Trial Restriping Project. October 21, 2010

Similar documents
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Foothill Expressway Improvements Between El Monte and San Antonio

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

VEHICLE EMISSIONS REDUCTIONS BASED AT SCHOOLS (VERBS) GRANT APPLICATION FY2012/13 FY2015/16

VT15 / Allen Martin Drive Intersection Scoping Study

122 Avenue: 107 Street to Fort Road

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

@ FRIENDLY ACRES COMMUNITY MEETING

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Albany Shaker Road Corridor Study Public Meeting # 2

Draft Final Report: South Palo Alto School Commute Safety Study

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Freeway ramp intersection study

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

COMMUNITY MEETING AGENDA

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

Committed to Service

City of Scotts Valley CITY COUNCIL STAFF REPORT

Upper Market Street Bike Lane Project

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Lawrence Avenue Streetscape Concepts August 30, 2011

Public Information Centre

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Safe Routes to School (SRTS) Improvements for Bishop s Peak & Pacheco Elementary Meeting #2 Summary

Broad Street Bicycle Boulevard Design Guidelines

Richmond-Adelaide Cycle Tracks

Meade Street Bridge Design Alternative Study

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

@ North Fair Oaks COMMUNITY MEETING

5. RUNNINGWAY GUIDELINES

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Broadway Complete Streets Project

AGENDA ITEM G-2 Public Works

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Lincoln Avenue Road Diet Trial

North Avenue Corridor Study

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Designing for Pedestrian Safety

Draft North Industrial Area-Wide Traffic Plan

Community Task Force March 14, 2018

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Bike Planning: A New Day

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Columbia Pike Implementation Team (CPIT) Meeting

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Central Avenue Bikeway Traffic and Safety Impact Assessment

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

Lake Whitney Elementary School

Forest Hills Improvement Initiative

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Bicycle + Pedestrian Connectivity Gap Analysis

Military Road Safety Improvements

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

I-105 Corridor Sustainability Study (CSS)

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Transcription:

Arastradero Road Trial Restriping Project P t C t ti C it O t hm ti N 1 Post Construction Community Outreach Meeting No. 1 October 21, 2010

Agenda Staff Introductions Project Background Project Status Traffic Data Collection Summary Current CommunityInput Proposed Immediate and Long Term Improvements Question/Answers

Project Background Charleston Arastradero Traffic Calming Project Arastradero Rd Community Input Period 2007 09 One Year Trial Period (Aug 2010 11) Lane Reduction Traffic Calming Treatments

Project Status Major Construction Complete Aug/Sept 2010 Pavement Surface Treatment Trial Restriping Pending Arastradero Rd Improvements Final Bike Lane/Parking Lane Bike Lane Stencils Clemo Av Suzanne Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Nov 2010 On Going One Year Trial Period Monitoring

Pre Project Traffic Count and Speed dsummary Arastradero May 2010 w/o Georgia e/o Pomona e/o McKellar AM - EB AM - WB 592 680 733 992 952 1016 PM - EB 963 960 870 PM - WB 638 653 712 Average Daily 18,523 18,458 18,137 85% Speed 35.1 36.0 32.0

Pre Project Traffic Count and Speed dsummary Arastradero May 2010 w/o Georgia e/o Pomona e/o McKellar Donald Maybell AM - EB AM - WB 592 680 733 992 952 1016 PM - EB 963 960 870 PM - WB 638 653 712 Average Daily 18,523 18,458 18,137 755 1,638 85% Speed 35.1 36.0 32.0 24.0 24.0

Post Project Data #1 Oct 2010 Traffic Count and Speed dsummary Arastradero October 2010 AM - EB AM - WB w/o Georgia e/o Pomona e/o McKellar 560 672 720 968 924 924 PM - EB 1,076 996 912 PM - WB 596 709 682 Average Daily 18,022 18,467 18,064 85% Speed 34.2 33.8 32.7

Post Project Data #1 Oct 2010 Traffic Count and Speed dsummary Arastradero October 2010 w/o Georgia e/o Pomona e/o McKellar Donald Maybell AM - EB AM - WB 560 672 720 968 924 924 PM - EB 1,076 996 912 PM - WB 596 709 682 Average Daily 18,022 18,467 18,064 812 1,646 85% Speed 34.2 33.8 32.7 25.1 24.22

Travel Time Survey Summary October 2010 Westbound Alma St to Foothill (El Camino to Gunn HS) a Eastbound Gunn HS to Alma St (Gunn HS to El Camino) AM Peak Hour Average 8:40 (4:29) 6:43 (4:07) 7:25AM to 8:00 PM Minimum 6:09 ( 3:51) 4:53 (2:49) 4 days / 9 runs Maximum 12:38 (5:16) 9:29 (6:08) PM Peak Hour Average 5:51 (2:10) 641(416) 6:41 (4:16) 5:15 PM to 6:30 PM Minimum 5:06 (1:57) 5:15 (3:25) 1 days / 4 runs Maximum 6:36 (2:20) 8:07 (5:19) a time from after entering El Camino Real intersection

Community Input Positive Input Easier to Turn On/Off of Arastradero Speed Reduction More comfortable for bicyclists More comfortable for pedestrians Neighborhood street feel No difference in commute period Faster commute at Times

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation

El Camino Real Traffic Signal Operations City/Caltrans Traffic Signal Ops Coordination VTA Bus Stop Relocation Crossing Guard Operations

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord

Alta Mesa McKellar Ln Left Turn Access Immediate: Eastbound KEEP CLEAR stencils Do Not Block Intersection Signs Watch for Future 24 inch White Bars to Box Intersection

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping

Clemo Dr Crosswalk Existing Today

Clemo Dr Crosswalk Proposed Crosswalk (Nov 2010) Immediate: Raised Median Ped Activated Flashing Beacon Enhanced Crosswalk markings/signage

Clemo Dr Crosswalk Proposed Crosswalk (Nov 2010) Immediate: Raised Median Ped Activated Flashing Beacon Enhanced Crosswalk markings/signage

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk

Coulombe Dr Traffic Signal Modification

Coulombe Dr Traffic Signal Modification

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing

Donald Dr Terman Rd Traffic Signal Operations Existing Configuration Today

Donald Dr Terman Rd Traffic Signal Operations Option: Extended Left Turn Storage to Terman Dr Helps Eliminate Left Turn Queue Spill over to Westbound Arastradero Rd Traffic King Arthur Ct Shared Left Turn Lane

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Speeding West of Hubbart Dr Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing Striping & Signal Timing

Speeding Vehicle Speed Feedback Signs Option: New raised median island with VSFS facing westbound Arastradero Rd Relocate VSFS from Cemetary to Hubbart Dr facing eastbound Arastradero Rd

Community Input Areas of Concern General Comments Do Not Like Improvements Travel Time on Arastradero Rd Increased Lane Drops/Merges Confusing El Camino Real Traffic Signal Operations Alta Mesa McKellar Lane Left Turn Access Clemo Dr Crosswalk Nov 2010 Coulombe Dr Traffic Signal Modification Donald Dr Terman Rd Traffic Signal Ops Speeding West of Hubbart Dr Response One Year Trial Monitor/Solicit Input Corridor Signage Evaluation City/Caltrans/VTA Coord Signage & Striping Enhanced Crosswalk Enhanced Signal Phasing Striping & Signal Timing Vehicle Speed Feedback Signs

QUESTIONS/COMMENTS transportation@cityofpaloalto.orgorg