CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/27/16 HIGHWAY: COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

Similar documents
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/05/2005

Tabulation of Bids. Counties: Project(s):

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

PROPOSAL. PROPOSAL OF, a corporation a

Riverside County Transportation Department Summary of Bids

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties:

REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO Park Hill School District Grandstand Installation

September Reporting on Work Plan 95-R-15 Final Report. Prepared by: Reviewed by:

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties:

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED)

Tabulation of Bids. Counties:

Click the Accounting band.

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

The first lift, mainline, shall be placed using a spray paver.

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

E-12 Education FY Budget November 2016 Forecast Property Tax Tracking 2017 Regular Session

Highway Committee MINUTES OF MEETING August 22, 2016

COTTER MILL SITE SUMMARY - RML

Tabulation of Bids. BERGEN, ESSEX, HUDSON, MORRIS, PASSAIC, SUSSEX, UNION Letting Date: Counties:

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

General Notes. Project No /15/2018 Page 1 of 1

Education Finance Levies House Recommendations HF 4328 DE2 Property Tax Levy Tracking ($ in thousands)

General Notes. Project No /15/2018 Page 1 of 1

Purchase Order. PO Date: 4/20/2016. Buyer: Phone #: FOB: Freight Prepaid Terms: Net 30 I N V O I C E

4 GENERIC COST ESTIMATING TOOL

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

OPTAMARK 90 MIL Price List November 1, Preformed Thermoplastic Pavement Markings. FREE TRAINING NO PREHEATING REQUIRED

FENCE RENTAL, PURCHASE, INSTALLATION, SUPPLIES & SERVICE - REQUIREMENTS CONTRACT INVITATION FOR BID PRICE SHEET ATTACHMENT E

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

EXPRESSION OF INTEREST

Greenman-Pedersen, Inc. C-2. Engineering and Construction Services

Country Trails PTO Student Directory. Fall Book Fair - Read All About It! Mother/Daughter Fall Fun. Yearbooks on Sale Now!

Artistic Bike Racks and Traffic Modification for Bike Lanes

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Trip Generation Impact Analysis Reporting Form

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

Team BUSY : Excise register RG-23 A-11, provision made to input starting S.No.

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

Reserve Study Navigation Options

City of Hope, Idaho Transportation Plan

Check Number: Currency: EUR ( ) Address: Beam Heath Way. City: Middlewich Road Nantwich. State/Province: Cheshire.

City of Port Hueneme Sealed Bid Auction Surplus Supplies

ENERGY SECTOR COORDINATION

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

MEMORANDUM. Date: April 25, Town Commission. Dave Bullock, Town Manager

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Specifications of Cryogenic vacuum jacketed valves

Federal Project No.: STP-007-8(154)

Faxed responses are not acceptable - Return bid in a sealed envelope with the bid number noted on the outside.

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Official Record Book

Chip Seals, Slurry Seals & Micro Surfacing

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

TO: Karen P. Brust, City n r - ~~

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

APPENDIX E Activity Defect Assignment

Your invoice guide GUIDE. How to use this guide. NOTE: The invoice shown here is for illustrative purposes only.

Promotion Contract

SUMMARY COSTS: (Please attach a detailed budget including all sources of recipient funding)

BOONE COUNTY, MISSOURI. Request for Bid #12-22MAR Chip Seal Pavement Preservation for Boone and Callaway Counties and the City of Columbia

RSA Efforts in the Tampa Bay Area

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S

STATE OF MINNESOTA PRICE PAGE (Typed Response Required)

OneBayArea Grant Application

MANUAL. DHRUV CHAUHAN MARG COMPUSOFT PVT.LTD. Mobile: Office: (30 Lines)

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions

2016 BICYCLE PAVEMENT MARKINGS CONTRACT DOCUMENTS. General Construction

CERTIFICATION GUIDELINES AND ORDER FORM

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.

FisherPak Instructions

AFFINITY SPORTS [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11]

Flora Williams, CEA Family & Consumer Science, Arvitta Scott, CEP CEA 4-H & Youth Development,

OPTAMARK 125 MIL Price List November 1, Preformed Thermoplastic Pavement Markings. FREE TRAINING NO PREHEATING REQUIRED

2019 BSA SUMMER SPLASH RULES OF COMPETITION - VERSION 2.0

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

CONTENTS 2 LEAGUE FEE BREAKDOWN 3 STANDARDS OF EXCELLENCE 4 DIVISIONS OFFERED 5 CAPTAIN MEETING AGENDA 6 INTRODUCTION TO USTA JR.

Rio Mills Rd/Berkmar Dr Extended Connection

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

ALTA 300 Colonial Center Parkway, Suite 140 Roswell, GA 30076

BATCH MANUFACTURING RECORD FOR PRODUCT X,

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

DEPARTMENT OF TRANSPORTATION Traffic Engineering Division 30 W. Mifflin Street, Suite Mission, Goals and Objectives

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

PUBLIC INFORMATION MEETING

2018 OASL Hosting Manual

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

Technical Specifications (In-Cash Procurement)

Transcription:

565,853.54 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 1/27/16 62 CONTRACT ID: 6277661 : RMC - 6277661 CONTRACT: 121449 AWARD : $4,436,834.21 ED : $4,436,834.21 ADJ. ED : $5,2,687.75 CONTRACT: CONTRACTOR: RONALD R. WAGNER & CO., LP HIGHWAY: US9 DISTRICT NAME: Laredo COUNTY: VAL VERDE AREA ENGINEER: ANTONIO PEREA, P.E. AREA NUMBER: 13 ESTIMATE NUMBER: 8 LETTING DATE: 12/2/214 ESTIMATE PAID: AWARD DATE: 12/18/214 ESTIMATE PERIOD: 7/1/215 to 7/31/215 NOTICE TO PROCEED DATE: 1/8/215 ESTIMATE TYPE: FINL WORK BEGIN DATE: 1/3/215 % COMPLETE: 1. ACCEPTED DATE: 7/15/215 % TIME USED: 82.67 PHYSICAL WORK COMPLETION DATE: // % RETAINAGE:. RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $5,2,687.75 PARTICIPATING NON-PARTICIPATING $5,2,687.75 RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS PAID TO CONTRACTOR $5,2,687.75 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/ ENGINEER DATE

CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 5 CONTRACT TIME STATEMENT WORK BEGIN DATE: 1/3/215 ASSESSED LIQ DAMAGES: TIME CHARGES BEGIN: 1/3/215 LIQ DAMAGE RATE: $97. DAYS: 75 LIQUIDATED DAMAGES: C. O. ADJUSTED DAYS: DAYS AT CURRENT DAYS: 75 PER DAY $97. DAYS CHARGED : 62 TOTAL: PHYSICAL WORK COMPLETE: // DAILY BREAKDOWN Date or Charged Credited 7/1/215 1 AWAITING FINAL DOCUMENTATION 7/2/215 1 AWAITING FINAL DOCUMENTATION 7/3/215 1 AWAITING FINAL DOCUMENTATION 7/4/215 1 SATURDAY 7/5/215 1 SUNDAY 7/6/215 1 AWAITING FINAL DOCUMENTATION 7/7/215 1 AWAITING FINAL DOCUMENTATION 7/8/215 1 AWAITING FINAL DOCUMENTATION 7/9/215 1 AWAITING FINAL DOCUMENTATION 7/1/215 1 AWAITING FINAL DOCUMENTATION 7/11/215 1 SATURDAY 7/12/215 1 SUNDAY 7/13/215 1 AWAITING FINAL DOCUMENTATION 7/14/215 1 AWAITING FINAL DOCUMENTATION 7/15/215 1 WORK ACCEPTED 7/23/215 1 Pending Final CO 7/31/215 1 Final Estimate Diary Adjustment Date or PERIOD SUMMARY Charged Credited 17 17 AWAITING FINAL DOC 1 OTHER - SEE RMRKS 2 SATURDAY 2 SUNDAY 2 WORK ACCEPTED 1

CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 5 WORK PERFORMED THIS PERIOD RMC - 6277661 CONTROL 6277661 CATEGORY 1 SEAL COAT CONTRACT QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 15 521 11 MOBILIZATION LS 358,91..1 $35,891. 1. 1. 11 5221 33 BARRICADES, SIGNS AND TRAFFIC HANDLING MO.1 1. $.1 3. 3. TOTAL EARNINGS THIS ESTIMATE

CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 5 CONTRACT S CATEGORY RMC - 6277661 CONTROL 6277661 1 SEAL COAT CONTRACT SUPP NET CO $ 75 316275 16 AH (TIER I) GAL 2.935 468,215.8 14,724.2 68,94. 1,787,238.9 8 316276 16 AH (TIER II) GAL 2.935 15,321.1-12,921.1 2,4. 7,44. 85 316277 16 AH (TIER III) GAL 2.935 371,592. 5,78. 377,3. 1,17,375.5 9 3162717 16 AGGR (TIER I) CY 43.26 13,747.4 2,65.6 16,353. 77,43.78 95 3162718 16 AGGR (TIER II) CY 35.83 489.9-429.9 6. 2,149.8 1 3162719 16 AGGR (TIER III) CY 42.43 9,332.4 1,31.6 1,643. 451,582.49 15 521 11 MOBILIZATION LS 358,91. 1.. 1. 358,91. 11 5221 33 BARRICADES, SIGNS AND TRAFFIC HANDLING MO.1 3.. 3..3 115 5121 ONE-WAY TRAFFIC CONTROL HR.1 64. -493. 147. 1.47 12 6622115 1 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA.1 23,551. 1,622. 25,173. 251.73 125 66623 1 REFL PAV MRK TY I (W) 4" (BRK)(1MIL) LF.26 33,514. 12,17. 45,621. 11,861.46 13 666212 1 REFL PAV MRK TY I (W) 4" (SLD)(1MIL) LF.25 83,944. 2,663. 851,67. 212,91.75 135 666236 1 REFL PAV MRK TY I (W) 8" (SLD)(1MIL) LF.5 5,869. 733. 6,62. 3,31. 14 666248 1 REFL PAV MRK TY I (W) 24"(SLD)(1MIL) LF 5. 1,835. 31. 2,145. 1,725. 145 666254 1 REFL PAV MRK TY I (W) (ARROW) (1MIL) EA 16. 29. -4. 25. 4,. 15 666269 1 REFL PAV MRK TY I(W)(DBL ARROW)(1MIL) EA 26. 6. 4. 1. 2,6. 155 666296 1 REFL PAV MRK TY I (W) (WORD) (1MIL) EA 18. 31. -4. 27. 4,86. 16 666215 1 REFL PAV MRK TY I (Y) 4" (BRK)(1MIL) LF.26 17,648. 32,171. 139,819. 36,352.94 165 6662111 1 REFL PAV MRK TY I (Y) 4" (SLD)(1MIL) LF.26 625,216. -6,512. 618,74. 16,863.4 17 6662142 1 REF PAV MRK TY II (W) 4" (BRK) LF.12 33,514. 8,777. 42,291. 5,74.92 175 6662176 1 REF PAV MRK TY II (Y) 4" (BRK) LF.12 17,648. 48,241.2 155,889. 18,76.68 18 6662178 1 REF PAV MRK TY II (Y) 4" (SLD) LF.11 625,216. 1,96. 627,176. 68,989.36 185 672212 34 REFL PAV MRKR TY I-C EA 2.6 3,276. -87. 2,469. 6,419.4 19 672215 34 REFL PAV MRKR TY II-A-A EA 2.5 13,81. -191. 13,619. 34,47.5 Category Subtotal $5,2,687.75 RMC - 6277661 CONTROL 6277661 CATEGORY 1 SEAL COAT CONTRACT SUPP NET CO ($) 195 96121 MATERIAL ON HAND DOL 1..... CO #1 Category Subtotal. TOTAL EARNINGS THIS CONTRACT $5,2,687.75

CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 5 CONSTRUCTION ESTIMATE COMBINED ($) 316275 16 AH (TIER I) GAL 2.94 468,215.8 68,94. 1,787,238.9 316276 16 AH (TIER II) GAL 2.94 15,321.1 2,4. 7,44. 316277 16 AH (TIER III) GAL 2.94 371,592. 377,3. 1,17,375.5 3162717 16 AGGR (TIER I) CY 43.26 13,747.4 16,353. 77,43.78 3162718 16 AGGR (TIER II) CY 35.83 489.9 6. 2,149.8 3162719 16 AGGR (TIER III) CY 42.43 9,332.4 1,643. 451,582.49 521 11 MOBILIZATION LS 358,91. 1. 1. 358,91. 5221 33 BARRICADES, SIGNS AND TRAFFIC HANDLING MO.1 3. 3..3 5121 ONE-WAY TRAFFIC CONTROL HR.1 64. 147. 1.47 6622115 1 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA.1 23,551. 25,173. 251.73 66623 1 REFL PAV MRK TY I (W) 4" (BRK)(1MIL) LF.26 33,514. 45,621. 11,861.46 666212 1 REFL PAV MRK TY I (W) 4" (SLD)(1MIL) LF.25 83,944. 851,67. 212,91.75 666236 1 REFL PAV MRK TY I (W) 8" (SLD)(1MIL) LF.5 5,869. 6,62. 3,31. 666248 1 REFL PAV MRK TY I (W) 24"(SLD)(1MIL) LF 5. 1,835. 2,145. 1,725. 666254 1 REFL PAV MRK TY I (W) (ARROW) (1MIL) EA 16. 29. 25. 4,. 666269 1 REFL PAV MRK TY I(W)(DBL ARROW)(1MIL) EA 26. 6. 1. 2,6. 666296 1 REFL PAV MRK TY I (W) (WORD) (1MIL) EA 18. 31. 27. 4,86. 666215 1 REFL PAV MRK TY I (Y) 4" (BRK)(1MIL) LF.26 17,648. 139,819. 36,352.94 6662111 1 REFL PAV MRK TY I (Y) 4" (SLD)(1MIL) LF.26 625,216. 618,74. 16,863.4 6662142 1 REF PAV MRK TY II (W) 4" (BRK) LF.12 33,514. 42,291. 5,74.92 6662176 1 REF PAV MRK TY II (Y) 4" (BRK) LF.12 17,648. 155,889.2 18,76.68 6662178 1 REF PAV MRK TY II (Y) 4" (SLD) LF.11 625,216. 627,176. 68,989.36 672212 34 REFL PAV MRKR TY I-C EA 2.6 3,276. 2,469. 6,419.4 672215 34 REFL PAV MRKR TY II-A-A EA 2.5 13,81. 13,619. 34,47.5 TOTAL EARNINGS $5,2,687.75