Water Main Break Response Protocols for Chlorinated Systems (In Development Version )

Similar documents
Seattle s Experience with Water Main Depressurization Events

Watermain Replacement and Connection Procedure

DEP Notification, Precautionary Boil Water Notices and Incident Reporting

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure

PHYSICAL FACILITIES Consultant s Handbook Division 33 Utilities 1300 Disinfecting Underground Potable Water Piping.

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

DW Module 8: Distribution Answer Key

Emergency Response Planning Guide

BSR GPTC Z TR GM References and Reporting Page 1 of 8

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

NATURAL GAS RESPONSE SOG

Emergency Situation Assessment

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

O&M MANUAL HIGHLIGHTS

Excavation safety around natural gas

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE COMMUNICATION PIPE REPAIRS

BUTTERFLY VALVES Series 800

Responding to Natural Gas Pipeline Emergencies

HYDROSTATIC LEAK TEST PROCEDURE

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

Lockout / Tagout Program OSHA 29 CFR

Aquashield to Mitigate Water Ingress of Gas Pipes

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

ENVIRONMENTAL HEALTH AND SAFETY STANDARD OPERATING PROCEDURES

Associated Hazard (outcome) Control Measures. Reduction of water supply

MUELLER. Xp, & Lineseal 350 Butterfly Valves

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

H. Control of Hazardous Energy: Lockout/Tag Out

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

CastCreations PRODUCT DESCRIPTION. Redwood Stump Fire Pit Item #: C1002. CastCreations Ph: Aurora, Utah

Well Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM

Trainers Manual A412. CITY OF SASKATOON Water and Sewer Section. Water Connection Repair Trainer s Manual. Version # 1-0-2

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Environmental Health & Safety Policy & Procedure #35

Central Washington University

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

rd Quarter Continuing Education Hazardous Materials Defensive Actions/ Emergency Decon

Technical Service Bulletin May 2017 TSB

Emergency Water Injection /28/2017 updated 07/21/2017

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

Excavation safety around natural gas

SCOPE OF WORK. The Repair of the Mobile Harbour Crane leaking Luffing Cylinder

EMERGENCY EYEWASH STATIONS & SAFETY SHOWERS GUIDELINES

Plant Isolation Lock out/tag out Procedure

1020 Industrial Drive, Orlinda, TN fax

SECTION PRESSURE TESTING OF PIPING

ELKHART BRASS MANUFACTURING COMPANY

SITE INSPECTION PROCEDURE FORM

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Sewage

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

WILD WELL CONTROL WARNING SIGNS OF KICKS

Disinfection procedure for water mains and services

Lockout Tagout Program

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Removal of hydraulic load holding valve incident causing injury

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

Installation Manual. Model # SF-3W 9/16/03 REV 1. Arch Chemicals, Inc Lower River Road. P.O. Box 800 Charleston, TN PULSAR

Accu-Tab PowerBase 3012AT by Axiall Corporation

BERGER PAINTS BARBADOS LIMITED P.O.BOX 218, BRANDONS, ST. MICHAEL BRIDGETOWN BB12069, BARBADOS W.I PH# (246) FAX# (246)

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

Solenoid Valves used in Safety Instrumented Systems

Hazardous Energy Control

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

Approved by Principal Investigator Date: Approved by Super User: Date:

Gettysburg College. Energy Control Program

Farm Chlor Chlorinator Instruction Manual

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

Be our partner in safe, reliable natural gas delivery

TECHNICAL DATA CAUTION

July 15, 2002 Chemical Agent Exposure at Tooele Chemical Disposal Facility (TOCDF)

Disinfecting Water Mains

RiskTopics. Lockout/Tagout October 2017

ANNUAL IDOL COMPLIANCE TRAINING

Distribution Operation Maintenance Strategy Scottish Waters DOMS IAF Impact Risk Assessment Form Completion Guide

Lockout Tagout Program

Lockout/Tagout - Energy Control Program

O&M Receiving and Inspection. Storage of Water Treatment Media

Control of Hazardous Energy Lockout / Tagout Program

SECTION DOMESTIC WATER PIPING

ENVIRONMENTAL HEALTH DIVISION POOL SAFETY 2017 UPDATES

Flow transients in multiphase pipelines

FLANGED TWO-PIECE BALL VALVES

Accu-Tab Systems 1000 Series by Axiall Corporation

Design Requirements for Eyewash and Safety Shower Units

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

Lockout/Tagout - Control of Hazardous Energy Program

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS


Susceptibility of Distribution Systems to Negative Pressure Transients. Presenters: Kala Fleming and Mark Le Chevallier Moderator: Jian Zhang

FLANGED TWO-PIECE BALL VALVES

LOCKOUT/TAGOUT PROGRAM

DEFENSE LOGISTICS AGENCY LAND AND MARITIME P.O. BOX 3990 COLUMBUS, OHIO

Transcription:

Water Main Break Response Protocols for Chlorinated Systems (In Development Version 4.30.14) Steve Deem, P.E. PNWS AWWA May 2014 Eugene, Oregon

Mission To protect the health of the people of Washington State by ensuring safe and reliable drinking water.

Water Main Break Categories Type I Positive pressure maintained during break Pressure maintained in pipe during repair Unlikely contamination intrusion Type II Controlled pipe repair with limited depressurization after shutdown Pressure maintained at break site until pipe exposed and hole dewatered, shutdown limited to immediate valved off area, no loss of pressure elsewhere in the system Limited possibility of contamination intrusion

Water Main Break Categories Type III Loss of pressure at break site or depressurization elsewhere in the system Loss of pressure at the break site while the pipe is still buried or submerged and / or pressure loss elsewhere in the system Possible / actual contamination intrusion Type IV Catastrophic main break / water loss event resulting in complete loss of water service Water loss is extensive compared to system capacity, resulting in no pressure / no water. Storage loss leaves limited flushing capacity Possible / actual contamination intrusion

Type I Main Break Procedures Response Procedures Assess environmental impacts respond accordingly Call Washington 811 Excavate to below break Maintain pit water level below break Disinfect repair parts, swab or spray repair site w/ 1% chlorine solution Make repair with pipe still pressurized Restore residual disinfectant level at the break to background levels by flushing No Boil Water Advisory (BWA) No bacteriological samples

Type II Main Break Procedures Assess environmental impacts respond accordingly Call Washington 811 Excavate to below break Maintain pit water level below break Isolate / shut off customer services in affected area Provide customer notification door hanger, personal contact, email Controlled shutdown with established procedures (SOPs) Disinfect repair parts, swab or spray repair site w/ 1% chlorine solution Make repair Conduct low velocity flush to displace water in affected piping Restore residual disinfectant level at the break to background levels by flushing Instruct customers to flush premise plumbing upon return to service. Verify service restored to all isolated customers No Boil Water Advisory (BWA) (If don t isolate services is BWA warranted?) Recommend bacteriological samples (HPC) to validate procedures service restored prior to obtaining results

Type III Main Break Procedures Assess environmental impacts respond accordingly Call Washington 811 Provide generic water main break notification and customer response steps on utility website asap (or directly to customers) Evaluate possible contamination including consideration of CCC Program Call DOH and local health jurisdiction decide appropriate public notification message / methods Issue BWA update utility website (System wide or pressure zone specific). Isolate / shut off customer services at the break site (if practical) Excavate to below break Disinfect repair parts, swab or spray repair site w/ 1% chlorine solution Make repair Post repair disinfection may be needed if an uncontrolled break has allowed contamination to enter the system (Refer to (new) AWWA Std C651 Section 4.11)

Type III Main Break Procedures Conduct scour flush (3 ft/sec) to remove any break related sediment Conduct low velocity flush throughout the widespread area subject to low pressures to displace water and to restore background chlorine residual. Restore residual disinfectant level at the break to background levels Check residual disinfectant level throughout the distribution system Instruct customers to flush premise plumbing upon return to service. Verify service restored to all isolated customers Collect bacteriological samples to verify the effectiveness of the response and to provide basis for lifting targeted advisories. (More samples may be warranted based on water system size or size of impacted area). Rescind BWA/Boil Water Order based on water quality monitoring results. What about 24 hour BWA?

Type IV Main Break Procedures Response to a Type IV break / event will be the same as Type III response procedures with additional emphasis on the following: Assess utility capacity to deal with event seek aid sooner than later! Significant depletion of storage tank reserves could affect fire flow capability fire fighters should be notified Storage tank depletion may also impact ability to adequately flush the distribution system following repairs leading in delays to fully restoring water service and lifting the BWA. Conservation messages may therefore need to be included with BWA notification.

Challenges Areas for additional discussion? Washington State Department of Health Division of Environmental Health

Steve Deem, P.E. 253.395.6767 steve.deem@doh.wa.gov