CTTF SURVEY DEBRIEF FOR The Municipal Service District Monday, February 12, 2018

Similar documents
2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Welcome! San Jose Avenue Open House August 25, 2015

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME Public Information Centre

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

NORTH HIGHLAND LAKE ROAD PROJECT

Item No. 14 Town of Atherton

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

CITY CLERK. (City Council on October 2, 3 and 4, 2001, adopted this Clause, without amendment.)

Public Information Centre

North Shore Transportation Improvement Strategy

91

Idea-66: Westbound I-66 Inside the Beltway

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

Upper Market Street Bike Lane Project

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

3.0 Future Conditions

Bay to Bay Boulevard Complete Streets Project

DKS & WASHINGTON COUNTY Washington County Transportation Survey

RM 620 FEASIBILITY STUDY

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

@ FRIENDLY ACRES COMMUNITY MEETING

Roundabouts Near At-Grade Railroad Crossings

Stakeholder Consultation Survey Proposed Cycle Options on Napa Valley Avenue

Roosevelt Estates Neighborhood Improvements

Edenbrook Hill Drive Traffic Calming Study

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Lawrence Loop SWOT Analysis

Safe Routes to School Committee. Task Force Meeting Notes Wednesday, September 6, 2017

Traffic Signal Phasing Study Summary & Staff Recommendations

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

Design Traffic Technical Memorandum

Project Goals and Objectives

Road Diets FDOT Process

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

2011 Countywide Attitudinal and Awareness Survey Results

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

Sardis Elementary School Road Safety Plan. Produced by: Sardis Elementary School - Safer School Travel Team in cooperation with Safer City

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Multi-Modal Traffic Analysis. Parisi and Associates

New Seward and 36 th Avenue Intersection Conceptual Design

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Transportation Impacts: Toronto York Spadina Subway Extension

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

February 11, 2016 TPO Board Presentation

TOWN OF PAYSON TRAFFIC CALMING MANUAL

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Flashing Yellow Left Turn Arrows: Scottsdale Experience

3.2.2 Proposed Road Network within Phase 1B Lands

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

Durrance Elementary School

Community Transportation Plan

3.0 PROJECT DESCRIPTION

Public Opinion about Transportation Issues in Northern Virginia

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

MEMORANDUM. To: 1.0 PURPOSE

REPORT. Engineering and Construction Department

Legislative Update Williamsburg Residency

Request for Authorization to Open Public Comment Period

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913

TRAFFIC CALMING ON BELEHRADSKA STREET IN PARDUBICE

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Transcription:

CTTF SURVEY DEBRIEF FOR The Municipal Service District Monday, February 12, 2018 Survey 1- Intersection Improvements Survey 2- Widening of AIA, Mickler Road and Palm Valley Rd Powered by

Survey #1 Intersection Improvements Survey Population: 23,198 Surveys Distributed: 8,840 IP addresses Survey Responses: 1,577 Statistical Validity: Confidence Level of 99% Margin of error: 2.68% Powered by

Q1: With which Community or Home Owners Association do you most closely identify? The numbers are a % of the overall respondents

Q2: How many years have you been a resident?

Q3: What is your age?

Q4: How many drivers are in your household?

Q5: What are your primary reasons for driving in and through Ponte Vedra?

Q6: DOLPHIN BLVD (FIGURE 8 on web site) Do Not Block signs and pavement markings are recommended at this location to prevent delays for the eastbound and northbound left-turn traffic. Are you in favor of the proposed intersection improvements at SR A1A at Dolphin Boulevard?

Q7: SOLANA RD (Figure 7 on the web site)improvements are proposed at Solana Road to enhance vehicular safety on the west leg of the intersection. Are you in favor of the proposed intersection improvements at SR A1A at Solana Road?

Q8: Sawgrass Village Drive (Figure 6 on the web site)improvements on the west leg of the intersection are proposed at Sawgrass Village Drive. Are you in favor of the proposed intersection improvements at SR A1A at Sawgrass Village/L Atrium Drive?

Q9: PGA Tour Boulevard (Figure 5 on the web site) Are you in favor of the proposed intersection improvements at SR A1A at PGA Tour Boulevard?

Q10: Mickler Road (Figure 4 on the web site)the proposed configuration at Mickler road and SR A1A includes widening on the west leg turning onto AIA. Are you in favor of the proposed intersection improvements at SR A1A at Mickler Road?

Q11: Palm Valley Road / Mickler Road Roundabout (Figure 9 on the web site)to improve capacity and traffic flow, it is proposed to convert the roundabout at Mickler Road at Palm Valley Road to a four-leg, signal-controlled intersection. Are you in favor of the proposed intersection improvements at Palm Valley Road at Mickler Road?

Q12: Palm Valley Road at Roscoe (Figure 10 on the web site)the reconfiguration of Roscoe Boulevard at Palm Valley Road is proposed to enhance safety and traffic flow at the intersection. Are you in favor of the proposed intersection improvements at Palm Valley Road at Roscoe?

Conclusions: Survey #1 Intersection Improvements Respondents are clearly in favor of intersection improvements except for the removal of the roundabout Overall the results on the roundabout were inconclusive except for the which was not in favor and within the margin of error. 15

Survey #2 Road Widening Survey Population: 23,198 Surveys Distributed: 8,840 IP addresses Survey Responses: 1,497 Statistical Validity: Confidence level of 99% Margin of error: 2.45% Powered by

Q1: With which Community or Home Owners Association do you most closely identify? Please select one and answer survey only once. Powered by

Q2: How many years have you been a resident? Powered by

Q3: What is your age? Powered by

Q4: How many drivers are in your household? Powered by

Q5: What are your primary reasons for driving in and through Ponte Vedra? Powered by

Q6: Widening Mickler Road and Palm Valley Road as Described Below Are you in favor of the proposed widening from two to four lanes of Mickler Road / Palm Valley Road from A1A to the Intra-coastal (refer to the map - from SR AIA at Mickler Rd to Palm Valley Rd at Roscoe Blvd )? Powered by

Q7: Widening SR A1A as Described Below Are you in favor of the proposed widening of SR A1A from two to four lanes from Mickler at A1A to the south gate of Sawgrass CC (refer to the map - from SR AIA at Mickler Rd to SR A1A at Sawgrass Drive)? Powered by

Q8: Widening SR A1A as Described Below Are you in favor of the proposed widening of SR A1A from four to six lanes from ATP Tour Boulevard to J. Turner Butler Boulevard (refer to the map from SR A1A at ATP Tour Blvd to SR A1A at Marsh Landing Pkwy)? Powered by

Conclusions: Survey 2 Road Widening Respondents are slightly in favor of widening 210 through to AIA and the lower portion of AIA from 2 to 4 lanes although somewhat inconclusive on the lower portion of AIA. Respondents are clearly opposed to the widening of AIA from 4 to 6 lanes. Powered by 25

Next Steps Powered by

Work of the CTTF: The Citizens Traffic Task Force met with County, State and other Government entities in December, January and February to debrief them on the results of the survey. We are in the process of giving them the community s priority list of improvements from the TPO study and based on the survey. These improvements will be considered on the 2022-2026 budgeting cycle for St John s County. While not likely, improvements may happen faster if roadway money becomes available from other sources. Additional work will be required to fully understand the community's preferences around closely contended changes such as the removal of the roundabout. 27