Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy)

Similar documents
connections 2040 the waco metropolitan transportation plan amendment 2

Texas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Demographic Characteristics and Trends of Bexar County and San Antonio, TX

Applications for Funding

Wildlife In The Landscape

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

plyr Modelling large data Hadley Wickham

Enhancing Downtown

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

This page intentionally left blank.

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * *

Complete Streets Policies in Charlotte

City of San Bernardino

Rail Station Fact Sheet Downtown Denton Transit Center

Amador County Pedestrian and Bicycle Plan Survey Results

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

CHAPTER 1 INTRODUCTION

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Section 1 - North Lamar: Tech Ridge to US 183

Proposed Project I 35 from Denton to Cooke County Line

Rail Station Fact Sheet Downtown Carrollton Station

Table #6 VISION CHARACTERISTICS

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

J.R. Small Engines 9450 E. Bankhead Hwy Aledo TX, Morrison Outdoor Power Equipment 8300 County Road 508 Alvarado TX, 76009

Planning Committee STAFF REPORT

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

Hennepin County Bicycle and Pedestrian Planning

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

MPO PROPOSITION 1/CATEGORY 2 PROJECTS (METROPOLITAN CORRIDORS)

Transportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways.

MULTIMODAL NEEDS ASSESSMENT

PRESS RELEASE San Joaquin Council of Governments

TRANSPORTATION & MOBILITY

San Bernardino County Non-Motorized Transportation Plan - Chapter 5

Rail Station Fact Sheet Buckner Station

Pedestrian and Bicycle Conditions

BICYCLE AND PEDESTRIAN PLAN REPORT

OPPORTUNITY ZONE TRACT LISTING

ALLEGHENY COUNTY. Allegheny County Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

Foothill Expressway Improvements Between El Monte and San Antonio

This page intentionally left blank.

Bicycle and Pedestrian Plans and Improvements

I-10 AT SCENIC LOOP RD. Open House

DRAFT INVESTMENT CORRIDORS

Proposed White Flint Separated Bike Lane Network September 2015

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Central Avenue Corridor Study FPID Number:

2.0 Existing Conditions

Transportation Assessment

Bikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop

Plan Peoria AZ Public Workshop #1 April Day # Green, Red, or Yellow Category: (Public Safety, Transportation, Parks and Recreation, Natural Envi

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM Program Call Projects Selected for Funding

ALLEGHENY COUNTY. Allegheny County Active Transportation Profile 2017 REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

CITY OF HARLINGEN COMPREHENSIVE PLAN PRIORITY LIST

Orinda Bicycle, Trails and Walkways Master Plan

TRANSPORTATION TRAINING TOPICS. April 6, 2010

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME

Bicycle Count Data. December 2008

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

Project Fact Sheet. August 1,

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm

2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

HUD's 2012 Continuum of Care Homeless Assistance Programs Housing Inventory Count Report

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

CONCERNS / CHALLENGES

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM

State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

a 20 year period. separate phases of development with staggered years)

Good Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

Texas Department of State Health Services Vital Statistics Unit

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

Rail Station Fact Sheet CityLine/Bush Station

Linking Transportation and Health in Nashville & Middle Tennessee

KEARNY MESA COMMUNITY PLAN UPDATE

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?

Complete Streets Training. Georgia Municipal Association June 27, 2016

Texas Department of State Health Services Vital Statistics Unit

This page intentionally left blank.

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

OTO BIKE/PED PLAN REPORT

2012 PRIORITY TRANSPORTATION PROJECTS

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Transcription:

EXHIBIT A TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECTS SELECTED FOR FUNDING SMALL URBAN AREAS (POPULATION 5,001 200,000) Nominating Entity TAP Project Name Federal Funds Bryan South College Phase 1 Shared Use Path, Sidewalks and Bike Route $2,152,919 Huntsville Lake Road, SH 75 and FM 1374 Safe Sidewalks $2,385,285 Bryan FM158 Safety Lighting of Existing Sidewalks and Path $1,590,382 Killeen Heritage Oaks Hike and Bike Trail, Segment 4 $2,448,281 Denton County Transportation A-Train Bike and Pedestrian Trail - Eagle Point Section $2,396,699 Authority El Campo Sidewalk Project Along Avenue I and West & East Norris Streets $352,820 Dallas County Pleasant Run Road Trail $2,364,904 Granbury Granbury Town Square Pedestrian Safety Improvements $1,619,200 Tyler Legacy Trails Phase I $3,520,840 Town of Anthony Wildcat Drive Safe Routes to School $315,508 Boerne Trail System Expansion - Connecting People to Places $2,365,266 Wichita Falls Hike and Bike Trail From Wichita Bluff Park to LP 11 $1,363,766 Sherman Sherman Streetscapes - Phase II $458,574 Sulphur Springs Crosstown Trail $712,892 Galveston Downtown Pedestrian Transit Connectivity Improvements $402,494 Aransas Pass Aransas Pass 2015 TAP Improvements $695,836 Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy) $515,193 Total Award $25,660,859

EXHIBIT A TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM AWARD FOR NONURBAN AREAS (POPULATION OF 5,000 OR LESS) Project Sponsor TASA Project Name Federal Funds Dripping Springs Sportsplex Dr Gap Elimination & Connectivity $325,155 Groveton Groveton Downtown Sidewalks 738,579 Hallettsville Hallettsville - School to Square Sidewalks 287,000 Liberty Hill Liberty Hill Downtown Bike/Ped Loop 1,163,066 Mathis San Patricio Ave (SH 359) Sidewalks 596,160 Mont Belvieu Mont Belvieu Sidewalks 1,193,970 Mont Belvieu Sidewalk Lighting FM 365 & Eagle Dr 986,593 Mount Vernon Mount Vernon Public Housing Safe Routes To School 174,918 Presidio Bledsoe Blvd Shared Use Path & Sidewalks 1,482,393 Presidio Presidio High/Middle School Connection 890,132 Presidio Louvain Blvd & Foothill Blvd Safe Routes To School 1,435,004 Primera Stuart Place Rd Sidewalks 462,730 Quinlan S Church St Sidewalk Improvements 301,967 Taft Sidewalks for Schools, Parks, & Public Buildings 707,980 Waller Waller Sidewalks 1,107,016 Whitewright Whitewright Sidewalks 1,211,545 Winnsboro Meadows & Knight St Sidewalks 305,887 El Paso County Tornillo Shared Use Path 1,972,400 Knox County Knox County Sidewalks 249,471 Lamar County Prairieland & Chaparral NETT-Phase 2 1,191,400 Presidio County Bagley Ave, Silver St & Wilson St Safe Routes To School 298,731 Presidio County Marfa - US 67 Shared Use Path 280,490 Red River County Red River County NETT East Phase 2 522,567 Red River County Red River County NETT West Phase 2 941,394 Total Award Nonurban $18,826,548

EXHIBIT B TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM AWARD FOR SMALL URBAN AREAS (POPULATION OF 5,001 TO 200,000) Project Sponsor TASA Project Name Federal Funds Aransas County Aransas County Sidewalks $648,600 Abilene US 83/84 Ped-Bike-Transit Safety Corridor 504,129 Belton South Belton Shared Use Path 1,432,456 Bryan N Earl Rudder Frwy (SH6) E Frtg Road Shared Use Path 932,176 Bryan Coulter Dr Sidewalks & Bike Lanes 1,029,860 Denison Katy Trail 919,914 El Campo Sidewalk Along West & East Norris St 129,441 Harlingen Harlingen-Loop 499 Sidewalks 415,215 Longview Guthrie Creek Shared Use Path Phase 2 & 3 3,028,235 Marshall Johnson St Sidewalks 720,525 Midland Downtown Ped & Bike Infrastructure Phase 1 501,630 Rockdale Historic Cameron Ave Downtown Sidewalks 1,276,960 San Angelo Downtown San Angelo Connectivity Project 1,960,335 San Marcos San Marcos River Shared Use Path 1,935,758 San Marcos Downtown Accessible Ped Signal Improvements 163,894 Texas City Bay Street Shared Use Path 410,154 Tyler Tyler Bike Stripe 940,526 Waco 11th/12th St & Gurley Ln Bike/Ped Infrastructure 474,536 Waco Historic Elm Ave Bike/Ped Infrastructure 2,484,000 Wichita Falls Wichita Falls - Barnett Rd to Seymour Hwy Shared Use Path 1,954,485 Wichita Falls Wichita Falls - Loop 11 to Lucy Park Shared Use Path 2,071,596 Wichita Falls Wichita Falls - L Wichita, W of L Wichita Park Shared Use Path 1,406,450 Total Award Small Urban $25,340,875