Valve Proving System for automatic Shutoff Valves

Similar documents
Valve Proving System for automatic Shutoff Valves

Valve Proving System for automatic Shutoff Valves

Hot-Air Blowers 12 / / Hot-Air Blowers

Bypass Compensator Cartridge, Size 16

THERMOFLO FLUID PUMPS& SYSTEMS THERMOFLO FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 SEALED SYSTEMS EXPANSION VESSELS PRESSURIZERS

Workfit -SR, Dual Monitor Short Surface

Automatic Valve Proving Control

The Discussion of this exercise covers the following points: The open-loop Ziegler-Nichols method. The open-loop Ziegler-Nichols method

Hybrid Relief Valves

Lesson 8: Application Technology

VB-7253 Series. Application. Features. Applicable Literature

First Aid in School Policy

ML OXIPRES INSTRUCTION MANUAL

Pinpoint GPS. FCC and IC Compliance Statement

SETUP & PREPARATION KNOW YOUR PRODUCT 1. ASSEMBLY CORDLESS POLE PRUNER. Fitting Rear Handle

Owner s Manual For TAC Series Planetary Gear Air Winches ORIGINAL TEXT

Operation Maintenance Installation Warranty Manual

* Different spooltypes up to 330 l/min. in combination with simultaneously control.

SGP-20S SGP-25S SGP-32S SGP-40S. Price $ $ $ $ Filtered compressed air, lubricated or non-lubricated

POWER COMBICON feed-through plugs mm pitch DFK-PC 16/...-ST(F)-10,16

Inverted POWER COMBICON feed-through plugs mm pitch DFK-IPC 16/...-ST(F)-10,16

ANNEX 1 CLASSIFICATION AND LABELLING SUMMARY TABLES

INDUSTRIAL. AUTOMOTIVE. AUTOMATION. ENERGY EFFECTIVE ENERGY SOLUTIONS

400 Series Flat Panel Monitor Arm Rotate Mount Double Pivot P/L

Pinpoint GPS 90-8M

Owner s Man ual. For MTA1000 and MTA2000 Series Cycloidal Gear Air Winches

TANTALUM ELECTROLYTIC CAPACITORS

APPNA SPRING MEETING CHICAGO, ILLINOIS RETAIL BAZAAR REGISTRATION MARRIOTT DOWNTOWN MAGNIFICENT MILE 540 NORTH MICHIGAN AVENUE

2014 Victorian Shooting Championship

GRENADES INTRODUCTION: EOD CONSIDERATIONS ANTI-ARMOR/HEAT: SAFETY: FRAGMENTATION: IMPACT FRAGMENTATION: FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY

Grade 6. Mathematics. Student Booklet SPRING 2011 RELEASED ASSESSMENT QUESTIONS. Record your answers on the Multiple-Choice Answer Sheet.

Contents TRIGONOMETRIC METHODS PROBABILITY DISTRIBUTIONS

Owner s Manual. For TH330MR1 Hydraulic Winches Dedicated for Personnel Lifting

his is a preview only - it is not a valid BS7671 certificate. This is a nly - it is not a valid BS7671 certificate. This is a preview only - it is

PRACTICAL EXPERIENCE WITH THE INTRODUCTION OF HONEYCOMB SHROUD SEALS ON MW SUPERCRITICAL PRESSURE UNITS

Owner s Manual For M452 and M492 Series Spur Gear Hand Winches ORIGINAL TEXT

Chp. 3_4 Trigonometry.notebook. October 01, Warm Up. Pythagorean Triples. Verifying a Pythagorean Triple... Pythagorean Theorem

QPL... Pressure Switches. Siemens Building Technologies HVAC Products

Solenoid gas valve. The solenoid gas valve is also applicable as a main gas valve Pilot gas valve for forced draft burners

Corrective actions identified

Owner s Manual For 4WM2 Series Worm Gear Hand Winch ORIGINAL TEXT

Workrite Sierra HX & HXL Assembly Instructions for 3-leg Electric Workcenters

Minnesota s Wild Turkey Harvest Fall 2016, Spring 2017

Instructions. Electronic Aquarium Water Change System. Replenishing Water. Extracting Water. Includes instructions for:

INVESTIGATION 2. What s the Angle?

Robot Control User Manual /0718-V01

Chapter 4 Group of Volunteers

Rules of Hockey including explanations. Effective from 1 January 2017

Firearm Safety. Links to Topics below XAVIER BECERRA THE SIX BASIC GUN SAFETY RULES. Attorney Genera] The. Six Basic Gun Safety Rules

ERRATA for Guide for the Development of Bicycle Facilities, 4th Edition (GBF-4)

Owner s Man ual. For 4HPF/4HWF/4HBP Series Helical/Parallel, Helical/Worm, Helical/Bevel and Planetary Gear Power Winches

Double valves for biogases and recycling gases

Fully insulated, heavy-gauge steel cabinet stage or single-stage thermostats

DM80VC / DC80VC. Two-Stage Variable Speed Gas Furnace 80% AFUE. Heating Input: 60, ,000 BTU/h

VGD40.../VGD41... Double gas valves. Building Technologies Division Infrastructure & Cities Sector

Hook-up Checklist for the Ranger PM7000 (EU)

How To Demonstrate Guide E24 & E26

VGG... VGF... VGH... Gas Valves. Siemens Building Technologies HVAC Products VGG... VGF... VGH...

Explosion-proof solenoid valves on/off and proportional controls - UL certification

TECHNICAL BULLETINApril 2016

VGG... VGF... VGH... Gas Valves. Building Technologies HVAC Products VGG... VGF... VGH...

SPECIFICATIONS ATTENTION

The Pythagorean Theorem and Its Converse Is That Right?

Connectors according to DIN / IEC

Rules of Hockey including explanations. Effective from 1 January 2015

Asbestos Management Program

USA Field Hockey s Modifications to the 2017 FIH Rules of Hockey

Owner s Manual For 5122 Series Portable Davit Cranes ORIGINAL TEXT

Name Class Date SAMPLE. Complete the missing numbers in the sequences below. 753, ,982. The area of the shape is approximately cm 2

Flow Divider / Combiner Cartridge Valves

TOURNAMENT REGULATIONS OUTDOOR COMPETITIONS

Type OSE. Type OSE Slam-Shut Valve. Features and Benefits. Introduction. Bulletin 71.6 D102356X012. April 2018

Pressure reducing valves (with check valve) X(C)G, XGL

Explosion-proof solenoid valves on/off and proportional controls - ATEX or Rostechnadzor Russian certification

EG15*... SERIES. SOLENOID GAS VALVES WITH 1/2 CONNECTION AND OPERATING PRESSURE UP TO 500 mbar DESCRIPTION

O.K. Safety first CDN USA. Table of Contents. Approvals. Attention IFGC CSA UL ANSI NFPA

United States Patent (19)

INSTRUCTION MANUAL. CET MkII TUBULAR REACTOR. CET MkII ISSUE 16

Some models are supplied with a protective film on steel and aluminium parts. This film must be removed before installing/using the appliance.

A Measurement Framework for National Key Performance Measures

PCT MINIMUM DOCUMENTATION

Valve Proving System VDK 200 A S06*

DIGITAL COUNTER TYPE / 2- POINTER DIAL INDICATING TYPE

Data Compression. Reduce the size of data. Reduces time to retrieve and transmit data. Compression ratio = original data size/compressed data size

Owners Manual Bottle Filler Freeze Resistant Tubular Fountain & Pet Fountain with 98837C Dual Valve Control Assembly

INSTALLATION INSTRUCTIONS AND USER MANUAL FOR SLOAN EAF GOOSENECK SERIES FAUCETS

Gebrauchs- und Montageanleitung Operating and installation instructions. Instrucciones de uso y montaje. Instrucţiuni de montaj şi utilizare

ANATOMY OF A TRIPOD: Friction Lock (column) 8 Boots / Footwear. Friction Lock (Leg)

Exploring Impacts of Countdown Timers on Queue Discharge Characteristics of Through Movement at Signalized Intersections

PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS?

BERMAD Fire Protection

THE EFFECT OF GRADED HYPOXIA ON THE METABOLIC RATE AND BUCCAL ACTIVITY OF A LUNGLESS SALAMANDER (DESMOGNATHUS FUSCUS)

Integration of modelling and monitoring to optimize network control: two case studies from Lisbon

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1

DIFFERENTIAL PRESSURE REGULATING VALVE zcon

Valve Proving System VDK 200 A S02

Cash Valve CRYOGENIC CONTROLS. ISSUED - FEBRUARY 2000 CAVMC-0514-US-0208 ISO 9001 Certified

IFP C175-* REMOTE CONTROL RELIEF VALVE

VGG... VGF... VGH... Gas Valves. Building Technologies HVAC Products VGG... VGF... VGH...

STUDENT STUDY GUIDE GENERAL COMPETENCIES OF THE INCIDENT COMMANDER. INCIDENT COMMANDER INTRODUCTION Time: 5 min

Transcription:

LGY lve Proving System for utomtic Shutoff lves 11... The 11... vlve proving system is designed for use with shutoff vlves in connection with gs urners nd gs pplinces. n the event of indmissile lekge, the system prevents the urner from strting up. The 11... system conforms to the requirements of 3 covering utomtic shutoff vlves for use with gs urners nd gs pplinces to 1. The 11... nd this Dt Sheet re intended for use y OMs which integrte the vlve proving system in their products. en 2.0.200 uilding Technologies H Products

Use The 11... is designed for utomtic gs vlve proving (lekge test) sed on the pressure proving principle. t is for use on gs-fired comustion plnt with or without vent pipe to tmosphere. n the cse of plnts with no vent pipe where stndrds pply, the notes given in «onnection exmples without vent pipe to tmosphere» must e oserved. Used in connection with 1 or 2 commercilly ville pressure switches, vlve proving is utomticlly initited with every urner strtup, either - prior to urner strtup - during the prepurge time if it lsts minimum of 0 seconds - immeditely fter controlled shutdown, or - on completion of the urner control s control sequence, e.g. t the end of the postpurge time The vlve proving test is sed on the 2-stge pressure proving principle: 1. First test phse: The vlve on the mins side is tested y evcuting the test spce nd y monitoring the tmospheric pressure in it. 2. Second test phse: The vlve on the urner side is checked y pressurizing the test spce nd y monitoring the gs pressure. f the pressure increses excessively during the first test phse clled «Test1», or decreses excessively during the second test phse clled «Test2», the vlve proving system will inhiit urner strtup nd initite lockout. n tht cse, the lockout reset utton will light up to indicte the fult. emote indiction of the fult is lso possile. progrm indictor, which stops whenever fult occurs, indictes which of the vlves is leking. The vlve proving system cn e reset either on the unit itself or vi n electric remote reset fcility. rning notes To void injury to persons, dmge to property or the environment, the following wrning notes should e oserved. Do not open, interfere with or modify the control unit. Mounting notes ll ctivities (mounting, instlltion nd service work, etc.) must e crried out y qulified stff efore performing ny wiring chnges in the connection re of the 11..., completely isolte the unit from the mins supply (ll-polr disconnection) nsure protection ginst electric shock hzrd y providing dequte protection for the vlve proving system s connection terminls nsure tht wiring is in n orderly stte Press the lockout reset utton only mnully (pplying force of no more thn ) without using ny tools or pointed ojects Do not press the lockout reset utton on the unit for more thn seconds since longer presses will destroy the lockout rely Fll or shock cn dversely ffect the sfety functions. Do not put such units into opertion, even if they do not exhiit ny dmge nsure tht the relevnt ntionl sfety regultions re complied with 2/ uilding Technologies en H Products 2.0.200

nstlltion notes Live nd neutrl conductors must not e interchnged ommissioning notes Prior to commissioning, ensure tht wiring is in n orderly stte Stndrds nd certifictes onformity to directives - lectromgnetic comptiility M (immunity) - Directive for gs pplinces / 33 0 / 3 SO 001: 2000 ert. 003 SO 01: 1 ert. 3233 ertified complete with plug-in se: Type reference 11.323 --- x x x --- x 11.3232 --- x --- x --- x 11.23 x --- x x x --- 11.232 x --- --- x --- --- Service notes ch time unit hs een replced, ensure tht wiring is in n orderly stte Disposl notes The unit contins electric nd electronic components nd must not e disposed of together with domestic wste. Locl nd currently vlid legisltion must e complied with. 3/ uilding Technologies en H Products 2.0.200

Mechnicl design lve proving system 11... Housing - Plug-in design - xchngele unit fuse (including spre fuse) - Mde of impct-proof nd het-resistnt lck plstic - Lockout reset utton with viewing window showing: The fult signl lmp The lockout indiction - oupled to the progrm spindle - ith trnsprent lockout reset utton - sy-to-rememer symols indicting the type of fult nd the time lockout occurred - Synchronous motor of the sequence switch with ger trin nd step ction sequence switch - mshft with 1 nondjustle cms - Progrm indictor t the hed of the cmshft - 1 min nd 1 uxiliry rely - Lockout rely cn e electriclly reset from remote loction nd provides the «Lockout» nd «eset» functions - Unit fuse nd spre fuse ll electricl components re interconnected vi printed circuits. Type summry Type reference Mins voltge t3 t 11.323 0...1 2. s 2. s 11.3232 220...20 2. s 2. s 11.23 ¹) 0...1 s s 11.232 ¹) 220...20 s s Legend t3 t Filling the test spce vcuting the test spce ¹) lve opening times do not conform to 3 Ordering lve proving system 11... (without plug-in se) refer to «Type summry» Plug-in se not included in the delivery, must e ordered s seprte item! onnection ccessories for medium-cpcity refer to Dt Sheet 230 urner controls - Plug-in se GM11 with Pg11 threds for cle entry glnds - Plug-in se GM11.1 with M threds for cle entry glnds PT resistor ( 230 ) - For lod on terminl of LMG2... GK2 / uilding Technologies en H Products 2.0.200

Technicl dt Generl unit dt 11... nvironmentl conditions Mins voltge - 11.3232-11.323-11.232 ¹) - 11.23 ¹) 220 1 %... 20 + % 0 1 %... 1 + % 220 1 %... 20 + % 0 1 %... 1 + % ¹) lve opening times do not conform to 3 Mins frequency 0...0 Hz ± % Unit fuse (uilt-in) T.3H20 to D 0 12 Primry fuse (externl) mx. (slow) eight pprox. 00 g Power consumption - During the test pprox. 3. - During opertion pprox. 2. Mounting position Optionl Degree of protection P 0 (to e ensured through mounting), except the connection re (terminl se) Sfety clss Perm. input current t terminl 1 mx. (pek current 20 / 20 ms) Perm. current rting of control terminls mx. (pek current 20 / 20 ms) equired current rting of pressure switch min. 1, 20 Storge D 021-3-1 limtic conditions clss 1K3 Mechnicl conditions clss 1M2 Temperture rnge -20...+0 Humidity < % r.h. Trnsport D 0 21-3-2 limtic conditions clss 2K2 Mechnicl conditions clss 2M2 Temperture rnge -0...+0 Humidity < % r.h. Opertion D 0 21-3-3 limtic conditions clss 3K Mechnicl conditions clss 3M2 Temperture rnge -20...+0 Humidity < % r.h. ondenstion, formtion of ice nd ingress of wter re not permitted! / uilding Technologies en H Products 2.0.200

Function During the first phse of the vlve proving test clled «Test1», tmospheric pressure must exist in the length of pipe etween the vlves to e tested. n plnts with vent pipe to tmosphere, tmospheric pressure is ville if the vlve proving test is mde prior to or during the prepurge time. n plnts without vent pipe, tmospheric pressure is mde ville s the vlve proving system opens the vlve on the urner side during the time «t». f the vlve proving test is performed fter urner opertion, the vlve on the urner side fter the controlled shutdown cn e kept open until «t» hs elpsed, thus lowering the pressure in the test spce nd mking certin its gs content is urnt off in the comustion chmer during the postpurge time. Prerequisite for this procedure is suitle control progrm of the urner control s provided y urner controls type LF..., LFL..., LGK... or L... The test spce is closed off fter evcution. During the first test phse «Test1», which then follows, the 11... checks with the pressure switch if the tmospheric pressure in the test spce is mintined. f the vlve on the mins side is leking, cusing the pressure to rise ove the switching point of the pressure switch, the 11... will trigger n lrm nd initite lockout. The progrm indictor then stops to indicte «Test1». f the pressure does not increse ecuse the vlve closes correctly, the 11... continues its progrm with the second test phse «Test2». For tht purpose, the vlve on the mins side is opened during «t3» so tht the test spce is pressurized («filling» the test spce). During the second test phse if the vlve on the urner side is leking this pressure must not fll elow the switching point of the pressure switch. f it does, the 11... will initite lockout lso, thus preventing the urner from strting up. On successful completion of the second test phse, the 11... closes the internl control loop etween terminls 3 nd (circuit pth: terminl 3 - contct «r2» - terminls nd - contct - terminl ). This control loop is normlly included in the urner control s strt control loop. fter the control loop hs een closed, the progrmming mechnism of the 11... returns to its strt position to switch itself off. During these so-clled idle steps, the positions of the progrmming mechnism s control contcts remin unchnged. / uilding Technologies en H Products 2.0.200

Progrm nd lockout indictor n the event of lockout, the progrmming mechnism stops nd thus the position indictor fitted to the spindle of the mechnism. The symol tht stops ove the reding mrk indictes the test phse during which lockout occurred nd lso gives the numer of progrmming steps completed from the strt of this test phse (1 step = 2. seconds). Mening of the symols: Strt position = operting position n plnts without vent vlve: vcution of test spce y opening the vlve on the urner side Test1 «Test1» with tmospheric pressure (vlve proving test on the mins side) Filling the test spce y opening the vlve on the mins side Test2 «Test2» with gs pressure (vlve proving test on the urner side) dle steps until progrmming mechnism switches itself off Operting position = strt position for the next vlve proving test n the event of lockout, ll terminls receiving voltge from the 11... will e deenergized, except terminl 13, which is used for lockout indiction. fter reset, the progrmming mechnism utomticlly returns to its strt position to immeditely progrm new vlve proving test. ote ontrol sequence fter power filure Do not press the reset utton for more thn seconds. power filure prior to evcuting the test spce does not cuse the control sequence to chnge. f power filure occurs fter the evcution, the vlve proving test will not e continued when power is restored, ut the progrmming mechnism first returns to its strt position nd then performs the complete vlve proving test. / uilding Technologies en H Products 2.0.200

lcultion of the lekge rte escping from length of pipe (PG - P) x x 300 QLeck = Ptm x ttest Legend Qleck in dm³ / h Permissile lekge rte in dm³ or liters per hour PG in mr Overpressure in pipe section etween the vlves to e tested, t the eginning of the test phse P in mr Overpressure set on pressure switch (normlly set to 0 % of the gs mins pressure) Ptm in mr solute pressure (1.013 mr norml pressure) in dm³ olume of test spce confined y the vlves to e tested, including the spce in the vlves themselves Ttest in s Durtion of proving time xmple PG P = 30 mr = 1 mr QLeck = (30-1) x.3 x 300 13 x 2. = 20 l/h Ptm = 13 mr =.3 dm³ ny vlve lekge rte exceeding 20 l/h cuses the 11... to initite lockout ttest = 2. s ote Select volume of pipe section etween the gs vlves to e checked nd overpressure «P» set on pressure switch such tht the mximum permissile gs lekge rte «QLeck» will not exceed the rte specified in the locl regultions. / uilding Technologies en H Products 2.0.200

onnection digrm Legend L Si L lrm signl for «leking vlve» Min rely with contcts «r...» S Unit fuse (uilt-in) Lockout rely with contcts «r...» Pressure switch for vlve proving test (does not replce the gs pressure switch used to signl lck of gs) K1 Lockout reset utton K2 emote lockout reset utton Gs pressure switch (for lck of gs) H uxiliry rely with contcts «hr...» L1 Lockout wrning lmp (uilt-in) Si xternl primry fuse SK ontrol contct (for inititing the vlve proving test) SM Synchronous motor of progrmming mechnism 1) K1 1) K2 L1 SK 1 1 S r1 r2 tm. 3 r2 r1 1 1 P Gs M ~ SM X r3 X 12 1 23 20 1/020 22 21 2 H 1) Do not press «K...» for more thn seconds 13 L 2 11 11 Sequence digrm Legend t t1 22.1 s First test phse with tmospheric pressure t2 2 s Second test phse with gs pressure For 11.323... t3 2. s Filling the test spce t 2. s vcuting the test spce For 11.23... t3 s Filling the test spce t s vcuting the test spce t.3 s Totl durtion of vlve proving test until urner is relesed t. s ntervl from strt to energizing min rely t20 22.1 s unning time of progrmming mechnism until it switches itself off in the operting = strt position (idle steps) X X t t Progrm indiction t1 Test1 t3 t2 Test2 t20 01e/001 11 1 11 12 Output terminls controlled y the control unit or electriclly connected Gs vlves controlled to evcute the test spce Gs vlves controlled to fill the test spce ent vlve, normlly open; closed during vlve proving test from the eginning of «Test1» / uilding Technologies en H Products 2.0.200

onnection exmples with vent pipe to tmosphere using urner controls type LG2..., LG3... or LG... For other connections, refer to the connection digrm of the relevnt urner control. H L lve proving test prior to urner strtup LG2.../3.../.../LMG2... 12 S / / 3 M 1 2 0/003 lve proving test following immeditely the controlled shutdown 0/003 LG2.../3.../.../LMG2... 12 3 S / / M H L 2 1 GK2 3) P 1 r2 2 3 1 12 1 1 20 22 21 2 11 23 11 13 L 1 1 2 3 r2 1 12 11 1 23 20 22 21 2 11 13 L ³) Only in connection with LMG2... Plnts with vent pipe to tmosphere 1 2 s01/0 onnection exmples with vent pipe to tmosphere using urner controls type LF..., LFL... or LGK..., or the control unit L... lve proving test during the prepurge time (min. 0 seconds) nd following immeditely the controlled shutdown in plnts with vent pipe to tmosphere. Dely on mke of rely d > 2 seconds. xpnding flme urner or interrupted pilot urner lve proving test following immeditely the controlled shutdown xpnding flme urner or interrupted pilot urner LF1 L1 LGK... 1 1 / 12 131 1 / /001 LF1 L1 LGK... / 1 / 11/001 K2 d 2 1 1 r2 1 1 2 LP 3 12 1 23 20 22 21 2 11 11 13 K2 1 1 3 r2 1 1 2 12 1 11 23 20 22 21 2 11 13 L L / uilding Technologies en H Products 2.0.200

onnection exmples with vent pipe to tmosphere using urner controls type LF..., LFL... or LGK..., or the control unit L... For other connections, refer to the connection digrm of the relevnt urner control. lve proving test just prior to urner strtup lve proving test during the prepurge time (min. 0 s) xpnding flme urner or interrupted pilot urner xpnding flme urner or interrupted pilot urner LF1 L1 / 0/001 LF1 L1 1 1 / 0/001 LGK... 1 / LGK... 12 131 1 / LP K2 1 1 3 r2 1 1 2 12 1 23 20 22 21 2 11 11 13 K2 1 1 3 r2 1 1 2 12 1 11 23 20 22 21 2 11 13 L L lve proving test with 2 pressure switches G Pressure switch for the vlve proving test with gs pressure. This pressure switch must e set to the minimum gs pressure permitted during the proving test. f this pressure is not reched during the test, the 11... will initite lockout. Pressure switch for the gs vlve proving test with tmospheric pressure. This pressure switch must e set to the mximum gs pressure permitted during the proving test with tmospheric pressure. f this pressure is exceeded during the test, the 11... will initite lockout. G nd must e overlod-proof up to the gs pressure level. G 1 0/0 Plnts with vent pipe to tmosphere SKP0 1 2 s02/0 ) ( 11/ uilding Technologies en H Products 2.0.200

onnection exmples without vent pipe to tmosphere (for pplictions not covered y ) using urner controls type LF..., LFL... or LGK..., or the control unit L... lve proving test following immeditely the controlled shutdown in plnts without vent pipe. lve or «1» remins open fter the controlled shutdown until the strt of the first test phse is reched in order to evcute the test spce nd to urn off the gs in the comustion chmer during the fterurn time. xpnding flme urner or interrupted pilot urner LF1 L1 / 12/001 3 LGK... 1 / M2 K2 1 1 3 r2 1 1 2 12 1 11 23 20 22 11 21 2 13 L lve proving test with 2 pressure switches G Pressure switch for the vlve proving test with gs pressure. This pressure switch must e set to the minimum gs pressure permitted during the proving test. f this pressure is not reched during the test, the 11... will initite lockout. Pressure switch for the gs vlve proving test with tmospheric pressure. This pressure switch must e set to the mximum gs pressure permitted during the proving test with tmospheric pressure. f this pressure is exceeded during the test, the 11... will initite lockout. G nd must e overlod-proof up to the gs pressure level. G 1 0/0 Plnts without vent pipe to tmosphere PL SKP0 1 2 s03/0 ) ( 12/ uilding Technologies en H Products 2.0.200

onnection exmples without vent pipe to tmosphere using urner controls type LG2..., LG3... or LG... For other connections, refer to the connection digrm of the relevnt urner control. lve proving test prior to urner strtup lve proving test following immeditely the controlled shutdown LG2.../3.../.../LMG2... 12 3 13/003 LG2.../3.../.../LMG2... 12 3 1/003 L H M 2 S / / P M 2 GK2 3) S / / L H 1 3 r2 1 2 12 1 1 11 23 20 22 11 21 2 13 1 3 r2 1 1 2 12 11 1 23 20 22 21 11 2 13 1 L 1 L ³) Only in connection with LMG2... Plnts without vent pipe to tmosphere s0/0 1 2 Legend, 1, 2 Gs vlves controlled to evcute the test spce L lrm signl for «Leking vlve» Gs vlve controlled to fill the test spce ent vlve, normlly open; closed during vlve proving test from the eginning of «Test1» Pressure switch for vlve proving test (does not replce the gs pressure switch used to signl lck of gs) Sfety shutoff vlve, normlly closed (optionl) K2 emote lockout reset utton Gs pressure switch (for lck of gs) H Min switch LP ir pressure switch M... Fn («M2»: pre- nd postpurging) PL eference pressure for SKP0... ontrol thermostt or pressurestt (e.g. oiler control thermostt) Pipe orifice; its dimeter must e determined such tht in the event of leking pilot gs vlve, the pilot flme cnnot fterurn on completion of the second sfety time so tht presence of the min flme cnnot e simulted S Sfety limit thermostt T Dely off time rely; the time should e set to pprox. «t» (min. «t»... mx. «t») of the urner control Limit thermostt or pressure switch or pressure limiter 13/ uilding Technologies en H Products 2.0.200

onnection exmples without vent pipe to tmosphere using urner controls type LF..., LFL... or LGK..., or the control unit L... For other connections, refer to the connection digrm of the relevnt urner control. lve proving test just prior to urner strtup lve proving test during the prepurge time (min. 0 s) xpnding flme urner or interrupted pilot urner xpnding flme urner or interrupted pilot urner LF1 L1 / 2/001 LF1 L1 1 1 / 2/001 LGK... 1 / LGK... 12 13 1 1 / LP K2 1 1 r2 1 1 3 2 12 11 1 23 20 22 11 21 2 13 K2 1 1 3 r2 1 1 2 12 1 23 20 22 21 11 11 2 13 L L lve proving test with 2 pressure switches G Pressure switch for the vlve proving test with gs pressure. This pressure switch must e set to the minimum gs pressure permitted during the proving test. f this pressure is not reched during the test, the 11... will initite lockout. Pressure switch for the gs vlve proving test with tmospheric pressure. This pressure switch must e set to the mximum gs pressure permitted during the proving test with tmospheric pressure. f this pressure is exceeded during the test, the 11... will initite lockout. G nd must e overlod-proof up to the gs pressure level. G 1 Plnts without vent pipe to tmosphere 0/0 s0/0 ) ( P L SKP0 1 2 ) ( 1/ uilding Technologies en H Products 2.0.200

r2 onnection exmples without vent pipe to tmosphere using urner controls type LF..., LFL... or LGK..., or control unit L... nd ctutor SKP0... with expnding flme urners For other connections, refer to the connection digrm of the relevnt urner control. lve proving test just prior to urner strtup lve proving test during the prepurge time (min. 0 s) LF1 L1 1 1 2/001 3/ LF1 L1 1 1 2/001 3/ LGK... 12 13 1 1 / LGK... 12 13 1 1 / T M LP K2 1 3 1 1 1 2 12 1 11 23 20 22 21 11 2 13 K2 1 1 3 r2 1 1 LP 2 M 12 11 1 23 20 22 21 11 2 13 L L lve proving test with 2 pressure switches G Pressure switch for the vlve proving test with gs pressure. This pressure switch must e set to the minimum gs pressure permitted during the proving test. f this pressure is not reched during the test, the 11... will initite lockout. Pressure switch for the gs vlve proving test with tmospheric pressure. This pressure switch must e set to the mximum gs pressure permitted during the proving test with tmospheric pressure. f this pressure is exceeded during the test, the 11... will initite lockout. G nd must e overlod-proof up to the gs pressure level. G 1 0/0 ir pressure «PL» for the SKP0... must e sufficiently high to open the SKP0... lthough the urner s ir dmper is closed. Otherwise, the 11... will initite lockout when performing «Test1». Plnts without vent pipe to tmosphere SKP0 02/0 1/ uilding Technologies en H Products 2.0.200

Dimensions Dimensions in mm 11..., 1, 2, 2,, 3 3 123 Plug-in se GM11 / GM11.1 m0/030 3 / 200 Siemens uilding Technologies Production GmH Suject to chnge! uilding Technologies en H Products 2.0.200