Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Similar documents
Usage Policies Notebook for Trion RIE / ICP Dry Etch

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Usage Policies Notebook for Parylene Coating System

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD)

Usage Policies Notebook for Quintel 2001 Mask Aligner

Usage Policies Notebook for STS DRIE System

Usage Policies Notebook for HITACHI S Field Emission Scanning Electron Microscope System

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

OXFORD PLASMALAB 80PLUS (CLOEY)

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Unaxis PECVD. SiH4 (5% in He)

Standard Operating Manual

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Arizona State University NanoFab XACTIX ETCHER. Rev A

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

March CS-1701F Reactive Ion Etcher

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Oerlikon Sputtering Evaporator SOP

Standard Operating Manual

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Standard Operating Manual

Xactix XeF2 OPERATION MANUAL

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

STS PECVD Instructions

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

University of Minnesota Nano Center Standard Operating Procedure

Xactix Xenon Difluoride Etcher

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

STS ICP-RIE. Scott Munro (2-4826,

Standard Operating Manual

Basic ICP Operating Procedures

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Operating Procedures for Metal Evaporator I

Standard Operating Procedure. For. PVD E-Beam

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

University of Minnesota, MN Nano Center Standard Operating Procedure

QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

Birck Nanotechnology Center

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Nordiko Metal Sputtering System Standard Operating Procedure

COMELEC C-30-S Parylene Coating System

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

University of MN, Minnesota Nano Center Standard Operating Procedure

Revised: June 7, 2017

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

Cambridge NanoTech: Savannah S100. Table of Contents

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Birck Nanotechnology Center

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

Standard Operating Manual

Standard Operating Manual

THERMAL EVAPORATION UNIT (for Al evaporation)

Test Facilities Experiment Review

Notes-PECVD: Chamber 1

University of MN, Minnesota Nano Center Standard Operating Procedure

PURDUE UNIVERSITY TEFLON CORE PCB THRU-HOLE PREPARATION FOR BLACK HOLE APPLICATION RF LAB. Professor in charge: William Chappell MSEE 289

Standard Operating Procedure

MANUAL FOR SPTS APS (DIELECTRICS ETCHER)

SPUTTER STATION STANDARD OPERATING PROCEDURE

[needs to be discussed with faculty if any new material to be done]

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Operating Instructions

School of Chemistry SOP For Operation Of Glove Boxes

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

REPRODUCIBILITY IN OPTICAL THIN FILM PROCESSING PART 1, THE VACUUM AND PUMPING

STS DRIE User SOP Location: NRF Cleanroon, Dry Etch Bay

Photolithography. Operating Instructions

User guide for operating the Agilent 6420A QqQ mass spectrometer by direct infusion/injection

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

[USING THE VITROBOT April 9, Using the Vitrobot

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Chapter 8: Cryo-sorption pumps

COBILT CA-800 Mask Aligner Equipment Operation

Eco Snow CO2 Clean System Operation

Plasma II (AXIC) Standard Operating Procedure. Revision: 1.0 Last Updated: Feb.6/2013, Revised by Grace Li

Chapter 2 General description of the system

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

User Guide. Nano Digitcool Programmable freezer. Edition: 02/24/2016. Lire attentivement ce manuel avant d utiliser Nano Digitcool

Standard Operating Manual

Standard Operating Procedure for Solvent use in EMAL

Application Note. ASTRON Remote Plasma Source Ignition Best Practices PROBLEM

Equipment Operating Procedure Glove Box

BASF Flash Fire FRC Assessment Tool

Angstrom Dielectric Sputterer Operation Manual

Operating Instructions

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

Armfield Distillation Column Operation Guidelines

MATERIAL SAFETY DATA SHEET "W" TEST SOLUTION NFPA HAZARD RATINGS* 2 Moderate health hazard 3 Highly flammable SECTION 1: PRODUCT INFORMATION

University of MN, Minnesota Nano Center Standard Operating Procedure

Transcription:

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100 Revision date September 2014

2 Emergency Plan for AMST MVD 100 Standard Operating Procedures for Emergencies Contact information Person Lab Manager Director Staff Super User Phone number Jake Hes, 949-824-8239 (day), 562-522-8328 (alternate) G.P. Li: 949-824-4194 (day), 949-824-2047 (alternate) Mo Kebaili: 949-824-8239 (day), 949-494-5892 (alternate) Carlos Ruiz (818) 527-6349 (Anytime, voicemail or text only) Hazardous chemicals, gases, and conditions Hazard name Vacuum High temperature High voltage Isopropyl alcohol FDTS Vapor Description of hazard Implosion Burn or ignition source Electrical shock, ignition source Flammable solvent Harmful (see the MSDS of Heptadecylfluoro 1,1,2,2 Tetrahydrodecyl Trichlorosilane)

3 Authorized users for AMST Molecular Vapor Deposition System MVD 100 The following users have been authorized to use this equipment. Name Date staff Initials

4 Usage Policies for AMST Molecular Vapor Deposition System MVD 100 Standard policies for usage AMST MVD 100 is a molecular vapor deposition system that can deposit single molecule layer (or monolayer) by layer in order to modify the surface properties of the devices. With the current setup in the BiON cleanroom, the system can deposit FDTS* with the thickness of a few nanometers onto the substrates to make them extremely hydrophobic. * Note: FDTS stands for Heptadecylfluoro 1,1,2,2 Tetrahydrodecyl Trichlorosilane. Contact information The INRF / BiON staff or the lab manager can be reached at 824-8239 or 824-9831. Authorized users Only the INRF/BiON registered users who have completed the training and passed the certification may use this equipment. The users may only use the portion of the system for which they have been trained. Training The users must have received direct training from the staff in order to use this equipment. The users are expected to understand the nature of the system, as well as the proper control and use of the crystal monitor. Training varies slightly, depending on the material to be deposited on the substrate. Contact the staff for details or to arrange for a training session. Usage logs The users are required to log all activity in the log sheets provided. All users must log when they use the evaporator (date and time), which material they deposited, and when they completed their process in the user log sheet. If the users notice anything unusual, they should record it in the user log sheet, and add details in the maintenance log sheet. Any maintenance to the tool must be logged in the maintenance log sheet (maintenance staff only). Safety equipment There is no specific safety equipment for use on this tool, however, cleanroom gloves and tweezers should be used when handling substrates in the evaporator chamber. Care should be taken not to avoid hitting their head on the chamber or pinching their fingers upon lowering the hoist. Safety Follow the INRF / BiON lab safety rules RF Hazard: The system uses RF power to generate plasma for chamber cleaning and substrate pre-treatment.

5 Chemical Hazard: Do not vent the chamber before purging process finishes. Report to the staff immediately if suspect there is a vapor leak. Some chemicals used in the system are flammable and toxic. Emergency shut down: In case of emergency, shut down the whole system by pressing the red emergency button.do not attempt to fill FDTS vessel. All FDTS fills will be performed by INRF Staff. Please contact staff if any suspicious odor is detected. Standard equipment and materials The laboratory provides the following gas: N 2. Other gases must be cleared with the lab manager. User maintenance Please clean substrates prior to use Waste disposal Dispose of broken glass and broken wafers in the appropriate container. Dispose of alcohol soaked wipes in a waste container marked for flammable solid waste. Scheduling Reservation can be done on-line also the system can be used on a first-come, first served usage if no reservation was made. Other issues Users should record the base pressure on the log sheet prior to venting the chamber. Users should remain physically present at the tool during evaporation to monitor the deposition rate and the current set point, and they should also monitor the chamber pressure during operation. On completion of the evaporation, the system should be left in the idle mode, with the high vacuum valve open. Users should record the roughing time into the log sheet. Any new materials introduced into the system need to be cleared with the lab manager or the staff. At no time should a user adjust a system pressure regulator. Non-standard use Users may not modify any hardware on this equipment. For the usage of non-standard processes, gases or materials, contact the staff or the lab manager.

6 Usage Notes for AMST Molecular Vapor Deposition System MVD 100 Guide for using MVD 100 correctly Procedures 1. Log into the login computer if there is no problem commented by the last user on the log sheet. See Fig. 1. Fig. 1 2. Go to the mechanical chase room. Do NOT go in if there is liquid or other suspicious material on the floor. Open the oxygen valve. See Fig. 2A. Make sure the chiller and the dry pump are on. See Fig. 2B. Go back to the tool room. A B Fig. 2 3. Log into the MVD tool with the password the trainer has assigned to you. See Fig. 3. Fig. 3 4. Temperature settings Touch Temp Control button in Main Menu. Touch the Line Supply 3 button and the Chamber Temperature button to turn them on.

7 Touch the Line 1 and Line 3 buttons to turn them on. See Fig. 4. DO NOT TURN ON LINE 1 ON THE LEFT COLUMN (the #### button) Fig. 4 Fig. 5 5. Load sample(s) Touch Chamber Routines in Main Menu. See Fig. 5. Touch Vent and wait until the chamber lid is loosen. The screen will indicate when the chamber is completely vented. Open the lid and observe the chamber if it is clean or not. If not (usually there are small white particles), spray the cleanroom wipe with IPA and wipe the chamber and the lid with it. Load the sample(s) at the center area of the chamber. See Fig. 6. Fig. 6 Close lid and touch Pumpdown while applying force to the lid to ensure vacuum. The screen will say Idle when the pumpdown procedure is complete. 6. Touch Process Sequences. Touch the orange button for the Multi-layer sequence. Load and select an desired sequence. Click Yes on the pop-up menu. See Fig. 7. Fig. 7 7. Touch Process Sequences. Touch the green button for the Multi-layer sequence to run it. It takes about 3.5 hours for a 6-layer deposition. 8. Write down the oxygen flow rate, the setting RF power, the forward and reflected powers on the log sheet.

8 9. Write down the information of the processing cycles. See Fig. 8. Do NOT leave before the first cycle is finished. It takes about 4 hours to finish the 6 cycles. The machine state reads Idle (written in white on the monitor) when the process is done. Inform the staff if there is any fault (written in red) on the screen. Fig. 8 10. Unload sample(s) Touch Chamber Routines. Touch Vent and wait until the chamber lid is loosen. Open the lid. Unload the sample(s). Close lid and touch Pumpdown while applying force to the lid to ensure vacuum. Tough Main Menu. Touch Temperature Control. Touch the Line Supply 3 button and the Chamber Temperature button to turn them OFF. 11. Log out the MVD tool. 12. Comment on the log sheet. 13. Go to the mechanical chase room and close the oxygen valve. 14. Log out the login computer.