TERMINAL PROCEDURES PUBLICATION SYMBOLS

Similar documents
1. You may request a contact approach if there is 1 SM flight visibility and you can operate clear of clouds to the destination airport.

FLIGHT OPERATIONS PANEL

RNAV/RNP Operations & VNAV Approaches

ILS Approach Nomenclature

ILS APPROACH WITH A320

ENR 3. ATS ROUTES. For detailed descriptions of specific lower altitude ATS routes, refer to current editions of the following publications:

PERFORM A NDB APPROACH [A320]

Procedures & Techniques

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

B-757 FLEET OPERATIONS

From Nonprecision to Precision-Like Approaches

CRITERIA FOR THE DEVELOPMENT OF INSTRUMENT PROCEDURES TP 308 / GPH 209 CHANGE 7 VOLUME 3 PRECISION APPROACH (PA) PROCEDURE CONSTRUCTION

Continuous Descent Final Approach

COSCAP-South Asia ADVISORY CIRCULAR FOR AIR OPERATORS

Mandatory Briefing Bardufoss (ENDU)

I3101 WORKSHEET. Planned Route: Takeoff: KGPT, RWY 32 Altitude: 5,000

2 ETSO-C115c#9 Airborne Area Navigation Equipment Flight Management Systems (FMS) Using Multi-Sensor Inputs

Learning. Goals LAND. basics as. Abeam C B. Abeam G C. Page 1 of 13. Document : V1.1

Final Examination Doc 8168 NOT FOR COMMERCIAL PURPOSES EXAM

Cirrus SR20/22 Aircraft with Cirrus Perspective Avionics. Pilot s Operating Handbook

RNAV (GPS) RWY 10 RNAV (GPS) RWY 10 NE-1,25 NOV 2004 NE-1,25 NOV 2004 (BID) 104^ 284^ 104^ 104^ ^ 284^

Descend Pilot s Discretion

VI.B. Traffic Patterns

RNP APCH procedures for BEJAIA Soummam-Abane Ramdane RWY26

SCOTLAND-UNITED KINGDOM.

VI.B. Traffic Patterns

Příloha 1. Standardní provozní postupy pro výcvik přiblížení RNP v letecké škole F AIR

Noise Abatement Takeoff 1 Close In Profile

LNAV & VNAV Integration Review Basics

Cessna 172 Profiles. TRAFFIC PATTERNS (Check Chart Supplement prior to flight) Index

Flying The Boeing

Copyright 2014 Gleim Publications, Inc. and/or Gleim Internet, Inc. All rights reserved. Duplication prohibited.

777 SIM NOTES (Oct10) V1 CUT (with TAC, w/o TAC)

MANEUVERS GUIDE. Liberty Aerospace 1383 General Aviation Drive Melbourne, FL (800)

Ref.: SP 65/4-17/78 23 June 2017

Chapter 4 PROCEDURE CONSTRUCTION

Part B: Airport Configurations

OBSTACLE DEPARTURE PROCEDURES Part 3

NIFA CRM / LOFT CONTESTANT BRIEFING

Flying The Boeing Advanced

Cessna 172S Skyhawk Standardization Manual

VISUAL AIDS FOR DENOTING OBSTACLES

Tutorial - How to interpret an approach plate

I2201 WORKSHEET. Planned Route: Takeoff: KSAT, RWY 31R Altitude: 6,000 Route: KRND via Radar vectors RND KSAT Airport Diagram

CLT Continued Aircraft Operations Evaluations

Flying The Embraer Brasilia (EMB-120)

Aerodrome Design Manual

POWER-OFF 180 ACCURACY APPROACH AND LANDING

VISUAL AIDS FOR DENOTING OBSTACLES

Piper PA Seminole 1. Standardization Manual

PROCEDURE DOCUMENTATION

Cessna 172R Profiles

T A K E O F F A N D C L I M B

FAA-S-ACS-6 June 2016 Private Pilot Airplane Airman Certification Standards. Task ACS Settings

PROCEDURES AND PROFILES TABLE OF CONTENTS

VFR Circuit Tutorial. A Hong Kong-based Virtual Airline. VOHK Training Team Version 2.1 Flight Simulation Use Only 9 July 2017

FederationofMalysia EDICTOFGOVERNMENT±

(SDF) PU402. (MAPt) WELCH PU406

(SDF) PU402. (MAPt) WELCH PU406

VI.A-E. Basic Attitude Instrument Flight

FLYING TO BANKSTOWN AND BACK TO BATHURST. Suggestions. Errol Chopping, December, Have Sydney VTC and Sydney VNC Charts

Lufthansa Flight Training (LFT) GmbH (Preliminary Text) Instrument Flight Procedures

2100 Autopilot Programmer/Computer PN Software Mod Code L or Later WAAS Capable Pilot s Operating Handbook

Teaching Landings by the Numbers: Quantifying the Visual Approach and Landing

Cessna 152 Standardization Manual

FLYING OPERATIONS. Hard Landing

STOLPORT MANUAL. Doe 9150-AN/899 SECOND EDITION INTERNATIONAL CIVIL AVIATION ORGANIZATION

AERODROME STANDARDS and RECOMMENDED PRACTICES

Compiled by Matt Zagoren

PRIVATE PILOT MANEUVERS Practical Test Standards FAA-S A

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, PO Box 103 Croatia

3rd Eurocontrol CDO Workshop

Mountain Fury Mountain Search Flying Course Syllabus Fourth Sortie : High Altitude Search

Advance edition (unedited) Doc 9905-AN/471. Notice to Users

XII.A-D. Basic Attitude Instrument Flight

CESSNA 172-SP PRIVATE & COMMERCIAL COURSE

COCKPIT INSTRUMENTATION:

Inspecting Aerodrome Construction

Pilot s Operating Handbook

TRN DHN RUS DEHNAMAK 3A (DHN 3A) NAGMA 2A, NAGMA 2B, RABAM 2A RABAM 2B, RABAM 1C, RADAL 1A VARAMIN 2A (VR 2A), VARAMIN 2B (VR 2B) ARRIVALS .STAR.

STUDY OF LANDING TECHNIQUE DURING VISUAL APPROACH

NORMAL TAKEOFF AND CLIMB

I2102 WORKSHEET. Planned Route: Takeoff: KNSE, RWY 32 Altitude: 12,000 Route: RADAR DEPARTURE. Syllabus Notes None. Special Syllabus Requirements None

Civil Air Patrol Auxiliary of the United States Air Force

VII.E. Normal and Crosswind Approach and Landing

Circuit Considerations

C-182P MANEUVERS GUIDE TABLE OF CONTENTS

Q3201 WORKSHEET. Planned Route:

NORMAL TAKEOFF PILOT TRAINING MANUAL KING AIR 200 SERIES OF AIRCRAFT

AIC FRANCE A 31/12. Publication date: DEC 27. Page 1/7. SUBJECT : Deployment of CDO (continuous descent operations) on the French territory

S-TEC. Pilot s Operating Handbook

SHAW APP CON 4 NM (FAF) POROY RW21. OLAWE Visual Segment - Obstacles. JCOLE 2 NM to RW21 RW21 3 NM 2 NM (500-1) (500-1)

Guidance Notes PRIVATE AND COMMERCIAL PILOT TRAINING

TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES

Discuss: 1. Instrument Flight Checklist

Accident Prevention Program

VII.H. Go-Around/Rejected Landing

REPUBLIC OF CROATIA. LDZA - New PBN instrument flight procedures at Zagreb Airport

TEST? 2016 Technical Training Exam

ILS or LOC/DME Z RWY 23

Transcription:

TERMINAL PROCEDURES PUBLICATION SYMBOLS 58 AERONAUTICAL INFORMATION STANDARD TERMINAL ARRIVAL (STAR) CHARTS................. 59 DEPARTURE PROCEDURE (DP) CHARTS....................... 59 APPROACH LIGHTING SYSTEM.............................. 60 AIRPORT DIAGRAM/SKETCH................................ 64 INSTRUMENT APPROACH PROCEDURES PLAN VIEW............. 65 INSTRUMENT APPROACH PROCEDURES PROFILE VIEW.......... 67 GENERAL INFORMATION Symbols shown are for the Terminal Procedures Publication (TPP) which includes Standard Terminal Arrival Routes (STARs), Departure Procedures (DPs), Instrument Approach Procedures (IAP) and Airport Diagrams.

59 U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information STANDARD TERMINAL ARRIVAL (STAR) CHARTS DEPARTURE PROCEDURE (DP) CHARTS STANDARD TERMINAL ARRIVAL (STAR) CHARTS DEPARTURE PROCEDURE (DP) CHARTS RADIO AIDS TO NAVIGATION VOR TACAN ROUTES VOR/DME NDB/DME VORTAC LOC/DME LOC NDB (Non-directional Beacon) LMM, LOM (Compass locator) Marker Beacon Localizer Course SDF Course SPECIAL USE AIRSPACE ALTITUDES 5500 2300 4800 2200 Mandatory Minimum Maximum Recommended (Cross at) (Cross at or above) (Cross at or below) Localizer Offset AIRPORTS REPORTING POINTS/FIXES WAYPOINTS STAR Charts DP Charts NOTES (NAME) (" " omitted when it conflicts with runway pattern) WAYPOINT (Compulsory) WAYPOINT (Non-Compulsory) MAP WP (Flyover) FLYOVER POINT W WAAS VNAV outages may occur daily due to initial system limitations. WAAS VNAV NOTAM service is not provided for this approach.

U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information 60 APPROACH LIGHTING SYSTEM APPROACH LIGHTING SYSTEM RUNWAY TOUCH- DOWN ZONE AND CENTERLINE LIGHT- ING SYSTEMS SHORT APPROACH LIGHTING SYSTEM SALS/SALSF (High Intensity) SAME AS INNER 1500' of ALSF-1 APPROACH LIGHT- ING SYSTEM SIMPLIFIED SHORT APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICA- TOR LIGHTS SSALR SSALR ALSF-2 (High Intensity) LENGTH 2400/3000 FEET MEDIUM INTENSITY (MALS AND MALSF) OR SIMPLIFIED SHORT (SSALS AND SSALF) APPROACH LIGHT- ING SYSTEMS MALS MALSF SSALS SSALF MALS, MALSF, SSALS, SSALF APPROACH LIGHTING SYSTEM ALSF-1 MEDIUM INTESITY APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICA- TOR LIGHTS MALSR MALSR SAME LIGHT CONFIGURATION AS SSALR. OMNIDIRECTIONAL APPROACH LIGHTING SYSTEM ODALS ODALS

61 U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information APPROACH LIGHTING SYSTEM APPROACH LIGHTING SYSTEM VISUAL APPROACH SLOPE INDICATOR VASI VASI VISUAL APPROACH SLOPE INDICATOR VASI VASI PRECISION APPROACH PATH INDICATOR PAPI "T"-VISUAL APPROACH SLOPE INDICATOR "T"-VASI PAPI "T"-VASI

U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information 62 APPROACH LIGHTING SYSTEM PULSATING VISUAL APPROACH SLOPE INDICATOR PVASI PVASI TRI-COLOR VISUAL APPROACH SLOPE INDICATOR TRCV TRCV ALIGNMENT OF ELEMENT SYSTEMS APAP APAP

63 U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information AIRPORT DIAGRAM/SKETCH AIRPORT DIAGRAM/SKETCH ARRESTING GEAR uni-directional bi-directional NOTES Jet Barrier Arresting System REFERENCE FEATURES Buildings Tanks Obstruction Highest Obstruction Airport Beacon Runway Radar Reflectors Hot Spot Control Tower # Helicopter Alighting Areas Negative Symbols used to identify Copter Procedures landing point Runway TDZ elevation Runway Slope (shown when runway slope equals or exceeds 0.3%) A symbol is shown to indicate runway declared distance information available, see appropriate A/FD, Alaska or Pacific Supplement for distance information.

U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information 64 AIRPORT DIAGRAM/SKETCH RUNWAYS Hard Surface Other than hard surface St opways, Taxiways, Parking Areas Displaced Threshold Closed Runway Closed Taxiway Under Construction Metal Surface Runway Cent erline Lighting Airport Facility EMAS 1200 X 200 Arresting System Operations (in feet)

65 U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information INSTRUMENT APPROACH PROCEDURES PLAN VIEW INSTRUMENT APPROACH PROCEDURES PLAN VIEW TERMINAL ROUTES Procedure Track Missed Approached Visual Flight Path Procedure Turn (Type degree and point of turn optional) RADIO AIDS TO NAVIGATIONS VOR TACAN NDB VOR/DME VORTAC NDB/DME LOM/LMM (Compass locator at Outer/Middle Marker) Marker Beacon Localizer (LOC/LDA) Course SDF Course Right side shading-front Course; Left side shading-back Course HOLDING PATTERNS Missed Approach HOLD 8000 Arrival LOC/DME LOC/LDA/SDF/MLS Transmitter (shown when installation is offset from its normal position off the end of the runway.) Limits will only be specified when they deviate from the standard. Holding pattern with max. restricted airspeed: (175K) applies to all altitudes. (210K) applies to altitudes above 6000' to and including 14000' DME fixes may be shown. Arrival Holding Pattern altitude restrictions will be indicated when they deviate from the adjacent leg. Localizer Offset REPORTING POINTS / FIXES/ WAYPOINTS MINIMUM SAFE ALTITUDE

U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information 66 INSTRUMENT APPROACH PROCEDURES PLAN VIEW TERMINAL ARRIVAL AREAS INSTRUMENT APPROACH PROCEDURES PLAN VIEW MISCELLANEOUS Final Approach Fix (FAF) (for non-precision approaches) Glide Slope/Glide Path Intercept and final approach fix for vertically guided approach procedures. Visual Descent Point (VDP) Visual Flight Path Minimum MSL altitudes are charted within each of these defined areas/subdivisions that provide at least 1,000 feet of obstacle clearance, or more as necessary in mountainous areas. SPECIAL USE AIRSPACE OBSTACLES FACILITIES / FIXES ALTITUDES Mandatory (Cross at) Minimum (Cross at or above) Maximum (Cross at or below) Recommended Mandatory Block

67 U.S. TERMINAL PROCEDURES PUBLICATION: Aeronautical Information INSTRUMENT APPROACH PROCEDURES PROFILE VIEW PROFILE VIEW ILS or LOC APPROACH Procedure Turn Glide Slope Threshold Crossing Height Glide Slope Intercept Two different methods are used for vertical guidance: PT Fix until Established Outbound (Some approaches may use a restrictive note) Glide Slope at Outer Marker/FAF FAF (vertically guided approaches) FAF (non-precision approaches) ILS Missed Approach Point Glide Slope Missed Approach Track Airport Profile a. GS indicates an electronic glide slope or barometric vertical guidance is present. In the case of an Instrument Landing System (ILS) and Wide Area Augmentation System (WAAS) L PV approach procedures, an electronic signal provides vertical guidance. Barometric vertical guidance is provided for RNP and LNAV/VNAV instrument approach procedures. All ILS, LPV RNP, and L NAV/VNAV will be in this format locat ed in t he lower left or right corner. b. Other charts without electronic or barometric vertical guidance will be in this format, indicat ing a non-precision vertical descent angle to asist in preventing controlled flight into terrain. On Civil (FAA) procedures, this information is placed above or below the procedure track following the fix it is based on. MLS APPROACH M-AJE 6.5 Glidepath at FAF Final Approach Fix (FAF) 3300 Glidepath 3.00 TCH 50 360 180 MLS 00 R/L 3300 3250 M-AJE 2.2 MLS Glidepath RNAV APPROACH NON PRECISION DESCENT FROM HOLDING PATTERN Visual Descent Point (VDP) Final Approach Segment Vertical Descent Angle (VDA)