Short and Long Term Needs

Similar documents
Sponsored By: Support From:

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

GENERAL DESCRIPTION. Page 1 of 5

Proposed Action, Purpose and Need Technical Memorandum

RM 620 FEASIBILITY STUDY

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

I-10 AT SCENIC LOOP RD. Open House

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

3.0 Future Conditions

APPENDIX D COST SUMMARY TABLES

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

#!! "$% ##! &! # '#! % $ #!

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Fairfax County Parkway Widening Fairfax County

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

FY 2006 TRANSPORTATION CAPITAL PROGRAM

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

Appendix D: Concept Screening

Chapter 5 Future Transportation

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Access Routes from US 101 to the Richmond San Rafael Bridge

Route 79/Davol Street Corridor Study

State Route 160 (Blue Diamond Highway)

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Final Project Prioritization Plan

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

LOOP 360 IMPROVEMENT STUDY

Basalt Creek Transportation Refinement Plan Recommendations

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg.

IH 20 RANGER HILL PUBLIC MEETING

Current Roadway Projects Wednesday, September 03, 2014

Financial Project ID No(s).: and ETDM No(s).: and 14181

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Proposed Project I 35 from Denton to Cooke County Line

Chapter 4 Traffic Analysis

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Project Description Form 6V

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Harrah s Station Square Casino

4.0 Recommended Transportation Plan

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

4.0 Recommended Transportation Plan

County of Fairfax, Virginia. Department of Transportation

INTERSTATE 540 IMPROVEMENT STUDY

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

TRANSPORTATION COMMISSION Agenda Staff Report

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Section Access Control Plan - SH 14 (Mulberry Street)

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Project Fact Sheet. August 1,

CHAPTER 1 INTRODUCTION

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

US Route 30 Master Plan Optimal Corridor Conceptual Plan

Project Description Form 8EE

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

A: PLANNED P ROJECTS PROJECTS

Please find below the Town staff s responses to NCDOT s recommended roadway stipulations listed in a letter dated May 25, 2015.

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Welcome to the Sellwood Bridge Project Open House!

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

APPENDIX L: COST ESTIMATING TOOLS

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Central Avenue Corridor Study FPID Number:

Transcription:

Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation network have been identified as necessary to handle the existing and anticipated future traffic demand on the area s transportation network. As a result, the proposed projects listed below are expected to address the needs of this fast-growing area and allow for the reasonable access of the general public to homes, jobs, shopping and entertainment. It will be up to the responsible entities to implement the suggested solutions. The proposed projects have been grouped into Corridors and each grouping includes a brief description of the project; estimated construction cost (2014 dollars, exclusive of potential right-of-way acquisition); implementing entity or entities (Shenandoah, Oak Ridge North, Woodlands Road Utility District #1 (WRUD#1), Montgomery County, TxDOT, Harris County and Conroe); potential funding sources (federal, state, local, etc.); plan goals met (economic development, maximization of mobility, quality of life, and project consensus); and mobility issues addressed (IH 45 alternative, N/S and E/W connectivity, access to Grand Parkway, local circulation, overall mobility, bicycle/pedestrian, and intersection). Short Term Needs (0-5 years) (Note: Bicycle accommodations are recommended on all new or widened facilities. The type of accommodations will be determined by implementing entities and their partners during the design process.) Key Corridors Rayford Road Construct a roadway overpass on Rayford at the UP Railroad. Estimated cost: $13.7 million Widen Rayford Road to six lanes, incorporating access management strategies, from the UP Railroad to Legends Run Drive and from Fox Ravine Drive to Grand Parkway. Estimated cost: $21.5 million Total construction cost estimate: $35.2 million Implementation entity: Montgomery County 9/30/2014 South County Mobility Plan: Public Meeting Page 1 of 20

, UP Railroad SCMP goals: Economic development; maximize mobility Mobility issues addressed: overall mobility, E/W connectivity Woodlands Parkway /Robinson Road Corridor Woodlands Parkway/Robinson at IH 45 Convert the Woodlands Parkway/Robinson Road at IH 45 to a single-point urban interchange (SPUI), including frontage road U-turn lanes. In the event that funding is not available for a SPUI, it is recommended that a Diverging Diamond interchange be constructed as an interim solution. Construction cost estimate: $51.2 million Implementation entities: Montgomery County, TxDOT, project consensus, local circulation Robinson Road Widen to four lanes from IH 45 to east of the UP Railroad, including its realignment to convert the two intersections at Hanna Road into a single intersection controlled by a traffic signal. Construction cost estimate: $10 million Implementation entities: Oak Ridge North, Montgomery County Woodlands Parkway Extend IH 45 direct connectors over Woodloch Forest and Six Pines. Construction cost estimate: $26.5 million Implementation entities: Woodlands RUD#1, Montgomery County Lake Woodlands Drive Widen to six lanes from Lake Front Circle to IH 45. Estimated cost: $6.8 million Construct an overpass on Lake Woodlands at Grogans Mill. Estimated cost: $4.3 million 9/30/2014 South County Mobility Plan: Public Meeting Page 2 of 20

Construct a westbound-to-eastbound U-turn at the intersection of Lake Woodlands Drive at Target/The Woodlands Mall entrance. Estimated cost: $1.3 million Total construction cost estimate: $12.4 million Implementation entities: WRUD#1, Montgomery County Potential funding sources: State, local SCMP goals: Economic development; maximize mobility, project consensus, local circulation, overall mobility Grogans Mill Road Widen to six lanes from Woodlands Parkway to Research Forest. Construction cost estimate: $6 million Implementation entities: WRUD#1, Montgomery County Potential funding source: Local Mobility issues addressed: N/S connectivity, overall mobility Gosling Widen to four lanes from Flintridge to Grand Parkway, including a 2 lane bridge over Spring Creek. Construction cost estimate: $41 million Implementing entities: WRUD#1, Montgomery County, Harris County, Conroe Potential funding sources: State, local Mobility issues addressed: N/S connectivity, IH 45 alternative, Grand Parkway access Birnham Woods Widen to four-lanes from Elan Blvd to the Grand Parkway. Estimated cost: $7.2 million - Construction cost estimate: $7.2 million - Implementation entity: Montgomery County - Potential funding sources: Local - SCMP goals: Maximize mobility 9/30/2014 South County Mobility Plan: Public Meeting Page 3 of 20

- Mobility issues addressed: Grand Parkway access, local circulation Elan Blvd Widen to 4 lanes from Aldine Westfield to Birnham Woods Drive. Estimated cost: $5.5 million - Construction cost estimate: $5.5 million - Implementation entity: Montgomery County - Potential funding sources: Local - SCMP goals: Maximize mobility - Mobility issues addressed: Access to Grand Parkway, local circulation 9/30/2014 South County Mobility Plan: Public Meeting Page 4 of 20

Additional Short Term Corridors: North/South Kuykendahl Widen to four lanes from Lake Woodlands Drive to Bay Branch. Construction cost estimate: $6.6 million Implementing entities: WRUD#1, Montgomery County Potential funding sources: Local Mobility issues addressed: N/S connectivity Gosling Conduct an environmental assessment to extend Gosling Road north from SH 242 to FM 1488. Study cost estimate: $800,000 Implementing entities: WRUD#1, Montgomery County, Harris County, Conroe Potential funding sources: State, local Mobility issues addressed: N/S connectivity, IH 45 alternative, Grand Parkway access Grogans Mill Road Conduct a feasibility study to address the need for improving intersection at Woodlands Parkway. Study cost estimate: $600,000 Implementation entities: WRUD#1, Montgomery County Potential funding source: Local Mobility issues addressed: N/S connectivity, overall mobility Grogans Mill Road and Direct Connector Study Conduct a environmental and schematic study to evaluate options to improve interchange capacity in the north-south direction at Grogans Mill at Woodlands Parkway, including the widening of Grogans Mill to six lanes from Woodlands Parkway to Sawdust, a grade separation from Grogans Mill to South Park Drive, widening of South Park Drive, widening of Westridge Road, widening of Pruitt Road, and a direct connector from IH 45 northbound to Pruitt Road westbound. 9/30/2014 South County Mobility Plan: Public Meeting Page 5 of 20

Study cost estimate: $2 million Implementation entities: WRUD#1, Montgomery County, TxDOT Mobility Issues addressed: IH 45 alternative, N/S connectivity Sawmill Road Extension Study Conduct an environmental assessment to extend Sawmill Road from South High Oak Circle (south of Sawdust) to Holzwarth, including a new bridge over Spring Creek. Study cost estimate: $300,000 Implementation entities: Montgomery County, Harris County; potentially ExxonMobil and Springwoods Potential funding sources: State, local, private. Mobility issues addressed: N/S connectivity David Memorial Drive Construct four lanes divided extension from Shenandoah Park Drive to SH 242. Construction cost estimate: $11 million Implementation entities: Shenandoah, Montgomery County, Conroe Potential funding sources: Local, private (Methodist Hospital) Mobility issues addressed: IH 45 alternative, N/S connectivity Harpers Way Conduct a route study to extend Harpers Way south from Laughing Falcon Trail to proposed Tamina Road extension. Study cost estimate: $300,000 Implementation entities: Montgomery County, Conroe Potential funding source: Local Mobility issues addressed: IH 45 alternative, N/S connectivity 9/30/2014 South County Mobility Plan: Public Meeting Page 6 of 20

Fairview/Blair/Foster Corridor Study Conduct a route study to build a road from Rayford to SH 242 via Foster, Blair and Fairview alignments. Study cost estimate: $900,000 Implementation entities: Montgomery County, Conroe Mobility issues addressed: IH 45 alternative, N/S connectivity Songwood Drive, Blair Road, and Oak Ridge Park Corridors Songwood Extend Songwood Drive from Pinewood to Sleepy Hollow. Estimated cost: $2 million Extend Songwood Drive/ Industrial Way from Springwood to Robinson. Estimated cost: $3.9 million Blair Extend Blair Road from Curry to Cox. Estimated cost: $1.8 million Oak Ridge Park Extend Oak Ridge Park from Robinson to Curry. Estimated cost: $1.1 million Total construction cost estimate: $8.8 Million Implementation entities: Oak Ridge North, Montgomery County Potential funding source: Local Mobility issues addressed: N/S connectivity Oak Ridge School Road/Hanna Extend north to connect to Johnson. Construction cost estimate: $1.4 Million Implementation entities: Oak Ridge North, Montgomery County Potential funding sources: Local Mobility issues addressed: N/S connectivity 9/30/2014 South County Mobility Plan: Public Meeting Page 7 of 20

Aldine Westfield Road Conduct an environmental assessment and develop schematic drawings for the extension of Aldine Westfield Road from the Hardy Toll Road to Ed Kharbat Drive in Conroe. Study cost estimate: $5 million Implementation entities: Montgomery County, Harris County Mobility issues addressed: IH 45 alternative, N/S connectivity, Grand Parkway access Townsen Blvd Conduct a route study extending Townsen Boulevard to SH 242 (providing connection between Rayford, Robinson, and Tamina). Estimated cost: $6.3 million 9/30/2014 South County Mobility Plan: Public Meeting Page 8 of 20

Additional Short Term Corridors: West/East FM 1488 Perform an alternatives analysis to determine the alignment to extend FM 1488 from IH 45 to FM 1314. This extension would provide an alternative to SH 242. Study cost estimate: $1.4 million Implementation entities: Montgomery County, Conroe, UP Railroad Mobility issues addressed: Overall mobility, E/W Connectivity SH 242 Widen by adding one lane in each direction from Gosling to IH 45, and from Harpers Way to FM 1314. Construction cost estimate: $52 million Implementation entity: TxDOT Potential funding sources: Federal, state Mobility issues addressed: Overall mobility, E/W Connectivity Shenandoah Park Drive Conduct a route study to extend from David Memorial to the San Jacinto River. Study cost estimate: $1 million Implementation entity: Montgomery County Potential funding source: Local Research Forest/Tamina Corridor Research Forest Improve the intersection at Research Forest and Grogans Mill by converting the existing four-point intersection into a one- or two-point intersection. Estimated cost: $3.1 million 9/30/2014 South County Mobility Plan: Public Meeting Page 9 of 20

Improve the intersections at Six Pines, Holly Hill and Pinecroft by adding right turn lanes. Estimated cost: $3.9 million Widen Research Forest/Tamina Road at IH 45 by adding one traffic lane in each direction under the freeway bridge. Estimated cost: $2.1 million Tamina Widen by adding one lane in each direction from IH 45 to David Memorial. Estimated cost: $700,000 Improve the intersection of Tamina and David Memorial. Estimated cost: $1.1 million Conduct an environmental assessment to extend Tamina Road from Hanna Road to FM 1314, including a grade separation at the UP Railroad and a new bridge at the San Jacinto River. Estimated cost: $3 million Total construction cost estimate: $ 10.9 million Study cost estimate: $3 million Implementation entities: Shenandoah, Montgomery County, Conroe, project consensus, local circulation Lake Woodlands Drive Conduct an environmental impact study for the extension of Lake Woodlands Drive from IH 45 to Sleepy Hollow Road. Study cost estimate: $600,000 Implementation entities: WRUD#1, Oak Ridge North and Montgomery County Potential funding sources: State, local SCMP goals: Economic development; maximize mobility, project consensus, local circulation, overall mobility Robinson Road Conduct an environmental assessment to elevate the UP Railroad at Robinson and to extend Robinson from east of UP Railroad to Townsen. 9/30/2014 South County Mobility Plan: Public Meeting Page 10 of 20

Study cost estimate $1.6 million Implementation entities: Oak Ridge North, Montgomery County, UP Railroad Rayford/Sawdust Corridor Implement access management strategies (raised median, driveway consolidation) and add right turn lanes at all the signalized intersections between Grogans Mill and UP Railroad. Estimated cost: $14.9 million Construct a new two-lane road under IH 45 at Spring Creek to connect both sides of IH 45. Estimated cost: $19.9 million Total construction cost estimate: $34.8 million Implementation entity: Montgomery County, UP Railroad Mobility issues addressed: overall mobility, E/W connectivity Lexington Blvd Widen Lexington Blvd to four lanes from Rayford to East Benders Landing. Construction cost estimate: $9.3 million Implementing entity: Montgomery County Potential funding source: Local Mobility issues addressed: N/S and E/W connectivity Area Wide Improvement Package Implement an aggressive incident clearance program. Estimated cost: $1.8 million Implement a traffic signal timing optimization program. Estimated cost: $900,000 Install dynamic message signs throughout the study area. Estimated cost: $700,000 Total cost estimate: $3.4 million Implementation entity: Montgomery County Potential funding sources: Federal, local, project consensus 9/30/2014 South County Mobility Plan: Public Meeting Page 11 of 20

Mobility issues addressed: Overall mobility, intersection improvement Intersection Improvement Package Add turn lanes to the following intersections: College Park Drive/SH 242 at Gosling (dual left from WB 242 to SB Gosling; dual right from NB Gosling to EB 242; dual left from NB Gosling to WB 242) East Panther Creek at Woodlands Parkway (Dual SB left and right turn lane) Flintridge at Gosling (SB and WB right turn lanes) FM 1488 at Kuykendahl (Dual WB turn lane) FM 2978 at Woodlands Parkway (Dual SB left turn lane) Kuykendahl at Woodlands Parkway (NB and SB through lanes and SB right turn lane) Lake Woodlands Drive at Gosling (Dual WB left and WB right turn lanes) Pinecroft Drive/Mall Entrance at Lake Woodlands Drive (NB right turn lane) Woodloch Forest at Woodlands Parkway (Dual SB left turn lane) Total construction cost estimate: $4.1 million Implementation entities: WRUD#1 and Montgomery County Potential funding sources: Federal, local Mobility issues addressed: Intersection improvement Bicycle/Pedestrian Network Preliminary Design Conduct design for the new bicycle/pedestrian connector routes to correspond with new roadway construction and the Spring Creek Greenway. Design cost estimate: $3 million Implementation entity: Montgomery County Potential funding sources: Federal, local SCMP goals: Quality of life Mobility issues addressed: Lack of multimodal transportation options 9/30/2014 South County Mobility Plan: Public Meeting Page 12 of 20

Long Term Needs (6-25 years) (Note: Bicycle accommodations are recommended on all new or widened facilities. The type of accommodations will be determined by implementing entities and their partners during the design process.) North/South Corridors Gosling Road Extend Gosling Road from SH 242 to FM 1488. Construction cost estimate: $25 million Implementation entity: Montgomery County Potential funding sources: State, local Mobility issues addressed: IH 45 alternative, N/S connectivity Grogans Mill Road Widen Grogans Mill Road from four to six lanes between Woodlands Parkway and Sawdust. Estimated cost: $11.5 million Widen Grogans Mill from two to four lanes from Research Forest to Vision Park. Estimated cost: $5.5 million Depending on the results of earlier study, improve the intersection at Grogans Mill at Woodlands Parkway to accommodate traffic volume. Estimated cost: $20 million Depending on the results of earlier study, Construct a grade separation at South Park Drive, widen South Park Drive to four lanes, widen Westridge Road to four lanes, widen Pruitt Road to four lanes, and construct a new direct connector from northbound to Pruitt Road westbound. Estimated cost: $53.1 million Total construction cost estimate: $90.1 million Implementation entities: Woodlands RUD#1, Montgomery County, TxDOT SCMP goals: economic development maximize mobility Mobility issues addressed: IH 45 alternative, N/S connectivity Sawmill Road Extension Depending on results of earlier study, extend from South High Oak Circle to Spring Creek. (Sawmill will connect to Holzwarth in Harris County which will provide a direct connection to Grand Parkway). 9/30/2014 South County Mobility Plan: Public Meeting Page 13 of 20

Construction cost estimate: $8.8 million Implementation entities: Montgomery County, Harris County Potential funding sources: State, local SCMP goals: economic development, maximize mobility Mobility issues addressed: N/S connectivity, IH 45 alternative, Grand Parkway access Atkinson Lane Extend from Vision Park Blvd to St Lukes Way. Construction cost estimate: $6.7 million Implementation entities: Shenandoah, Montgomery County Potential funding source: Local Mobility issues addressed: IH 45 alternative, N/S connectivity Vision Park/Shenandoah Park and Nursery Road/Sagewood Drive Construct two new main-lane overpasses at IH 45 and Vision Park Drive/Shenandoah Park Drive and at IH 45 and Nursery Road/Sagewood Drive. Construction cost estimate: $80 million Implementation entities: Shenandoah, Oak Ridge North, Montgomery County, TxDOT Mobility issues addressed: Local circulation Harpers Way Depending on results of earlier study, extend Harpers Way south from Laughing Falcon Trail to Tamina Road. Construction cost estimate: $11 million Implementation entities: Montgomery County Potential funding sources: Local Mobility issues addressed: IH 45 alternative, N/S connectivity 9/30/2014 South County Mobility Plan: Public Meeting Page 14 of 20

Fairview/Blair/Foster Corridor Depending on results of earlier study, construct a 2-lane road from Rayford to SH 242 via Foster, Blair and Fairview alignments. Construction cost estimate: $30.8 million Implementation entities: Montgomery County, Harris County Mobility issues addressed: IH 45 alternative, N/S connectivity Aldine Westfield Road Depending on the result of the environmental assessment, extend from Riley Fuzzell to Ed Kharbat Drive in Conroe. Estimated cost: $131.9 million Construct two direct connector ramps to Hardy Toll Road. Estimated cost: $36.5 million Total construction cost estimate: $168.4 million Implementation entities: Conroe, Montgomery County, Harris County Mobility issues addressed: IH 45 alternative, N/S connectivity, local circulation, Grand Parkway access Birnham Woods Drive Extend Birnham Woods Drive from Rayford Road to Birnamwood Blvd in Harris County. Estimated cost: $26 million Construct a new bridge over Spring Creek. Estimated cost: $5.2 million Widen to 4 lanes from Rayford Rd to Grand Parkway. Estimated cost: $9.9 million Widen and extend Birnham Woods from Elan Blvd to Robinson. Estimated cost: $14.7 million Total construction cost estimate: $55.8 million Implementation entities: Montgomery County, Harris County Mobility issues addressed: IH 45 alternative, N/S connectivity, Grand Parkway access 9/30/2014 South County Mobility Plan: Public Meeting Page 15 of 20

Townsen Blvd Construct a bridge on Townsen Boulevard over Spring Creek. Estimated cost: $21.1 million Construct a new road from the Spring Creek to Grand Parkway. Estimated cost: $109.3 million Construct a new road from the Grand Parkway to SH 242. Estimated cost: $80.4 million Total construction cost estimate: $210.8 million Implementation entities: Montgomery County, Harris County, Conroe Potential funding sources: State, local, private Mobility issues addressed: IH 45 alternative, N/S connectivity, Grand Parkway access 9/30/2014 South County Mobility Plan: Public Meeting Page 16 of 20

West/East Corridors FM 1488 Depending on results of the previous study, extend FM 1488 east from IH 45 to FM 1314. Construction cost estimate: $52.9 million Implementation entities: Woodlands RUD#1, TxDOT Shenandoah Park Drive Depending on results of the previous study, extend Shenandoah Park Drive as 4 lanes from David Memorial to the San Jacinto River. Construction cost estimate: $33 million Responsible implement entities: Montgomery County Research Forest Widen to 6 lanes from Shadow Bend to FM 2978. Estimated cost: $16.5 million Construct an underpass at Research Forest at Grogans Mill. Estimated cost: $14.3 million Reconstruct the interchange at Research Forest at IH 45 to accommodate ten traffic lanes under the bridge. Estimated cost: $40.1 million Total construction cost estimate: $70.9 million Implementation entities: WRUD#1, Montgomery County, TxDOT Tamina Road Depending on results of the previous study, extend Tamina Road from Hanna Road to FM 1314, including a grade separation at the UP Railroad and a new bridge at the San Jacinto River. Construction cost estimate: $92 million 9/30/2014 South County Mobility Plan: Public Meeting Page 17 of 20

Implementation entity: Montgomery County Potential funding sources: State, local, UP Railroad Mobility issues: E/W connectivity Lake Woodlands Drive Depending on results of the previous study, extend Lake Woodlands Drive from to Sleepy Hollow Road, including an overpass at the UP Railroad. Estimated cost: $19.4 million Widen Sleepy Hollow Road to 4 lanes from Main Street to Townsen. Estimated cost: $24.6 million Total construction cost estimate: $44 million Implementation Construction entities: Oak Ridge North, Montgomery County Potential funding sources: State, local, UP Railroad, local circulation Sleepy Hollow Widen Sleepy Hollow Rd from Main St to Hayes Ranch Rd. Construction cost estimate: $24.6 million Implementation entity: Montgomery County Potential funding sources: State, local Robinson Rd Depending on results of the previous study, extend Robinson Road from Hanna Road to Townsen Blvd. Estimated cost: $30.2 million Construct railroad overpass (UPRR over road) Estimated cost: $23.5 million Construction cost estimate: $53.7 million Implementation entities: Oak Ridge North, Montgomery County Potential funding sources: State, local, UP Railroad 9/30/2014 South County Mobility Plan: Public Meeting Page 18 of 20

Elan Blvd Extend from Birnham Woods Dr to Townsen Blvd. Construction cost estimate: $11.1 million Implementation entity: Montgomery County Potential funding sources: State, local SCMP goals: maximize mobility Sawdust Road and Rayford Road Corridor Widen Sawdust and Rayford Roads from six to eight lanes from Grogans Mill to the UP Railroad. Estimated cost: $16.8 million Reconstruct the IH 45 interchange to accommodate 10 lanes under the bridge. Estimated cost: $40.1 million Total construction cost estimate: $56.9 million Implementation entities: Montgomery County, TxDOT, Grand Parkway access, local circulation Rayford Rd Extend from Townsen Blvd to North Park. Estimated cost: $60 million Widen to 4 lanes from Waterbend Cove to Birnham Woods Dr. Estimated cost: $8.7 million Construction cost estimate: $68.7 million Implementation entities: Montgomery County, Harris County Potential funding sources: State, local, private Lexington Blvd Extend Lexington Blvd from East Benders Landing to Townsen. Estimated cost: $13.4 million Extend Lexington Blvd from Rayford to Birnamwood Blvd. Estimated cost: $5.5 million 9/30/2014 South County Mobility Plan: Public Meeting Page 19 of 20

Total construction cost estimate: $18.9 million Implementing entity: Montgomery County Potential funding source: Local Mobility issues addressed: N/S and E/W connectivity Bicycle/Pedestrian Network Construct new bicycle/pedestrian connector routes to correspond with new roadway construction, the Spring Creek Greenway, and path in Grand Parkway right-of-way. Construction cost estimate: $27 million Implementing entities: WRUD#1, Shenandoah, Oak Ridge North, Montgomery County, TxDOT SCMP goals: Quality of life Mobility issues addressed: N/S and E/W connectivity, overall mobility Additional Recommendation Encourage TxDOT and H-GAC to conduct a Major Investment Study (MIS) to investigate the need for and feasibility of additional capacity in the IH 45 N/Hardy Toll Road corridor from BW 8 in Harris County to Loop 336 North in Montgomery County. South County Mobility Plan Short Term Cost Estimates: Construction: $340.3 Million Key Corridors: $195 Million Additional Corridors: $145.3 Million Studies: $ 23.8 Million Total short term: $364.1 Million Long Term Construction Cost Estimate: Grand Total Construction Cost Estimate: $1.23 Billion $1.59 Billion Construction cost only: does not include potential right-of-way acquisition cost or utility relocation. 9/30/2014 South County Mobility Plan: Public Meeting Page 20 of 20