Environment Agency Asset Recovery Programme, approved projects 30th June Description of Repair Title)

Size: px
Start display at page:

Download "Environment Agency Asset Recovery Programme, approved projects 30th June Description of Repair Title)"

Transcription

1 Environment Agency, approved projects 30th June 2014 Have works New project Risk Name (Project already or URN Area RFCC Location National Grid Ref Management SMP Policy Description of damage Description of Repair Title) Ownership started on accelerated Authority site? project? Replace a flapped outfall at Coombe cellars damaged 675 Coombe Cellars Outfall Teignmouth SX Unknown Replace a flapped outfall at Coombe cellars damaged by floods by floods Beesands Rock Armour Replacement (Emergency Re-position rip-rap moved by tides; Possible 676 Beesands SX Third Party Loss of rip rap defence during 2 tidal events partnership with Westward Ho! Rock Armour Replacement Repair and reprofile existing and additional rock armour protection to Repair and reprofile existing and additional rock 677 Westward Ho! SS Third Party Torridge landfill site damaged by floods armour protection to landfill site damaged by floods Bucks Mills Sea Defence 678 Bucks Mills SS Third Party Torridge to quay wall damged in floods accel to quay wall damged in floods 679 Starcross Tide Gate Starcross SX Third Party Damage to seals from tidal surge Repair damage to seals damaged by tidal surge Bude Neet - left bank d/s Embankment failure. Temporary defence installed. Needs Existing embankment damaged. Temporary defence 681 Bude SS LA Nanny Moore permanent replacement installed. Needs permanent replacement / 682 Bude Neet - The Strand Bude SS /LA Existing flood wall damaged - requires repair Existing flood wall damaged - requires repair Ongoing subject to additional costs due to further Ongoing subject to additional costs due to 688 Perranporth FAS Perranporth SW damage/increase scope of work. further damage/increase scope of work. Natural Ongoing subject to additional costs due to further Ongoing subject to additional costs due to 689 Helston FAS Helston SW England damage/increase scope of work. further damage/increase scope of work. Emergency sand bagging and patch repair to 691 Bude Neet Repair Bude SS LA Emergency sand bagging and patch repair to damaged flood bank damaged flood bank Copperhouse Gate 692 Hayle SW to control system to restore operation of gate. New to failed gate operation controls actuator Existing bank damaged due to high tidal waters. 693 Calstock bank repairs Calstock SX ? Existing bank damaged due to high tidal waters. Requires repair. Requires repair. 694 St Mary's Quay St Mary's SV N/A Isles of Scilly Damage to quay surface and storm walls Damage to critical transport infrastructure. Storm damage to masonry sea wall resulting loss of masonry units Replacement of masonry and backfilling. 695 Mermaid Sea Wall St Mary's SV CIOS Isles of Scilly and leakage of the fill and heart material Reinstatement of surfacing 696 Bryher Coastal Defence Bryher SV N/A Isles of Scilly St Agnes Great Pool 697 St Agnes SV N/A Isles of Scilly Coastal Eastern Green Coastal Significant damage to large scale sea defence. Requires permanent Emergency works already started in 13/14 to remove 698 Penzance SW CC Defence repair. and replace large sections of riprap. Storm damage during Januaryt and February storms resulting in Reconstruction of damaged masonry including Portreath Finger Pier 699 Portreath SW LA loss of splash wall, loss of hearting, loss of coping slabs and rebuilding splash wall, relaying coping slabs and destruction of monkey hut monkey hut wave protection building Damage due to significant wave impacts. Harbour wall provides flood Reconstruction of masonry quoin using recovered 700 Portreath Harbour Wall Portreath SW LA defence to community. Complete collapse of quoin. materials Reprofiling of beach after waves elevated beach level by 3m and to beach profile.and removal of sand from 702 Porthmeor Beach St Ives SW N/A drove sand into properties, smashing windows and doors properties on ground anf first floor level Existing stone/masonary sea wall damaged (loss of joints/ Repair stone/masonary sea wall ie reseat copings and 704 Porthcurnick Sea Wall Porthcurnick SW N/A copings)during 13/14 tidal event. repoint wall. Wave action outflanked existing coastal defences and headwall of Stabilise washout sections, form foundation and relay 705 Swanpool Coastal Path Falmouth SW N/A main river crushed stone footpath. Extend coastal defence 707 Perranporth Beach Perranporth SW N/A Damage to beach profiles. Reprofiling of beach to protect properties Fistral Surf Centre Erosion of sand dunes, loss of gabion retaining wall and Emergency placement of 500 tonnes of rock armour 708 Newquay SW CC undermining of National Surf Centre and Lifeboat Station to arrest erosion Newquay Harbour Sea Storm damage to rth quay and inner harbour walls resulting in 709 Newquay SW N/A Repointing of masonry and infilling of voids Wall loss of pointing and voiding of masonry resulting in loss of 710 Bude Breakwater Bude SS N/A masonry facing, heart material and undermining Bude Harbour Training Undermining of training wall and risk of collapse. Damage sustained 711 Bude SS ? Underpinning and masonry repairs Wall on two separate occassions, hence second bid for URN Repair of coastal defences including stitching of 712 Crooklets Sea Bude SS N/A Damage to coastal defence due to wave action. Buildings collapsed. copings and filling of voids Construction of new flexible defence, rather than replacement of masonry sea wall, as a managed Seaton () Beach Collapsed tidal defence due to wave action, which resulted in 713 Seaton SX CC realignment approach to create amore sustainable Coastal complete destruction of beach café. frontage. Reprofiliing of beach, which lost 8m of elevation during storms Damaged coastal defence and risk to properties. Storms resulted in Repair of damaged coastal defence including gunnite breaching of sea wall, overtopping of waves and shingle resulting in of sea wall. There is a hole in the bottom of the clock 714 Kingsand Sea Wall Kingsand SX ? damage to property and personal injuries. Stability of buildings was tower, damage to stone masonary and a hole in the compromised. defence. Demolish corner of seawall (approx 5m in each Damage to existing masonry sea wall including collapse of corner direction) and recast foundations and rebuild using 715 Durnford Street Sea Wall Plymouth SX Plymouth CC and washout of mortar joints. Wall continues to deteriorate reclaimed stone. Rake out joints and repoint approx increasing risk. 50m of seawall. River Lemon Flood Wall Replace length of flood defence wall destroyed by 726 Newton Abbot SX Third Party Flood defence wall collapse during flood event flooding Existing revetment washed away or damaged, loss of timber and Dawlish Warren Replace damaged revetment, groyne repairs, public 727 Dawlish Warren SX Third Party broken structure of groyne, loss of beach profile at access point Emergency safety work increasing risk to public. Structural survey. joints and pointing 728 Ilfracombe Harbour Ilfracombe SS Third Party Structural survey. joints and pointing damaged by floods damaged by floods Structural survey. joints and pointing 729 Cheyne Beach Sea Wall Ilfracombe SS Third Party Structural survey. joints and pointing damaged by floods damaged by floods Structural survey. joints and pointing 730 Pottington Bank Barnstaple SS Third Party Structural survey. joints and pointing damaged by floods damaged by floods Repair joints, pointing, flapped outfalls damaged in 731 East Water Tidal Wall Bideford SS Third Party Repair Joints, pointing, flapped outfalls damaged due to flooding. the floods River Lemon Flood Wall 876 Newton Abbot SX Third Party Repair damaged flood wall Replace wall damaged by floods 877 Colyton Colyton SY Third Party Minor damage to banks and fencing Replace damaged by floods Extend proposed works to replace lost embankment Dawlish Warren 878 Dawlish Warren SX Third Party Loss of sand dunes and gabion defences embankment across the Warren and replace Accelerated Work strengthened gabion defence Powderham Screen Replace Powderham Screen damaged while clearing during winter Replace Powderham Screen damaged while clearing 879 Exeter SX Third Party Replacement floods during winter floods Replace seals on tide flood gate damaged during 880 Seaton Tidal Gate Seaton, Devon SY Third Party Replace seals on tide flood gate damaged during flooding flooding

2 881 Clyst Honiton Expansion Joints Exeter SX Third Party Repair Expansion joints blown out over combined flood event Repair Expansion joints blown out over combined flood event 882 Gissage Dragons Teeth Honiton ST Concrete repairs to stilling basin dragons teeth damaged during flooding Concrete repairs to stilling basin dragons teeth damaged during flooding 883 Tegnmouth Tidal Flap and structural assessment Teignmouth SX Repair tidal flap backing plate broken during floods and defence void structural assessment Repair tidal flap backing plate broken during floods 884 Powderham Embankment Exeter SX Third Party Fill holes in Powderham Embankment damaged during overtopping event Fill holes in Powderham Embankment damaged during overtopping event 885 Longbridge Meadow Cullompton ST Fill washouts at Linhay Farm U/S Longbridge Meadow Fill washouts at Linhay Farm U/S Longbridge Meadow 886 Tipton St John Desilt Ottery St Mary SY Third Party 887 Sidbyes Desilt Sidmouth SY Third Party 888 Bovey Tracey Desilt Bovey Tracey SX Third Party 889 Bovey Tracey Channel Bovey Tracey SX Reinstate washouts Bovey Tracey caused by floods Reinstate washouts Bovey Tracey caused by floods 890 Monkerton Honiton ST Third Party Repair Monkerton Gabion baskets damaged during high flows Repair Monkerton Gabion baskets damaged during high flows 891 Woodbury Woodbury SY Repair Woodbury Gabion Baskets damaged during high flows Repair Woodbury Gabion Baskets damaged during high flows 892 Lympstone Fluvial Lympstone SX to Wotton Brook storage area wall where high flows damaged joints to Wotton Brook storage area wall where high flows damaged joints 893 Shutterton Brook Access Dawlish SX Damage to Shutterton Brook U/S access point Damage to Shutterton Brook U/S access point 895 Instow Ramp Bideford SS Repair damage to handrailing caused by floods Repair damage to handrailing caused by floods 896 Instow Tidal Gate Bideford SS Repair seals and road plate damaged by tides Repair seals and road plate damaged by tides 898 Ilfracombe Gate Ilfracombe SS Repair seals and road plate damaged by tides Repair seals and road plate damaged by tides 900 Ashford and Bradiford outfall repairs Barnstaple SS Revetment and headwall repairs at Ashford and Bradiford Outfalls due to high flows Revetment and headwall repairs at Ashford and Bradiford Outfalls due to high flows 901 East The Water Tidal Wall Bideford SS Repair joints, pointing, flapped outfalls damaged due to flooding. Repair joints, pointing, flapped outfalls damaged due to flooding. 902 Velator Braunton SS Storm tanks investigation; repair pressurised culvert blown out during high flows Storm tanks investigation; repair pressurised culvert blown out during high flows 903 Yelland Barnstaple SS Bank 6 repair washouts/breach caused by high flows Bank 6 repair washouts/breach caused by high flows 904 Hele Beach Ilfracombe SS Reduced flow capacity identified post winter 13/14 storms Carry out CCTV survey to identify cause. Scope and deliver effective repairs 905 Bishops Tawton Bishops Tawton SS Damaged outfalls and pointing of masonry wall damaged during high todal/fluvial flooding Repair flapped outfalls and repoint masonry wall damaged during high todal/fluvial flooding 906 Coombe Martin Coombe Martin SS Reduced flow capacity in culvert after winter 13/14 storms. Carry out CCTV survey to identify cause of reduced flow, scope and deliver repairs. 907 Horsey Island Braunton SS Revetment repairs TBC Revetment repairs TBC 908 Lynmouth Lynmouth SS to wave return wall damaged during tidal surge to wave return wall damaged during tidal surge 910 Helston County Bridge Helston SW Desilt for Conveyance of FDS Desilt for Conveyance of FDS 911 Loe Bar Emergency Works Helston SW Beach recharge to cover exposed fluvial assets for public safety Beach recharge to cover exposed fluvial assets for public safety 912 St Blazey Stream Desilt St Blazey Desilt of watercourse following high flows in Dec 2013, causing deposition Desilt of watercourse following high flows in Dec 2013, causing deposition 913 Lower Tamar Flood banks Lower Tamar - Spot repairs at various locations Spot repairs at various locations 1065 Water Cascade Outer Hope Hope Cove SX Third Party District Localised erosion of base of stone wall Provide concrete toe protection 1066 Wall to viewing area, Inner Hope Hope Cove SX Third Party District Erosion behind retaining wall worsening. Potential health and safety issue if failure occurs Backfill material and secure using concrete cap 1067 Wall adjacent to Highway, Inner Hope Hope Cove SX Third Party District Wall damage - quite extensive 5m x 1m strip at mid height. The wall provides protection to a road and failure would also put a property at risk of tidal flooding Remove loose stonework and re-bed on mortar 1072 Parapet Wall outside old peoples tea room District Wall has cracked and moved. Dangerous structure as potential to collapse if leaned upon. Wall has cracked and moved. Dangerous structure as potential to collapse if leaned upon Salcome - rth Sands Winrow 18 District Culvert failure (due to wave action) causes flood to critical infrastructure - SWW Pumping Station Culvert failure (due to wave action) causes flood to critical infrastructure - SWW Pumping Station 1075 South Sands - Grass Verge + Slipway District Slipway back broken. Grass verge washed away. Slipway back broken. Grass verge washed away South Sands - Retaining wall to hard District Cracks enlarged, some local collapse (minor). Cracks enlarged, some local collapse (minor) South Sands - Retaining wall to highway District Collapse of wall and highway due to fluvial flooding Collapse of wall and highway due to fluvial flooding m from head of creek, west side at Tacketwood Kingsbridge SX Third Party District Facing wall collapsed (4m x 3m). Pre-cast panels behind intact. 4m x 3m facing to be replaced, secured and joints resealed to precast units behind Highway adjacent to beach rth Hallsands SX Third Party District Road and rock armour washed away. Road and rock armour washed away Dartmouth - Bayards Cove Dartmouth SX Third Party District Existing grade 2 listed stone wall that forms a de facto flood defence againt tidal flooding. Damage sustained during winter 2013/14 tidal events to pointing and structure of wall. Approximately 5m of historic listed stone wall to be rebuilt 1086 Topsham Quay Wall Topsham SX Third Party Exeter City Significant damage to the quay wall, especially the Goat Walk. 5-6 properties internally flooded, plus another 60 properties protected by sandbags. Replace copings and pointing to areas of the wall affected breakwater District Coastal protection wall capping slab Coastal protection wall capping slab 1088 breakwater District Access Stairwell Access Stairwell

3 1089 breakwater District Coastal protection wall capping and damaged railings Coastal protection wall capping and damaged railings 1090 Breakwater District Damaged capping stones and RC slab to coastal protection wall Damaged capping stones and RC slab to coastal protection wall 1091 Breakwater (Emergency District Sheet pile wall protruding anchor rods and beach draw down Sheet pile wall protruding anchor rods and beach draw down assessment 1092 Eastcliffe, Teignmouth Teignmouth SX Third Party District Damaged capping slab to coastal protection wall Damaged capping slab to coastal protection wall 1093 Early's Wall, Dawlish Dawlish SX Third Party District Damaged capping slab to coastal protection wall Damaged capping slab to coastal protection wall 1094 Beesands - Overflow pipe Beesands SX Third Party District Concrete protection broken, MH chamber destroyed and pipe discharging halfway along pipe. Concrete protection broken, MH chamber destroyed and pipe discharging halfway along pipe Beesands - Play Area Beesands SX Third Party District Fencing broken, rubble in play area. Fencing broken, rubble in play area. Westward Ho! - Pebble 1098 Ridge (Emergency Repair, Phil Winrow 18th March Westwood Ho! SS Third Party Torridge District Breaching of pebble ridge, with flooding of land behind and resulting high risk to 17 properties. Replace pebble ridge using material won from the beach. 14) 1099 Westward Ho! - Sea Wall Westwood Ho! SS Third Party Torridge District Sea Wall - openning of horizontal cracks over c. 50m. Sea Wall - repair and grout large cracks Westward Ho! - Promenade Westwood Ho! SS Third Party Torridge District Debris clearance, fencing off of damaged areas, repairs to sea defence edging, surfacing, fencing, seating etc. Debris clearance, fencing off of damaged areas, repairs to sea defence edging, surfacing, fencing, seating etc Westward Ho! - Burrows Westwood Ho! SS Third Party Torridge District Temporary repairs to coastal defences. Temporary repairs to coastal defences Bucks Mills Sea Wall Bucks Mills SS Third Party Torridge District Sea Wall (and associated Lime Kilns) breach during winter storms and erosion to foundation ramp. Only tourist access to beach (approx 30k tourists pa)/ Health and safety risk. Cast new supporting ramp rebuild stone sea wall 1103 Corbyn Head Sea Wall Torbay SX Third Party Torbay Erosion of core of revetment/wall and loss of joint material during winter event. Emergency works approved Phil Winrow (18/3/14). Ref Infrastructure at risk. The void within the revetment/wall has been filled with 80m³ of concrete and we are currently checking whether there are any further voids behind this revetment Meadfoot Sea Wall - Ilsham Valley end Torbay SX Third Party Torbay A number of small sections of wall have been damaged and part of the revetment has been washed away resulting in undermining of the wall. Emergency works approved Phil Winrow (18/3/14). Ref infrastructure Rebuild wave return wall, replace revetment material and backfill undermined section of wall with marine grade concrete Hollicombe (Emergency Torbay SX Third Party Torbay Previous bagged repair has been washed away revealing large void Previous bagged repair has been washed away revealing large void Victoria Breakwater, 1106 Brixham (Emergency Brixham SX Third Party Torbay Storm damages has undermined the beach end of the breakwater resulting in a large void opening Storm damages has undermined the beach end of the breakwater resulting in a large void opening 1107 Goodrington Sea Wall at Roundham Road Torbay SX Third Party Torbay A section of sea wall has been damaged including loss of facing wall and infill behind,. In addition damage to surface of slipway A section of sea wall has been damaged including loss of facing wall and infill behind,. In addition damage to surface of slipway Corbyn Head/Torre Abbey, 1109 Torquay (Emergency Torquay SX Third Party Torbay Damage to concrete revetment, steps and stone revetment. Carry out repairs to concrete revetment and integral steps and stone revetment Oddicombe, Torquay Torquay SX Third Party Torbay Damage has occurred to steps and concrete slabs forming a coastal protection asset. Includes erosion to foundations, large concrete slabs moved and damage to concrete publically accessed areas. Reseat and secure concrete slabs forming walkways, epoxy repairs to worn surfaces and provide concrete toe protection. Damage has occurred to the block facing on the outer wall of the 1111 Princess Pier, Torquay Torquay SX Third Party Torbay pier. The pier acts as a de facto flood defence asset protecting varied commercial activity in the low lying areas of Torquay. Failure of the Reset and repoint block wall to restore protection. facing stone increases the risk of flooding to this area Ilfracombe Sea Wall Ilfracombe SS Third Party Torridge District Sea Wall - collapse of 5 to 6 metres; extent of weakening/damage not yet known Sea Wall - collapse of 5 to 6 metres; extent of weakening/damage not yet known 1114 Instow Sea Wall Instow SS Third Party rth Devon Sea Wall - collapse of 6 to 8 metre length. Sea Wall - collapse of 6 to 8 metre length Pulhayes Farm East Budleigh SY Third Party Collapse of bank providing flood defence to Pulhayes farm etc. Collapse of bank providing flood defence to Pulhayes farm etc Sea wall Repair Exmouth, East of Old Lifeboat Station Slipway SX Third Party East Devon Void beneath sea wall now exposed. Void beneath sea wall now exposed Sea wall Repair Exmouth, New Lifeboat Station to Orcombe Point SX Third Party East Devon Holes in Sea Wall Holes in Sea Wall 1118 The Victoria Wall Exmouth, Mamhead Slipway to The Octagon. SX Third Party East Devon Coping damaged and pointing Coping damaged and pointing 1126 Sea Wall Sidmouth, Jacobs Ladder SY Third Party East Devon Reinforcement of sea wall now exposed. Reinforcement of sea wall now exposed River Sid Wall Sidmouth, Port Royal SY Third Party East Devon Section of railing washed away/ damaged. Potential health and safety risk to general public using footpath behind sea wall. Replace damaged railuings 1131 Axmouth Harbour Seaton SY Third Party East Devon Hole in footpath on top of Sea Wall and damaged coping. Potential erosion and eventual collapse increaing flood risk to harbour cottages. Backfill hole with concrete and replace damaged copings 1132 Axmouth Harbour Shingle Spit Seaton SY Third Party East Devon Shingle spit now lower and widened to 200m Reprofile shingle spit to original levels 1134 South Efford Marsh Sea Wall Repair Averton Gifford Sea wall adjacent to tide gate damaged. Repair Sea wall and embankment Oddicombe to Babbacombe Rock Revetment Torquay SX Third Party Torbay Remedial works to repair revetment Remedial works to repair revetment 1136 Ilfracombe Harbour Ilfracombe SS Third Party rth Devon Joint washout to higher levels of the harbour wall structure that forms a de facto defence. Carry out structural survey, scope and deliver repairs/ repoint joints Cove Sea Wall Repair Cove SS Third Party rth Devon repair to stone wall collapse repair to stone wall collapse 1142 Rapparree Cove SS Third Party rth Devon damage to railings/ sea wall and concrete hardstandings/ footpath damage to railings/ sea wall and concrete hardstandings/ footpath 1143 Lympstone Tidal Defence Lympstone SX Repair to sea defence/tide gate Rebuild sea defence wall and replace/refit tide gates 1144 Fenny Bridges Gauging Station Honiton SY approx 100 metres of river bank erosion at or about gauging station Stabilise 100 metres of river bank to prevent gauging station being washed away 1145 Anode replacement due to exceptional wave action Polperro gate Polperro SX Anode replacement due to exceptional wave action Polperro gate Anode replacement due to exceptional wave action Polperro gate 1147 Bolingey FDS Weir Repair Bolingey SW Damage to overflow weir that forms integral part of Bolingey FAS. Damage to overflow weir that forms integral part of Bolingey FAS Bridgerule Banks Repair Bridgerule SS Additional damage to portion of Bridgerule pumping station adjacent to pu,p station. Dadditional damage to portion of Bridgerule pumping station adjacent to pu,p station Bude Neet - left bank u/s Nanny Moore Bude SS to flood defence embankment damaged 2014 events to embankment damaged during floods 1156 Bude - Widemouth Bay Bude Undermining of coastal protection including DDA ramp Underpinning of mass concrete structure 1157 Constantine Bay Padstow SW Storm damage including undermining and loss of stability to coastal defences Underpinning and reconstruction of destabilised coastal defnces

4 1158 Caffa Mill 1159 Copperhouse gate overhaul due to poor state of bottom guide channels Copperhouse SW Copperhouse gate repairs to damaged bottom guide channels due to winter storms Survey copperhouse gate to assess repairs required to bottom guide channels and effect repairs 1160 Coverack sea Wall Coverack SW Collapse of sea wall and undermining of adjacent infrastructure, resulting in severance of access to the main community Temporary filling of breach with dumpy bags, followed by soil nailing and mass concrete retaining wall 1161 Crackington Haven 1162 Downderry Downderry?????????? 1163 Falmouth - Castle Drive Falmouth SW Harlyn Bay Harlyn Bay Storm damage to coastal defences which are bridge abutment and cliffing of sand dune system to masonry sea wall and stabilisation of sand dunes 1167 Falmouth - Gyllingvase Falmouth SW Looe Harbour Looe SX CC Delamination of masonry facing to harbour wall, collapse of infill and subsequent voiding. Reconstruction of damaged sea wall including dowelling of new masonry and reinforcement 1171 Looe - Hannafore Looe SX CC Loss of recurve copings during storms. Fracturing of main body of wall Hessenford Stream Culvert De-Silt Hessenford SX required to return 1173 River Pol De-silt Polperro SX required to return 1174 Pentewan De-silt Pentewan SX required to return 1175 Angarrack bypass culvert De-silt Hayle SW required to return 1176 Perranporth Bypass Culvert De-silt Perranporth SW required to return 1177 Mevagissey De-silt Mevagissey SX required to return 1178 Tamerton Foliot Stream Desilt Plymouth SX required to return 1179 Torybrook De-silt Plympton SX performance of performance of 1180 Newport, River Kensey Desilt Launceston SX performance of performance of 1181 Perranporth Stream De-silt Perranporth SW performance of performance of 1182 Clawton, River Claw De-silt SX performance of performance of 1183 Polmorla Stream De-silt Wadebridge SW performance of performance of 1184 Truro, Millpool De-silt Truro SW performance of performance of 1185 Loe Pool outlet De-silt Helston SW performance of performance of 1186 River Cober De-silt Helston SW performance of performance of 1187 Stratton De-silt Bude SS performance of performance of 1188 St Blazey Stream De-silt St Blazey SX performance of performance of 1189 Longbrook De-silt Plympton SX performance of performance of 1190 Flexbury De-silt Bude SS performance of performance of 1191 Prideaux LLFA De-silt SX performance of performance of 1193 Mullion Harbour Mullion SW Storm damage to breakwater that protects community Reconstruciton and making good fo damaged end of breakwater including sealing end of pier 1194 Newlyn Coombe Flood Newlyn SW Environment Agency Underscouring or river bank wall by wave action running up watercourse Underpinning of damaged flood defences 1195 Newquay - Fistral Sand Dunes Newquay Undermining of coastal defences that protect dune system and reduce rate of erosion to hinterland Repair gabions to comply with Health and Safety and replace timber revetment 1196 Carbis Bay Repair of partial outfall collapse Carbis Bay SW Partial collapse pof outfall structure due to undermining of concrete structure. Partial collapse pof outfall structure due to undermining of concrete structure Mawgan Porth Mawgan Porth SW Damaged Revetment on raised fluvial/tidal defence. Damaged Revetment on raised fluvial/tidal defence Padstow tidal gate, overhaul over stressed of bottom hinges Padstow SW Padstow tidal gate, over stressed bottom hinges during winter 13/14 event Carry out inspection to determine appropriate repairs to bottom gate hinges and effect repairs Penzance - Bolitho Gardens Penzance SW Damage to coast protection wall on three separate occasions, resulting in complete loss of sea wall for its enntire length and significant erosion into hinterland. Initial breach during January storms was exacerbated by February and March storms removing entire wall and eroding hinterland. Placement of rock armour to fill breach to avoid significant further risk to mainline railway, local community, main trunk road into and out of Penzance and 80 properties Newquay - Fistral Newquay SW Newquay - Harbour - Slipway/South Pier Newquay SW Further damage sustained to Towan Sea during February 1210 Newquay - Towan Newquay SW and March storms resulting in loss of temporary works, further breaching of adjacent sections of sea wall and loss of recurve wave Placement of temporary rock armour, replacement of recurve coping and reconstruction of masonry sea wall return wall Newquay - Towan Newquay SW Damage to coastal protection asset during January storms involving breach of sea wall, overtopping and loss of splash wall and voiding of backfill material Filling of void with mass concrete and permanent repair to include reconstruction of masonry sea wall 1214 Penzance - Wherrytown Culvert Penzance SW Environment Agency Damage to outfall from main river including infilling of culvert with beach material and abrasion of headwall discharge Repair and replacement of discharge outfall

5 1215 Penzance - Chyandowr Penzance SW Disruption to existing rock armour coastal defences Resetting of coastal defences including replacement of moveed rock armour Breach of armourflex mattress and significant risk to mainline Emergency works completed in 13/14. Placement of 1216 Penzance - Eastern Green Phase 1 Penzance SW railway, local community, trunk road and approx 80 properties. Significant reputational risk if transport link had been lost as seen rock armour to fill breach to avoid significant further risk to mainline railway, local community, main trunk elsewhere. road into and out of Penzance and 80 properties Polperrro Flood Wall Polperro SX Damage to flood wall due to wave action to masonry flood wall 1219 Newlyn to Wherrytown Penzance SW CC Damage to sea wall including holing of masonry facing, loss of recurve copings, complete loss of section of sea wall and erosion into hinterland Repair of masonry sea wall and replacement of recurve copings. Potential fall back of sea wall postion to more sustainable location and prevention of outflanking of adjacent sea defences Damage to toe of sea defence including removal of cut 1220 Penzance - Promenade Penzance SW CC Damage to primary, secondary and tertiary tidal defence due to wave action. Undermining of the main defence and to infrastructure. ashlar masonry units and replacement, localised repair to damaged secondary and teritiary splash walls and recurve copings 1222 Penzance Harbour Coastal Defence Penzance SX Loss of toe defence to sea wall and loss of masonry blocks. Exposure of foundations Emergency works completed locally during 13/14 to repair local washouts on south quay 1223 Porthleven Harbour Gate Porthleven SW Damage to harbour gate which provides flood defence to community Carry out survey of gates ( 5k) to enable scope to be determined. Carry out repairs (allowance of 100k in bid) 1225 Poldhu Poldhu 1226 Porthcothan Porthcothan 1227 Porthleven - Harbour area (sea defences) Porthleven 1228 Porthleven - Methleigh Bottoms Porthleven Watercourse overtopped and resulted in overland flow flooding 8 properties and damaging associated flood defence assets Reinstatement of flood defence 1230 Porthleven Sea Wall Porthleven 1232 Porthpean Porthpean Underreaming to slipway and sea wall, loss of masonry and cracking to concrete surfacing Underpinning and reapirs to masonrey sea wall. Crack repairs to surfacing 1234 St Ives - Porthmeor Sea 1235 Waterfront Wave Wall Portreath Wave damage to wave attentuation structure that prevents uprush and run up into community Recast centre reinforced concrete columns and underpinning of structure 1236 Portreath Quay 1237 Portwrinkle 1238 Praa Sands SW Readymoney 1240 St Ives - Wheal Dream St.Ives SW Erosion of sea wall and outflanking of terminal end of structure Reconstruciton of wall which forms part of a coast protection structure preventing loss of properties and museum 1242 St Ives Harbour Piers St Ives SW Wave action led to voiding and loss of masonry pointing compormising the integrity of the pier, which forms a breakwater and reduces flood risk in the main community Repointing and infilling of voids in masonry. Replacement of disrupted masonry units 1243 Lambeth Walk, St Ives St Ives Storm damage to coastal defence. Disruption of rock armour and subsequent damage to sea wall and copings Replacement of rock armour units and reapirs to wall 1244 Pedn lva, St Ives St Ives Storm damage resulting in loss of recurve copings and uplift of apron Replacement of recurve units, copings and reinstatement of apron 1245 St Ives - Porthmeor Beach St Ives Inundation of sand over defences and into properties Relocation of sand compromising coastal defences and reprofiling of beach to reduce risk of wave run up 1246 St Ives - Porthmeor Beach Café & Beach Huts St Ives Storm damage to coastal defences including destruction of commercial buildings that provide a coast protection benefit. Occurred on two separate occassions hence the duplicaiton of lines to the sections of the buildings that fulfil a coast protection function, leaving main building repairs to third party 1247 St Mawes sea Wall St Mawes SW CC Damage to sea wall including loss of masonry and damage to parapet Replacement of lost masonry and repairs to flood wall 1249 St Mawes - Summers Beach 1251 Tiddy Brook Plympton SX Supporting stone walls to the channel damaged during high winter flows of 13/14. Discreet repairs to sections of low stone walls in channel to prevent collapse and erosion of earth embankments that form flood defence Torpoint - Marine Drive Torpoint Coastal defence protecting approximately 50 flats. Storm damage resulted in voiding of sea wall, loss of facing masonry and backfill material. Rebuild masonry wall and infill voids 1253 Trebarwith Strand 1254 Trevone Trevone Storm damage to retaining wall resulting in breaching and loss of masonry structure Reconstruction of masonry sea wall 1267 Plymouth - Mount Batten Plymouth SX CC Plymouth CC Cracks in outer wall of Moutbatten breakwater Failure of quay surface next to Mountbatten slipway and Mountbatten Centre Failure of ground slab on promenade of Mountbatten breakwater in multiple locations Repair of promenade and quay and cracks in breakwater 1269 Plymouth - Pottery Quay Plymouth SX Plymouth CC Failure quay walls at Pottery Quay Carry out structural survey of quay walls and scope appropriate repairs to restore wall condition to pre 13/14 event Plymouth - Lawrence Road Plymouth SX Plymouth CC Failure of gabion basket defence supporting Lawrence Road Remove failed gabions and fill material, reprofile base and relay new gabions and fill material Plymouth - West Hoe Pier and Grand Parade Sea Wall Plymouth SX Plymouth CC Damage to sea walls that constitute a ocast protection asset including partial demolition. Breach of outer walls of West Hoe pier Carry out structural survey and scope out repairs including breach. Carry out repairs to match existing Plymouth - West Pier Plymouth SX Plymouth CC Damage to quay wall at West Pier, near Mayflower Steps Carry out minor repairs to masonry wall including rake out and replace blown joints 1293 Plymouth - Oreston Wall Plymouth SX Plymouth CC Damage to quay walls at Oreston Quay, including masonry loss and joint wash out. Carry out structural survey to determine extent of damage, scope works and carry out masonry repairs, repointing and core grouting as required Seaton Tramway Seaton, Devon SY Third Party Approx half mile of tramway acting as defacto flood defence washed out. Approx half mile of tramway acting as defacto flood defence washed out Exwick Radial Gates Exeter, Devon SX Damage caused to runners during winter fluvial event causing gates to be ineffective. Removal and replacement of steel runners/guide rails in order to allow full operation of Radial Gates Shaldon Steps repair Shaldon, Devon SX Foundations of flood defence wall undermined and 2 associated public access steps now unsafe due to erosion during winter tidal event. Access PSRA. Underpinning of tidal defence wall, construct new foundations and reseat mass concrete steps Bowling Green Embankment Repair Topsham SX Exeter City Exeter City Breach in embankment Accelerated 40m Breach repairs using sheet piling 1470 Porth Minnick Coastal Defence St Mary's SV to SV Isles of Scilly Isles of Scilly Banking and rock Armour on upper part of cable tied concrete block revetment New Replace soil and rock armour,reprofile top of revetment 1471 Porthloo Bank St Mary's SV to SV Duchy of Isles of Scilly Managed Realignment (MR) Coastal erosion of protective sand bank / mud bank fronting Boat Park and domestic properties yes accelerated Replace and reinstate dune / create sleeper wall 10-15m behind current dune face 1472 Gorran Haven Sea wall Gorran Haven SX CC Damage to sea wall masonry and movement from substrate Repair as per original but with anchors

6 Repair to damaged river banks following high river flows during 2013/14 floods. Cut out bank,rebuild, Par River Bank Repair Par SX Damage to river Par banks adjacent to Highway Dam. New compact and reprofile. Tie into competent existing bank. extensive running resulted in engine overheating requiring flt no sw Bradney Somerset fleet ops no replace pump overhaul/replacement Port Gaverne Coastal Breach of coastal defence during February storms resulting in loss of Filling of void behind coastal defence and Port Gaverne SX Defence masonry sea walll, loss of highway and risk to adjacent properties reconstruction of masonry sea wall Talland Bay Sea Defence Reinstatement of coastal defence involving sprayed Talland Bay Wave damage to coastal protection revetment and gabions concrete and replacement of gabions Lympstone Tidal Gate Environment Environment Lympstone, Devon SX damaged during storms and gate will not close Repair gate mounting frame / attachment to wall Agency Agency to washed out front and back face of Wash out of front and back face of embankment and damaged crest embankment and damaged crest following January Rea Bank Rea SO following January tides. tides. Short term fix to secure integrity of defence prior to permanent works in spring / summer 2014 Minsterworth & ards Works to temporariliy repair flood damge to flood Minsterworth area SO Wah out of material causing low spots following January tides Flood Bank banks at Minsterworth Epney Wall Epney SO Leaking joints in flood wall to seal leaking joints Ashleworth Ring Bank Ashleworth Quay SO Defence seepage Repair to seepage through ring bank Alney Island Alney, Gloucester SO Defence seepage Construct pump sump to aid pumping of seepage Extensive wrack clearance from estuary embankments Extensive wrack build up on estuary embankments following Jan following Jan 2014 tidal floods to allow inspection, Severn Estuary Severn Estuary N/A 2014 tidal floods preventing full inspections, and damaging grass New prevent damage to grass cover and prevent vermin cover. infestation. Damage to embankment crests along the estuary from overtopping Topographic Survey to establish low crest lengths Severn Estuary Severn Estuary N/A New and saturation creating low spots. damaged by floods. Ark Corner Bank Confluence Area SJ Damage to Ark Corner flood bank causing low spot Refurbish section of flood embankment Battlefield Brook Screen Battlefield Brook Trib SJ Screen Damaged due to heavy debris Screen Replacement due to flood damage Damaged access steps to outfall preventing operational access and Mordiford Access Steps Mordiford SO Replace damaged steps with concrete structure causing a health and safety risk Stapleton Lodge Wall Presteigne SO Wash out and damage of mortar joints in flood wall Re-point flood wall Newport Strine Newport SJ Large Tree blocking width of channel at Newport Strine Removal of tree Incident indicative costs: Staff costs manning incident room, ambassadors and policing flood barriers 150k, Incident costs West Area N/A n/a Incident Response Costs New Operational Field team costs: 50k, Kempsey pumping, generator and repair costs 50k. Horsbere Brook Gloucester SO Erosion of spillway to spillway and erosion protection in brook Uckinghall Uckinghall, Worcestershire SO Relocation of sensors, repairs delayed due to flood incident Relocation of sensors Alney Island FAS 2012 to damage to flap valves on A417, including Alney Island, Gloucester SO Damaged flap valves on A417 Floods improved access Ashleworth Quay Walkway Ashleworth Quay, Steel walkway damaged preventing operational access and causing 2012 Floods SO to steel walkway Ashleworth a health and safety risk Cornham Flood bank Reinstate flood damaged bank profile following Jan Cornham, Gloucester SO Reinstate flood damaged bank profile following Jan 2014 tidal floods New repairs 2014 tidal floods Reinstate flood damaged erosion of bank following Jan 2014 tidal Reinstate flood damaged erosion of bank following ards Flood bank repairs The ards, Bollow. SO New floods Jan 2014 tidal floods The Strand, Westbury wall The Strand, Westbury SO to damaged flood wall following Jan 2014 tidal floods New Repair cracked wall above outfall and outfall itself repair to leaking flood wall expansion joints following Jan 2014 tidal Epney Wall repair Epney, Hardwick SO New Investigate riverside and core of flood wall and repair. floods Lapper Ditch Outfall Epney, Hardwick SO to outfall damaged by Jan 2014 tidal floods New to outfall damaged by Jan 2014 tidal floods Priding wall repair Priding, Framilode SO to flood wall expansion joints following Jan 2014 tidal floods New Investigate riverside and core of flood wall and repair. Ashleworth quay flood Repair to flood bank at slipway and flood gates to prevent seepage Repair to flood bank at slipway and flood gates to Ashleworth Quay SO New bank repairs identified during Jan 14 floods. prevent seepage identified during Jan 14 floods. Shuthonger flood bank Repair to flood bank to prevent seepage identified during Jan 14 Repair to flood bank to prevent seepage identified Shuthonger, Tewkesbury SO New repairs floods. during Jan 14 floods. Urban Minsterworth Erosion protection and repair of crest damage following Jan 2014 Repair of crest damage and other erosion following Minsterworth SO New erosion protection tidal floods Jan 2014 tidal floods Structural inspections and repairs of tidal outfalls damaged in Jan Structural inspections and repairs of tidal outfalls Estuary Outfall Works Severn Estuary defences Various 2014 tidal floods damaged in Jan 2014 tidal floods Repair of floating boat barriers and alteration of Evesham Weir Health and Floating boat barriers at Evesham Weir damaged in February. Fixed Evesham SP New damaged fixed boat barriers to prevent public access Safety Works boat barriers previously damaged. for H&S needs. Rea / Hempstead flood to bank damaged by Jan 2014 tidal floods and Rebuild of poor embankment, that was damaged in Rea SO Accelerated bank repairs reinstatement of crest levels January 2014 floods to damage to crest and sides of the Longney Elmore erosion Damage to crest, sides and toe of embankment following January embankment caused by the January and February Longney and Elmore SO New protection and February tidal events. tidal events, including replacement of blockstone at the toe of the embankment Hampton Bishop Lugg Hampton Bishop, Hereford. Reinstatement of damaged crest following Jan 2014 SO Reinstatement of damaged crest following Jan 2014 floods New Crest River Lugg floods Hampton Bishop Hampton Bishop, Hereford. Repair to base of flood bank damage due to seepage identified Repair to base of flood bank damage due to seepage SO New Embankment River during Jan 14 floods. identified during Jan 14 floods. Edgerley Outfall Confluence Area River Remove deformed sheet piles, install rock armour and SJ to outfall damaged by Jan 2014 floods New Replacement Severn, Edgerley concrete around walkway. Mordiford Bridge Mordiford, River Lugg SO Repair to flood bank to prevent seepage (deferred from 2013/14) New to seepage of flood bank at Mordiford. Embankment Cleobury Mortimer Screen Replace 4 screens on the Pudding Brook damaged beyond repair by Replace 4 screens on the Pudding Brook damaged Cleobury Mortimer SO New Replacements Jan 2014 floods. beyond repair by Jan 2014 floods Existing trash screen damaged by heavy debris and scouring. Winyates Way trash Worcestershire Repair to trash screen damaged by heavy debris and Matchborough, Redditch SP Replacement at correct angle to flow with improved setting to be New screen replacement LLFA scouring. more resilient. The continued high water levels has broken the motor on this Bridgnorth Gauge Replace gauging station by new station as existing Bridgnorth SO "bubbler" hydrometric station, causing lonng periods where levels New Replacement equipment is now obsolete. have been unavailable for flood warning. Putson Screen Putson SO Private Damage to Outfall Outfall and Access construction Collapsed culvert resulted in major flooding to several Gardens. Internal flooding was prevented by the provision of pumping arrangements. This continued over three months during the period of Extreme weather conditions Staffs Warks and West Replace with oversized culvert and provision of flood Central Lea Vale Road Culvert DUDLEY Although the culvert was in a poor condition it is Clear that the Mids retention pools extreme weather resulted in major Deterioration The existing old culvert is of an inadequate size to Take current design storm standards And is a very poor condition Pimperne Brook, d/x of Pumping station failed, deployment of 2x6" and 1x12" mobile pumps 408 Wessex Wessex Pimperne Pumping Station ST East Street, Blandford to increase pump capacity to protect Deployment of 2" mobile pump to pump surface water trapped behind 410 Wessex Wessex Embankment The, Downton SU embankment Riverside Place, Deployment of 6" mobile pump to pump surface water trapped 411 Wessex Wessex Wall SU Fordingbridge behind our defence wall. Deployment of 4" mobile pump to pump surface water trapped 412 Wessex Wessex Embankment West Street, Ringwood SU behind our defence wall. Deployment of 6" mobile pump to pump surface water trapped 413 Wessex Wessex Embankment Stoney Lane, SZ behind our defence wall. Barlins - Bridge Street, Deployment of 2" mobile pump to pump surface water trapped 414 Wessex Wessex Wall SZ behind our defence wall. Loss of most of shingle beach which forms the flood defence. Preston Beach Sea 415 Wessex Wessex Weymouth SY Further damaged to sea defences in February 2014 exposing the foundation of the defence to scour due large wave actions. 416 Wessex Wessex Chiswell Shingle Beach Portland SY Loss of most of shingle beach which forms the flood defence Gabion Baskets and mattresses which extend for 550 metres along 417 Wessex Wessex Chiswell Gabion Repair Portland SY Chesil Beach have been exposed, ripped open and deformed by wave attack. 418 Wessex Wessex Freshwater Burton Bradstock SY Loss of shingle beach which forms part of the flood defences. 419 Wessex Wessex East Beach West Bay, Bridport SY Loss of shingle beach which forms the flood defence. 420 Wessex Wessex Wareham Tide Banks Wareham SY Erosion of tide bank by flood water overtopping the banks. Deployment of 2x6" and 1X12" mobile pumps Deployment of 6" mobile pump Deployment of 6" mobile pump Deployment of 4" mobile pump Deployment of 6" mobile pump Deployment of 2" mobile pump Emergency reprofiling and repair to damaged sea defence to prevent progressive failure and breach if not carried out. Risk to life due to breaching and overtopping of the sea wall and road closure. Emergency reprofiling to prevent progressive failure and breach of defence Emergency repairs to the gabion baskets and mattresses to prevent flood defence from failure. Emergency reprofiling to prevent progressive failure and breach of defence Emergency reprofiling to prevent progressive failure and breach of defence Rebuilding the tidebank between South Bridge and Redcliffe with material won from the delph ditch

Appendix C Defences Assessment DRAFT

Appendix C Defences Assessment DRAFT Appendix C Defences Assessment Appendix C March 2010 Appendix C March 2010 Defences Assessment The following text summarises the coast protection and sea defences present in the Cornwall and Isles of Scilly

More information

The South West Coast Path by bus / single car

The South West Coast Path by bus / single car The South West Coast Path by bus / single car With careful planning it is possible to walk the South West Coast Path as a series of day walks either using buses, or when these are not available by retracing

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Coastal Processes Day Criccieth

Coastal Processes Day Criccieth Coastal Processes Rivers (Conwy) Rivers (Peris) Urban Studies Lowland Glaciation Tourism and National Parks Soils Sand Dunes Upland Glaciation Rural Settlements The Centre and Staff Fieldwork Equipment

More information

Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION

Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION Location reference: Policy Unit reference: Plan: Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION The long term aim for this section

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

The Wet and Wild Winter of in west Cornwall

The Wet and Wild Winter of in west Cornwall DECEMBER 2013 The Wet and Wild Winter of 2013-2014 in west Cornwall It all started so benignly, then after a lovely sunny day with light winds on the 16 th, the unsettled, very wet and sometimes stormy

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

storms and coastal defences at chiswell

storms and coastal defences at chiswell storms and coastal defences at chiswell What is this booklet about? This booklet provides information about: How Chesil Beach and the Fleet Lagoon formed and how it has changed over the last 100 years

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

As temporary grade control facilities along waterways until final stabilization is established.

As temporary grade control facilities along waterways until final stabilization is established. Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically

More information

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS

NORTHERN CELL OPTIONS SHORTLIST RECOMMENDATIONS OPTIONS SHORTLIST RECOMMENDATIONS Coastal Unit C: Bayview Options recommended for MCDA scoring. Status quo. Planting 3. Renourishment (gravel) 6. Beach-scraping 7. Restore shingle crest. Inundation accommodation

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

BODMIN RETAIL PARK BODMIN, PL31 2GA. 55,067 sq ft Non-food bulky goods retail park. Retained Agent

BODMIN RETAIL PARK BODMIN, PL31 2GA. 55,067 sq ft Non-food bulky goods retail park. Retained Agent BODMIN RETAIL PARK BODMIN, PL31 2GA Retained Agent 55,067 sq ft Non-food bulky goods retail park LOCATION Bodmin is located in the county of Cornwall in the south-west of England. It is approximately 22

More information

Exeter Flood Defence Scheme

Exeter Flood Defence Scheme Exeter Flood Defence Scheme CECA South West Member s Presentation 30th November 2016 Tristan Bassett Commercial Services Manager, EA Don Higgs Framework Manager, BMM JV Update Covering.. Why we re Building

More information

Appendix to the State of Conservation report June 2010

Appendix to the State of Conservation report June 2010 Appendix to the State of Conservation report June 2010 South Devon and Dorset SMP review Poole and Christchurch Bays SMP review Channel Coastal Observatory strategic monitoring programme SW strategic monitoring

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

1. What is a Shoreline Management Plan?

1. What is a Shoreline Management Plan? Our coastline is changing We live in a part of the country with a unique and dramatic coastline, with coastal landscapes and seascapes that have been shaped by natural processes over geological timescales.

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION Dave Basco Old Dominion University, Norfolk, Virginia, USA National Park Service Photo STRUCTURAL (changes to natural, physical system) hardening (seawalls,

More information

Emergency Coastal Protection Works Practical Lessons For The Future From The Past

Emergency Coastal Protection Works Practical Lessons For The Future From The Past Emergency Coastal Protection Works Practical Lessons For The Future From The Past Angus Jackson1 Principal Engineer, International Coastal Management a.jackson@coastalmanagement www.coastalmanagement.com.au

More information

COASTAL HAZARDS. What are Coastal Hazards?

COASTAL HAZARDS. What are Coastal Hazards? COASTAL HAZARDS What are Coastal Hazards? Hazards in the New Jersey coastal zone include unavoidable risks to life and property generated by: coastal flooding, waves, high winds and waves, short-term and

More information

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

SANDBANKS COAST PROTECTION

SANDBANKS COAST PROTECTION SANDBANKS COAST PROTECTION David Robson, Senior Engineer, Coastal & Drainage Team Borough of Poole Leisure Services (T) 01202 265265 (E) d.robson@poole.gov.uk May 2003 SANDBANKS COAST PROTECTION Introduction

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring In 2012, the Delaware Surfrider Foundation Chapter formed the Surf Quality and Access Committee to focus on issues such as surf spot

More information

Coast Survey Stretch 03 Seaview High Street to Sandown Zoo

Coast Survey Stretch 03 Seaview High Street to Sandown Zoo Coast Survey Stretch 03 Seaview High Street to Sandown Zoo Overview map of the stretch Introduction The route starts at the attractive village of Seaview, through the wooded Priory Bay, passing the remains

More information

Identify one factor which influences wave strength (1 Mark) Factors which affect wave strength

Identify one factor which influences wave strength (1 Mark) Factors which affect wave strength Coasts revision Identify one factor which influences wave strength (1 Mark) Factors which affect wave strength Identify one factor which influences wave strength (1 Mark) Factors which affect wave strength

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com ABSTRACT Severe

More information

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

Coastal Change and Conflict

Coastal Change and Conflict Coastal Change and Conflict Outline of the Topic Contrasting Coasts why do all coasts not look the same? Geology of the coast the impact rock structure has on the coastline Waves Constructive and destructive

More information

Fish Passage Planning and Design

Fish Passage Planning and Design Fish Passage Planning and Design Culvert Fishway Planning and Design Guidelines Part I Design Drawings for Fishway Projects Ross Kapitzke James Cook University School of Engineering and Physical Sciences

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Chesil Beach, Dorset UK High energy, shingle coastline. Brighton Beach, Sussex UK Pebble beach

Chesil Beach, Dorset UK High energy, shingle coastline. Brighton Beach, Sussex UK Pebble beach Beaches: Depositional landform Extends from the highest high tide to the lowest low tide. Very important temporary store in coastal system. Accretion: sediment returning to the visible portion of a beach

More information

APPENDIX K CULVERT INSPECTION MEMO

APPENDIX K CULVERT INSPECTION MEMO APPENDIX K CULVERT INSPECTION MEMO McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

Tidal defences for Clevedon, North Somerset

Tidal defences for Clevedon, North Somerset Tidal defences for Clevedon, North Somerset We are t\ your env and for fi Your envidrink anc- Governm environrr The Envir environm ENVIRONMENT AGENCY inform ation Services Unit Please return or renew this

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions

Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions Map 8: Ayrshire Coast: Ardrossan North Bay to Stevenston Pier Map Content Descriptions 1. Built Heritage and Archaeology A total of twenty four sites were recorded in the area covered by Map 8. Of these

More information

Management Area 19 Management Area 20 Management Area 21 Management Area 22. Mount s Bay West (The Greeb to Point Spaniard)

Management Area 19 Management Area 20 Management Area 21 Management Area 22. Mount s Bay West (The Greeb to Point Spaniard) PDZ: 8 Mount s Bay West (The Greeb to Point Spaniard) (Including Marazion and St Michael s Mount) Management Area 19 Management Area 20 Management Area 21 Management Area 22 Mount s Bay West (The Greeb

More information

Shoreline Erosion Control Failures and How To Avoid Them

Shoreline Erosion Control Failures and How To Avoid Them 2008 Illinois Lake Management Association Shoreline Erosion Control Failures and How To Avoid Them by: Hank Sutton, President, Lake Rip Rap, Inc. www.lakeriprap.com - www.macoupinboats.com Setting the

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

DRAFT. Management Area 19 Management Area 20 Management Area 21 Management Area 22

DRAFT. Management Area 19 Management Area 20 Management Area 21 Management Area 22 PDZ: 8 Mounts Bay West (The Greeb to Point Spaniard) (Including Marazion and St Michael s Mount) Management Area 19 Management Area 20 Management Area 21 Management Area 22 Mounts Bay West (The Greeb to

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

Define the key terms: - Abrasion - Attrition - Hydraulic action - Solution. Y11 Coasts

Define the key terms: - Abrasion - Attrition - Hydraulic action - Solution. Y11 Coasts Define the key terms: - Abrasion - Attrition - Hydraulic action - Solution Abrasion caused by waves picking up material which is forced against the cliff face wearing it away Attrition where stones and

More information

Just a Balloon BALLOON DEBRIS ON CORNISH BEACHES

Just a Balloon BALLOON DEBRIS ON CORNISH BEACHES Just a Balloon BALLOON DEBRIS ON CORNISH BEACHES Cornish Plastic Pollution Coalition January 2017 BACKGROUND This report has been compiled by the Cornish Plastic Pollution Coalition (CPPC), a sub-group

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Authors: Tony Parker, Uwe Dornbusch Main driver: Improved defences Project stage: Ongoing construction/operation since 1992 Photo 1: Shoreham

More information

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people The Dynamic Coast Houses threatened by coastal erosion in California Right Place Resources A presentation about the interaction between the dynamic coast and people For the rest of the presentations in

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual LoneStar Fiberglass Pools Do-It-Yourself Installation Manual Chris 1/3/2008 Do-It-Yourself The installation of a LoneStar Fiberglass pool is a much simpler task than most people think. What is important

More information

Impacts of breakwaters and training walls

Impacts of breakwaters and training walls Across the eastern seaboard of Australia, breakwaters and training walls have instigated fundamental perturbations to coastal and estuary processes. This has induced long-term changes to foreshore alignments,

More information

Waves- how are they formed and how do they affect the coast?

Waves- how are they formed and how do they affect the coast? Question 7 Coasts Waves- how are they formed and how do they affect the coast? Waves are caused by friction between the wind and water causing the water to swell. The size and energy of a wave is influenced

More information

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman Historic dam failures and recent incidents Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman 1 Agenda 1. Dams in all their beauty 2. Hazards associated with dams

More information

DUNE STABILIZATION AND BEACH EROSION

DUNE STABILIZATION AND BEACH EROSION DUNE STABILIZATION AND BEACH EROSION CAPE HATTERAS NATIONAL SEASHORE NORTH CAROLINA ROBERT DOLAN PAUL GODFREY U. S. DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE OFFICE OF NATURAL SCIENCE WASHINGTON, D.

More information

Llandudno Beach Management Plan and Options Appraisal

Llandudno Beach Management Plan and Options Appraisal Llandudno Beach Management Plan and Options Appraisal August, 2017 G.B. Edwards BEng (Hons) CEng FICE Head of, Mochdre Offices, Conway Road, Mochdre, Colwyn Bay, LL28 5AB. Tel. (01492) 574000 Fax. (01492)

More information

COASTAL MANAGEMENT AND PROTECTION METHODS! 1

COASTAL MANAGEMENT AND PROTECTION METHODS! 1 COASTAL MANAGEMENT AND PROTECTION METHODS! 1 Strategy What it does Cons Pros Examples SOFT ENGINEERING: The use of ecological principles and practices to reduce erosion and achieve the stabilization and

More information

EMERGENCY WORK AT REPOS BEACH AUROVILLE REPORT 24 th SEPTEMBER 2013

EMERGENCY WORK AT REPOS BEACH AUROVILLE REPORT 24 th SEPTEMBER 2013 EMERGENCY WORK AT REPOS BEACH AUROVILLE REPORT 24 th SEPTEMBER 2013 Satprem Maïni, Lara Davis Auroville Earth Institute BACKGROUND The erosion of the sand beaches north of Pondicherry is the result of

More information

GCSE GEOGARPHY OCR B REVISION GUIDE Coasts

GCSE GEOGARPHY OCR B REVISION GUIDE Coasts GCSE GEOGARPHY OCR B REVISION GUIDE Coasts Definition: The interface between land and sea. Coastal regions cover only 10% of the inhabited land space, yet they are home to more than 60% of the world s

More information

If you have comments on this or suggestions for other terms that should be added to this glossary, please send an to

If you have comments on this or suggestions for other terms that should be added to this glossary, please send an  to Tide Gates Glossary There is very little information available anywhere related to tide gates and flap gates. This is a glossary of terms that are associated with, or useful when discussing, tide gates.

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, & 10422) Condition of Improvement 30 September 2009 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th Congress,

More information

M EMORANDUM O CTOBER 6, 201 6

M EMORANDUM O CTOBER 6, 201 6 M EMORANDUM O CTOBER 6, 201 6 TO: FROM: SUBJECT: BOARD OF DIRECTORS ERIC KUHN, GENERAL MANAGER PETER FLEMING, ESQ. DON MEYER, P.E., RAY TENNEY, P.E. WOLFORD AND ELKHEAD RESERVOIR OPERATIONS This memo summarizes

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Appendix 10B Photographs (Including Historical Images)

Appendix 10B Photographs (Including Historical Images) Lower Lee (Cork City) Drainage Scheme in association with Appendix 10B Photographs (Including Historical Images) Environmental Impact Statement APPENDIX 10B: PHOTOGRAPHS (INCLUDING HISTORICAL IMAGES) Plate

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES A. Adopted construction codes and installation requirements 1. 2015 edition of the International Residential Code and Appendix Q, 2. 2014 edition of the National

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Great Lakes Stream Crossing Inventory Instructions

Great Lakes Stream Crossing Inventory Instructions Great Lakes Stream Crossing Inventory Instructions This document is a guide to completing the Stream Crossing Data Sheet (2/28/11 version). Careful attention to this guidance will ensure consistent crossing

More information

Montserrat. Wise practices for coping with. i b bea n Se a

Montserrat. Wise practices for coping with. i b bea n Se a Wise practices for coping with Montserrat Car i b bea n Se a Fisheries Division, Montserrat Physical Planning Department, Montserrat University of Puerto Rico, Sea Grant College Program Caribbean Development

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Constructive waves build beaches. Each wave is low. As the wave breaks it carries material up the beach in its. material will then be deposited as

Constructive waves build beaches. Each wave is low. As the wave breaks it carries material up the beach in its. material will then be deposited as Constructive waves Constructive waves build beaches. Each wave is low. As the wave breaks it carries material up the beach in its swash. The beach material will then be deposited as the backwash soaks

More information

Poole Bay, Poole Harbour and Wareham Flood and Coastal Erosion Risk Management. Final Strategy December Aerial photo credit: Kitchenham Ltd

Poole Bay, Poole Harbour and Wareham Flood and Coastal Erosion Risk Management. Final Strategy December Aerial photo credit: Kitchenham Ltd Poole Bay, Poole Harbour and Wareham Flood and Coastal Erosion Risk Management Final Strategy December 2014 Aerial photo credit: Kitchenham Ltd 1 Foreword The Poole and Wareham Strategy area is one of

More information

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS 24 TH July 2013 MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS Vern Costelow Business Development Consultant AWMA Water Control Solutions INTRODUCTION Surface irrigation is still

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018

Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018 Job No. : 16009 Date: Jan 2018 Meath County Council Meath County Council Boat Slipways Technical Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 CONTENTS Page No. 1 INTRODUCTION... 1 1.1

More information

Redondo Beach Boat Launch Ramp Facility

Redondo Beach Boat Launch Ramp Facility Redondo Beach Boat Launch Ramp Facility Feasibility Report for the California Department of Boating and Waterways 2015 Grant Cycle For the City of Redondo Beach Submitted by March 13, 2014 Table of Contents

More information

Planning of Major Recreational Boating Facilities at Shell Cove Boat Harbour

Planning of Major Recreational Boating Facilities at Shell Cove Boat Harbour Planning of Major Recreational Boating Facilities at Shell Cove Boat Harbour B Morgan 1, Deborah Lam 1, Glenn Colquhoun 2 1 Advisian, Sydney, NSW 2 Frasers Property Australia, Shell Cove, NSW Abstract

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Estuarine Shoreline Stabilization

Estuarine Shoreline Stabilization Estuarine Shoreline Stabilization Property Owner s Guide to Determining the Most Appropriate Stabilization Method Estuarine shorelines are dynamic features that experience continued erosion. Land is lost

More information

Fish Friendly Crossings- Examples from Nash Stream

Fish Friendly Crossings- Examples from Nash Stream Fish Friendly Crossings- Examples from Nash Stream Maggie Machinist- North Regional Forester, Division of Forests and Lands. Nash Stream Nash Stream Forest is 40,000 acres, owned and managed by NH Division

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary

Policy. Stormwater Fencing. 1. Overview Objective Scope Summary Policy Stormwater Fencing 1. Overview 1.1. Objective The purpose of the Fencing Policy is to ensure the right information and consistent guidelines are used in fencing Sydney Water s Stormwater Network

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information