Changing the Climate of Mobility: Bellingham s Multimodal Transportation Networks

Similar documents
Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Supplemental Information for DRAFT TIP

Transportation Report on Annual Mobility

Transportation Report on Annual Mobility

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Transportation Report on Annual Mobility

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Six-Year ( ) Transportation Improvement Program (TIP)

Six-Year ( ) Transportation Improvement Program (TIP)

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period

Perryville TOD and Greenway Plan

Alabama Street Corridor. Road Diet Feasibility Study & Safety Improvements

Bicycle Master Plan Goals, Strategies, and Policies

San Jose Transportation Policy

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 1: Introduction

Bellingham Bicycle Master Plan Chapter 1: Introduction

Bellingham Comprehensive Plan Multimodal Transportation Chapter

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Chapter 3: Bicycle Network Recommendations

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Plant City Walk-Bike Plan

2014 Bellingham Bicycle Master Plan

PEDESTRIAN ACTION PLAN

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Hennepin County Bicycle and Pedestrian Planning

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

In November 2015, the City of Bellingham, WA, USA completed $4.3 million in safety

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

City of Waterloo Complete Streets Policy

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Chapter 5 Future Transportation

Peterborough Council on Aging

City of Jacksonville Mobility Fee Update

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Bicycle and Pedestrian Plans and Improvements

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Multimodal Evaluation at the City of Redmond

Rochester Downtown Bicycle Study 2009

CHAPTER 1 INTRODUCTION

City of Charlottesville Bicycle and Pedestrian Master Plan Update

APPENDIX D: 2012 EXISTING PEDESTRIAN RELATED POLICY

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

11/28/2016 VIA

Comprehensive Bicycle Master Plan 2014 ITE-IMSA Spring Conference March 6, 2014

Sustainable Transportation Initiatives and Plans in Caledon

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

Appendix C 3. Bicycle / Pedestrian Planning

PRESS RELEASE San Joaquin Council of Governments

West Village Mobility & Integration

Arlington s Master Transportation Plan

CONNECTING PEOPLE TO PLACES

Castro Valley Municipal Advisory Council March 19, 2018

Caddo Parish Bicycle Plan

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

Chapter 3: Bicycle Network Recommendations

T1-A - Service Reduction (Re-sizing)

STUDY ADVISORY COMMITTEE. October 8, 2015

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Appendix B: Prioritized Projects List

RE: Park Plaza Walgreens (P12-016)

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

SPEED MANAGEMENT FOR VISION ZERO

Transportation Master Plan Advisory Task Force

Physical Implications of Complete Streets Policies

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

PEDESTRIAN ACTION PLAN

Healthy Built Environments Cowlitz-Wahkiakum County, Washington

5. Pedestrian System. Accomplishments Over the Past Five Years

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

GPATS Long-Range Transportation Plan. Complete Streets

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

9/21/2016 VIA . RE: The Knot (DR16-270)

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

Appendix A-K Public Information Centre 2 Materials

ACTIVE TRANSPORTATION

PEDESTRIAN ACTION PLAN

First and Last Mile Plan. April 2016

Typical Rush Hour Commute. PennyforTransportation.com

The Bike Buzz in Richland. November 2017 Carl Berkowitz

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Transcription:

1 Changing the Climate of Mobility: Bellingham s Multimodal Transportation Networks Presented by: Chris Comeau, Transportation Planner, Public Works Climate Action Task Force March 6, 2019

2 Bellingham is the Regional Center (Employment, Shopping, Education, Medical Services, etc.) Disproportionate Number of Vehicle Trips In/Out of City

3 Heavy Influence by Visitors in Automobiles from Lower Mainland B.C., Canada U.S. Border Crossing Rank Peace Arch (SR 543) #3 Sumas (SR 9) #7 Lynden (SR 539) #14

4 Who Are We Planning For in Bellingham? BALANCE: All mobility needs for all modes must be carefully considered, balanced, and implemented so that the citywide multimodal transportation system continues to work for everyone.

5 What Are We Planning For? Long-Term Transportation Mode Shift Goals Tracked each year in the Transportation Report on Annual Mobility (TRAM)

Bellingham s Active Transportation Plans Pedestrian Master Plan (2012) 260-mile pedestrian network ~ 171.5 miles (66%) complete Prioritized 343 improvements Bicycle Master Plan (2014) 164-mile bicycle network ~ 73 miles (44%) complete Prioritized 186 improvements Slide 6 Multiuse Greenways Trails (1990 x4) Extensive citywide trail system 73 miles existing multiuse trails 40 miles (55%) = secondary transportation 6

Approved August 2012 (Adopted PMP into Comprehensive Plan November 2016) In 8 years (2013-2020) City Council approved construction and funding in 6-Year TIP* for: 43 PMP sidewalk network links 31 PMP pedestrian crossings 74* total pedestrian improvements Pedestrian Sidewalk Improvements Tier 1 Tier 2 Tier 3 Total Percent Completed 37% 23% 7% 12% Projects Completed 16 8 19 43 Projects Not Yet Completed 27 27 260 314 Total Sidewalk Projects 43 35 279 357* *Some sidewalk projects divided into pieces for funding and constructability Pedestrian Crossing Improvements Tier 1 Tier 2 Tier 3 Total Percent Completed 71% 40% 52% 54% Projects Completed 12 6 13 31 Projects Not Yet Completed 5 9 12 26 Total Crossing Projects 17 15 25* 57 *1 crossing at SR 539/Tremont eliminated as not feasible *2020 Pedestrian projects not yet completely programmed in 6-year TIP 7

Approved October 2014 (Adopted BMP into Comprehensive Plan November 2016) In 6 years (2015-2020) City Council approved construction and funding in 6-Year TIP* for: 80 BMP bicycle network links 19 BMP bicycle crossings 99* total bicycle improvements Bicycle Network Links* Tier 1 Tier 2 Tier 3 Total Percent Completed 64% 56% 32% 42% Projects Completed 14 30 36 80 Projects Not Yet Completed 8 24 77 109 Total Bike Projects 22 54 113** 189 *Includes "Further Study Needed" Links **2 links eliminated; determined as not feasible Bicycle Crossing Improvements Total Percent Completed 79% Projects Completed 19 Projects Not Yet Completed 5 Total Crossing Projects 24* *2 at Meridian/I-5 interchange not feasible *2020 Bicycle projects not yet completely programmed in 6-year TIP 8

9 Strategically Maximizing Transportation Funding There is always more need than funding 6-Year TIP is strategic to leverage additional funding Documented transportation improvement needs High priorities in adopted City plans Good, competitive grant funding candidates Timing of various grant funding cycles Public-Private Partnership Opportunities Growth-related: Where is development happening? Ideally, all of the above

10

2019 2020-2010 2018 2017 2016 2015 2014 2013 2012 2011 PROPOSED All 2021 Projects 2010-2021 Bike/Ped Facility Existing Bike and/or Ped Facility Bike Improvement Ped Improvement

How to Build Bicycle Network Connectivity At Relatively Low Cost by Using Existing Arterial Street Space Road Diets (multi-lane streets) Removing excess vehicle lane(s) to add bike lanes Rechannelization Reorganize / narrow lane markings to add bike lanes Resurfacing & Repair Add bike lanes via normal repair and maintenance Utility repair funding extended to install bikeways on surface Removal of Parking On-street parking utilization studies Remove low use parking on one side to add bike lanes 12

Road Diet 5 lanes reduced to 3 lanes with installation of buffer-protected bike lanes 13

Public Works Plan for Short-Term (2017-2020) and Long-Term (2021+) Connectivity of Pedestrian & Bicycle Facilities between Barkley Village & Downtown Birchwood -Orchard Under-Crossing 2020 SR 542 ADT 45,000 Major mobility barrier Squalicum Cr Multiuse Trail Bike-Ped Overpasses Buffered Bike Lanes 2019 R O O S E V E L T Barkley Village Multiuse Railroad Trail Buffered Bike Lanes 2018 Alabama St Mobility Barriers Existing bicycle facilities 2014 2015-2017 bicycle improvements Green bike boxes 2018 bicycle improvements Intersection improvements 2019-2020 improvements Intersection improvements (if funded) Future unfunded links & Intersection improvements Downtown S U N N Y L A N D BHS & Options 5 Whatcom Creek Multiuse Trail

Public Works Plan for Short-Term (2017-2020) and Long-Term (2021+) Connectivity of Pedestrian & Bicycle Facilities between Puget Neighborhood and Downtown Bellingham South Bay Multiuse Trail Waterfront Downtown Lakeway 5 Civic Whatcom Cr Multiuse Trail Puget Neighborhood Whatcom Falls Park Mobility Barriers Existing bicycle facilities 2014 2015-2017 bicycle improvements Green bike boxes 2018 bicycle improvements Intersection improvements 2019-2020 improvements Intersection improvements (if funded) Future unfunded links WWU Sehome HS Samish Neighborhood

Public Works Plan for Short-Term (2017-2020) and Long-Term (2021+) Connectivity of Pedestrian & Bicycle Facilities between Alderwood, Birchwood, & Columbia Neighborhoods Airport A L D E R W O O D Costco W Bakerview Fred Meyer Alderwood Birchwood B I R C H W O O D 5 Bellis Fair Mobility Barriers Existing bicycle facilities 2014 2015-2017 bicycle improvements BTC C O L U M B I A 2018 bicycle improvements Intersection improvements 2019-2020 improvements Intersection improvements (if funded) Future unfunded links & Intersection improvements

Public Works Plan for Short-Term (2017-2020) and Long-Term (2021+) Connectivity of Pedestrian & Bicycle Facilities between Cordata, W Bakerview & Meridian Bellingham Trail Connection Trail Connections RRFBs Cordata Pkwy Road Diet Cordata Community Park Open by end of 2019 East Horton Possible future ped/bike overpass? (very expensive) Van Wyck Future Park SR 539 / Guide Meridian Hwy to Canada 35,000-40,000 ADT Major mobility barrier Future Connection to James St King Mtn Mobility Barriers Existing bicycle facilities 2014 2015-2017 bicycle improvements Mahogany New traffic signals Division St Multiuse Trail WCC Kellogg 2018 bicycle improvements Intersection improvements 2019-2020 improvements Intersection improvements (if funded) Future unfunded links & Intersection improvements 5 Costco Fred Meyer W Bakerview Bellis Fair

Data Collection: Installing Permanent Bicycle Counters (Cascade Bike Club + WSDOT Grant) 2008-2018 18 Bike Count Locations Requires Volunteers 2018-2 Permanent Bike Counters installed - Illinois/I-5 Bike Bridge - Dupont/F Street 2019 7 Permanent Bike Counters being installed See map locations Future Perhaps More Permanent Counters Volunteer Count Locations 2008-2018 Permanent Counter Locations 2019 18

19 Transportation Education and Outreach (Needs to be on-going, long-term commitment) Bellingham s Travel With Care Public Education Campaign https://www.cob.org/services/transportation/pages/travel-with-care.aspx Bellingham Bicycle and Pedestrian Programs and Facilities https://www.cob.org/services/transportation/pages/biking.aspx Whatcom Smart Trips (Whatcom Council of Governments - WCOG) https://www.whatcomsmarttrips.org/

20 Brief Recap of Regional Transportation Realities Bellingham is the regional center for many trip purposes Economy depends on Regional travel Purchase of goods Sales tax $ Regional trips primarily by automobile (>95%) or public transit (<5%) Public transit doesn t compete well with auto for convenience or bulk goods

Opportunities to Affect Local Transportation Mode Shares Given the regional travel and economic realities, what can Bellingham do to reduce local auto mode share while increasing walking, biking, and transit? Some Local Options: Ask voters to renew Transportation Benefit District (TBD) November 2020 Continue to implement Bicycle & Pedestrian Plans, including crossings of I-5 Manage privately-funded dockless bicycle share in public right-of-way Implement higher-density Transit-Oriented Development along WTA GO Lines Expand auto parking management areas and increase metered parking rates Recruit employers, create jobs with salaries based on local cost of living Require affordable (inclusionary) housing for local wage workers Work with Smart Trips to educate and encourage non-auto trips 21

22 Bellingham s Multimodal Transportation Networks Chris Comeau, AICP-CTP, Transportation Planner Public Works Engineering 360.778.7946 ccomeau@cob.org