LIQUID LEVEL GAUGE FOR WELDING ZGAU 716 O&M, 717 O&M, 718 O&M, 719 O&M

Similar documents
Installation / Operation / Maintenance Manual KLINGER Reflex Level Gauge Type R 25

USER MANUAL. 1. Principle of operation. 2. Delivery condition. SPRING-LOADED SAFETY VALVES zarmak. Edition: 07/2016 Date: V (ex.

Manual Actuated Boiler Blowdown Valves

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

L21S/SR/ST Glass Level Gauges

Engineering Data Sheet

INSTALLATION & MAINTENANCE INSTRUCTION

100C Air Compressor Kit

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

IMPORTANT SAFETY INSTRUCTIONS

MAINTENANCE PROCEDURE FOR X 650

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

200 PSI COMPRESSORS - MODEL NUMBERS

Installation, Operation, and Maintenance Manual

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WHEATLEY Series 500 Swing Check Valve

400C & 450C DUAL PERFORMANCE VALUE PACKS

Operation Manual Air Saver Unit ASV5000 Series

Installation, operation & maintenance manual - original version

SCA Series Inverted Bucket Steam Traps

The X-11 Molding Chamber

ZZYP TYPE AUTOMATIC PRESSURE REGULATING CONTROLL VALVE

INSTRUCTION MANUAL Pressure Relief Device LPT

SV5 Safety Valve Installation and Maintenance Instructions

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Model VR6 System. Installation, Operation & Maintenance

k valve 2 (50)HF 2½ (65)SF installation guide aylesbury For valve sizes (DN): tel fax

USER MANUAL. 781T (ex. 781) 776 ( ex. 775-I)

444C DUAL PERFORMANCE VALUE PACK

TEST SPECIFICATION NYT-909-C

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

BCV31 DN20 - Blowdown Control Valve

Installation & Operation Manual Proven Quality since 1892

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

SPECIFICATIONS ATTENTION

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

MANUAL. Sesame. Thermoplastic Tank Technologies

MUD 1. Vent check valves. Instruction and maintenance manual.

Atmospheric relief valve type 1100 Installation and maintenance instructions

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

PC3_ and PC4_ Pipeline Connectors

TITAN FLOW CONTROL, INC.

Eaton Filtration, LLC

Operation Manual. PEGAS NovoTap, PEGAS NovoTap+

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Model GP PRESSURE REDUCING VALVE Installation & Operation Manual

FLOW CONDITIONER «EMIS-VEKTA 1200» EMIS-VEKTA 1200.UM.PS v User manual Passport. «EMIS», CJSC Russia, Chelyabinsk

Combination Air Valve

BCV31 DN40 - Blowdown Control Valve

Eaton Filtration, LLC

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Flowmeter. Original operating manual DFM

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Installation and commissioning instructions 255 series and 256 series

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

24 Litre Air Compressor

Hydrostatic Pressure Testing

1.0 - OPENING AND CLOSING THE DOOR

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

Accu Max Limited Warranty

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Supplementary instructions. Rod and cable components. for VEGAFLEX series 80. Document ID: 44968

IMPORTANT SAFETY INSTRUCTIONS

200 PSI FAST-FILL AIR SOURCE KIT

200 PSI HIGH-FLOW AIR SOURCE KIT

PAPR Flow Tester. instructions. part no WARNING

Instruction manual. HLSD-2 Circular Access Tank Cover IM-TE91K041-EN1 ESE Date of issue: August 29, 2012

36H SERIES Combination Gas Valve

FLANGED TWO-PIECE BALL VALVES

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

INSTALLATION, OPERATING & MAINTENANCE MANUAL WATER DRAIN VALVE

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

Armatures for analytical probes

TP1 and TP2 Temporary Cone Shaped Strainers

Preferred Instruments Danbury, CT USA

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

KTM 50 (DN ) Installation, maintenance and operating instructions

GILMONT ACCUCAL FLOWMETERS

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Transcription:

LIQUID LEVEL GAUGE FOR WELDING ZGAU 7 O&M, 77 O&M, 78 O&M, 79 O&M Edition: 07/0 Date: 0.07.0 GO WITH OUR FLOW SPIS TREŚCI. Introduction. Construction. Installation. Installation of liquid level gauge of more than 000 mm. First run. Replacement of glasses 7. Checking for chokepoint of chamber 8. Final remarks 9. Warranty 7 type 0, 07, 08, 09 7 type 0,,,,,,,7 77 type,,,. Introduction 77 type,7,8,9,0,,, 78 type 8,9,0, 79 type,,,7,8,9 Liquid level gauges are used to showing liquid level in pressure vessels at following work parameters: Liquid level gauges 7 type 0, 07, 08, 09 and 77 type,,, with flat glass 70, bar, temp. max 0 o C Liquid level gauges 7 type 0,,,,,,,7 and 77 type,7,8,9,0,,, with flat glass 70S/70SCrNi, 0 bar temp. max 0 o C Liquid level gauges 78 type 8,9,0, and 79 type,,,7,8,9 with flat glass 70, 0 bar, temp. max 0 o C Test and working pressure according to the relevant standard regulations.

. Construction P SJR 7O 7M Drawing. Liquid level gauge 7 type 0, 07, 08, 09 Drawing. Liquid level gauge 7 type 0,,,,,,,7 7 8 Side connector Connecting screw P SJR 7 8 Side connector Connecting screw 77O 77M SJR Drawing. Liquid level gauge 77 type,,, Drawing. Liquid level gauge 77 type,7,8,9,0,,,

Nr poz. Nazwa detalu Stosowane materiały 78O 78M /C SJR Nr poz. 7 Nazwa detalu Side connector Stosowane materiały 79O 79M /C SJR Drawing. Liquid level gauge 78 type 8,9,0, Drawing. Liquid level gauge 79 type,,,7,8,9 Table. Dimension of liquid level gauge 7 type 0, 07, 08, 09 and 77 type,,, Size 0 I II III IV Axle base L 00 0 00 0 00 Length of sight-glass A 0 00 0 0 0 mm Length of frame B 80 8 88 0 Dimensions of glass xx7 0xx7 80xx7 0xx7 0xx7 Table. Dimension of liquid level gauge 7 type 0,,,,,,,7, 77 type,7,8,9,0,,,, 78 type 8,9,0,, 79 type,,,7,8,9 Size 0 I II III IV Axle base L 00 0 00 0 00 Length of sight-glass A 0 9 9 mm Length of frame B 7 9 8 Dimensions of glass xx7 0xx7 80xx7 0xx7 0xx7

. Installation Before installing liquid level gauge on device, check if liquid level gauge is not damage after transport and if glass is not cracked. Liquid level gauges should be assembled to device on stiff or additionally stiffened fittings in order to protect liquid level gauge against possibility of self-disassembly. For example - solution of stiffening are shown on Drawings and. Drawing. Stiffening of connectors of boiler Drawing 7. Stiffening of liquid level gauges heads Assembly of liquid level gauge: flange of liquid level gauge to device flange applying flat gaskets. First the flange of bottom head should be screwed and then upper head to adjust to required dimension and to screw to connector. Non-tilting liquid level gauges 7, 78 should be assembled in vertical position. In case of tilting liquid level gauges 77, 79 with flat glass it is possible to set at an angle below 0 o. User should mark min. and max. level on the frame.. Installation of liquid level gauge of more than 000 mm Due to the length and weight of liquid level gauge, the installation should be performed directly on the object. Liquid level gauge should be installed as follows: Attach a frame to the tank using the holes in the support frame. Assembly bottom cock on the tank outlet Put a frame pin in the gland chamber of the lower head and tighten a gland nut slightly, sealing a connection Put an upper head on the frame and tighten a gland nut slightly sealing a connection of the frame with the head Mount the upper head on the tank outlet and tighten fixing bolts slightly Tighten all the bolts and nuts to seal the liquid level indicator connections. Perform a leakage test of liquid level gauge. In case of any leaks, tighten the bolts or nuts to seal the connections additionally. Other operating and assembly instructions - according to general instructions applicable to liquid level gauges.

In case of liquid level gauge with leakage test or commissioning supervised at the manufacturer's site, a liquid level gauge should be first mounted on the bolts fixing a frame to the tank, then the heads should be mounted to the tank outlets. Liquid level gauge should be always hold by the frame and never by he head.. First run During of start of the boiler, at opened liquid level gauge cocks, pressure and temperature grow up slowly and danger of thermal shock does not exist. Fast raising of temperature at liquid level gauges can be cause of shortened time of exploitation of glasses or their cracking. In case of starting of liquid level gauge, after previous disassembling from working boiler (for example in aim of exchange of glass), danger of fast raising of temperature at liquid level gauge exists. In order to avoid this, the following recommendations should be followed: Close bottom cock, open drain cock, and then gap a top cock to get a clearly visible stream of flowing down of condensate along glass. After period of 0 min. all elements of liquid level gauge should obtained working temperature. Close the drain cock. Liquid level gauge will start to fill with condensate. Otworzyć w pełni górną głowicę. Full open top cock. Full open bottom cock. During slow heating, gaskets settle down, and after some time, leakages are possible. All screws, nuts or screw plugs in place of leaks should be screwed by dynamometer key. Before screwing the nut ( Drawings,,) (8 - Drawings,) (7-Drawing ) heads should be open and close few time with key. This sealing operation should be made at closed heads cock and with open drain cock. In case of leaking during exploitation, connections should be sealed as in previous point. If leaks continue, gaskets should be replaced. During long stop, liquid level gauge should be drained. This means, top and bottom cock has to be closed, and drain cock open. O for open and Z for close, are marked on gauge of drain cock.. Replacement of glasses Before replacement of reflex glasses, top and bottom cock should be closed and the drain cock opened. In order to replace of glasses, screw ( Drawings,,) ( Drawings,, ) in upper and bottom head should be unscrew and frame or glass tube with gland box ( Drawings,, ) ( Drawings,, ) has to be removed from the heads. Replacement of glasses Gland nut ( Drawings,,) (8 Drawings,) (7 Drawings ) should be loosen and took out of the frame. pressure should be unscrew and damaged glass and gaskets under the glass should be removed. Clean up elements of the frame, put on glass with gaskets and assemble the frame. Studs should be screw tight with crisscross pattern, with intuition and even strength. In case of frames 70 tighten of screws should began from central screw and to go on towards ends of the frame. In case of frames 70S/70SCrNi and 70/70 CrNi tighten of nuts was shown on enclosed draft ( Drawing 8 ). Gland sleeve of assembled frame should be placed in gland box chambers (after inserting a packing). By screw gland nut ( Drawings,,) (8 Drawings,) (7 Drawing ) to seal up connection initially, and then to push gland box ( Drawings,, ) ( Drawings,, ) with the frame onto liquid level gauge s heads. screws ( Drawings,, ) ( Drawings,, ) with gaskets ( pcs. of gaskets Φx8x,) in upper and bottom heads.

7 8 Drawing 8. Sequence of tightening of screws in liquid level gauge frame 7. Checking for chokepoint of chamber Because of the possibility of limescale deposition or different dirt inside, liquid level gauge s chambers should be to checked for chokepoint. Frequency is dependent on the exploitation conditions and supervision requirements. In aim of checking of chamber chokepoint, liquid level gauge should be blown. Blowing is made for every head separately, by closing one head to blow the second one at open drain cock. In case of choked chamber: In case of choked chamber: Close bottom cock. Unscrew the screw ( Drawings,, ) ( Drawings,, ) from bottom head, insert to chamber a rod with diameter up to 8 mm and open the bottom cock. Unblock a channel with a rod and then take out the rod and close the bottom cock. Fix the bottom screw ( Drawings,, ) ( Drawings,, ). Repeat above for top head. Due to perform the above actions under pressure, special caution should be exercised, and the person should be trained and protected against possible burn (in case of hot medium). After cleaning of heads, frame should be also cleaned. For cleaning frame, top and bottom headcocks should be closed, drain cock opened and a rod used to clean chamber of the frame carefully through open drain cock. 8. Final remarks During service of liquid level gauges in exploitation, regulations of UDT as well as different regulations related to pressure devices has to be obey. Liquid level gauges are assembled in two types dependent on cock s switch handle location: right or left. If client does not specify the type, liquid level gauges are delivered in right type. Change of design is obtained by loosening of screw ( Drawings,, ) ( Drawings,, ) and turn of liquid level gauges heads about 80 o in relation to gland box and turn of drain cock. As a standard, flanges are drilled at PN /0 bar, as for DN0. Inlet hole in heads Φ mm. If during inspections or repairs some parts will prove for replacement, the order of new part should include: number of position, name of the element, size and using material.

9. Warranty ZETKAMA grants quality warranty with assurance for proper operation of its products, providing that assembly of them is done according to the user s manual and they are operated according to technical conditions and parameters described in ZETKAMA s catalogue cards. Warranty period is 8 months starting from assembly date, however not longer than months from the sales date. Other warranty terms are to be agreed between the manufacturer of the valve and the purchaser. The manufacturer reserves the right to introduce technical changes as the result of improving construction and manufacturing technology. Failure to comply by the user with the regulations and indications included in this user s manual shall exempt the manufacturer from any liability and warranty.