AIC FRANCE A 31/12. Publication date: DEC 27. Page 1/7. SUBJECT : Deployment of CDO (continuous descent operations) on the French territory

Similar documents
3rd Eurocontrol CDO Workshop

SULAYMANIYAH INTERNATIONAL AIRPORT MATS

Airbus Series Vol.2 (c) Wilco Publishing feelthere.com

COSCAP-South Asia ADVISORY CIRCULAR FOR AIR OPERATORS

2 ETSO-C115c#9 Airborne Area Navigation Equipment Flight Management Systems (FMS) Using Multi-Sensor Inputs

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

Aeronautical studies and Safety Assessment

Continuous Descent Final Approach

ENR 3. ATS ROUTES. For detailed descriptions of specific lower altitude ATS routes, refer to current editions of the following publications:

Tenth USA/Europe Air Traffic Management Research and Development Seminar

FLIGHT CREW TRAINING NOTICE

FLIGHT OPERATIONS PANEL

ILS APPROACH WITH A320

Aircraft Performance Calculations: Descent Analysis. Dr. Antonio A. Trani Professor

(B.III (corrigendum) CRD to NPA (B.III (corrigendum) CS-ADR Book 1 and 2 - Table J-1 to Book 1 Subpart J

RNAV/RNP Operations & VNAV Approaches

AVOID ABERRANT FLIGHT PLAN ROUTES

Flying The Boeing

Flying The Boeing Advanced

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, PO Box 103 Croatia

PROCEDURE DOCUMENTATION

PERFORM A NDB APPROACH [A320]

Mandatory Briefing Bardufoss (ENDU)

1. You may request a contact approach if there is 1 SM flight visibility and you can operate clear of clouds to the destination airport.

OPERATIONS MANUAL PART A INSTRUCTIONS AND TRAINING REQUIREMENTS FOR THE AVOIDANCE OF CONTROLLED FLIGHT INTO TERRAIN AND POLICIES FOR THE USE OF GPWS

New Airfield Risk Assessment / Categorisation

Final Examination Doc 8168 NOT FOR COMMERCIAL PURPOSES EXAM

SCT Trajectory & Separation Optimization

RNP APCH procedures for BEJAIA Soummam-Abane Ramdane RWY26

REPUBLIC OF CROATIA. LDZA - New PBN instrument flight procedures at Zagreb Airport

FLIGHT PERFORMANCE AND PLANNING (2) PERFORMANCE

VFR Circuit Tutorial. A Hong Kong-based Virtual Airline. VOHK Training Team Version 2.1 Flight Simulation Use Only 9 July 2017

Advisory Circular (AC)

From Nonprecision to Precision-Like Approaches

PPL Exam 1 Working File. Where significant calculation/thinking is required.

Aerodrome Safeguarding Airside Operational Instruction 16. AOI Owner - Operations Developments & Safety Manager

On interoperability and seamless within the context of SWIM

1.0 PURPOSE 2.0 REFERENCES

TERMINAL PROCEDURES PUBLICATION SYMBOLS

LNAV & VNAV Integration Review Basics

Flying The Embraer Brasilia (EMB-120)

FALCON SERVICE ADVISORY

Descent Planning with a Mechanical E6-B Flight Computer

Wake Vortices OPERATIONS. Where do Wake Vortices come from? What are the characteristics of wake vortices? CLAUDE LELAIE Former Head of Flight Test

CLT Continued Aircraft Operations Evaluations

LOW LAYER WIND SHEAR OVER DAKAR

LETTER OF AGREEMENT BETWEEN THE GOVERNMENT AND THE GOVERNMENT OF INDIA FOR THE CO-OPERATION SEARCH AND RESCUE SERVICES

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-60 SID MACAO RWY MAY 2016 (BIGRO 4 D, MIPAG 5 D, NLG 5 D, SHL 5 D) CAT A, B, C, D

PPL Exam 3 Working File. Where significant calculation/thinking is required.

Helideck Limitations List (HLL)

EASA need for Standards and AMC for Unmanned Aircraft

Time-based Spaced Continuous Descent Approaches in busy Terminal Manoeuvring Areas

Circuit Considerations

Takeoff Performance. A 1 C change in temperature from ISA will increase or decrease the takeoff ground roll by 10%.

Safety Management System and Aerodrome Resource management for AFIS Operators'

Descend Pilot s Discretion

S-TEC. Pilot s Operating Handbook

Revision Number Revision Date Insertion Date/Initials 1 st Ed. Oct 26, 00 2nd Ed. Jan 15, 08

FLYING OPERATIONS. Hard Landing

Flight Planning & Aircraft Performance Part 2

VR-TCAP Validation report for new possible altitude capture laws

Noise Abatement Takeoff 1 Close In Profile

Safety Criticality Analysis of Air Traffic Management Systems: A Compositional Bisimulation Approach

Helicopter Safety Recommendation Summary for Small Operators

International Search and Rescue Operations

T A K E O F F A N D C L I M B

OBSTACLE DEPARTURE PROCEDURES Part 3

SW FAB Free route strategy

Ongoing research in Hong Kong has led to improved wind shear and turbulence alerts

Flight Profiles are designed as a guideline. Power settings are recommended and subject to change based

EAD Client Satisfaction Survey 2016 Report

Maximum Rate Turns. Objective To carry out a balanced, maximum rate, level turn using full power.

GO AROUND PNF 3.THRUST REDUCTION/ACCELERATION ALTITUDE 1.GO AROUND INITIATION 5.DIVERSION. 4.HOLD (missed approach) 2.

Basic Mountain Flying

I2102 WORKSHEET. Planned Route: Takeoff: KNSE, RWY 32 Altitude: 12,000 Route: RADAR DEPARTURE. Syllabus Notes None. Special Syllabus Requirements None

B-757 FLEET OPERATIONS

AIRCRAFT SYSTEMS AUTO FLIGHT - FLIGHT AUGMENTATION

Ref.: SP 65/4-17/78 23 June 2017

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

What is stall? How a pilot should react in front of a stall situation

PRECISION APPROACH PNF

Go around manoeuvre How to make it safer? Capt. Bertrand de Courville

PRODUCT MANUAL. Diver Smart Interface Cable AS346

Accident Prevention Program

ZIPWAKE DYNAMIC TRIM CONTROL SYSTEM OUTLINE OF OPERATING PRINCIPLES BEHIND THE AUTOMATIC MOTION CONTROL FEATURES

Advance edition (unedited) Doc 9905-AN/471. Notice to Users

Climbing and Descending

Agenda Item 6-ATM Coordination (Airspace restructuring, AIS and SAR agreements)

CATS Workshop Target Windows modelling

Calculation of in-flight cruise performance for integration in an EFB System

JAR-23 Normal, Utility, Aerobatic, and Commuter Category Aeroplanes \ Issued 11 March 1994 \ Section 1- Requirements \ Subpart C - Structure \ General

PRIVATE PILOT MANEUVERS Practical Test Standards FAA-S A

Transportation Engineering II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Design and Installation of Low Level Cycle Signals

PURCHASE AND DELIVERY OF A HELIUM CLOSED-CYCLE OPTICAL CRYOSTAT. The present tender is only an unofficial translation provided as a courtesy.

Aerodrome Design Manual

FINAL REPORT. Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia

Mobility studies Dynamic pedestrian simulations

Preliminary Study of Aircraft Dynamics and Performance: High Gust Condition Aspect

Transcription:

TECHNICAL SERVICE : +33 (0)5 57 92 57 57 Fax : +33 (0)5 57 92 57 77 : sia-direction@aviation-civile.gouv.fr Site SIA : http://www.sia.aviation-civile.gouv.fr AIC FRANCE A 31/12 Publication date: DEC 27 SUBJECT : Deployment of CDO (continuous descent operations) on the French territory 1 INTRODUCTION After a trial and assessment period, the DSNA (French Directorate for Air Navigation Services) would now like to deploy continuous descent operations all across the French territory. When well performed by pilots, continuous descent reduces the effects of aircraft noise on the residential areas near airports and CO 2 emissions. Continuous descent approach performance indicators for the residential community (reduction of noise linked to the elimination of superfluous sound levels) are or shall soon be available for all large French airports. The gains in CO 2 shall be included in national greenhouse gas emission monitoring indicators. The DSNA will use this AIC to provide a set of recommendations and procedures on how to create, deploy and use this type of operation at national level, in order to help airlines perform successful CDO. Both the applications of the internationally standardized general principles and the French choices for fields which are not yet standardized are described in this AIC. 2 DEFINITION CDO (Continuous Descent Operations) is a flight technique which enables aircraft to have optimized flight profiles, either linked to instrument approach procedures and adapted airspace structures or air control techniques, by using reduced engine power and whenever possible, configurations limiting aerodynamic drag, in order to decrease the following: - noise nuisance in the areas surrounding the aerodromes, - emissions of gases into the atmosphere, - consumption of aircraft fuel. The above are reduced from the TOD (Top of Descent) at cruise level until the runway is reached. 3 SCOPE Continuous descent approaches may be used in airspaces dedicated to both the ENR (end of cruise flight) phase for STAR (standard arrival) procedures and the TMA (terminal control area) phase for INA (initial approach) procedures. They may be performed during both conventional and surface (RNAV) navigation. However, RNAV arrival and approach paths are now being developed whenever air traffic systems are assessed or improved. These RNAV paths are designed to reduce the distance travelled and allow optimized flight profiles on landing. They should make CDO more efficient. 4 CURRENT SITUATION OF PUBLICATIONS IN FRANCE To date, several French international aerodromes have Continuous Descent Approach type procedures, which are now processed and published using the term Continuous Descent Operations (CDO). Given the complexity of airspaces and the difficulty that air traffic control units have in authorizing such procedures in order to maintain safety in busy traffic conditions, two types of publication have been adopted: a) permanent documentation (AIP France), for procedures which are likely to be permanently authorized by the ATC, b) temporary documentation (AIP SUP), for procedures being assessed in accordance with operational constraints. At the time of publishing this AIC, Paris-Orly (LFPO) runway 06 and Strasbourg-Entzheim (LFST) runway 23 have permanent documentation. Marseille-Provence (LFML) runway 31R, Paris-Charles-de-Gaulle (LFPG) runways 08L-08R-09L-09R, Toulouse-Blagnac (LFBO) runways 14L-14R-32L-32R, Lyon-Saint-Exupéry (LFLL) runways 18L-36R and Bordeaux-Mérignac (LFBD) runway 23 have temporary documentation. International aerodromes such as Nice-Côte d Azur (LFMN), Nantes-Atlantique (LFRS) and Bâle-Mulhouse (LFSB) are being studied. Page 1/7

5 DESIGN AND DESCRIPTION OF A STANDARD PROCEDURE 5.1 Top of descent A CDO likely to be performed both during the ENR end of cruise flight phase and the STAR arrival phase or the INA initial approach phase will begin in the flight phase commonly called Top of Descent. This critical point of the CDO, which determines and guarantees compliance with the rest of the procedure until the subsequent flight phase, is determined by the FMS but may also be predefined and published or left to the initiative of the ATC. In brief TOD can begin following one of these three options: a) a point published in the procedure section (in particular STAR and INA); b) on the initiative of the ATC; c) on request from the crew. 5.2 Descent segments The following phases are likely to be broken down into descent and deceleration segments until final approach phase (FNA) preparation, and are performed at variable gradients depending on the type of aircraft, its weight, speed, weather conditions and also the flight management imposed by the crew. Vertical profile construction rules per altitude band may nevertheless be designed. Descent gradients with no particular constraint above FL100 may reach 4 (7%). The first deceleration segment, most often when approaching FL100, has a lower gradient, around 2 (3.5%). The subsequent segment (initial approach phase, INI) allowing aircraft to reach the landing phase (intermediate approach phase, INT and final approach phase, FNA) has a gradient close to 3 (5.2%). The descent profile computed during the last 10 NM before the beginning of the final approach (FAF) may be reduced to 2 (3.5%) in normal conditions and must not exceed 3 (5.2%). The difference in altitude created by the difference between the local runway QNH setting and the standard 1013 hpa setting must be taken into account, especially during a descent of a low flight level to an altitude over a short distance. Example: In the least favorable case where QNH is 1040 hpa, the aircraft will have to descend an extra 756 feet (28 ft per hpa for a difference of 27 hpa in ISA), which means that the gradient needed to reach the final approach fix in good conditions must be higher. The table below shows the possible variations of the gradient near interception level assuming that the aerodrome is at sea level and an interception level of 3000 feet, not taking wind gradients into account. FL at WP or TOD Altitude to lose to reach FNA level QNH 1013 hpa Standard gradient Distance traveled with standard gradient Altitude to lose to reach FNA level QNH 1040 hpa Corrected gradient identical WP or TOD FL100 7000 ft (2133m) 3-5.25% 40628 m (21.9 NM) 7756 ft (2364 m) 5.81 % - 3.35 FL090 6000 ft (1828 m) 3-5.25% 34819 m (18.8 NM) 6756 ft (2059 m) 5.91 % - 3.40 FL080 5000 ft (1524 m) 3-5.25% 29028 m (15.7 NM) 5756 ft (1754 m) 6.04% - 3.45 FL070 4000 ft (1219 m) 3-5.25% 23219 m (12.5 NM) 4756 ft (1449 m) 6.24% - 3.55 FL060 3000 ft (914 m) 3-5.25% 17409 m (9.4 NM) 3756 ft (1145 m) 6.57% - 3.75 FL050 2000 ft (610m) 3-5.25% 11619 m (6.3 NM) 2756 ft (840 m) 7.23% - 4.15 Page 2/7

Consequently, in order to ensure an optimized gradient less than or equal to 3, it is advised to either move the reference waypoint (WP or TOD) back or to lower the level when it passes. The last critical segment is the preparation of the final approach phase (FNA). This segment is relatively long and is not necessarily in relation with the intermediate approach phase (INT) with a minimum regulatory value of 30 seconds of flight at the given speed. In order to optimize this segment as much as possible and to reduce noise nuisance to a maximum, it must be performed with an optimum gradient close to 1 (1.7%) or less. This gradient also enables speed to be reduced at a rate of 20 to 30 kts/minute. 5.3 Published constraints A CDO is optimized when there are no level or speed constraints, as this enables the FMGS horizontal and vertical path calculation and monitoring capabilities to be used fully. The complexity of the air traffic systems around aerodromes nevertheless creates various constraints which may hamper the optimized vertical profile of a descent. The ATC authorities must do their utmost to minimize the constraints or allow aircraft to pass in [low level high level] windows compatible with the descent plans mentioned above. Speed constraints should also be avoided, except those concerning flight safety, airspace management or compliance to procedures. Finally, these published constraints must be respected by the FMS and the crew, unless otherwise instructed by the ATC. 5.4 Distance to runway (DTG, Distance To Go) The optimization of the CDO procedure is improved by informing the crew of the distance to the runway: - either at each significant waypoint of the published procedure, in particular during the initial approach phase (INA), - or on the initiative of the ATC during a radar vectoring procedure performed before the final approach phase (FNA). 6 PROCEDURE IDENTIFICATION Generally speaking, procedure identification meets the international recommendations and standards, as well as the national regulations in force. 6.1. Identification of the en-route procedure is based on the designation of the PDR and AWY. Example: UT184 G36 6.2. Identification of an arrival procedure must comply with the designation of a STAR. Example: NARAK 6G 6.3. Identification of an INA initial approach procedure may be the designation of a STAR procedure or simply the designation of an IAF, initial approach fix. Example: (INA) LAVGO 1A or LAVGO 7 FUNCTIONAL DIAGRAM (STANDARD PROFILE) The following diagram illustrates the vertical profile of such a procedure. It contains: - the various gradients enabling descents, speed decreases and preparation of ILS interception, - the published monitoring constraints, like altitude windows or mandatory minimum levels, distance to the runway from each characteristic point. Page 3/7

TRANSLATION FIGURE AIC CDO Profil haut et bas d une zone d évolution CDO High and low profile of a CDO operating zone Profil probable d une procédure CDO Likely profile of a CDO procedure Procédure non CDO Non CDO procedure Pente haute théorique Theoretical high gradient Contrainte niveau Level constraint Zone de réduction des nuisances sonores Noise reduction zone Interception du radioalignement de descente ILS Interception of ILS glide path Pente ILS ILS gradient Segment de décéleration Deceleration segment Conception d un palier en approche intermédiaire Creation of a level during intermediate approach Profils verticaux en paliers Vertical profiles in levels Pente basse théorique Theoretical low gradient Page 4/7

8 MAPPING ASPECT For a crew to optimize its descent profile, a CDO must be published like any other AIP procedure. It shall mention the following information: - a warning specifying that this procedure is optimized for use during the CDO; - distance to the runway at each waypoint (WP) of the procedure during the initial approach phase (INA), and, if necessary: - a clearly identified top of descent; - level constraints; - speed constraints. See Appendix 1: Example of initial approach section (INA) Toulouse-Blagnac airport (LFBO) 9 PHRASEOLOGY The procedures are usually encoded and stored in the FMS databases. The identification of the aeronautical documentation procedure, the identification of the procedure in the database and the phraseology used by the ATC must be consistent. Clear communication between the pilot and controller is essential to perform a CDO procedure safely. Clearance outside constraints probably published on the various segments of the CDO procedure may be successively issued using the following phraseology: - during the ENR (en route) phase via a waypoint (WP) - Citron Air 1 2 3 Proceed Route ESISI - NARAK - When (you are) ready, descend level 1 9 0 via NARAK or Descend at own discretion cleared level 1 9 0 via NARAK or Descend level 1 9 0 via NARAK - during the arrival phase (STAR) via the initial approach fix (IAF) - Citron Air 1 2 3 Proceed NARAK 6G Arrival - When (you are) ready, descend level 1 1 0 via LAVGO or Descend at own discretion cleared level 1 1 0 via LAVGO or Descend level 1 1 0 via LAVGO - during the initial approach phase (INA) - Citron Air 1 2 3 Proceed LAVGO Approach - Descend 3000 feet QNH 1 0 1 3 ILS runway 3 2 right 10 OPERATIONAL IMPLEMENTATION ATC ACTION When allowed by the density of the traffic inside the given airspace, the ATC will propose the available CDO procedures by default in order to encourage aircraft crew to perform them. The ATC applies the methods below. However, the real-time operational situation may lead it to take action in order to maintain flight safety. 10.1 During the performance of a published procedure Clearance, based on the identification of ENR waypoints (PDR or AWY), of the arrival procedure (STAR) and the initial approach procedure (INA), either successively or on a segregated basis, allows a crew to perform such a procedure and enables: a) the FMS to be used fully; b) the choice of the vertical profile to be as flexible as possible; c) the flight to be performed with no drag or power. Any additional control instruction which introduces level constraints, a change in the rate of descent or speed is likely to disturb the management of this procedure optimized by the FMS. It should therefore be avoided except for safety requirements. Any shortening of the path (radar or GOTO) should also be avoided for the same reasons. As regards the flight, the procedure should be performed, together with all the published constraints. Page 5/7

10.2 During the performance of a radar vectoring or mixed procedure Whenever possible, the controller should send the pilot information about the distance to the runway (DTG). The pilot will then be able to optimize his descent profile during the performance of the procedure. 11 FEEDBACK This document has been discussed with manufacturers, airlines and operational staff. It may be improved during meetings organized by the DSNA with its clients, so that their needs may be better acknowledged. 12 REFERENCE TEXTS - Resolution A33-7, Annex C: recommendations for a balanced approach to reduce the noise impact (ICAO); - EU Directive 2002/30/EC (ECAC); - First agreement committing all the air industry stakeholders (Grenelle de l environnement/meeddat, 28 January 2008) (Grenelle Environment Forum/French Ministry of Ecology, Sustainable Development and Energy); - ICAO document 9931: CDO Manual - ICAO doc 8168: PANS OPS Vol I and II - ICAO doc 4444: PANS ATM Page 6/7

Procedures developed under the concept CDO Page 7/7 FR/