Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Similar documents
Countywide Transit Corridors Functional Master Plan

Abstract. Source of Copies The Maryland-National Capital Park and Planning Commission 8787 Georgia Avenue Silver Spring, MD 20910

Rapid Transit in Montgomery County

Bus Rapid Transit Plans

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Arterial Transitway Corridors Study. Ave

Appendix G: Bicycle Parking Space Recommendations at Transit Stations

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland

Abstract. Source of Copies The Maryland-National Capital Park and Planning Commission 8787 Georgia Avenue Silver Spring, MD 20910

South King County High-Capacity Transit Corridor Study

Countywide Bus Rapid Transit Study Consultant s Report (Final) July 2011 DEPARTMENT OF TRANSPORTATION. Barrier system (from TOA)

Seattle Transit Master Plan

WHAT IS BRT? Jack M. Gonsalves, PE, Parsons Brinckerhoff, Inc. February 22, 2012

BRT for Berkeley A Proposal for Consideration

Roadways. Roadways III.

Arterial Transitway Corridors Study

Community Task Force July 25, 2017

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Metropolitan Council Transportation Committee

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Proposed White Flint Separated Bike Lane Network September 2015

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Arterial Transitway Corridors Study. Sept. 26, 2011

MONTGOMERY COUNTY PLANNING DEPARTMENT

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

5. RUNNINGWAY GUIDELINES

Understanding Our Options, Lessons and Potential of Bus Rapid Transit (BRT) Graham Carey P.E., AICP November 2, 2011

Preliminary Transportation Analysis

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

Highway Transitway Corridor Study

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

York Region Population and Employment Growth

Scope of the Transit Priority Project

Durham Region Long Term Transit Strategy

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

Transportation Master Plan Advisory Task Force

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Description of Planning Board Recommended Network

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Regional Transportation Needs Within Southeastern Wisconsin

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Community Engagement Process

Locally Preferred Alternative Report May 27, North-South Corridor Study

Appendix A-K Public Information Centre 2 Materials

FY2006 Budget Board Budget Committee request for information. Board Request: Detailed information on bus route 5A DC-Dulless Airport

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

MONTGOMERY COUNTY COUNCIL

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

Chapter 3 BUS IMPROVEMENT CONCEPTS

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Wilshire Boulevard Bus Rapid Transit Project

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

SMART 1 Public Meeting #1. February 24, 2016

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Measuring and Communicating Mobility:

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

The Who and What: Bus Rapid Transit Riders and Systems in the U.S.

How familiar are you with BRT?

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Fitting Light Rail through Well-established Communities

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

APPENDIX 14: CONNECTIONS: TRANSPORTATION ANALYSIS. Transportation Planning, Analysis

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

North Hollywood to Pasadena BRT Corridor Technical Study. Eco-Rapid Transit/Orange Line Development Authority March 8, 2017

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Welcome. If you have any questions or comments on the project, please contact:

APPENDIX E BIKEWAY PRIORITIZATION METHODOLOGY

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Detailed Evaluation of Alternatives Report FINAL April 20, North-South Corridor Study

I-105 Corridor Sustainability Study (CSS)

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

US 29 Bus Rapid Transit Corridor Planning Study FINAL. Corridor Study Report From Silver Spring Transit Center. April 2017

Aurora Corridor to E Line

Rochester Downtown Bicycle Study 2009

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

M14A/D Select Bus Service

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Hennepin County Bicycle and Pedestrian Planning

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

From Disarray to Complete Street:

Transcription:

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses January 2013: Mid-County CAB February 2013: Coalition for Smarter Growth March-May 2013: BRAC Implementation Committee, Action Committee for Transit, the Montgomery County Civic Federation, Rockville Planning Board, and Rockville Mayor and Council Webpage links to all staff memos, presentations, and resources, as well as an invitation to comment

Schedule Public Hearing Draft March 18, 2013 Planning Board approves advertisement of Public Hearing Draft, which begins 30-day review period Public Hearing May 2, 2013 Planning Board holds public hearing Worksessions May thru June 2013 Planning Board holds worksessions on the Functional Plan

Schedule Planning Board Draft July 25, 2013 Planning Board delivers Planning Board Draft to County Council and County Executive; 60-day review period begins Final Master Plan approval Fall-Winter 2013 County Council approves the Master Plan Final Master Plan adoption Fall-Winter 2013 Maryland-National Capital Park and Planning Commission adopts the approved Master Plan

Countywide Transit Corridors Functional Master Plan Presentation outline 1. Overview of recommended transit corridor network 2. Designation of Bicycle-Pedestrian Priority Areas (BPPAs) 3. MARC Brunswick Line third track 4. BRT as part of the solution to transportation challenges 5. Individual recommended transit corridors

Transit Corridor Network Overview

Recommended Transit Corridor Network Network 10 corridors 79 miles a mix of treatments 2-phase master plan Corridors 1. Georgia Avenue North 2. Georgia Avenue South 3. MD355 North 4. MD355 South 5. New Hampshire Ave 6. North Bethesda Twy 7. Randolph Road 8. University Boulevard 9. US29 10.Veirs Mill Road CCT. Corridor Cities Twy

Bicycle-Pedestrian Priority Areas

Bicycle-Pedestrian Priority Areas Designation around station areas would promote better ped/ bike accommodation in: design construction operations

MARC Brunswick Line Expansion

MARC Brunswick Line Expansion Addition of a third track would reduce conflicts with freight to increase: capacity flexibility reliability and to enable: more frequent service all-day service weekend service

BRT in the Transportation Network

Montgomery County Demographic and Travel Forecast Summary based on the 2012 CLRP Population Employment 2013 2040 Difference Percent Difference 998k 1.2M 206k 21% 529k 737k 208k 39% Vehicle Miles Traveled 22.0m 26.8m 4.8m 22% Lane Miles* 2,592 2,721 129 5% Lane Miles of Congestion 376 639 263 70% Note: Modeled lane miles include freeways, arterials, and many collectors, but few local roads

Purpose of the Countywide Transit Corridor Network enhance mobility and accessibility support economic development improve the environment provide an efficient transportation system that will facilitate Bus Rapid Transit (BRT) service

Master Plan Phasing for the Countywide Transit Corridor Network Phase 1: Recommend rights-of-way and treatments to serve land use in current area master plans Phase 2: Guidance for higher levels of treatment in conjunction with changes in land use as part of future area master plans

What is Bus Rapid Transit (BRT)? Dedicated Runningway Stylish Vehicles Branded Service Bus Rapid Transit Enhanced Stations Advanced Technologies Faster Fare Collection

Enhanced Stations

Level boarding areas

Off-vehicle fare collection

Real Time Transit Information

Branded vehicles Eugene (OR) EmX (from LTD) Kansas City MAX (from KCATA) Cleveland Silver Line (from GCRTA) Los Angeles Orange Line (from flickr.com)

Dedicated runningways One-lane median Two-lane median

approximately 150 miles of corridors from MCDOT BRT Feasibility Study, plus additional segments recommended by Transit Task Force

Functional Plan Focus Determine where rights-of-way should be reserved for transit corridors BRT-only facilities Bus lanes shared by BRT and local buses

Modeling sequence for 2040 forecast year No-Build: existing transportation network plus Constrained Long Range Plan facilities, including CCT & Purple Line Build 1: 152-mile BRT network of median busways Build 2: 152-mile BRT network with mostly median busways and some curb lanes Build 2A: 87-mile network with a mix of treatments

Transportation Modeling Three modeling runs in addition to no-build for the 2040 forecast year: Treatment Build 1 Build 2 Build 2A Two Way Median 152 140 29 Curb Lanes 12 41 Mixed Traffic 17 Total (miles) 152 152 87

Network and Treatment Considerations Corridor Function Forecast Peak-Hour Ridership Initial Corridor Treatment activity center corridor express corridor commuter corridor >1,600 = median busway >1,000 = curb lanes <1,000 = mixed traffic two-lane median busway two-lane side busway one-lane median busway managed lanes curb lanes mixed traffic

Network & Treatment Considerations BRT Demand Bus Speed Impacts on Other Traffic Transit Corridor Network Network Integrity Property Impacts Local Bus Demand

2040 Forecast Daily BRT Ridership Corridor Build 1 Build 2 Build 2A MD 355 South 49k 46k 44k MD 355 North 34k 32k 22k Veirs Mill Rd & University Blvd 27k 27k 18k Georgia Avenue (North & South) 24k 24k 12k New Hampshire Avenue 22k 21k 10k US 29 18k 16k 16k Randolph Road 16k 16k 11k Rockville-LSC 14k 14k 7k Old Georgetown Road South 11k 11k Old Georgetown Road North 8k 8k Muddy Branch Road 8k 8k Connecticut Avenue 6k 7k ICC 6k 6k Norbeck Road 6k 5k North Bethesda Transitway 4k 4k 10k University Blvd-Grosvenor 2k 2k Total 254k 247k 150k

5 corridors that can stand alone MD 355 South very high ridership MD 355 North very high ridership US 29 high ridership North Bethesda Transitway moderate ridership Georgia Ave North low ridership

5 less independent corridors New Hampshire Ave Georgia Ave South Veirs Mill Rd Randolph Rd University Blvd

Master Plan Phasing for the Countywide Transit Corridor Network Phase 1: Recommend rights-of-way and treatments to serve land use in current area master plans Phase 2: Guidance for higher levels of treatment in conjunction with changes in land use as part of future area master plans

Recommended Phase 1 Network Treatment Staff Draft Two Lane Median 19 Two Lane Side Busway 1 One Lane Median 20 Curb Lanes 4 Managed Lanes 1 Mixed Traffic 34 Total (miles) 79

Recommended Phase 1 Network

Recommended Phase 2 Network Treatment Treatment Phase 2 Phase 1 Two Lane Median Two Lane Median 31 19 Two Lane Side Two Busway Lane Side Busway 1 1 One Lane Median One Lane Median 31 20 Curb Lanes Curb Lanes 5 4 Managed Lanes Managed Lanes 1 1 Mixed Traffic Mixed Traffic 10 34 Total (miles) Total (miles) 79 79

Recommended Phase 2 Network

Recommended Phase 2 Network with Master Plan mode-share goals 25% 30% 50% 30% 30%* 37% 39% 50% *per draft plan

Determining Final Corridor Treatment Initial modeling included: all median busways treated the same as Light Rail Transit (LRT) to determine maximum ridership Treatment thresholds were lowered to account for: high-level of analysis long time frame model attributes that could increase ridership Final treatments were increased on several segments to maintain network integrity

Households Recommended Transit Network Compared to 2040 Forecasts fair good very good Jobs fair good very good

WMATA MetroExtra Service

WMATA Priority Corridor Network

Individual Corridors

Georgia Avenue North & South

MD355 North & South

New Hampshire Avenue & North Bethesda Twy

Randolph Road & University Boulevard

US29 & Veirs Mill Road

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN