Worker s Safety Handbook for Rigger and Signalman

Similar documents
Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Premium PowerPoint Presentation. Rigging Review

Rigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014

Work At Heights Toolkit. for Supervisors

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

operation WARNING! Operator must read and understand instructions here and on sling prior to use.

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

USER S GUIDE LIFTING TERMINOLOGY

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

References: EM Section 15 OSHA UFGS

Basic Rigging And Wire Rope

For Review Only No Copying No Saving No Lending No Posting Online

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

Heavy Equipment & Rigging Specialist Training

WEB SLING BASICS AND HOW TO ORDER WEB SLINGS

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

British Columbia Carpenter Apprenticeship Program

SOP GEN-007X Crane and Winch Operations

CURRICULUM DEVELOPMENT ADVISORY. Rigger and Signalman Course

Crane & Rigging Brain Teasers

Heavy Equipment Technician Rigging

Ⅱ-14.Installing precast concrete exterior wall panels

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

SAMPLE PAGE. Section 2... Wire Rope

Rigging. Student Booklet

Lift-All Wire Rope & Slings

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

Session Objectives. Business & Legal Reports, Inc. 1011

M S I C R A N E S C A L E

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

Slings Steel Chain, Wire Rope and Metal Mesh

Safety in Precast Erection

Section 15 TABLE OF CONTENTS Rigging. 15.A General B Personnel Qualifications

SECTION 15 RIGGING. b. Defective rigging shall be removed from service.

This training session focuses on safe rigging for crane and derrick operations at construction sites. A critical job for the safety of any crane or

Care, Use and Inspection

WIRE ROPE AND SLING BASICS. Total. of Wires WIRE ROPE SLINGS. Use of EIP, IWRC rope gives 15% greater capacity than IP, IWRC ropes.

8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES

SERVING MANUFACTURERS, DISTRIBUTORS & RELATED SERVICE PROVIDERS FOR THE MATERIAL HANDLING INDUSTRY SINCE

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

TULSA CHAIN.COM, LLC.

Crane Signal Person Basic Training Video Comprehension Assessment

M ANITOWOC M-65 W. 65-MTon liftcrane 6,804 6,124. Courtesy of Crane.Market KG CLAMSHELL KG DRAGLINE

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Introduction: Materials needed to conduct this training: White board, black board or presentation tablets. Projector

Versie Date: USAGE AND SAFETY MANUAL SPREADERBEAMS

Triple Tine Mechanical Grapple

View thousands of Crane Specifications on FreeCraneSpecs.com. MANITOWOC M-85W 95-Ton liftcrane 20,000 lb CLAMSHELL 18,000 lb DRAGLINE

On the Go Swing System Instruction Manual

Winchline n a box WINCH LINE SELECTION GUIDE. Wire Rope Winchlines are superior to most other winchlines found in the market place due to the

SLINGS, HOISTING & RIGGING

Serial Number: Lot Number: Purchase Date: General Factors Accepted / Rejected Supportive Details or Comments. Accepted Rejected.

IF LAW ENFORCED WHERE THE BEAM TONGS ARE USED CONTRADICTS AN INSTRUCTION(S) OR PART OF AN INSTRUCTION(S), VESTIL IS NOT RESPONSIBLE FOR ANY

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

Sling Safety. Construction Safety and Health Outreach Program. U.S. Department of Labor OSHA Office of Training and Education May 1996 INTRODUCTION

OPERATIONS and SAFETY MANUAL

WHS- 43 Lifting Equipment Procedure

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

INSTRUCTION MANUAL HEAVY-DUTY BEAM TONGS MODEL BT (20, 40, & 60)

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

Once the job has been planned and the site has been inspected according to WHS and site requirements it is important to follow work procedure and

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices

On the Go Swing System Instruction Manual

Fall Protection Checklist. Guardrail System

Safety Handbook. Quality, Environmental, Health & Safety Policy

SECTION 2. Wire Rope Slings & Bridles

Attachment Solutions. Multi-Lift System. Operator s Manual. Conforms to ASME B 30.20, BTH-1 Design Category B, Service Class 3

PROCEDURES Power Lines

NEVER EXCEED WORKING LOAD LIMITS PAGE

Warning CABLE REPLACEMENT INSTRUCTIONS. Questions? - Call Telpro Inc. Customer Service at or

Surface exploration drilling

GENERAL INFORMATION WIRE ROPE SLINGS

LOOK. THINK. DO. Basic Workplace Safety and Health (WSH) Rules 6for Working at Heights. Secure safety harness when working at heights.

Operator s Manual. Series 2100 Contractor Lifts

Flammable and Combustible Liquids

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

Cranes. Upon Completion. Subpart N. Participants will understand: » Scope of the new standard. » General overview including:

Operator s Manual Series 2400 Material Lift

Dangerous Occurrence: Collapse of mobile crane

LIFTING RIG Multi-Product Installation Rig

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

Visit: 27

BEAMGUARD SAFETY POST TM INSTRUCTIONS

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

CORPORATE SAFETY MANUAL

Lifting Slings. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Lifting Beam. Introduction. Important Notes. Key Benefits. User Guide

Ken Overton (Safety Engineering Services), CraneWorks Magazine (July-August 1994 Issue)

Dusty residue when twisted open. Crushed, jammed, or flattened strands. Gaps between strands. Heat damage, torch burns, or electric arc strikes

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

MODULAR ALUMINUM PANEL SHIELDS MAPS

RATCHET RELEASE SHACKLE

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

Meuangvang Development Co.LTD Standard Working Procedure 011 Towing Equipment

SAFE WORK PROCEDURE LOCATION WRITTEN BY APPROVED BY DATE CREATED LAST REVISION

Transcription:

Worker s Safety Handbook for Rigger and Signalman

Contents Preface 3 Proper Attire for Rigger and Signalman 4 Roles and Responsibilities of a Rigger 5 Good and Bad Rigging Practices 12 Inspection of Hooks and Shackles 26 Types of Wear and Tear for Wire Ropes 28 Roles and Responsibilities of a Signalman 31 Recommended Crane Hand Signals 33 Good Communication Practices 36 Year of issue: 2011 2

Preface This handbook serves as a workplace safety and health resource for workers who are involved in work activities involving lifting equipment such as cranes. The Rigger and Signalman handbook highlights general safety pointers to ensure safe lifting operations. This handbook was developed to assist the Rigger and Signalman to better understand their roles and responsibilities, show examples of good and bad practices for loading and rigging, perform basic inspection of lifting equipments such as hooks, shackles and wire ropes, adhere to good communication practices, and recognise crane hand signals. 1. Proper Attire for Rigger and Signalman Wear personal protective equipment (PPE) Put on the proper attire and PPE at all times Helmet Identification Tag Helmet Identification Tag This handbook is produced for education and informational purposes by the National Crane Safety Taskforce and Workplace Safety and Health Council and serves as a reference for good practices. Reflective Vest Safety Boots Gloves Reflective Vest Safety Boots Gloves Figure 1: Signalman attire Figure 2: Rigger attire 3 4

2. Roles and Responsibilities of a Rigger Check slings 3. Roles and Responsibilities of a Rigger Check load Check the slings and ensure that the rigging angle is correct. Make sure the load is properly secured and inform the Crane Operator of the weight of the load. 5 6

4. Roles and Responsibilities of a Rigger Check lifting gears 5. Roles and Responsibilities of a Rigger Ensure load lifted is safe and balanced Make sure the lifting gears such as slings and shackles are well-maintained and in good working condition. Make sure the load is stable, secured and balanced before any lifting operation. 7 8

6. Roles and Responsibilities of a Rigger Ensure loose loads are secured 7. Roles and Responsibilities of a Rigger Report defective lifting gear to Lifting Supervisor Make sure any loose items are placed in a proper receptacle or container to prevent the load from falling during the lifting operation. Immediately report any defective or faulty lifting gear to the Lifting Supervisor. 9 10

8. Roles and Responsibilities of a Rigger Use paddings on the load edges 9. Good and Bad Rigging Practices Correct use of choker hitches Figure 3: Make sure there is no cutting action on the running line. Place adequate paddings on the edges of the load to prevent the sling from damage. Figure 4: Do not use shackle pin as it will become loose over time. Figure 5: Make sure there is no cutting action of the wire rope sling eye on the running line. 11 12

10. Good and Bad Rigging Practices Correct way to balance a shackle load 11. Good and Bad Rigging Practice Correct hook-up methods Packings Hook Washers Figure 8: Make sure the safety latch is in good condition. Figure 6: Insert sufficient washers to centralise the position of the shackle. Figure 9: Make sure the shackle is hooked up correctly. Figure 7: Make sure the shackle is not pulled down at an angle. 45 45 Figure 10: Make sure the shackle is equally spaced apart. 13 14

12. Good and Bad Rigging Practices Correct rigging method Figure 12: Secure the hooks facing out. Figure 11: Wrong hooking up method. Figure 13: Do not secure the hooks facing in. Figure 14: Do not wrap a rope around the hook. 15 16

13. Good and Bad Rigging Practices Correct rigging method 14. Good and Bad Rigging Practices Correct rigging method It will tilt to one side Figure 15: Make sure the load is rigged correctly before lifting. Figure 17: Do not tie the sling from one eye bolt to another as it will tilt to one side. Figure 16: The load will tilt to one side during lifting if it is not rigged correctly. 17 18

15. Good and Bad Rigging Practices Hook up unused slings 16. Good and Bad Rigging Practices Correct loading method Load Load Result Figure 20: Correct loading method. Figure 21: The eye bolt will bend if loading is not done correctly. Figure 18: Make sure any unused slings are hooked up properly. Figure 19: Do not leave unused slings unhooked. 19 20

17. Good and Bad Rigging Practices Use paddings during lifting 18. Good and Bad Rigging Practices Correct methods of joining sling eyes Shackles Shackles Sling Eye Figure 22: Correct ways of using paddings to prevent damage to the sling. Figure 24: Use a shackle to join the sling eyes. No Padding Figure 23: The sling will be damaged if paddings are not used on the load. Figure 25: Wrong method of joining the sling eyes. 21 22

19. Good and Bad Rigging Practices Use original screw pin 20. Good and Bad Rigging Practices Use tag line to control movement of the load Original Screw Pin Figure 26: Use the original screw pin for the shackle. Bolt Figure 27: Do not use a bolt as a screw pin as it will bend. Use a tag line to control the movement of the load during a lifting operation. 23 24

21. Good and Bad Rigging Practices Correct method of unloading 22. Inspection of Hooks and Shackles Check hook for any defects and make sure it is in good working condition Shoring Planks Check for cracks and twisting Check for wear and deformation Signs of Opening Up Figure 28: Place load on shoring planks during unloading. Check for wear and cracks Check that hook is not twisted Figure 29: Do not use the crane to pull out the sling from under the load. 25 26

23. Inspection of Hooks and Shackles Check shackle for any defects and make sure it is in good working condition 24. Types of Wear and Tear for Wire Ropes Check wire ropes for any defects and make sure they are in good working condition Check wear Check cracks, bending and twisting Figure 30: Crushed severely. Pin always seated Check wear and straightness Check opening width Figure 31: Flatten severely. 27 28

25. Types of Wear and Tear for Wire Ropes Check wire ropes for any defects and make sure they are in good working condition 26. Types of Wear and Tear for Wire Ropes Check wire ropes for any defects and make sure they are in good working condition Figure 32: Bird cage. Figure 37: Bulged severely. Figure 33: Dog-leg kink. Figure 38: Core protrusion. Figure 39: Excessive clearance between strands. Figure 34: Kink. Figure 35: Open kink. Figure 36: Closed kink. 29 30

27. Roles and Responsibilities of a Signalman Check load is properly rigged 28. Roles and Responsibilities of a Signalman Give correct crane hand signals Check the load is properly rigged before giving clear signal to the Crane Operator to lift the load. Give the correct crane hand signals clearly to the Crane Operator to lift the load. 31 32

29. Recommended Crane Hand Signals Understand and practice correct crane hand signals Hoist Lower Jib Up Derricking Jib Jib Down Figure 42: Clench and unclench fingers to signal take the strain. Figure 40: Signal with one hand. Other hand on head. Slew Left Slew Right Travel to me Travel from me Figure 43: Arm extended, pointing with finger in direction of swing of boom. Figure 41: Signal with both hands. 33 34

30. Good Communication Practices Practice good communication within the Lifting Team Extend Jib/ Trolley Out Retract Jib/ Trolley In Telescoping Jib/ Horizontal Jib Figure 44: Signal with one hand. Other hand on head. LIFTING PLAN and SWP Stop Emergency Stop Figure 45: Clench and unclench fingers to signal inch the load. Communication between Lifting Supervisor, Rigger and Signalman must be maintained at all times. 35 36

31. Good Communication Practices Practice good communication within the Lifting Team Published in July 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced or transmitted in any form or by any means, in whole or in part, without prior written permission. The information provided in this publication is accurate as at time of printing. All cases shared in this publication are meant for learning purposes only. The learning points for each case are not exhaustive and should not be taken to encapsulate all the responsibilities and obligations of the user of this publication under the law. The Workplace Safety and Health Council does not accept any liability or responsibility to any party for losses or damage arising from following this publication. This publication is available on the Workplace Safety and Health Council Website: www.wshc.sg Email: contact@wshc.sg Rigger and Signalman must maintain good communication between each other at all times. 37