Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Similar documents
Arizona State University NanoFab XACTIX ETCHER. Rev A

Xactix Xenon Difluoride Etcher

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Xactix XeF2 OPERATION MANUAL

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

OXFORD PLASMALAB 80PLUS (CLOEY)

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

TABLE OF CONTENTS 2 INTRODUCTION 4 DELEGATION OF RESPONSIBILITIES 5 INSTALLATION 6

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Standard Operating Manual

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Standard Operating Manual

University of MN, Minnesota Nano Center Standard Operating Procedure

University of MN, Minnesota Nano Center Standard Operating Procedure

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

University of Minnesota, MN Nano Center Standard Operating Procedure

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

Cambridge NanoTech: Savannah S100. Table of Contents

STS ICP-RIE. Scott Munro (2-4826,

University of Minnesota Nano Center Standard Operating Procedure

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Basic ICP Operating Procedures

March CS-1701F Reactive Ion Etcher

AX5000 Operational Manual

University of MN, Minnesota Nano Center Standard Operating Procedure

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Standard Operating Manual

User Manual for the Mars Calibration Bench

Birck Nanotechnology Center

Standard Operating Procedure. For. PVD E-Beam

CircuFlow Quick Setup Guide

Standard Operating Manual

Equipment Operating Procedure Glove Box

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Standard Operating Manual

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

Standard Operating Manual

STS PECVD Instructions

NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Notes-PECVD: Chamber 1

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

6900 Maintenance Instruction System Flush

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Chamber Test Testing Theory

MJB-3 Mask Aligner Property of TAU MNCF August 2012

CLEANLINESS STANDARD NCPRE tool contamination classification

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Operating Procedures for the. SAMCO ICP RIE System

6800 Maintenance Instruction System Flush Procedure

March Asher Operation

Operating Instructions

Unaxis PECVD. SiH4 (5% in He)

Warnings: Notes: Revised: January 8,

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

AFDXXX(X)AC Series Operators Manual Please read this manual thoroughly before attempting to operate your water maker.

Standard Operating Manual

Plasma Asher: March PX-500 User guide (May-30, 2017)

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

The MRL Furnaces USED FOR THIS MANUAL COVERS

Warnings: Notes: Revised: October 5, 2015

SPLIT HOPKINSON PRESSURE BAR OPERATIONS MANUAL 5/9/2014

Hertfordshire Girls Football Partnership League Promoting the development of girl s football in Hertfordshire

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Usage Policies Notebook for STS DRIE System

Armfield Distillation Column Operation Guidelines

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Standard Operating Procedure

NRF Suss Delta 80 Spinner SOP Revision /14/2016 Page 1 of 11. Suss Delta 80 Spinner SOP

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Standard Operating Manual

MANUAL FOR SPTS APS (DIELECTRICS ETCHER)

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Using the Akta Prime plus October 22, 2012

FAULT CODE TROUBLESHOOTING INDEX

Usage Policies Notebook for Trion RIE / ICP Dry Etch

COMELEC C-30-S Parylene Coating System

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

Karl Suss MJB4 Mask Aligner

Birck Nanotechnology Center

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Operation of the mask aligner MJB-55

Lockout/Tagout - Control of Hazardous Energy Program

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Transcription:

Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Xactix XeF2 Etcher. All users are expected to have read and understood this document. It is not a substitute for in-person training on the system and is not sufficient to qualify a user on the system. Failure to follow guidelines in this document may result in loss of privileges. 2 REFERENCE DOCUMENTS o Appropriate Tool Manuals o MSDS for XeF2 3 DEFINITIONS Sublimate- to change from a solid to a gas or from a gas to a solid without becoming a liquid. 4 TOOLS AND MATERIALS 4.1 General Description 4.1.1 The Xactix XeF2 Etcher may be used for dry, isotropic, vapor-phase etching of silicon. 4.2 Etch Fixtures 4.2.1 Etch fixtures 5 SAFETY PRECAUTIONS 5.1 Personal Safety Hazards 5.1.1 The Xactix XeF2 Etcher uses XeF2 gas which when combined with water forms HF. All substrates to be etched must be dry. Any substrate coming from a wet chemical process must be hard baked for 5 minutes at 150 C to dehydrate before processing with XeF2. RIT SMFL Page 1 of 10

5.2 Hazards to the Tool 5.2.1 Ensure all covers and panels are on and closed. The gas box door must remain closed so the preheater can keep the XeF2 warm enough to sublimate. 5.2.2 XeF2 pressure set points must be below 3.3Torr. Above 3.8Torr at 25 C XeF2 will not sublimate. Set points above the sublimation limit will make the recipe stall waiting to achieve an unreachable pressure. 5.2.3 Any recipe requiring Nitrogen flow must have a minimum pressure set point of 2Torr. Lower pressures can cause Valve 11 not to open and recipe will not run and hang up. 6 INSTRUCTIONS 6.1 Initial State Check 6.1.1 Card Swipe In on card swipe panel #1. 6.1.2 Ensure the N2 regulator on the rear left corner of the tool indicates between 10 and 20 psi on the gage. 6.1.3 Ensure the emergency stop buttons are pulled out on both the system and the power control box below the bench. 6.1.4 Under the bench verify the LINE POWER light on the Power Control Box is on. 6.1.5 On the Power Control Box verify the Control Power light is on. 6.1.6 Ensure compressed air is on set between 70 and 100 psi gage on the left rear corner of the tool. 6.1.7 If the vacuum pump is not running or the system has been turned off, press the green START button on the front of the tool. This should start the e1 series Xactics as well as the vacuum pump. After start up allow up to 4 hours for the gas box to stabilize temperature before processing. 6.1.8 Ensure the Dell computer below the counter is on. If not start it. 6.2 Starting the System 6.2.1 Launch the Xetch program from the desktop if not already open. 6.2.2 Login Username: smfl, Password: smfl all lower case and press Login. RIT SMFL Page 2 of 10

6.2.3 From the main menu select Load/Unload Sample. RIT SMFL Page 3 of 10

6.2.4 Answer Yes in the popup window and the system will pump and purge the chamber for approximately 3 minutes. 6.2.5 If a popup window appears Please close the shroud now pull the shroud handle forward to the mechanical stop until you hear it click. Then click OK in the popup. 6.2.6 Load or unload the chamber now. Press Examine to temporarily pump down. Press Done to purge the chamber and return to the main menu. This should pop up telling you it s ready to load. 6.2.7 Lift the chamber lid open. The chuck is reversible for 4 or flip it over for 6. Place the chuck in the correct position for you sample. Load your sample. Close the lid and hold it down. CAUTION: Don t press CANCEL during the loading sequence. If the 3 minute pump and purge doesn t finish, moisture from the air can form HF. 6.2.8 If the placement of the sample doesn t matter or if running whole wafers press Done and hold the lid down until the chamber is under vacuum. If the placement of your sample is critical, press Examine and hold the lid until the chamber is under vacuum. Examine the placement after applying vacuum. If the sample is fine press OK to return to the Load/Unload screen. Press Done and the chamber will start the 3 minute pump and purge. If the placement isn t good and need to be repositioned, press OK then open and RIT SMFL Page 4 of 10

6.3 Recipe reposition the sample. Close the chamber and repeat the Examine pump down again until it is right. 6.3.1 Once the 3 minute pump and purge is finished the screen will return to the Main Menu. Select Etch Menu. If needed enter the lot number. If not press Done. 6.3.2 You can select and existing recipe. Most users create a recipe from the blank template. Move each slider to the desired value. Note the N2 must be set at zero or higher than 2.0 Torr or valve 11 may not open. XeF2 must be lower than 3.3Torr or the system will lock up trying to reach an unreachable pressure. Testing revealed the sublimation pressure at the machines stable temperature to be 3.3Torr for the XeF2. RIT SMFL Page 5 of 10

6.3.3 Either save the recipe or use it as a one-time etch. If saving the recipe click on Save. Type the name of the recipe and click Save again. Now the recipe is available in the Current Recipe drop down window. 6.3.4 Press Start Etch. The screen should display Performing etch pre-cycles This ensures it can reach all the recipe set points and the recipe will run properly. If all the set points are good, the screen will change to Etching. RIT SMFL Page 6 of 10

RIT SMFL Page 7 of 10

6.3.5 During an etch recipe you can select Change Cycles to add or reduce the number of cycles. Select OK when done. During an etch recipe you can select Change Cycles to add or reduce the number of cycles. Select OK when done. 6.3.6 If you need to end a recipe early, you can click the Stop button once. The recipe will finish the current cycle and then switch to the Main Menu without any further input. If you double click the Stop button you can stop a recipe mid-cycle. A pop up window will appear and ask Soft stop in progress-do you wish to perform a hard stop? Select Yes, Hard Stop and the cycle will immediately end and pump down the chamber and return to the Main Menu. If the cycle ends before you select Yes, Hard Stop or if the recipe ends it will pump down and return to the Main Menu anyway. 6.4 Inspection 6.4.1 Unless in Load/Unload mode the shroud can be pushed back and the microscope can be positioned over the sample to inspect the etch process even while etching. Turn on the Schott light source at the right rear of the tool and focus on the sample. 6.4.2 Once inspection is completed move the microscope back, turn off the Schott light source and pull the shroud all the way forward again to the mechanical stop and click. RIT SMFL Page 8 of 10

6.5 Load/Unload 6.5.1 Select Load/Unload Sample and repeat steps 6.2.3-6.2.6. 6.5.2 Unload the sample. Close and hold the chamber lid down and press Done. The chamber will start pump and purge and the computer will return to the Main Menu. 6.6 Shut Down 6.6.1 Card Swipe out on card swipe #1. 6.7 Errors During a run 6.7.1 If the tool cannot reach base pressure and either stalls or gives and error. Call a technician. Either the calibration has drifted or the tool is leaking. 7 APPROPRIATE USES OF THE TOOL If etching anything other than silicon contact the process engineer before proceeding. Though some other materials may work many other materials will not and could contaminate the tool. The tool is not intended to do gross removal of silicon. Clear all new processes with process engineering or staff. RIT SMFL Page 9 of 10

REVISION RECORD Original Issue Summary of Changes Originator Rev/Date Bruce Tolleson A-03/23/2016 RIT SMFL Page 10 of 10