ANALOG PRESSURE GAUGE

Similar documents
1811G/H PITOT-STATIC TEST SET

VLI Visible Level Interface Operation & Maintenance Manual

Technical Procedure for General Laboratory Equipment

PRESSURE COMPARATOR 10000PSI 700bar. Operator Instructions CRYSTAL. engineering corporation

BAUSCH & LOMB ENGINEERING ROCHESTER. Title: Membrane Press Procedure Page 1 of 14

INSTALLATION AND OPERATING INSTRUCTIONS

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

Document Number: 239/34000/76 Revision: (-) 2009-Apr-13

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Basic Nitriding Sampling System Hydrogen Analyzer with Calculated % DA, % NH 3, and K N Values. Operations Manual

Draeger Fabius GS Pre-Use Check

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

AUTOMATIC HOSE TEST UNIT, TYPE SPU

Precision Hydrogen (All B&W Screen Models)

Model 106 DPI "Micro-switch" Installation and Operating Instructions

STANDARD OPERATING PROCEDURE FORCE DIAL FDN 100

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

STANDARD OPERATING PROCEDURE FORCE DIAL FDN 100

CalCheck. Instrument User Manual V1.8

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

CONSUMER MODEL INSTALLATION GUIDE

FireHawk M7 Interface Module Software Instructions OPERATION AND INSTRUCTIONS

Pressure Calibrators. Series PC..., PM...

TECHNICAL MANUAL CALIBRATION PROCEDURE FOR PRESSURE GAUGE. This publication replaces T.O. 33K dated 30 January 2012.

Product Information News September 26, 2003

TEL/jlRE" Introduction. Display Features and Modes. Startup Procedure. Power-Up Procedure. Adjustment Modes

Document Number: 302/34000/76 SV/sv Revision: (B) 2009/02/05

P5523. Users Manual. Liquid to Gas Separator. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

HOBO U20 Water Level Logger (U x and U x-Ti) Manual

PAPR Flow Tester. instructions. part no WARNING

Specifications and information are subject to change without notice. Up-to-date address information is available on our website.

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

Doc. P/N: Revision E November 7, 2014 BARFIELD, INC.

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

Upgrading Bio-Plex Manager 4.1, 5.0, or 6.0 Software to Bio-Plex Manager 6.1 Software

Hydraulic hand test pump Models CPP700-H and CPP1000-H

Standard Operating Procedure Measuring & Testing Equipment

User Manual Pressure Calibration System C and Hydraulic Pressure Pump Models T-620/T-620H Copyright 2008 AMETEK Denmark A/S

Copyright 2004 by the Thomas G. Faria Corporation, Uncasville CT No part of this publication may by reproduced in any form, in an electronic

Operator Quick Guide ORBISPHERE 3654

Observations Possible Causes Recommended Actions. Turquoise color

Onset Computer Corporation Inside this package: HOBO U20 Water Level Logger Calibration Certificate

PS-425 Pitot-Static/Air Data Tester

Preferred Instruments Danbury, CT USA

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

PPC4E Pressure Controller/Calibrator Superior rangeability and reliability

2465 Piston Gauge with 2456 PG Monitor, Setup in COMPASS for Pressure

Armfield Distillation Column Operation Guidelines

SERVICE BULLETIN. TOPIC: Cylinder NUMBER: SUPERSEDES: NEW DATE: May 15, Indexing Basic Cylinder Height On CFR F-1/F-2 Rating Units

WIKA INSTRUMENT CORPORATION

O P E R A T O R S M A N U A L

Maintenance Manual. Liquid Level Transmitter CT801-SI, CT801-TA

256 Pneumatic Pressure Indicator

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

PROCEDURE TWO-PLY TESTABLE BELLOWS D 1 OF 5 TWO PLY BELLOWS TEST PROCEDURE

SOP: Buck Scientific BLC-20P HPLC Operation

TEST SPECIFICATION NYT-909-C

Pneumatic high-pressure controller Model CPC7000

Air Bubbler Depth Gauge DG2200 Installation and Reference Manual

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Contents. Overview Setup Safety Instructions Operating Instructions Connection Diagram Specifications...

Green 0-3% Acceptable Orange 3.1-5% Alert Red 5.1 and up Fail. Calibrated By:

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

BT 800-OX Operating Manual

Hydraulic comparison test pump Models CPP1000-X, CPP1600-X

OPERATION MANUAL DIVE CALIPER NOT SCALE / IF IN DOUBT ASK* *ALL UNITS IN MM/DEGREES UNLESS SPECIF. Dive Caliper General DC-051

Calibration Procedure

Instrument Installation and Performance Verification

Micro Dial-Flowmeter. Instructions for Use

Aerobic Respiration. Evaluation copy

Dance Team Tabulation Program. Instruction Manual For use with a MAC

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Liquid Handling Systems

D-Opto Dissolved Oxygen Sensor Operation Manual for the D-Opto 4-20mA

Adam Equipment. DENSITY DETERMINATION KIT for AFP, AAA and AAA/LE SERIES BALANCES OPERATOR S MANUAL

GDS OPERATING PROCEDURE

Calibration Procedure

Standard Operating Procedure

Thermo Environmental Model 146C Calibrator Certification. Section Revision No September 17, 2014 Page 1 of 54

Mechanical Pressure Measurement

Pneumatic high-pressure controller Model CPC7000

Operating Instructions

Mass Flowmeters. Mass Flowmeters for Gases

Pressure is our Business

DQM Annual Hopper QA Checks

Using the Akta Prime plus October 22, 2012

Hydraulic hand spindle pump Models CPP1000-M, CPP1000-L

PCS 340 Core Saturator : 115 Volt : 230 Volt. Instruction Manual

Technical Procedure for Instrument Calibration and Maintenance

BIOPAK 240R MAINTENANCE TOOL KIT. TOOL KIT PART NUMBER: B Revision A

OPERATION MANUAL. Hand Held Leak Tester Model # ZUTR-10002

FPG8601 Force Balanced Piston Gauge

Oxygen Dialflow Meter. Instructions for Use

Product Information News

BUBBLER CONTROL SYSTEM

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination

BGA244 Binary Gas Analyzer

P3000 Deadweight Tester Setup, Part 1: Limited Partial Correction Method

Transcription:

304-00103 ANALOG PRESSURE GAUGE CALIBRATION PROCEDURE BARFIELD P/N 304-00103 20-304-00103 August 6, 2013 BARFIELD, INC. Corporate Headquarters 4101 Northwest 29th Street Miami, Florida 33142 www.barfieldinc.com Email: gsesales@barfieldinc.com

REVISION RECORD REV. ECO # REV. DATE DESCRIPTION OF CHANGE A August 06, 2013 Initial Release Created to support pressure gauge Barfield P/N: 304-00103 20-304-00103 August 06, 2013 Page 2 / 6

REQUIRED EQUIPMENT (OR EQUIVALENT) QUANTITY PART NUMBER EQUIPMENT NAME SPECIFICATIONS 1 4513E Pressure Comparator 1 GaugeCAL XP Windows Software Program used for Calibration of gauges 1 4513EB IS31-600PSI See Crystal Engineering Specifications See Crystal Engineering Specifications 0-600 PSI (±0.05% of Reading + 0.005% of F.S.) APPLICABLE DOCUMENT LIST DOCUMENT NUMBER DESCRIPTION GaugeCal XP Pressure Comparator Operator Instructions FastCal XP User s Manual for Gauge Calibration Software IS31-600PSI See linked document in P&V under 304-00103 Linked Files: K:\Acrobat View Files NOT Generated by Barfield\USG Model 1409 3in Portable Test Gauges.pdf 20-304-00103 August 06, 2013 Page 3 / 6

Figure 1 Ametek Model 1409 series, P/N: 161952, 300 PSI gauge also referenced by Barfield P/N: 304-00103 1.0 INCOMING CALIBRATION CERTIFICATION CHECK AS RECEIVED The purpose of this procedure is to confirm the Instrument (Ametek Model 1409 series, P/N: 161952, 300 PSI gauge also referenced by Barfield P/N: 304-00103) meets the OEM accuracy specification of 0.5% of span. At the completion of this certification check, a Certificate of Calibration will be generated for each instrument. 1.1 Remove reservoir cap. 1.2 Wind the handle fully CCW until it stops, than CW about 10 turns. Note: This prevents the fluid from flowing through the comparator leaking out from the UUT test port. 1.3 Verify the IS31-600 psi reference gauge is installed on the GaugeCal-XP test bench. 1.4 Power ON the IS31-600 reference gauge. 1.5 After IS31-600 initializes, press the zero button Note: this must be done before installing UUT 1.6 Turn handle CW on GaugeCal-XP test bench until fluid is seen rising up near the top of quick connect fitting. Keep fluid level ~ 2 threads below top of fitting. 20-304-00103 August 06, 2013 Page 4 / 6

1.7 Before installing UUT gauge on GaugeCal-XP test bench, verify pointer indicates ~0 psi (± 2 psi.) If zero adjustment is required, unscrew gauge collar ring which secures polycarbonate clear cover from gauge. While gentle holding pointer from moving (don t hold pointer, position finger against dial above or below pointer as need to keep it from rotating during the next step) use adjustment tool received with gauge and insert tool in small hole on tail end of indicating pointer. If pointer indicates + offset for 0 turn tool CCW gently. Remove tool and finger from dial and observe pointer position to see if it is resting on 0. Repeat steps until 0 indication is achieved. 1.8 Install UUT on GaugeCal-XP Test Bench. 1.9 Turn handle on GaugeCal-XP test bench for a reading of 0 (±0.1) on the IS31-600 reference gauge. 1.10 Verify reservoir has enough isopropyl alcohol. If required add fluid, a mixture of 50% distilled water / 50% Isopropyl alcohol. 1.11 Remove any remaining air bubbles from the Comparator. Note: This is done by winding the handle of the Comparator CCW until it stops, notice if the reservoir level drops indicating air is in the system. It may be necessary to do this several times until the reservoir level does not drop from winding the handle CW ~ 10 turns followed by CCW ~10 turns until it stops. 1.12 Run the FastCal-XP program. 1.13 Select Lookup Existing Gauge or Create New Gauge, whichever is applicable. 1.14 If Create New Gauge is selected, perform the following steps, otherwise continue with step 1.13. Welcome to the Add New Gauge Select Next > Step1: Select Ametek as the Manufacture Select Next >. Step2: Select the Model: 1409-161952 Select Next > o Note: Ametek Model: 1409, Range: 161952 = 300 PSI Step3: Select Location: Barfield Inc. (Shop 3) Select Next > Step4: Enter Gauge Information o Gauge number (Barfield p/n s/n) Example: 304-00103-0117 Note: p/n-s/n required to create unique gauge number in the database. o Serial number: 0117 (This is redundant but is required so the gauge record is unique). o Nickname: Not required (blank) o Calibration due: mm/dd/yyyy Enter today s date with the year advanced by 1. Another words calibration required in 12 months. o Select: Finish 20-304-00103 August 06, 2013 Page 5 / 6

1.15 Select Perform as Received Cal. 1.16 The Calibration Wizard welcome page will be displayed while it autodetect the reference. 1.17 The Calibration Wizard will prompt for the 1 st Reading @ 0.0 PSI, while UUT gauge is indicates 0 ± 3 PSI, select Next Point. Note: Adjust 0 if required on UUT per MFG instruction if required. 1.18 Using the GaugeCal-XP test bench, turn the handle CW until the UUT gauge displays the Target Pressure value prompted by the Calibration Wizard. 1.19 While UUT gauge indicates the Target pressure, select Next Point. 1.20 Repeat steps 1.18 & 1.19 above for the next five pressure calibration points. Continue with step 1.21 after ALL pressure calibration points have been completed. Verify that ALL calibration points taken resulted with a P for Pass (i.e. gauge is within Tolerance specification). Backup an repeat test pressure again to see if it will Pass. 1.21 As prompted by the Calibration Wizard VENT, turn the handle CCW on the GaugeCal-XP test bench until the UUT gauge displays 0.0 PSI. 1.22 Select Finish 1.23 Select Use As-Received for As Left. 1.24 Select Save Data. {located under Calibration Status section of screen} 1.25 Select Generate Certificate. 1.26 FastCal-XP program will launch Microsoft Excel and generate and display the Calibration Certificate for the UUT. 1.27 Excel will present an exception window stating: To Continue saving as a macro-free workbook select Yes 1.28 Using Microsoft Excel, select Office Button {top left corner of screen}, Print, select Entire workbook. This will print ALL 3-pages of the Calibration Certificate for the UUT. 1.29 Apply a calibration label to the rear of the Gauge. 1.30 If one or more points Failed, the test gauge must be tagged BER or if the gauge is new, return to Vendor for credit. 1.31 This completes the Instrument Certification Procedure. 20-304-00103 August 06, 2013 Page 6 / 6