Bus Rapid Transit and all that JAZZ September 30, 2013

Similar documents
PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Greater Cleveland Regional Transit Authority

Technical Working Group November 15, 2017

Bus Rapid Transit Plans

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

WHAT IS BRT? Jack M. Gonsalves, PE, Parsons Brinckerhoff, Inc. February 22, 2012

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Community Task Force November 15, 2017

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

Roadways. Roadways III.

Scope of the Transit Priority Project

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

Aurora Corridor to E Line

Arterial Transitway Corridors Study. Ave

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Speaker: Brian Dranzik, Fiscal & Policy Administrator Milwaukee County

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

ECONOMY PEOPLE ENVIRONMENT

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Seattle Transit Master Plan

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Wilshire Boulevard Bus Rapid Transit Project

Appendix A-K Public Information Centre 2 Materials

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

Tunnel Reconstruction South 5 th Street Association October 16, 2018

BRT for Berkeley A Proposal for Consideration

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

From Disarray to Complete Street:

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Metropolitan Council Transportation Committee

The Who and What: Bus Rapid Transit Riders and Systems in the U.S.

How familiar are you with BRT?

95 th Street Corridor Transportation Plan. Steering Committee Meeting

Typical Rush Hour Commute. PennyforTransportation.com

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Ann Arbor Downtown Street Plan

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Geary Corridor Bus Rapid Transit

Community Task Force July 25, 2017

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

S T A T I O N A R E A P L A N

Arterial Transitway Corridors Study. Sept. 26, 2011

PEDESTRIAN ACTION PLAN

Chapter 3 BUS IMPROVEMENT CONCEPTS

Community Engagement Process

Active Transportation Facility Glossary

Why invest in the 1 Street S.W. Corridor?

Joseph Iacobucci. James Czarnecky, AICP

GRTC PULSE. Arriving June 24, May 30, Overview by: Carrie Rose Pace Greater Richmond Transit Company Director of Communications

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

York Region Rapid Transit Corporation

5. Automobile Circulation, Wayfinding and Signage

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

Arterial Transitway Corridors Study

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

ABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan

5. RUNNINGWAY GUIDELINES

Streetscape: Core Shopping District

Bicycle Master Plan Goals, Strategies, and Policies

Uniting Cleveland through the Euclid Corridor Transportation Project

Operational Comparison of Transit Signal Priority Strategies

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development

19th St/Oakland Station Modernization

The Bay Bridge Corridor Congestion Study

Calgary Transit Route 302 Southeast BRT Year One Review June

Capital Improvement Project Application: Bike Racks, Bus Stop Shelters, Sidewalks in Kings Canyon/Ventura Corridor Page 1 of 10

11/28/2016 VIA

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Public Event 1 Community Workshops

Durham Region Long Term Transit Strategy

Project Narrative. Albuquerque, NM. July 31, 2015

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Tonight is for you. Learn everything you can. Share all your ideas.

PUBLIC REALM MASTER PLAN

41st Avenue B-Line Kerrisdale Village Street Improvements

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Complete Streets in Constrained Corridors: Chicago s Central Loop BRT

Transcription:

Bus Rapid Transit and all that JAZZ September 30, 2013 Michael Hernandez Assistant General Manager/COO Monterey-Salinas Transit mhernandez@mst.org

MST Service Area

MST Today Monterey County s Sole Transit Operator Transit District /Regional Taxi Authority Administrator 60 regular/seasonal bus routes 142 vehicles (80 buses, 8 trolleys, 54 minibuses) 237 direct employees, 85 contracted (MVTI) $30M annual operating budget 4.5 Million annual passenger boardings

QUALITY TRANSIT -- NOW

QUALITY TRANSIT -- NOW

Start With The Data Oct 2005 - Implementation of MST Grapevine Express service demonstrated that elimination of transfers and unique branding resulted in dramatic ridership increase on a single route. Dec 2005 - Customer Survey revealed lowest levels of customer satisfaction in the following areas: On-time Performance Service Frequency Bus Stop Amenities Aug 2006 - COA reveals lines serving Sand City, Seaside had a highest percentage of transfers to routes serving Cannery Row and Monterey Bay Aquarium

Fremont/Lighthouse BRT Line Aquarium Cannery Row Highest ridership corridor on Peninsula Nearly 4,000 passengers per day Conference Center Fisherman s Wharf

Fremont/Lighthouse BRT Line 6.75 mile corridor highest ridership in area Cities of Monterey, Seaside and Sand City, and State of California Links major visitor and shopping destinations Monterey Bay Aquarium Cannery Row Fisherman s Wharf Downtown Monterey - Conference Center - Historic Dist. Monterey County Fairgrounds Regional Shopping Malls Hotels, Motels & Inns

Fremont/Lighthouse BRT Goals Create a seamless transit connection between the local communities for residents, employees and tourists of the area Improve the level of service for transit through more frequent service, more reliable service, and a higher capacity of service Showcase a high-quality transit service that is an attractive option for all forms of local travel Support local land use planning goals to develop mixed-use corridors that are well served by transit

Fremont/Lighthouse BRT Goals Achieve operational benefits of BRT without high capital investment No dedicated lanes Target congested intersections Use vehicles appropriate sized vehicles Create stations that keep passengers informed and comfortable Fast, frequent, reliable service!

QUALITY TRANSIT -- NOW

BRT Project Funding FTA Section 5309 Very Small Start Program: $2,773,038 State of California Prop. 1B: $2,645,250 City of Monterey Regional Surface Transportation Program Fund: $607,000 AB-2766; Monterey Bay Unified Air Pollution Control District: $350,000 Total Budget: $6,375,288 13

Six Phases Of A Project 1. Enthusiasm 2. Disillusionment 3. Panic 4. Search for the Guilty 5. Punishment of the Innocent 6. Praise and Honors for the Non-Participants

MST BRT Brand Identity What should we call our BRT????? Bay Rapid Transit historical name of MST Breeze, Wave tie to oceanfront location English/Spanish - Rapid, Viva, Bravo, Presto Symbols???

Seeking Inspiration Lane Transit District Emx, Eugene OR

Seeking Inspiration Cleveland RTA Healthline

Key Design Features of the JAZZ Distinctive shelters & totems at 27 bus stops Custom concrete sidewalk improvements Bus stop Nubs and Bulbs Jazz-themed vehicles/stations Real-time bus arrival information Traffic enhancements Queue Jumps Signal Priority 10 minute frequency express service with stations ~ ½ mile apart. Linear museum of Monterey Jazz Festival history Each shelter/totem features museum quality display QR Codes enable riders to listen to historic performances Mobile website allows options to purchase music 21

JAZZ BRT Stops

JAZZ TOTEM Signage Design

JAZZ BRT Stops Unconstrained Locations Bus stops in lane of travel Mini-plazas created High-tourist locations Constrained Locations Bus stops partially in parking lanes No room to widen sidewalk into property

Fremont/Lighthouse BRT Stops Central Monterey Fremont at Aguajito (eastbound and westbound) Caltrans Freeway ROW Aguajito MPC

LED Lamps shine on glass chips circular pavers Decorative Pavings

Transit Info Panels - Route Map - Schedule - Fares / Passes - Phone Numbers - Website - Bilingual

Project Challenges: 100% staff change from original consultants Initial cost estimates were inadequate; level of effort under-represented Final construction approval from local jurisdictions Contactor delays, bid protests, bizarre events Production delays: shelters, electronic signage, furniture Modifications to construction sites Field Fit challenges Conforming existing grades and condition of project sites Change orders & modifications after approval of plan State DOT changed mind about jump queue lane 33

34

35

36

JAZZ BRT Project Cost Summary: Construction: $3,262,930 54.1% Bus Stop Amenities: Shelters, Totems, Benches, Bike Racks $1,082,329 18.0% ITS Technology - TSP, Cameras, On-Street $609,277 10.1% Design & Engineering / Consulting $775,264 12.9% Advertising, Marketing, Promotion, Branding $238,055 3.9% Misc. Additional Expenses: $61,397 1.0% Total: $6,029,252 37

So What Was Accomplished? 38

Significant Street, Sidewalk, Curb, Gutter and ADA improvements at 24 locations within four jurisdictions 34 Traffic Signals upgraded providing improved coordination and traffic flow Increased number of shelters by 280% ( 5 shelters to 19 shelters ) Total seating capacity on benches and in shelters increased 71% (63 to 108 seats) Shortened trip length the through the 6.75 mile corridor by 28% (:50 to :36) Passenger Boardings and On-Time performance outpacing system average Created hundreds of local jobs during a lengthy economic downturn Created a unique customer experience that marries art, history and transit 39

Accomplishments Jump Queue Lane in Action Traffic Signal Priority In Action Adwheel Award Winning TV Commercial

Lessons Learned 48

The Very Small Starts Program Is A Viable Source of Funding Multi Jurisdictional Projects Are Exceedingly Complicated There Is No Such Thing As A Small Construction Project There is No Such Thing As A Simple Visit By The Secretary of DOT Never Link A Project Completion To A Fixed Date/Event Have A Well-funded Legal Reserve On Hand and Insurance Coverage Murphy Was An Optimist! 49

General Manager / CEO Monterey-Salinas Transit csedoryk@mst.org Michael Hernandez Assistant General Manager/COO Monterey-Salinas Transit mhernandez@mst.org 50