California Water Service. PV Peninsula Water Reliability Project

Similar documents
Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE

MASTER BICYCLE AND PEDESTRIAN PLAN

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

Commuter Connections Regional TDM Marketing Group Meeting

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Appendix D: Public Meeting Notice

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Bank of America Chicago Marathon Community Outreach. Community Outreach Overview

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Traffic Guide. Please refer to the How to Use This Guide section below to learn how to navigate around event day closures.

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

122 Avenue: 107 Street to Fort Road

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Austin Avenue Bridges Project. Public Meeting Summary

Important Lane Closures for Jan , 2012

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010

Access Routes from US 101 to the Richmond San Rafael Bridge

Purple Line Extension Community Meeting

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

WELCOME. The following materials and resources are available to you:

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

I-105 ExpressLanes Project

Capital Beltway HOT Lanes Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

I-35 SMART WORK ZONE UPDATE

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Washington County, Oregon

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Wilshire Boulevard Bus Rapid Transit Project

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

West Circle Drive (CSAH 22) Traffic Operations Study

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

BICYCLE TOURISM: IDEAS FOR BEST PRACTICE

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

Southeast-1 Stations: ALIGNMENT OVERVIEW

Financial Project ID No(s).: and ETDM No(s).: and 14181

PUBLIC INFORMATION MEETING

Welcome! Fore River Bridge Reconstruction Project Quincy & Weymouth Project File No Public Information Meeting May 18, 2017

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

3.9 Recreational Trails and Natural Areas

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Upper Market Street Bike Lane Project

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Traffic Impact Statement

Technical Advisory Committee (TAC)

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

Orange Center Elementary School

RM 620 FEASIBILITY STUDY

Foothill Expressway Improvements Between El Monte and San Antonio

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

MONTGOMERY COUNTY COUNCIL MEMORANDUM

PROJECT FACT SHEET May 25, 2018

ACTION TRANSMITTAL No

PROJECT FACT SHEET March 21, 2018

^ Lee County So^mst <T:[oV1]^ Lee County

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

EVENTS May 1 Horse Happenings on the Hill More info: Ernie Howlett Park

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

Meadow Woods Elementary School

May 5, 2009 File:

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5194 FOR PUBLIC HEARING

Lee County Department of Transportation

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

BIKE PLAN CONTENTS GATEWAY

CHIEF PEGUIS TRAIL EXTENSION WEST

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

FACT SHEET VirginiaDOT.org

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

June 29, Dear Mr. Walter:

Giles Run Connector Road

Update of the Master Transportation Plan s (MTP) Bicycle Element

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Sloat Blvd. Pedestrian Safety Improvement Project

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Transportation Planning Division

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Transcription:

California Water Service PV Peninsula Water Reliability Project 1

What We ll Cover Cal Water Overview Project Background and Need Project Timeline and Next Steps 2

About California Water Service (Cal Water) Providing drinking water to the PV Peninsula for nearly 50 years Palos Verdes Estates, Rolling Hills, Rolling Hills Estates, Rancho Palos Verdes, and a portion of Lomita Water purchased from Metropolitan Water District of Southern California (MWD) Water is treated and delivered to PV residents, schools and businesses Serving the South Bay since 1927 3

Need for the Project Ensure the Peninsula is better prepared for the future for everyday use and emergency needs 4

Project Map D-500 replacement New Ridge pipeline 5

Project Timeline (Tentative) Fall 2018 to Spring 2019 Summer 2018 to Winter 2019 Summer 2018 to Winter 2019 End of 2018 to Spring 2019 Summer 2018 to Fall 2018 New Pump Station: Summer 2018 to Fall 2019 Summer 2018 Summer 2018 Water line installation begins Summer 2018 to Fall 2018 6

Palos Verdes Drive North Eastbound Lane Closure 4 week (or less) closure: July-Aug 2018 7

Traffic Detour: PVDN Eastbound Lane Closure 8

Project Timeline Seek required permits & approvals Finalize design CEQA completion Begin community open houses Begin construction PV Dr. North eastbound lane closure (one month) End of year: Expected completion 2017 Jan-Feb 2018 April May- June July- August 2019 Ongoing stakeholder outreach 9

Stakeholder Outreach We are committed to keeping the community informed through ongoing outreach 100+ community events and presentations Open houses, resident roundtable Neighborhood Outreach Committee Real-time text alerts, emails, direct mail Traffic signage, message boards, Apple Maps, Google Maps and Waze notifications Project web site and Facebook page Support for the PVPWRP includes: 10

Stay Updated Sign up for project updates on our web site and like our Facebook page! 11

Contact Information www.pvpwaterproject.com pvpwaterproject@calwater.com facebook.com/pvpwaterproject 310-257-1400 (Mention PVP Water Reliability Project) Quality. Service. Value. 12

Appendix Quality. Service. Value. 13

Existing Pipelines D-500 and Ridge systems Existing D-500 pipeline Existing Ridge pipeline 14

D-500 System D-500 replacement ends D-500 replacement begins 15

Ridge System New Ridge Pipeline Existing Ridge pipeline 16

Detailed Construction Timeline (Tentative) PV Drive North & Dapplegray Elementary School: Summer 2018 to Fall 2018 o Montecillo to Dapplegray Lane: Summer 2018 Fall 2018 o 9 p.m. to 7 a.m. o One lane of traffic open at all times, all lanes open during non-work hours o Dapplegray Lane to Dapplegray Elementary School: Summer 2018 o 7 a.m. to Midnight o Monday Friday, Saturday work as needed o One month eastbound lane closure with detour, Westbound lane open early July through early August o Dapplegray Elementary School (main driveway): Summer 2018 o 7 a.m. to 5 p.m. Dapplegray Elementary School (hillside + near ballfield): Summer 2018 to Fall 2018 o o o 7 a.m. to 5 p.m. Work in this section will begin near the ballfield and move up the hill from September to November 2018. Preparatory work, however, will start at the top of the hill during the Summer 2018, which will not impact ballfield use 17

Detailed Construction Timeline (Tentative) Bridle Trails: Fall 2018 to Winter 2019 o Palominos Ranchos Trail to Rolling Hills Road: 5 months o 7 a.m. to 5 p.m. o Rolling Hills Road to Botanic Garden Trail: 1 month o 7 a.m. to 5 p.m. South Coast Botanic Garden: Fall 2018 to Spring 2019 o South Coast Botanic Garden: 2 Months o 7 a.m. to 5 p.m. o Rolling Hills Methodist Church Lot: 2 weeks o 6 p.m. to 4 a.m. Monday thru Friday unless otherwise noted. 18

Detailed Construction Timeline (Tentative) Crenshaw Boulevard: End of 2018 to Spring 2019 o At least one lane of traffic open in each direction at all times o All lanes open during non-work hours o Crenshaw Blvd through PV Drive North intersection: 6 weeks o 8 p.m. to 6 a.m. o PV Drive North intersection to Crest Road: o 7 a.m. to 5 p.m. Pump Station: Summer 2018 to Fall 2019 o 7 a.m. to 5 p.m. Monday thru Friday unless otherwise noted. 19