. A period of not less than three months training experience is recommended before competence assessment. Level 2 personnel and their supervisors should be given: a) A recommended minimum duration of four hours of technical / classroom training. b) Practical demonstrations in the workshop. The trainer should demonstrate the correct practices for all the activities to be undertaken. GN22 GN23 GN24 GN25 For level 2 supervisors, no further training is required. For level 2 personnel, a period of monitored practice should be included to complete the training. During this time, the trainee should undertake all the activities to be carried out until competence in each activity can be demonstrated. It is recommended that the initial performance of each activity should be under the direct supervision of a competent person. For repetitions of each activity, the level of supervision should be appropriate to the risks involved. Level 3 activities are those which will cause contamination or physical damage if incorrectly carried out near to the axle bearing or axle bearing parts. The list identifies some activities that may produce contamination or physical damage to the axle bearings. This list is not exhaustive and the risks of any other operations should be considered based on knowledge of damage / failure mechanisms: a) Use of pressurised water sprays. b) Processes producing dust / debris near to axle bearings that are not fully sealed. c) Handling / transportation of axle bearing parts, assembled axle bearings or wheelsets. d) Storage of axle bearing parts, assembled axle bearings or wheelsets. e) Welding operations. Page 8 of 21

9 GN26 GN27 GN28 GN29 For level 3 personnel and supervisors, relevant technical instruction / training should be given at the workplace during a short briefing. For level 3 supervisors, no further training is required. For level 3 personnel, a period of monitored practice is required to complete the training. During this time, the trainee should undertake all the activities to be carried out, until competence in each activity can be demonstrated. It is recommended that the initial performance of each activity should be under the direct supervision of a competent person. For repetitions of each activity, the level of supervision should be appropriate to the risks involved Level 1 and level 2 classroom training GN30 Level 1 and level 2 classroom training should include: a) A common module for both levels of training. b) Separate modules for roller bearings and plain bearings. GN31 GN32 Roller or plain axle bearing modules may be deleted, as appropriate, if not applicable to the work being carried out. Classroom modules should incorporate the topics given below and should be structured such that personnel can understand all the information imparted without any specialist knowledge. Level 1 candidates should receive training to cover at least items c) to m). Level 2 candidates should receive training to cover at least items a) to k): a) Risks if vehicle is moved whilst the axle end cap is not in place. b) Protection of axle bearings during welding operations. c) Protection of axle bearings on the assembled wheelsets. d) Axle bearing terminology. e) Principles of axle bearing operation. f) Description of axle bearing types. g) Axle bearing failure mechanisms, their causes and consequences. h) Need for cleanliness. i) Handling and storage of axle bearings. j) Axle bearing contamination. k) Electrical damage. l) Defect records. m) Axle bearing defects and rejection criteria. GN33 Classroom modules for roller bearings should incorporate the topics set out below. Level 1 candidates only overhauling axle bearings which have been fully removed from the axle should, as a minimum, receive instruction to cover items a) to c). Level 1 candidates overhauling axle bearings which are not fully removed from the axle should receive instruction to cover all items. Level 2 candidates should receive instruction to cover all items: a) Axle bearing lubrication. Page 9 of 21

10 b) Axle bearing assembly checks. c) Method and importance of axle bearing sealing. d) Location and securement of the axle bearing. e) Axle bearing and journal examination. GN34 Classroom modules for plain bearings should incorporate the topics set out below. Level 1 candidates should receive instruction to cover all items. Level 2 candidates should receive instruction to cover at least items a) to d): a) Axle bearing lubrication. b) Axle bearing assembly checks. c) Method and importance of axle bearing sealing. d) Location and securement of the axle bearing. e) Pad examination. f) Axle bearing and journal examination. g) Surface finish requirements Level 1 and level 2 workshop training GN35 Workshop training can be in the actual workplace, or alternatively may be carried out in a training facility which has been constructed and equipped to duplicate the range of tasks and facilities present in the actual workplace. GN36 The workshop roller bearing module should demonstrate the correct maintenance techniques on the following bearing types, as applicable: a) Axlebox tapered roller bearings. b) Cartridge tapered roller bearings. c) Axlebox cylindrical roller bearings. d) Axlebox spherical roller bearings. GN37 Appropriate workshop modules should be produced to include the activities shown below. Training should include practical demonstrations of the correct maintenance / overhaul techniques required for each activity: a) Level 1 - roller bearing module: i) Axlebox fitting and removal. ii) iii) iv) Axle bearing fitting and removal from wheelset. Axle bearing dismantling. Axle bearing cleaning. v) Inspection of axle journal and axle bearing components. vi) vii) viii) Criteria for acceptance / rejection of axle journal and axle bearing components. Axle bearing assembly. Assembled axle bearing checks. Page 10 of 21

11 ix) Axle bearing lubrication. b) Level 1 plain bearing module: i) Axlebox fitting and removal. ii) iii) iv) Axle bearing dismantling. Axle bearing manufacture and machining. Inspection of axle journal and axle bearing components. v) Criteria for acceptance / rejection of axle journal and axle bearing components. vi) vii) viii) Axle bearing assembly. Assembled axle bearing checks. Axle bearing lubrication. c) Level 2 - roller bearing module: i) External examination. ii) iii) iv) Identifying axle bearings in distress. Hand rotation check. End float check. v) Lubrication. vi) vii) viii) ix) Removal and refitting of axle bearings. Removal and refitting of axle end cap. Prevention of risks due to handling and storage. Prevention of risks from water jets or other fluids used near the axle bearings. d) Level 2 - plain bearing module: i) General examination of the axlebox and journal. ii) iii) iv) Correct location of axle bearing. Examination of the lubrication pad. Lubrication. v) Permitted wear of axle bearings and journals. vi) vii) viii) Removal and refitting of axle bearings. Wheelset handling and storage. Prevention of risks from water jets or other fluids used near the axle bearings. Page 11 of 21

12 3.1.6 Level 3 training GN38 For level 3 training, a briefing by the supervisor responsible for the relevant activities will be sufficient in most cases. The training will vary according to the activities but in all cases should: a) Identify the recommended best practices and ensure that these can be correctly carried out by the trainee. b) Explain the risks and consequences involved and show how these can be avoided by use of the recommended best practices Assessment following training GN39 Following training, the trainees should be assessed by a competence assessor to establish that the required competence standard is achieved. GN40 GN41 Personnel covered by levels 1 to 3 training, as set out in this document, should be assessed by a competence assessor. The competence assessor should collect sufficient evidence to enable competence to be assessed against all the criteria covered in this document for the appropriate competence levels and the scope of the candidate s application. This should include: a) Performance evidence obtained by observance of the candidate s performance in a normal work situation undertaking prescribed tasks. b) Inspection of the finished work. c) Evidence of the candidate s knowledge, obtained by either oral or written questions, addressing aspects not covered by the performance evidence. GN42 Items set out in GN41 a) and b) should be supplemented by historical evidence of the candidate s performance, witness testimony from the candidate s superior or other authorised staff and personal accounts by the candidate, either oral or written Direct supervision GN43 Any person failing to achieve the required standards of competence should only work on axle bearings under direct supervision, as part of a training programme aimed at achieving the appropriate competence standard. GN44 GN45 When a candidate fails to demonstrate appropriate competence, the competence assessor should inform the candidate s employer, giving the reasons for failure and the recommendations for further training. Candidates should not undertake any work on axle bearings until competent, except as part of further training Maintaining competence GN46 Systems should be in place to ensure that a person s competence is maintained. GN47 The competence for all personnel covered by this document should become invalid in either of the following circumstances, until refresher training and reassessment has been successfully completed to regain the competence: a) After a period of two years maximum, for levels 1 to 3. b) After a period of six months maximum, for levels 1 and 2, if none of the duties for which competence is held have been carried out in that time. c) After a period of one year maximum, for level 3, if none of the duties for which competence is held have been carried out in that time. Page 12 of 21

13 GN48 GN49 GN50 GN51 All personnel covered by levels 1 to 3 training, as set out in this document, should undertake refresher training and reassessment by a competence assessor, as required. Refresher training and reassessment applies only to those areas for which competence has been previously held. If any new areas of competence are introduced, relevant training as set out in to of this document should be used. For all level 1 and 2 personnel it is recommended that approximately one hour classroom training and one hour workshop demonstrations should be given. The refresher training should be structured in accordance with the level of competence previously held. No period of monitored workshop practice is required to complete level 1 and 2 refresher training. For level 3 refresher training, a briefing by the supervisor responsible for the relevant activities will generally be sufficient. The training will vary according to need but should aim to emphasise the risks involved and to ensure that the candidate is aware of, and can carry out, the best practices to avoid the risks. 3.2 Records GN52 For each person working on the overhaul and maintenance of axle bearings set out in this document, there should be an auditable record of competence. The records should: a) Be available for inspection at all reasonable times. b) Clearly identify the types of axle bearings and / or vehicles on which the person has achieved the necessary competence level. c) Be kept up-to-date and show the current position for each person, reflecting the evidence collected during the training and assessment process and the continued competence of on-the-job experience. d) Be retained: i) At all times that the person is working in areas covered by this document. And ii) For a period of two years beyond the date when the person ceases to work in those areas where axle bearings are maintained and overhauled. GN53 Details in respect of each person working at levels 1 to 3 should be kept in a work log. which should include: a) Name and training category for each person. b) Facility where the work, training or assessment was undertaken. c) Date when work, training or assessment was undertaken. d) Details of classroom training completed. e) Details of workshop training completed. f) Results of competence assessment(s). g) Details of the axle bearing type(s), axle bearing manufacturer(s) and / or vehicle types on which the person is competent, where relevant. h) The start / finish dates and the duties undertaken for all time spent working as a competent person on axle bearing maintenance and overhaul. Page 13 of 21

14 GN54 The railway undertaking should ensure that persons are issued with, or have access to, all relevant publications and equipment necessary for them to undertake their duties when maintaining or overhauling axle bearings. 3.3 Competence assessors GN55 Competence assessors should: a) Have the relevant occupational skills, knowledge and experience to assess the categories of work competence as set out in this document. b) Compile the criteria to be used for competence assessment against the topic areas set out in this document. c) Assess competence against the topic areas set out in this document. Page 14 of 21

15 Appendix A Competence for Personnel and Supervisors Responsible for the Overhaul of Axle Bearings A.1 Technical knowledge required for personnel and supervisors GN56 The railway undertaking should ensure that personnel and supervisors responsible for the overhaul of axle bearings have demonstrated that they have knowledge in the following areas: a) The principles of axle bearing operation. b) Axle bearing failure mechanisms and their causes. c) The importance of achieving correct fit of the axle bearing on the axle journal and in the axlebox bore. d) The terminology used for axle bearings and their overhaul. e) Identification / designation of different axle bearing types. f) The requirements for corrosion protection. g) The importance of using matched components for axle bearing assembly. h) The importance of effective seals at the front and rear of the axlebox. i) The importance of the correct grease type, quantity and method of application. j) The importance of cleanliness during the overhaul of axle bearings and the consequences of dirt or liquid contamination. k) The importance of axle end and journal condition. l) The importance of the security of the axle end cap. m) The consequences of axle bearing failure. n) Knowledge of the documentation covering axle bearing overhaul and its location at the workplace. A.2 Practical skills required for personnel carrying out axle bearing work activities GN57 Uncontrolled When Printed The railway undertaking should ensure that personnel who overhaul axle bearings have demonstrated that they have the skills to perform the following operations, according to documented procedures: a) Overhaul of *: i) Cartridge roller bearings. ii) iii) Non-cartridge roller bearings. Plain bearings. * One or more of these axle bearing types may be excluded from the assessment if not relevant to the overhaul work carried out. In all cases, the competence record should be marked in accordance with GN52 b). b) Use of any special equipment necessary to carry out the overhaul. c) Examination of axle bearing components, to identify any damage present and determine if parts are fit for re-use or need to be scrapped. Page 15 of 21

16 d) Re-assembly of axle bearings, maintaining acceptable standards of cleanliness and handling. e) Applying the appropriate quantity and quality of axle bearing lubricant. f) Reporting any axle bearing damage or defects which are present. g) Maintaining good quality records. h) Handling, storing and protecting the assembled axle bearings. i) Carrying out end float and other assembly checks. j) Removal and refitting of axle bearing assemblies onto axles. A.3 Axle bearing management for supervisors GN58 The railway undertaking should ensure that supervisors who are responsible for the overhaul of axle bearings have demonstrated that they have sufficient knowledge of the following topic areas: a) The resources and equipment required for the activities being supervised. b) Control and calibration of the measuring equipment. c) The skill requirements of the tasks. d) Control of the workplace to ensure axle bearings are correctly overhauled. e) Management of quality records. f) Management of a reporting system covering the nature and cause of rejection of scrapped axle bearings. g) Provision of the documentation to cover axle bearing overhaul and the systems for its updating. Page 16 of 21

17 Appendix B Competence for Personnel and Supervisors Responsible for the Maintenance of Axle Bearings or any Activities which may Disturb the Axlebox / Axle Bearing Assembly B.1 Technical knowledge required for personnel and supervisors GN59 The railway undertaking should ensure that personnel and supervisors who are responsible for the maintenance of axle bearings or any activities which may disturb the axlebox / axle bearing assembly have demonstrated that they have knowledge in the following areas: a) The principles of axle bearing operation. b) Axle bearing failure mechanisms and their causes. c) Axle bearing examination and defects which can be identified with the bearing in-situ. d) Axle end condition and importance of correct security of the axle end cap. e) Axle bearing lubrication. f) Axle bearing assembly checks. g) Identification of the different axle bearing types. h) The need for stringent cleanliness. i) Handling and storage of axle bearings and assembled wheelsets. j) The terminology used for axle bearings. k) The importance of effective seals at the front and rear of the axlebox. l) The consequences and restrictions of moving a rail vehicle with the axle end caps removed. m) Knowledge of the documentation covering the activities to be carried out and its location in the workplace. B.2 Practical skills required for personnel carrying out axle bearing work activities GN60 The railway undertaking should ensure that personnel whose duties are within the scope of Appendix B have demonstrated that they have the skills to perform all tasks for which they are responsible. B.3 Axle bearing management for supervisors GN61 Uncontrolled When Printed The railway undertaking should ensure that supervisors whose duties are within the scope of Appendix B have demonstrated that they have sufficient knowledge of the following topic areas: a) The resources and equipment required for the activities being supervised. b) The skill requirements of the tasks. c) Management of quality records. d) Provision of the documentation to cover the activities being supervised and the systems for its updating. Page 17 of 21

18 Appendix C Competence for Personnel and Supervisors Responsible for Work Activities which may Influence the Condition of Axle Bearings C.1 Technical knowledge required for personnel and supervisors GN62 The railway undertaking should ensure that personnel and supervisors whose duties are within the scope of Appendix C have demonstrated that they are aware of the potential risks to axle bearings which may arise from the duties carried out. They should demonstrate that they have knowledge in the following areas: a) The basic principles of axle bearing operation. b) An appreciation of the relevant axle bearing failure mechanisms and their causes. c) The need for stringent cleanliness. d) The correct storage and handling of assembled wheelsets (see GM/RT2466). e) The correct storage and handling of partially or fully assembled axle bearings. f) The correct practices for using water jets or other fluids near axle bearings. g) Knowledge of the documentation covering the activities to be carried out and its location at the workplace. C.2 Practical skills required for personnel carrying out axle bearing work activities GN63 The railway undertaking should ensure that personnel whose work activities have the potential to influence the condition of axle bearings, or who are required to handle parts of the axle bearing or its assembly, have demonstrated that they have the skills to perform all tasks for which they are responsible. C.3 Axle bearing management for supervisors GN64 Uncontrolled When Printed Railway undertakings should ensure that supervisors whose duties are within the scope of Appendix C have demonstrated that they have sufficient knowledge of the following topic areas: a) The resources and equipment required for the activities being supervised. b) The skill requirements of the tasks. c) The correct handling and storage of axle bearings. d) Control of the workplace to ensure that axle bearings are not subjected to handling, contamination or other risks which may cause damage. e) Provision of the documentation to cover the activities being supervised and the systems for its updating. Page 18 of 21

19 Appendix D Multiple Training Modules D.1 Multiple training module duration Bearing type Axlebox tapered roller bearings Cartridge tapered roller bearings Axlebox cylindrical roller bearings Axlebox spherical roller bearings First module duration three months three months three months three months Table D.1 Duration for multiple training modules Second module duration one month one month one month one month Each subsequent module duration two weeks two weeks two weeks two weeks Page 19 of 21

20 Definitions Uncontrolled When Printed Axle bearings For the purposes of this document, axle bearings are those bearings, either roller or plain which are mounted on the axle and carry the mass of the vehicle. Competence assessor Person with relevant occupational skills, knowledge, experience and ability, who is qualified to assess competence as defined by the topic areas set out in this document. Competent person A person who has been assessed as competent to undertake specific tasks. Maintenance a) Actions which disturb or change any part of the axle bearing, the grease used in the axle bearing, the assembly on the axle and the parts used to retain or seal the assembly. b) In respect of a maintenance policy, all aspects including overhaul. Overhaul All actions carried out on the axle bearing at completion of a service period to assess if it is in, and returned to, an acceptable condition for further use. This will include disassembly, examination, re-assembly, re-greasing and where applicable, removal and re-fitting the assembly on the axle. Page 20 of 21

21 References Uncontrolled When Printed The Catalogue of Railway Group Standards and the Railway Group Standards DVD give the current issue number and status of documents published by. This information is also available from RGSC 01 RGSC 02 Railway Group Standards Code The Standards Manual Documents referenced in the text Railway Group Standards GM/RT2004 Rail Vehicle Maintenance GM/RT2466 Railway Wheelsets Page 21 of 21

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

Guidance on Risk Evaluation and Risk Acceptance

Guidance on Risk Evaluation and Risk Acceptance GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8643 Issue Two: June 2014 Rail Industry Guidance Note Issue record Issue

More information

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 2: Surface supplied diving to 30 m

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 2: Surface supplied diving to 30 m AS/NZS 2815.2:2013 Australian/New Zealand Standard Training and certification of occupational divers Part 2: Surface supplied diving to 30 m AS/NZS 2815.2:2013 AS/NZS 2815.2:2013 This Joint Australian/New

More information

Refresher Licensed Asbestos Supervisor Training

Refresher Licensed Asbestos Supervisor Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS Refresher Licensed Asbestos Supervisor Training This unit has nineteen learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure I. MISCELLANEOUS Guideline I-01 Guideline related to: Article 4 paragraph 3 What is to be understood by "sound engineering practice"? Sound engineering practice means, without prejudice to Article 5, paragraph

More information

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 Edition 4 December 2018 Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 / Edition: 4 Page 1 of 8 Contents 1. Introduction 2 2. Scope - Inspection Services

More information

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment Overview This standard covers a broad range of basic mechanical maintenance competences that will prepare you for entry into the engineering or manufacturing sectors, creating a progression between education

More information

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Marine Terminal Operations Competency Standard Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Industry : Oil, Chemical and Gas Industry Competency Category : 2.0 Moor, tend mooring and unmoor

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION ISSN 1172-3416 NZ GCP 1 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION Issued by the Secretary of Commerce in accordance with

More information

New Licensed Asbestos Manager Training

New Licensed Asbestos Manager Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Manager Training This unit has twenty-three learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

University Safety Policy Supplement

University Safety Policy Supplement Occupational Health and Safety Service, Kings Gate Newcastle upon Tyne NE1 7RU Tel 0191 208 6274 Document History University Safety Policy Supplement Lone working Approved October 2006 Re-ratified October

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

Syllabus for Licensable Work with Asbestos (Category C)

Syllabus for Licensable Work with Asbestos (Category C) Syllabus for Licensable Work with Asbestos (Category C) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of licensed asbestos training

More information

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) Local Exhaust Ventilation Inspection & Maintenance 1 LOCAL EXHAUST AND OTHER VENTILATION Contents 1. Introduction 2. Design specifications

More information

Controlling the Speed of Tilting Trains through Curves

Controlling the Speed of Tilting Trains through Curves Rail Industry Standard RIS-8012-CCS Date September 2017 Controlling the Speed of Tilting Trains through Curves Synopsis This document sets out the means by which tilting trains may be operated at higher

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS NOLRS VERSION 2.2 October 2009 Outdoor Council of Australia Ph: (08) 9248 6677 1800 660 540 Fax: (08) 9248 5799 Email: nolrs@outdoorcouncil.asn.au

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009 WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009 In exercise of the powers conferred by section 65 of the Workplace Safety and Health Act, the

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Procedure No.: PA-033-0006 Page: 1 of 19 Port Arthur, TX. Reviewed: 02/18 Effective: 02/06/18 (Rev.03) Supersedes: 02/15/16 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document

More information

General maintenance engineering applications

General maintenance engineering applications Unit 868 General maintenance engineering applications UAN: J/600/6007 Level: Level 2 Credit value: 12 GLH: 55 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

General maintenance engineering applications

General maintenance engineering applications Unit 068 General maintenance engineering applications Level: 2 Credit value: 12 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Introduction to Signalling Maintenance Procedures Reference Number SMP 01 (RIC Standard: SC 00 52 00 01 SI) Document Control Status Date Prepared

More information

Level 2 Diplomas in Smart Metering ( )

Level 2 Diplomas in Smart Metering ( ) Level 2 Diplomas in Smart Metering (7428-21-22-23) QUALIFICATION HANDBOOK August 2017 Version 6.1 Qualification at a glance Subject area City & Guilds number Age group approved Entry requirements Fast

More information

2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP

2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP 2018 CAMS NSW APPENDIX L FORMULA RACE CAR CHAMPIONSHIP 1. OBJECTIVE The objective of the championship is to promote and foster racing for wings & slicks open-wheel race cars. 2. CATEGORY ORGANISERS The

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

Level 3 Diploma in Moving Loads in Construction. Qualification Specification

Level 3 Diploma in Moving Loads in Construction. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 4 Support for candidates 5 Assessment 5 Internal quality assurance

More information

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT June 2013 Lead Manager John Green, Health & Safety Service Manager Responsible Director Director of Human Resources Approved By Health and

More information

Design & Technology Department Health & Safety Policy. Outwood Academy Ripon

Design & Technology Department Health & Safety Policy. Outwood Academy Ripon Design & Technology Department Health & Safety Policy Outwood Academy Ripon Document control table Document title: Author (name & job title): Version number: DT Health and Safety Policy Katy Bradford,

More information

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT August 2017 Important Note: The Version of this policy found on the HR Connect web page is the only version that is controlled. Any other

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd Estates Operations and Maintenance Practice Guidance Note Management of Pressure Systems V01 Date Issued Planned Review PGN No: Issue 1 - Nov 2015 Issue 2 Nov 2017 Author / Designation Responsible Officer

More information

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials

Unit 13 Monitoring reinstatement of sub-base and base (roadbase) in non-bituminous materials This unit covers the requirements that you must meet when monitoring the reinstatement of sub-base and base. You must ensure that you act in accordance with all current specifications and procedures and

More information

Control of Vibration at Work

Control of Vibration at Work Control of Vibration at Work 1) POLICY University of Glasgow will put in place measures to protect employees from the risks of Hand Arm Vibration Syndrome (HAVS) and Whole Body Vibration. These measures

More information

New Licensed Asbestos Operative Training

New Licensed Asbestos Operative Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Operative Training This unit has twenty-two learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 5: Dive supervisor. Australian/New Zealand Standard

AS/NZS :2013. Training and certification of occupational divers AS/NZS :2013. Part 5: Dive supervisor. Australian/New Zealand Standard AS/NZS 2815.5:2013 Australian/New Zealand Standard Training and certification of occupational divers Part 5: Dive supervisor Superseding AS 2815.5 2006 AS/NZS 2815.5:2013 AS/NZS 2815.5:2013 This Joint

More information

SOAS LONE WORKING GUIDANCE

SOAS LONE WORKING GUIDANCE SOAS LONE WORKING GUIDANCE Introduction This guidance is intended to assist managers and heads of department in assessing the risks associated with lone working and their staff. While there are no specific

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 1999L0092 EN 27.06.2007 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B DIRECTIVE 1999/92/EC OF THE EUROPEAN PARLIAMENT

More information

Lifting Operation & Lifting Equipment Procedure

Lifting Operation & Lifting Equipment Procedure SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting

More information

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals INTERIM ADVICE NOTE 171/12 Risk Based Principal Inspection Intervals Summary This Interim Advice Note sets out the requirements and guidance for service providers using risk based inspection intervals.

More information

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 08 Control of Substances Hazardous to Health (COSHH) Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Maintaining mechanical devices and equipment. Outcome one

Maintaining mechanical devices and equipment. Outcome one 006 UNIT 019 Maintaining mechanical devices and equipment Learning outcomes 1 Maintain mechanical devices and equipment 2 Know how to maintain mechanical devices and equipment Performance evidence must

More information

Automatic Warning System (AWS)

Automatic Warning System (AWS) Automatic Warning System Synopsis This document defines the functional, performance and application requirements for the Automatic Warning System. [This document contains one or more pages which contain

More information

SANCTIONED ARTICLES GOVERNING THE Kumho Tyres Pre 65 Race Series

SANCTIONED ARTICLES GOVERNING THE Kumho Tyres Pre 65 Race Series SANCTIONED ARTICLES GOVERNING THE 2018-19 Kumho Tyres Pre 65 Race Series Preamble The Pre65 Racing Saloons Inc. hereby declares that the following articles to be those of the KUMHO TYRES PRE65 SERIES governing

More information

SOP. Working in Confined Spaces

SOP. Working in Confined Spaces Purpose This procedure outlines the requirements for the management of entry into confined spaces in all work areas with the intention of minimising risks to health and safety from any potential hazards

More information

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines

IGEM/TD/2 Edition 2 with amendments July 2015 Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Communication 1779 Assessing the risks from high pressure Natural Gas pipelines Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen Communication 1779 Assessing the risks from high pressure Natural

More information

Mine Rescue Certification Training Standard

Mine Rescue Certification Training Standard Mine Rescue Certification Training Standard Mine Rescue Certification Training Standard Employers who have workers working in an underground workplace shall take the necessary precautions to ensure worker

More information

PROCEDURE First Aid. Number: C 2001 Date Published: 13 September 2013

PROCEDURE First Aid. Number: C 2001 Date Published: 13 September 2013 1.0 Summary of Changes This procedure has been re-drafted from the General Policy Guidelines enabling inclusion within the Policy and Procedure Document Library. It has been amended to incorporate changes

More information

Removal of Lead-Based Paint

Removal of Lead-Based Paint Safety Management System SP24-61 Process Authority: HS Manager Removal of Lead-Based Paint Approval: Chief Operating Officer Version Date:30/03/2015 Revision: B 1 Purpose To define the requirements for

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014 GE/RT8000/TS8 Rule Book Module TS8 One-train working s Issue 4 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved by Traffic

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE NPTC Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS

More information

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P29-02 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission

More information

HS329 Risk Management Procedure

HS329 Risk Management Procedure HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and

More information

WHS record keeping requirements

WHS record keeping requirements WHS record keeping requirements The table below provides details of the record keeping requirements in the Model Work Health and Safety Regulation, covering the following areas: Air-borne contaminant levels

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party

More information

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

UEFA Coaching Convention Contract and Directive

UEFA Coaching Convention Contract and Directive UEFA Directives governing the UEFA Coaching Convention and the UEFA Coach Education Programme 2010 Edition UEFA Coaching Convention Contract and Directive Table of Contents I. General provisions 6 Preamble

More information

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment Overview This standard covers a broad range of basic fluid power maintenance competences which will prepare you for entry into the engineering or manufacturing sectors, creating a progression between education

More information

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS

IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 1 : 2014 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 1: 2014 Copyright 2014 by British Compressed

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Standards of Practice Personal Protective Equipment

Standards of Practice Personal Protective Equipment Document Authority: I. PURPOSE Standards of Practice Personal Protective Equipment Whenever feasible, hazards must be eliminated through engineering, and/or administrative controls, prior to resorting

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information

Proficiency Module Syllabus. P601 - Thorough Examination and Testing of Local Exhaust Ventilation Systems

Proficiency Module Syllabus. P601 - Thorough Examination and Testing of Local Exhaust Ventilation Systems Proficiency Module Syllabus P601 - Thorough Examination and Testing of Local Exhaust Ventilation Systems Aim To provide the methodology, theoretical and practical knowledge to enable candidates to: Understand

More information

SAFETY PRINCIPLES FOR PRESSURE REGULATORS FOR MEDICAL OXYGEN CYLINDERS

SAFETY PRINCIPLES FOR PRESSURE REGULATORS FOR MEDICAL OXYGEN CYLINDERS SAFETY PRINCIPLES FOR PRESSURE REGULATORS FOR MEDICAL OXYGEN CYLINDERS Doc 104/16 Revision of Doc 104/03 EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70

More information

GUIDELINES. Guidelines. SAFed Guidelines on the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) The Safety Assessment Federation Ltd

GUIDELINES. Guidelines. SAFed Guidelines on the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) The Safety Assessment Federation Ltd Guidelines SAFed Guidelines on the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) GUIDELINES The Safety Assessment Federation Ltd (Document Reference: LG 2 Issue 01 Dated 23/07/99 Reviewed

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

W E L S H R U G B Y U N I O N LTD

W E L S H R U G B Y U N I O N LTD W E L S H R U G B Y U N I O N LTD PLAYER REGISTRATION AND TRANSFER REGULATIONS 1. Player Registration: (a) No player may represent a Club in any Fixture unless he is one of the registered playing members

More information

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: Corporate Electricity High Voltage SOP Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: John Biggs/Estates Officer

More information

GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES

GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES ESYD G-DIAKRIB/01/01/26-03-2015 1/6 ESYD G-DIAKRIB Issue: 01 Revision: 01 Issue Date: 28-11-2007

More information

GM/GN2497. Guidance on Railway Wheelset Tread, Gauging and Damage. Identification. Railway Group Guidance Note. Published by

GM/GN2497. Guidance on Railway Wheelset Tread, Gauging and Damage. Identification. Railway Group Guidance Note. Published by GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GM/GN2497 Issue One: December 2007 Railway Group Guidance

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

MCC Cricket Academy Terms And Conditions For The Hire Of Nets

MCC Cricket Academy Terms And Conditions For The Hire Of Nets MCC Cricket Academy Terms And Conditions For The Hire Of Nets September 2017 In consideration of you paying the hire cost ( Charges ), Marylebone Cricket Club ( MCC, we, us, our ) make the nets available

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure H. INTERPRETATION OF OTHER ESSENTIAL SAFETY REQUIREMENTS Guideline H-02 Guideline related to: Annex I Section 3.2.2 and 7.4 Final assessment (Annex I Section 3.2.2) of pressure equipment must include a

More information

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version Policy No: RM13 Version: 7.0 Name of Policy: Provision and Use of Work Equipment Policy Effective From: 26/04/2016 Date Ratified 10/03/2016 Ratified Health and Safety Committee Review Date 01/03/2018 Sponsor

More information

KAYAKING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

KAYAKING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS KAYAKING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS NOLRS VERSION 2.2 October 2009 Outdoor Council of Australia Ph: (08) 9248 6677 1800 660 540 Fax: (08) 9248 5799 Email: nolrs@outdoorcouncil.asn.au

More information

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS BRITISH STANDARD BS 341-4:2004 Transportable gas container valves Part 4: Pressure relief devices ICS 23.060.40 This British Standard, having been prepared under the direction of the Standards Policy and

More information

Work Equipment: LOCAL EXHAUST VENTILATION

Work Equipment: LOCAL EXHAUST VENTILATION Health & Safety Services Safety Code of Practice 46: Part 4 2 nd Edition, September 2014 Work Equipment: LOCAL EXHAUST VENTILATION University of Reading 2015 Page 1 Contents 1 Scope... 3 2 Introduction...

More information

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P21-01 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons

More information

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018

CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 CODE OF PRACTICE 42 IMPLEMENTATION OF EIGA CARBON DIOXIDE STANDARDS REVISION 2: 2018 Copyright 2018 by British Compressed

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Superseded by Iss 1.1 (to correct formatting) Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for assessing the driveability of lineside signalling

More information

Operating and maintenance manual Filter and reducing station Series / 1.0

Operating and maintenance manual Filter and reducing station Series / 1.0 Operating and maintenance manual Filter and reducing station Series 961 04.2017 / 1.0 Original instructions ARCA Regler GmbH. All rights reserved. Cover picture background: Freepik.com ARCA Regler GmbH

More information

FLANGED TWO-PIECE BALL VALVES

FLANGED TWO-PIECE BALL VALVES INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please

More information

GOLF QUEENSLAND - Selection Policy

GOLF QUEENSLAND - Selection Policy Version vii 10 February 2015 GOLF QUEENSLAND - Selection Policy Policy Purpose: This policy provides selection policy and guidelines for the selection of Players to Golf Queensland Representative Teams

More information

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities. 11/13/1995 4 5/20/2013 1 of 10 Authority and Scope Regulation: 29 CFR 1910.146 Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3788:2006 AS/NZS 3788:2006 Australian/New Zealand Standard Pressure equipment In-service inspection AS/NZS 3788:2006 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

Initial training - OCCUPATIONAL HEALTH AND SAFETY and FIRE PROTECTION

Initial training - OCCUPATIONAL HEALTH AND SAFETY and FIRE PROTECTION Initial training - OCCUPATIONAL HEALTH AND SAFETY and FIRE PROTECTION Project registration number: CZ.1.05/2.1.00/03.0078 Project name: Národní ústav duševního zdraví (National Institute of Mental Health)

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information