JOURNAL MAJOR TRANSIT AND TRANSPORTATION CONSTRUCTION TRAFFIC MANAGEMENT COMMITTEE Thursday, January 17, 2019, 9:00 AM 1149 S. Broadway, 1 st Floor Conference Room No. 150, Los Angeles, CA 90015 Committee Members: +Richard Liu (BOE), Chair Omar Braish (BOE), Co-Chair Walter Carrera (BOE Diana Crowder (BOE) Vatche Kouyoumjian (LADOT) Marco Arroyo (LADOT) Ron Jackson (BSS) John Calderon (ConAD) Mariann Karish (BOE) +Absent It is the responsibility of the Major Transportation Construction Traffic Management Committee to review applications for permits to work within the streets and determine work site traffic control conditions within the Transit Project Impact Area (LAMC 62.250). To be placed on the agenda, a brief description of the project must be emailed to ENG.TCTMC@lacity.org by 12 PM on Thursday in order to present the following Thursday. Additionally, it is the policy of the Committee to allow public comment on individual agenda items subject to such time limits as the Committee Chairman may deem appropriate. Appeals Committee - The General Manager of the Department of Transportation, the City Engineer, the Director of the Bureau of Street Services, and the Director of the Bureau of Contract Administration, or their designees. The City Engineer shall be the Chairperson of the Appeals Committee. The Appeals Committee considers appeals regarding Worksite Traffic Control Conditions and night work. The President of the Board of Public Works decides those appeals heard by the Appeals Committee that end in a tie vote. If you would like to appeal the committee s determination, please email ENG.TCTMC@lacity.org with your request. It is requested that individuals who require the services of a translator contact ENG.TCTMC@lacity.org no later than the day preceding the meeting. Whenever possible, a translator will be provided. Sign language interpreters, assistive listening devices, or other auxiliary aids and/or services may be provided upon request. To ensure availability, you are advised to make your request at least 72 hours prior to the meeting you wish to attend. SI REQUIERE SERVICIOS DE TRADUCCION, FAVOR DE NOTIFICAR LA OFICINA CON 24 HORAS POR ANTICIPADO.
PUBLIC COMMENT: The Committee will hear public testimony on agenda items under the Committee's jurisdiction. MINUTES: Review and adopt January 10, 2019 meeting minutes. AGENDA ITEMS: 1) Charlie Jun (I Park Inc) 820 S Wilton Pl PLE: Excavation work to route an electrical conduit from the NE corner of 8th and Wilton to property. U-P#: 2018010974 DISPOSITION: No Show. 2) Edder Pinedo (TMI/JH Snyder Construction) 5757 Wilshire Blvd PLE: Road closure on Curson Ave for a Concrete Pour. BSS#: 2019000272 DISPOSITION: Moved to Next Week. 3) Steve Osborn (Right of Way/Wilshire Construction LP) 800 S Harvard Blvd PLE: Fence and Canopy on 8th St. Sidewalk. BSS#: 2019000081 DISPOSITION: 190022-PLE TLR Issued. 4) Jacqueline Machado (Engineering Associates) 6015 W Olympic Blvd PLE: Trench to install conduit and HH to pull FOC. U-P#: 2018015791 DISPOSITION: Item Returned. 5) Ryan Provost (Blaine Tech Services) BSS#: 2019000309-2/2/19 DISPOSITION: 190024-PLE TLR Issued. 6) Ryan Provost (Blaine Tech Services) BSS#: 2019000310-2/23/19 DISPOSITION: 190025-PLE TLR Issued. 7) Ryan Provost (Blaine Tech Services) BSS#: 2019000311-3/30/19 DISPOSITION: 190026-PLE TLR Issued. 8) David Ronquillo (TMI/ LG Signs) 10840 Wilshire Blvd PLE3: Single Lane Closure to install a Banner. BSS#: 2019000288 DISPOSITION: 190023-PLE3 TLR Issued.
9) Scott Reynolds (Roadway/Smith Brothers Crane) 10899 Wilshire Blvd PLE3: Crane to set a prefab unit for an event at Hammer Museum. BSS#: 2019000305, 000306 DISPOSITION: 190027-PLE3 Under Review. Site Specific. 10) Ryan Provost (Blaine Tech Services) 3553 S La Brea Ave CTC: Routine groundwater sampling of existing wells. BSS#: 2019000322 DISPOSITION: 190028-CTC TLR Issued. 11) Shahram Fadakar/Mark Patterson (LADWP) 3670 Crenshaw Blvd CTC: Install 2-2.5 x4 Fire Hydrants. U-P#: 2018012878 DISPOSITION: 190029-CTC Under Review. 12) Cassie Fausel (TRC) 5101 W Jefferson Blvd CTC: Discussing issues with our TCP. BSS#: DISPOSITION: Item Returned 13) Lissete Henderson (Blaine Tech Services) Avalon & 55 th St. SCSR: Conducting quarterly sampling and monitoring of existing wells. TCTMC#: 180604-SCSR BSS#: 2018008333 DISPOSITION: 190030-SCSR Under Review. 14) Robert Herrera (Inland Engineering) 156 W Slauson Ave SCSR: Open trench 180' to place 2-4" and 1-4 PVC conduit. Place (1) 24 x36 CATV vault. U-P#: 2019000065 DISPOSITION: 190031-SCSR Under Review. 15) Marvin Hermosillo (LADWP) 5054 S Vermont Ave SCSR: Install a 2 fire service on the east side of Vermont Ave, 20 south of 51st St. U-P#: 2018011659 DISPOSITION: 190032-SCSR Under Review, Site Specific. 16) Jacqueline Machado (Engineering Associates) 801 S Figueroa St RC: Trench to install conduit and HH to pull FOC. U-P#: 2018015034 DISPOSITION: Item Returned. 17) Scott Reynolds (Roadway/Hydraulic Crane) 624 S Grand Ave RC: Crane to set loads of piping for building construction. BSS#: 2019000308 DISPOSITION: 190033-RC TLR Issued.
18) Rocky Guerra (Right of Way/City Constructors Inc/Anglemyer Crane) 712 Olive St RC: Generator Install using 275-ton crane. BSS#: 2019000116 DISPOSITION: 190034-RC TLR Issued. 19) Tracy Nash (BKB Construction) 609 S Grand Ave RC: BKB Construction is requesting permission to install overhead protection on Grand Ave and 6 th St. BSS #: 2019000168 DISPOSITION: 190035-RC TLR Issued 20) Rocky Guerra (Right of Way/Bragg Crane & Rigging) 330 S Hope St RC: HVAC install with 500-ton crane. BSS#: 2019000068 DISPOSITION: Moved to next week. 21) Julia Aust/Jimmy Toetz/Michael Alessio/Connor Webber (Joey Restaurant/Shawmut Construction) 700 W 7 th St RC: Minor curb cut for a new drain and scaffolding on the sidewalk to cut (e) columns. BSS#: 2019000321 DISPOSITION: Moved to next week. 22) Ashley Cluck (Right of Way Inc/Anglemyer Crane) 630 W 6th St RC: 350-Ton Crane in the right of way taking the parking +three travel lanes to lift electrical equipment. BSS#: 2019000324, 000475 DISPOSITION: 190036-RC Under Review, Pending Police Commission. 23) Anthony Soriano (TMI/Matt Construction) 135 N. Grand Ave RC: Hope St lane closures for deliveries of materials to job-site. BSS#: 2018014122 DISPOSITION: 190037-RC - TLR Issued. 24) Anthony Soriano (TMI/Matt Construction) 135 N. Grand Ave RC: Trash bin BSS permit renewal. BSS#: 2018014121 DISPOSITION: 190038-RC TLR Issued. 25) Anthony Soriano (TMI/Greystar Development & Construction) 680 Imperial St (Santa Fe Ave) SSB: Sewer laterals on Santa Fe Ave. BSS#: 2018000313 DISPOSITION: 190039-SSB - Under Review, Site Specific. 26) Darrell Tieu (Caltrans/Edison) 4 th & Pecan St SSB: Caltrans plans to upgrade the pump station electrical works located near the LA 101 UC and 4th Street/Pecan St. Close the eastbound inside lane #2 on 4 th St. BSS#: DISPOSITION: No Show
27) Old business items, Haul Route submittals and miscellaneous discussion items. TLRs were approved and issued for the following old business items: 180888-CTC 180928-PLE3 190016-RC 190017-RC 190020-RC 190021-SSB Q:\TCTMC\Meeting Minutes\TCTMC Meeting Minutes 1-17-19\Agenda 1-17-19.docx