I-20 East Transit Initiative

Similar documents
I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

SMART 1 Public Meeting #1. February 24, 2016

Appendix A-K Public Information Centre 2 Materials

MARTA Expansion Update

Everett Transit Action Plan. Community Open House November 16, 2015

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

Calgary Transit Route 302 Southeast BRT Year One Review June

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

South King County High-Capacity Transit Corridor Study

Arterial Transitway Corridors Study. Ave

Transportation Trends, Conditions and Issues. Regional Transportation Plan 2030

Arterial Transitway Corridors Study

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

METRO Light Rail: Changing Transit Markets in the Phoenix Metropolitan Area

Frequently Asked Questions (FAQ)

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

Regional Alternatives Analysis. Downtown Corridor Tier 2 Evaluation

Metropolitan Council Transportation Committee

Highway Transitway Corridor Study

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Giles Run Connector Road

Appendix A-1: Purpose and Need Statement

Fordham Plaza. Conceptual Design Study

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Community Transportation Plan Acknowledgements

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

Item B1 November 19, 2009

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

DON MILLS-EGLINTON Mobility Hub Profile

Speed Limits Study and Proposal. Public Input Session: 8/14/13

NEWMARKET CENTRE Mobility Hub Profile

Community Engagement Process

City of Davenport CitiBus Public Transportation Study. April 2015

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

DON MILLS-SHEPPARD Mobility Hub Profile

I-105 Corridor Sustainability Study (CSS)

Multi-Modal Facility Feasibility Study (WFC006)

Midtown Corridor Alternatives Analysis

Appendix T 1: Additional Supporting Data

Typical Rush Hour Commute. PennyforTransportation.com

Project Narrative. Albuquerque, NM. July 31, 2015

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Transit. Transit Ridership in Decatur. 9 Transit CHAPTER 9

Bus Rapid Transit Plans

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

STUDY ADVISORY COMMITTEE. October 8, 2015

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

VISION Long Range Plan Update Board Workshop. February 10, 2016

TRANSPORTATION & MOBILITY

Feasibility Study for Intermodal Facility in Anchorage, Alaska

6 Screen 3 Analysis and Results

Rochester Area Bike Sharing Program Study

NORTH YORK CENTRE Mobility Hub Profile

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Durham Region Long Term Transit Strategy

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

TAMPA BAY EXPRESS (TBX)

Sacramento Grid 2.0. The Downtown Transportation Study

BRT for Berkeley A Proposal for Consideration

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

North Shore Transportation Improvement Strategy

2045 Long Range Transportation Plan. Summary of Draft

Technical Working Group November 15, 2017

Interim Transit Ridership Forecast Results Technical Memorandum

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

SANTA MONICA BOULEVARD CORRIDOR

Decision on North Waterloo Routing

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP

Arterial Transitway Corridors Study. Sept. 26, 2011

Public Event 1 Community Workshops

Speaker: Brian Dranzik, Fiscal & Policy Administrator Milwaukee County

Transit Ridership - Why the Decline and How to Increase. Hosted by the. Virginia Transit Association

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

Previous Transit Studies MTTF MEETING #

DUNDAS WEST-BLOOR Mobility Hub Profile

Central Avenue Corridor Study FPID Number:

WELCOME EXERCISE. Share your thoughts on the study area by: Placing a GREEN DOT on areas you like or where something good is happening and;

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Major Mobility Improvement Program (MMIP)

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Key objectives of the survey were to gain a better understanding of:

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Appendix T-2: Transportation Facilities Inventory

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Transcription:

I-20 East Transit Initiative Public Meetings Tuesday, October 26 DeKalb Medical Center Hillandale Community Room 2801 DeKalb Medical Parkway Lithonia, GA 30058 6:00pm 8:00pm Wednesday, October 27 East Lake YMCA Community Room 275 East Lake Boulevard Atlanta, GA 30317 6:00pm 8:00pm Thursday, October 28 South DeKalb Mall Community Room 2801 Candler Road Decatur, GA 30034 6:00pm 8:00pm

Study Team MARTA John Crocker, PhD Project Manager Tameka Wimberley, AICP Deputy Project Manager Don Williams General Planning Consultant Manager Jacobs JJG Pat Smeeton Consultant Project Manager Jonathan Webster, AICP Project Planner Sycamore Consulting Jen Price Public Involvement Planners for Environmental Quality Inga Kennedy Public Involvement James Davis Public Involvement

Project Background

Study Area

Study Overview Detailed Corridor Analysis (DCA) - Detailed Corridor Analysis (DCA) - Update the previous planning efforts to reflect changes in travel trends, land use, and demographics. Build upon previous planning efforts regarding alignments, station locations, and modes. Result of DCA will be an updated Locally Preferred Alternative (LPA). Draft Environmental Impact Statements (DEIS) - Indepth, environmentally focused study centered on the natural, social, cultural, and physical impacts and benefits of potential transit investments. Required for all federally funded transportation projects.

Project Implementation Timeline

Study Schedule

Public Outreach Range of outreach techniques to be undertaken, such as: Newsletters and Project Fact Sheet Community stakeholder interviews Public meetings Speakers bureaus Web page (http://www.itsmarta.com/i20-eastcorr.aspx) Facebook page

Stakeholder Outreach/Interviews Federal, State, and Local Elected Officials Neighborhood Associations Corridor Residents Business Leaders Civic and Religious Institutions Local Government Staff Community Groups

Stakeholder Interviews: What We Heard Rail would attract riders/development/public support 18% Need improved connectivity/transportation options 16% Need improved/more reliable transit service 15% Congestion in corridor, particularly I-20 10% Rail is the appropriate technology for the corridor 9% Aging population will need mobility options 6% Transit should serve Rockdale County Little opposition expected 5% 5% Need to educate the public about transit Opposition due to fear of crime and NIMBY's 4% 4% Need to avoid historic neighborhoods East Atlanta an appropriate location for station 1% 1% 0% 5% 10% 15% 20%

Initial Study Findings Population and Employment Growth Travel Patterns Increasing Transit Demand Transit Dependant Populations Increasing Congestion Levels

Population and Employment Growth 2005 2030 Change Growth Population I-20 East 449,000 566,000 117,000 26% Corridor Atlanta Region 4,944,939 7,377,951 2,433,012 49% Employment I-20 East Corridor 213,000 312,000 99,000 47% Atlanta Region 3,003,487 3,835,118 831,631 28% 2005-2.6 million daily person trips to and from the study area. 2030 - up 36% to 3.5 million daily trips. Source: Atlanta Regional Commission, Travel Demand Model

Increasing Corridor Congestion Between 2005-2030 the percentage of daily travel in congested conditions on major corridor roadways is expected to increase by 63%. Congested conditions on I-20 are projected to increase 100%, from 5 to 10 hours per day. The average travel speeds on I-20 are expected to decline from 39-31 mph in AM peak and 37-27 mph in PM peak. AM Westbound Congestion AM Westbound Congestion

2005 Congested Roadways Increasing Corridor Congestion

2030 Congested Roadways Increasing Corridor Congestion

Travel Patterns Majority of persons utilizing I-20, travel to and from Downtown/Midtown Atlanta in the peak hours. The Downtown and Midtown Business Districts represent the most concentrated employment destination for commuters who live in the corridor. Employment destinations in north DeKalb County (Emory-CDC, Perimeter) and north Fulton County (Buckhead, Perimeter, GA 400) are also major draws for corridor residents. AM Westbound Congestion

Peak Hour Peak Hour Interstate Travel Travel Patterns

Increasing Transit Demand MARTA rail boardings at eastern Blue Line stations up 9% from 2001-2008. GRTA express bus ridership up 118% from 2006-2008. MARTA bus boardings for study area routes up 12% from 2006-2009. 2005 2030 Change Growth Transit 143,700 253,000 109,300 76% Trips All Trips 2,585,700 3,515,800 930,100 36% Sources: Atlanta Regional Commission, Travel Demand Model ; MARTA; GRTA; I-20 East Corridor Study (2001)

Transit Dependent Populations Percentage of zero-car households in the corridor is more than twice the regional average. High concentrations can be found adjacent to I-20 East surrounding the Atlanta CBD, in Reynoldstown, Edgewood, and East Atlanta neighborhoods Outside the perimeter concentrations can be found adjacent to I-20 along Wesley Chapel Road, and in the Lithonia and Conyers areas. Households Zero Car Households Percentage I-20 East Corridor 147,311 22,542 15% Atlanta MSA 1,504,871 110,401 7% State of Georgia 3,006,369 248,546 8% Source: U.S. Census 2000

Preliminary Purpose and Need Statement The purpose of the I-20 East Transit Initiative is to provide transit investments that enhance east-west mobility and improve accessibility to residential areas and employment centers within the corridor. This regionally significant transportation corridor is characterized by limited travel options and high levels of delay and congestion.

Keypad Voting Exercise You will use this keypad to select your response The last number you press will be recorded You cannot vote multiple times These are not magic remotes they will not work on anything else Please leave here Thank you!!

Identified Corridor Issues Which corridor issue is the most critical to you? Public Voting Results in Red 1. Increasing traffic congestion in corridor (22.6%) 2. Limited travel choices - I-20 is the only real corridor that provides east-west mobility between downtown Atlanta and Mall at Stonecrest (33.9%) 3. Lack of travel time competitive transit service in corridor (24.2%) 4. Areas of the corridor are in need of revitalization (11.3%) 5. There are high levels of traditionally underserved populations (8.1%)

Project Goals Which project goal is the most important to you? Public Voting Results in Red 1. Improve East-West Mobility (19.0%) 2. Improve Travel Options in Corridor (19.0%) 3. Improve Accessibility to Jobs and Housing (14.3%) 4. Improve Transit Service for Underserved Populations (4.8%) 5. Promote Economic Development/Revitalization (22.2%) 6. Encourage Transit Supportive Land Use and Development Patterns (9.5%) 7. Minimize Impact to Social and Natural Resources (1.6%) 8. Promote Cost Effective Transit Investments (0.0%) 9. Enhance Regional Transit Connectivity (9.5%)

Reasons for Riding Transit What is the primary reason you would ride a new transit service in the I-20 Corridor? Public Voting Results in Red 1. Work (40%) 2. Shopping (9.2%) 3. Airport (3.1%) 4. Sporting/cultural events (16.9%) 5. Education (6.2%) 6. Religious services (1.5%) 7. Social/recreational (12.3%) 8. Other (10.8%)

Transit Technologies Transit Technologies to be Studied in the I-20 Transit Initiative

Transit Technologies - BRT Bus Rapid Transit (BRT) Limited stop service Rivals rail speeds Operates in exclusive or shared Rights-of-Way Less expensive to construct and operate than rail, but lower capacity Usually features dedicated stations

Transit Technologies - LRT Light Rail Transit (LRT) Powered by overhead catenary wires Usually in exclusive Rights-of-Way, but can operate in mixed traffic Lower capacity than HRT, but less expensive to construct Higher capacity than BRT, but more expensive to construct and operate

Transit Technologies - HRT Heavy Rail Transit (HRT) High speed, very high capacity Grade-separated Rights -of -Way Electric railway and/or overhead catenary wires High-platform loading More expensive to construct than LRT, BRT Potential to be obtrusive in neighborhoods and limit connectivity

Transit Technologies Which transit technology is the most appropriate for the I-20 Corridor? Public Voting Results in Red 1. Bus Rapid Transit (22.7%) 2. Light Rail Transit (50.0%) 3. Heavy Rail Transit (27.3%)

Questions/Comments

Contacts John Crocker, PhD MARTA Project Manager 2424 Piedmont Road NE Atlanta GA 30324 404-848-8292 jtcrocker@itsmarta.com Pat Smeeton Consultant Project Manager 400 Colony Square 1201 Peachtree St, Ste 1905 Atlanta GA 30361 678-333-0450 pat.smeeton@jacobs.com