Multi-Modal Facility Feasibility Study (WFC006)

Similar documents
Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

North Coast Corridor:

12/13/2018 VIA

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

(US80 TO SKYLINE DRIVE)

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

I-395 Express Lanes Northern Extension Project Public Hearings

Arterial Transitway Corridors Study. Ave

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Appendix A-K Public Information Centre 2 Materials

I-20 East Transit Initiative

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Technical Working Group November 15, 2017

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Everett Transit Action Plan. Community Open House November 16, 2015

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Community Task Force July 25, 2017

Bus Rapid Transit Plans

Preliminary Transportation Analysis

Transportation Master Plan Advisory Task Force

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

I-35W Solutions Alliance Project Update July 13, 2017

Pop-up Workshop Series Compilation of Community Feedback

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

Item B1 November 19, 2009

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Community Task Force March 14, 2018

Access BART: TOD and Improved Connections. October 29, 2008

MASTER BICYCLE AND PEDESTRIAN PLAN

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Seattle Transit Master Plan

Community Task Force November 15, 2017

Light Rail Transit in North Central Calgary Open House and Workshop Summary. Summer 2013


ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Planning for Bus Rapid Transit in the Milwaukee Region

Public Event 1 Community Workshops

6 Screen 3 Analysis and Results

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

Key objectives of the survey were to gain a better understanding of:

Governor s Transportation Vision Panel

C Line Planning Phase Public Engagement Plan

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670


PROJECT OVERVIEW. Auburn Station Access Improvements Project

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Standing Committee on Policy and Strategic Priorities

City of Wilsonville 5 th Street to Kinsman Road Extension Project

101 Corridor Managed Lanes

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT


Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Solana Beach Comprehensive Active Transportation Strategy (CATS)

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

Transportation Technology and Infrastructure Committee February 13, 2017

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

6-1 ELK GROVE GENERAL PLAN MOBILITY

Frequently Asked Questions (FAQ)

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Diamond Springs Parkway Project

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

VIRGINIA RAILWAY EXPRESS

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

2 BOLTON COMMUTER RAIL SERVICE FEASIBILITY STUDY

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Transit-Driven Complete Streets

Geary Bus Rapid Transit Project

I-105 Corridor Sustainability Study (CSS)

Metropolitan Council Transportation Committee

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

Central Jersey Transportation Forum. March 2007

Rochester Area Bike Sharing Program Study

CITY OF ELK GROVE TRAILS COMMITTEE

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Arterial Transitway Corridors Study

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Highway 217 Corridor Study. Phase I Overview Report

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4

Transcription:

Multi-Modal Facility Feasibility Study (WFC006) Presented by: Michael Costa, Interim Transit Manager Kevin Bewsey, Senior Civil Engineer October 25, 2017

Background 1. Received a $125,000 Sustainable Transportation Planning Grant from Caltrans and SACOG for a Multimodal Facility Feasibility Study 2. April 2017 Executed a contract with Kimley Horn and Associates to perform the study 2

Study Goals 1. Identify and assess the feasibility of potential locations for a multi-modal facility on existing or future passenger rail service lines 2. Evaluate potential reductions to commuter traffic 3. Select a recommended location(s) using a detailed evaluation process and public input 4. Inform future planning and funding efforts for a multi-modal facility 3

Study Process Schedule 7 months (June 2017 to Dec 2017) Process: School St 1. Identify potential site locations 2. Estimate ridership and congestion relief 3. Evaluate site locations based on evaluation criteria 4. Present draft results to the public 5. Incorporate public input Grove St Kent Waterman Rd 6. Identify recommended multi-modal facility site(s) 4

Stakeholder Agencies San Joaquin Joint Powers Authority (SJJPA) Sacramento Area Council of Governments (SACOG) Sacramento Regional Transit (SacRT) 5

Rail Service Connectivity Connecting to existing or future rail services will maximize the benefits of a Multi-Modal Facility. Gain access to national, state and regional destinations Leverages past and future infrastructure investments Potential to have Multi-Modal Facility costs partially or fully covered by near term grant opportunities As such, the Feasibility Study has focused on potential sites immediately adjacent to existing or future rail services 6

SacRT - Existing Light Rail Services Light Rail is owned and operated by SacRT Blue line currently stops at Cosumnes River College (CRC) Recent Blue Line extension of 4.3 miles cost $270M 7

SacRT - Future Light Rail Services Blue Line extension from CRC to Civic Center would cost approximately $230M City continues to plan for an extension but: Extension is not funded No apparent nearterm funding opportunities No timeline identified for extension 8

SJJPA - Existing Heavy Rail Services Rail Lines Owned by UPPR City has no influence over: Rail line uses Volume of train traffic Eastside Line (Fresno Subdivision) SJJPA currently provides Amtrak passenger service (2 off peak trains) UPRR unlikely to allow additional passenger service on the east line Westside Line (Sacramento Subdivision) No existing passenger service 9

SJJPA - Future Heavy Rail Services Eastside Line UPRR unlikely to allow additional passenger service on the east line (2 off peak trains and 1 peak train) Westside Line UPRR conducting a study to determine if they are willing to allow SJJPA passenger service on this line Potential for considerably more daily passenger trains 10

Site Requirements Initial Screening Adjacent to a current or future passenger rail corridor (heavy or light rail) Within or adjacent to City Limits Space for 1,000-foot long platform along tracks 5-10 acres for facilities including parking Connectivity to existing transportation system Prefer vacant lots or lots with low real estate impacts Minimize risk of environmental issues (e.g. wetlands, soil contamination) Avoid excessive construction/site design costs 11

Initial Screening - Map of 13 Potential Sites 12

Detailed Evaluation Criteria Within City Limits Rail service feasibility Site adequacy for multimodal use Grant potential Accessibility Ridership estimation Site acquisition feasibility Cost Other risk factors Congestion relief Changes to bus network Nearby bus and bike facilities Opportunity for supporting 13 uses

Detailed Evaluation 4 Potential Sites 14

Two Open Houses August 2, 2017-20 attendees September 14, 2017-30 attendees Public Outreach Two Online Forums August 2 16 (Questionnaire) - 138 participants September 14 21 (Comment Forum) - 6 comments received City Council update on August 23 rd via Consent Agenda 172 Total Comments Provided 15

Public Outreach Notifications City Newsletter Sept/Oct 2017 (City Wide) City Webpage Project Webpage Notifications at City Council Meetings Press Releases News Articles in the Citizen Social Media Week at a Glance, NextDoor, Twitter and Facebook Attempted contact with Home Owner and Neighborhood Associations for which contact information was readily available 16

Summary of Public Input In general, most of the public are in favor of having a Multi-Modal Facility. Public input on specific site locations is as follow: Site 1 Bilby/Willard Not a centralized location. Viewed by some as the most viable location for commuting to Sacramento Area Possibilities for future bay area connections. Located too close to existing established neighborhoods. Concerned with home values, crime, traffic, train noise Site 2 Franklin/Elk Grove Boulevard Impacts to the Stone Lakes National Wildlife Refuge Site 3 Civic Center/Future Light Rail Centralized location. Connectivity with future bus rapid transit and/or light rail services Site 4 Grant Line More centralized than Sites 1 and 2, Not near neighborhoods. Near State Route 99 17

#1 Preliminary Study Results Heavy and Light Rail Assume there will be a multi-modal facility on each type of rail service in the future. 18

#2 Preliminary Study Results Light Rail Site Site 3 would be recommended as a viable location for the light rail multi-modal facility 19

#3 Preliminary Study Results Recommended Heavy Rail Line 1. East line (Fresno Subdivision) has limited SJPPA passenger service potential 2. West line (Sacramento Subdivision) has better potential for expanded SJJPA passenger services and has a nearterm grant opportunity 3. Preliminarily recommend the West line (Sacramento Subdivision) as the rail corridor for the heavy rail multimodal facility 4. However, recommend allowing SJJPA and UPRR to conclude rail line negotiations before the City selects a recommended rail corridor. 20

#4 Preliminary Study Results Heavy Rail East Line Recommend Site 4 as a viable location for a potential heavy rail multimodal facility on the east line (Fresno Subdivision). 21

#5 Preliminary Study Results Heavy Rail West Line Recommend Site 1 and Site 2 as potentially viable locations for a heavy rail multi-modal facility on the west line (Sacramento Subdivision). 22

#6 Preliminary Study Results Estimated Cost The range of costs for a multi-modal facility is estimated between $15 million to $25 Million. 23

Next Steps Tonight Receive additional public input and direction from City Council November/December 2017 Finalize the Feasibility Study Future City Council Meeting Present the Final Feasibility Study to City Council for Approval 24

Questions & Comments Contact Information Tom Metcalf, Project Manager tmetcalf@elkgrovecity.org 916-478-2281 Project Webpage & Online Comment Forum bit.ly/elkgrovemultimodal 8401 Laguna Palms Way Elk Grove, CA 95758 25

Site Comparison Site Heavy Rail Connection Light Rail Connection Bus Rapid Transit Connection Ability to Attract Ridership Near Term Grant Opportunities Cost to Construct Centrally Located Right-Of-Way Acquisition Required Challenges Site 1 Willard & Bilby X Medium X High Less X Located in proximity to established neighborhoods. Concerns have been expressed about impact to home values, increase in crime, increase in traffic on local roads and increased noise due to trains. Site 2 - EG Blvd & Franklin X Medium X Highest More X Located within the Stone Lakes National Wildlife Refuge. Environmental impacts. Longer lead time for right-of-way acquisition. Site 3 - Civic Center X X High Lowest Most Dependent on future $230 million light rail extension and future bus rapid transit services Site 4 - Grant Line X Low Medium Less UPRR will likely not increase passenger service on the Fresno Line which is the rail line that serves this location. With only 2 or 3 trains a day, ridership will likely not be maximized at this location. 26