CE Marking FPC Manual For New Century Doors Limited

Similar documents
Construction Design and Management

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Process Safety Management Program for Contractors

MAINTENANCE, SERVICE & INSPECTION OF AIR RECEIVERS & COMPRESSORS

RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY

U00306: Maintain a safe and secure working environment

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS

NHBC Safemark Competency Accreditation Service

Hot Work Policy and Procedures

First Aid Policy Version 2.0

Plain Language Summary

NOISE MANAGEMENT PLAN CORAKI QUARRY

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL

STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice

VERSION 1.0 MARKS & SPENCER MARCH 2014 ECP MINIMUM STANDARDS DUE DILIGENCE FOR CHEMICAL COMPLIANCE

Pike County Housing Authority Trespass Policy i

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

Nowra Brickworks Quarry

Paul Oxley/Project Manager Robert Graves/Director of Facilities and Estates. Ventilation, Air, Conditioning,

Crane Mechanic (Limited Scope, Non-Commercial Lift) Competency Checklist and Employer Sign-off

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK

Safe Storage of Hazardous Chemicals

WCSC Walnut Tournament 2018

Technical Documentation

Method Statement January 2018 Service Works

ADDITIONAL SOURCES OF INFORMATION ARE:

HEALTH AND SAFETY POLICY CONTENTS 1. FOREWORD 2. INTRODUCTION

CURRICULUM DEVELOPMENT ADVISORY. Formwork Safety Course for Workers (FSCW)

A Guide to Relocating Hazardous Materials

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

GNAC SPORTS REGULATIONS OUTDOOR TRACK & FIELD [updated ]

CITY OF SACRAMENTO. Regulatory Compliance Program

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

SCALES NW BACK SAFETY PROGRAM

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

A template mass rescue operations plan

E25 FATIGUE MANAGEMENT

Visit Leader Emergency Action Card

NC Sturgeon Safety Management System

Effective Date: 15-March Table of Contents

SAFETY AND HEALTH STANDARD PARTICULATE and GAS / VAPOR EXPOSURES Effective Date: 09/30/10 Standard: 10.6 Document Number: KUCSH0043 Rev: 3

QUALITY, HEALTH, SAFETY & ENVIRONMENT (QHSE) PLAN

HYDROGEN SULFIDE (H2S)

POLICY FOR MANUAL HANDLING

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

Ayios Nikolaos Primary School s Attendance Policy

Confined Space Entry

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

Kowanyama State School Executive Summary

Go Ride A Wave - Employment Information Sheet (V13)

URGENT MEDICAL DEVICE RECALL : /29/ C Z

WORK HEALTH AND SAFETY POLICY

East Sussex Highways Highway Asset Inspection Guidance Document

Safety in Physical Education Guidance - updated January 2016

Opportunity for Public Participation. Plain Language Summary

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

Users Requirements Statement

Bus Driver Job Description

GURU GOBIND SINGH KHALSA COLLEGE December First Aid Policy

HYDROGEN SULFIDE (H2S)

POSITION DESCRIPTION CSCS CLEANER

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Medibank s Requirements for Recognised Providers

CACFO UK EDUCATION CENTRE

Bucasia State School Executive Summary

Exposure Control Plan

Topic Sheet No. 5 Safe rigging of rope access equipment

NSAI Agrément Approval Scheme for Installers of External Thermal Insulating Composite Systems (ETICS)

SELECTION POLICY (PARA) WORLD RANKING EVENTS EURO GP, ITALY (2-10 JUN) EURO GP, CZECH (30 JUN 8 JUL)

REGIONAL ADMINISTRATORS. PATRICK J. KAPUST Acting Director, Directorate of Enforcement Programs DATE: October 19, 2017

CLA Player Transfer Guide

First Aid. Policy and Guidance

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Material Safety Data Sheet " Paving Grade Bitumen"

SAFE WORK METHOD STATEMENT FOR: Maintlink PTY LTD

Red Bus Driver Job Description

Ipswich Central State School Executive Summary

2017 Active Allegheny Grant Program Program Guidelines

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Method Statement January 2018, Small Installations

Effective Date: 14-Feb-2017 SLING SAFETY GUIDELINES. Table of Contents

Koppers Carbon Materials and Chemicals Pollution Incident Response Management Plan

Related Rules This advisory circular relates specifically to Part 43 Subpart E, and Part 21 Subparts C, M, and N.

Early Learning Centre Child-Safe Environment Policy

USTA Atlanta Combo Doubles Registration Information Play begins in late April

GoM Logistics. GoM Region Offshore Travel Requirements

Crow s Nest State School Executive Summary

Assistant Coach 2013/14 ANZ Championship Season. Position Description

SCSA Annual Safety Awards

Model Curriculum 1. Structural Steel NDT Tester- UT/MPT/DPT

Emergency Response Policy and Procedure

STANDARD OPERATING PROCEDURE:

Transcription:

Overview This manual, including the dcumentatin and recrds referenced by it, cnstitutes the Factry Prductin Cntrl (FPC) system established by NEW CENTURY DOORS LIMITED, LEIGHTON BUZZARD, BEDFORDSHIRE. t ensure that prducts the Cmpany places n the market cnfrm t the stated perfrmance characteristics in accrdance with the requirements f the relevant Prduct Standard(s). The FPC system cnsists f prcedures, regular inspectins, tests and/r assessments, and the use f results t cntrl raw and ther incming materials r cmpnents, equipment, the fabricatin prcess and the prduct. The results f inspectins, tests r assessments requiring actin, and any actin taken, are recrded. Sectin A: Persnnel A1 - Persn respnsible fr FPC The management representative appinted with respnsibility fr FPC is TONY HUGHES (Directr) & TONY HORNE (Directr) The named persn/s are respnsible fr the FPC system establishing and maintaining the FPC manual ensuring that the manual is available t staff where it is relevant t their wrk and that they are familiar with it The Cmpany will ensure that all necessary resurces are at the management representative s dispsal fr him/her t carry ut these tasks. A2 Key persnnel interactins and respnsibilities The respnsibilities and authrities f, and the relatinship between, persnnel that manage, carry ut r check wrk affecting prduct cnfrmity are a) Tny Hughes Overall prductin respnsibility b) Tny Hrne Overall prductin respnsibility Victria Cavanagh - Manager Graham Bennett Q.C. All Prductin Staff

A3 Persnnel respnsible fr prductin stages These individuals have, as a minimum, respnsibility fr initiating actins preventing prduct nn-cnfrmities frm ccurring actins in respnse t nn-cnfrmities identifying and recrding prduct cnfrmity prblems Graham Bennett Harry Lindsay Victria Cavanagh A4 Cmpetence f persnnel affecting prduct perfrmance All such persnnel are cmpetent n the basis f apprpriate educatin, training, skills and experience as evidenced a) in the Cmpany s training recrds Training is carried ut thrugh a) Initial Intrductin & Inductin. b) Individual ne t ne task training. c) One t ne intrductin t materials, methds and prcedures. d) In huse grup training fr new methds, materials, machinery. Sectin B: Equipment B5 Calibratin f testing and measuring equipment The items f test and measurement equipment are calibrated peridically t ensure that wear, misuse r failure des nt affect cnsistency in the prductin prcess. Calibratin is carried ut by cmpetent persns identified in Sectin A. The items f equipment used fr measuring and testing prduct during and after fabricatin are a) Self calibrating CNC machinery. b) Individual Tape Measures. Each item f equipment, by type, is calibrated a) CNC machinery Daily b) Individual Tape Measures If Damaged B6 Inspectin f testing and measuring equipment Each item f equipment is inspected peridically t ensure that wear, misuse r failure des nt affect cnsistency in the prductin prcess. Inspectin is carried ut by cmpetent persns identified in Sectin A.

B7 Inspectin and maintenance f prductin equipment The items f prductin equipment are inspected peridically and maintained t ensure that wear, misuse r failure des nt affect cnsistency in the fabricatin prcess. Equipment inspectin and maintenance activities are carried ut by cmpetent persns identified in Sectin A. Prductin equipment maintenance is carried ut a) As Required. Sectin C: Raw Materials and Cmpnents C9 Specificatin f raw materials and cmpnents The specificatins f all incming materials and cmpnents are available frm the suppliers. C10 Inspectin f raw materials and cmpnents Delivery dcumentatin are signed by Graham Bennett Materials Cntrller/Q.C. All gds received are stred within the premises as sn as pssible fllwing delivery, and where lcated indrs are prtected frm damage, excesses f heat and light, and water penetratin. Sectin D: Prductin Prcess D11 Stages f prductin All stages f prductin are carried ut under cntrlled cnditins. Persns respnsible fr the stages f prductin are identified in Sectin A. The stages f prductin are a) cutting f PVC-U prfiles b) cutting f reinfrcing materials c) ruting and drainage f fabricatin d) welding f frames e) crner cleaning f welds f) Slab Sizing g) hardware fixing and assembly h) bead cutting if applicable i) factry glazing if applicable j) final inspectin

D12 Checking prcedure Checks n the prcesses and equipment used at each stage f prductin are undertaken by cmpetent persns identified in Sectin A. D13 Checks, results and crrective actin recrds a) Any suspect quality issues are reprted t the suppliers wh retain these recrds. Sectin E: Prduct Testing and Evaluatin E14 Maintenance f characteristics declared values The characteristics and their perfrmance values f these prduct types are declared in the Declaratins f Perfrmance a) stred in hard cpy frmat n-site Sectin F: Traceability and Marking F17 Prduct identificatin Individual prducts r prduct batches are identified by a) accmpanying dcumentatin Each identifier cntains a) the internal jb number The CE marking f each prduct is identified a) by labelling affixed t the packaging and/r invicing dcumentatin. F18 Prducts traceable t prductin rigin Finished prducts are traceable back thrugh prductin t the bught-in materials and cmpnents. This is t ensure that in the event f failure f the prduct it is pssible t trace back t the surce f the prblem. Windw and dr prfiles are identifiable thrugh inkjet cde markings printed alng each prfile length. All materials and cmpnents are traceable t each supplied batch thrugh the Cmpany s rder prcess and suppliers delivery dcumentatin.

Sectin G: Nn-cnfrming Prducts G20 Dealing with nn-cnfrmities Nn-cnfrmities are dealt with by the relevant suppliers wh can prvide traceability details. Where a prblem e.g. a cmplaint r any ther issue fund during internal inspectin, testing r assessment, r a deviatin frm established practice, is identified it is reprted as a nn-cnfrmity. All nn-cnfrmities are reprted t Tny Hughes and/r Tny Hrne Any prduct that is nn-cnfrming is identified t ensure that it cannt be released. Sectin H: Crrective Actin H22 Eliminating causes f nn-cnfrmities The crrective actin prcedure is detailed by ur supplier and retained fr future reference. Nn-cnfrmities are actined in a timely manner. Remedial actin t reslve the immediate prblem is undertaken and, where necessary, actin instigated t eliminate the cause f nncnfrmity.