Arastradero Road Trial Restriping Project P t C t ti C it O t hm ti N 1 Post Construction Community Outreach Meeting No. 1 October 21, 2010
Agenda Staff Introductions Project Background Project Status Traffic Data Collection Summary Current CommunityInput Proposed Immediate and Long Term Improvements Question/Answers
Project Background Charleston Arastradero Traffic Calming Project Arastradero Rd Community Input Period 2007 09 One Year Trial Period (Aug 2010 11) Lane Reduction Traffic Calming Treatments
Project Status Major Construction Complete Aug/Sept 2010 Pavement Surface Treatment Trial Restriping Pending Arastradero Rd Improvements Final Bike Lane/Parking Lane Bike Lane Stencils Clemo Av Suzanne Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Nov 2010 On Going One Year Trial Period Monitoring
Pre Project Traffic Count and Speed dsummary Arastradero May 2010 w/o Georgia e/o Pomona e/o McKellar AM - EB AM - WB 592 680 733 992 952 1016 PM - EB 963 960 870 PM - WB 638 653 712 Average Daily 18,523 18,458 18,137 85% Speed 35.1 36.0 32.0
Pre Project Traffic Count and Speed dsummary Arastradero May 2010 w/o Georgia e/o Pomona e/o McKellar Donald Maybell AM - EB AM - WB 592 680 733 992 952 1016 PM - EB 963 960 870 PM - WB 638 653 712 Average Daily 18,523 18,458 18,137 755 1,638 85% Speed 35.1 36.0 32.0 24.0 24.0
Post Project Data #1 Oct 2010 Traffic Count and Speed dsummary Arastradero October 2010 AM - EB AM - WB w/o Georgia e/o Pomona e/o McKellar 560 672 720 968 924 924 PM - EB 1,076 996 912 PM - WB 596 709 682 Average Daily 18,022 18,467 18,064 85% Speed 34.2 33.8 32.7
Post Project Data #1 Oct 2010 Traffic Count and Speed dsummary Arastradero October 2010 w/o Georgia e/o Pomona e/o McKellar Donald Maybell AM - EB AM - WB 560 672 720 968 924 924 PM - EB 1,076 996 912 PM - WB 596 709 682 Average Daily 18,022 18,467 18,064 812 1,646 85% Speed 34.2 33.8 32.7 25.1 24.22
Travel Time Survey Summary October 2010 Westbound Alma St to Foothill (El Camino to Gunn HS) a Eastbound Gunn HS to Alma St (Gunn HS to El Camino) AM Peak Hour Average 8:40 (4:29) 6:43 (4:07) 7:25AM to 8:00 PM Minimum 6:09 ( 3:51) 4:53 (2:49) 4 days / 9 runs Maximum 12:38 (5:16) 9:29 (6:08) PM Peak Hour Average 5:51 (2:10) 641(416) 6:41 (4:16) 5:15 PM to 6:30 PM Minimum 5:06 (1:57) 5:15 (3:25) 1 days / 4 runs Maximum 6:36 (2:20) 8:07 (5:19) a time from after entering El Camino Real intersection
Community Input Positive Input Easier to Turn On/Off of Arastradero Speed Reduction More comfortable for bicyclists More comfortable for pedestrians Neighborhood street feel No difference in commute period Faster commute at Times
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation
El Camino Real Traffic Signal Operations City/Caltrans Traffic Signal Ops Coordination VTA Bus Stop Relocation Crossing Guard Operations
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord
Alta Mesa McKellar Ln Left Turn Access Immediate: Eastbound KEEP CLEAR stencils Do Not Block Intersection Signs Watch for Future 24 inch White Bars to Box Intersection
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping
Clemo Dr Crosswalk Existing Today
Clemo Dr Crosswalk Proposed Crosswalk (Nov 2010) Immediate: Raised Median Ped Activated Flashing Beacon Enhanced Crosswalk markings/signage
Clemo Dr Crosswalk Proposed Crosswalk (Nov 2010) Immediate: Raised Median Ped Activated Flashing Beacon Enhanced Crosswalk markings/signage
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk
Coulombe Dr Traffic Signal Modification
Coulombe Dr Traffic Signal Modification
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing
Donald Dr Terman Rd Traffic Signal Operations Existing Configuration Today
Donald Dr Terman Rd Traffic Signal Operations Option: Extended Left Turn Storage to Terman Dr Helps Eliminate Left Turn Queue Spill over to Westbound Arastradero Rd Traffic King Arthur Ct Shared Left Turn Lane
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Speeding West of Hubbart Dr Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing Striping & Signal Timing
Speeding Vehicle Speed Feedback Signs Option: New raised median island with VSFS facing westbound Arastradero Rd Relocate VSFS from Cemetary to Hubbart Dr facing eastbound Arastradero Rd
Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Speeding West of Hubbart Dr Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing Striping & Signal Timing Vehicle Speed Feedback Signs
QUESTIONS/COMMENTS transportation@cityofpaloalto.orgorg