PEMBINA PIPELINE CORPORATION PETROLEUM TOLL SCHEDULE TOLLS APPLYING TO THE TRANSPORTATION OF PETROLEUM ON THE PEACE LVP PIPELINE SYSTEM Effective: July 1, 2017 ISSUED BY: Pembina Pipeline Corporation 4000, 585 8 th Ave. SW Calgary, Alberta T2P 1G1 Phone: (403) 231-7500 E-mail: Pipeline-Services@pembina.com
1. Rules and Regulations. This Toll Schedule is subject to the Rules and Regulations governing the Transportation of Petroleum issued by Pembina Pipeline Corporation, as amended, supplemented, modified or replaced from time to time (the "Rules and Regulations") and which are publicly available on Pembina s website at www.pembina.com. Unless otherwise specified herein, in this Toll Schedule all words and terms defined in the Rules and Regulations shall have the meanings ascribed to them in the Rules and Regulations, and in this regard: 2. "Carrier" means Pembina Pipeline Corporation. "Delivery Point(s)" means the following delivery points: Delivery Point Sweet Crude High Sulphur Crude Enbridge Edmonton Terminal Yes Yes Yes Gibson Edmonton Terminal Yes Yes No Kinder Morgan Transmountain Pipeline Yes Yes No KinderMorgan North 40 Terminal Yes Yes No Pembina Namao (Canadian Diluent Hub) No No Yes Strathcona Refinery Yes Yes No Condensate "Petroleum" means Crude Petroleum, Ethane Plus, Propane Plus, Butane and Condensate. "Pipeline System" means the Peace Pipeline System. "Receipt Point(s)" means the receipt points set forth in Section 6 of this Toll Schedule. 3. Canadian Currency. The tolls and other charges set forth in this Toll Schedule are references to and payable in Canadian dollars. 4. Specifications. Petroleum Tendered for transportation on the Pipeline System shall have the applicable specifications and these specifications are publicly available on Pembina s website at www.pembina.com. 5. Monthly Nomination Date. The Monthly Nomination Dates are as published in the Crude Oil Logistics Committee calendar. 6. Non-TA Shippers. The tolls payable by non-ta Shippers for the receipt, transportation and delivery of Petroleum shall be as follows: 2
PEACE LVP PIPELINE SYSTEM Effective: July 1, 2017 The rates listed in this tariff bulletin are for the gathering, transportation and delivery of Crude Petroleum & Condensate by pipeline to Edmonton from established Receipt Points on the Peace LVP Pipeline System and subject to the Rules & Regulations. FACILITY 0123090 Altagas Gordondale 16-31 16-31-078-11W6 Condensate $25.81 0139618 Aoc Kaybob 07-14 07-14-063-20W5 Crude/Condensate $16.26 0125149 Aoc Saxon 10-19 10-19-062-22W5 Crude $19.87 0000845 Arc Ante Creek 13-07 13-07-069-24W5 Crude $19.03 0049842 Arc Valhalla 06-14 06-14-075-09W6 Crude $25.29 0106663 BirchCliff Pouce Coupe 03-22 03-22-078-12W6 Condensate $29.30 8020028 Bonavista Rycroft 08-17 08-17-077-05W6 Crude $26.83 0048913 Bonavista Valhalla 13-08 13-08-076-10W6 Crude $22.53 0044977 Cabre Valhalla 07-31 07-31-076-08W6 Crude $23.73 0121759 Capio Valhalla 14-29 14-29-074-08W6 Crude $29.93 0130196 CEX Kicking Horse Kakwa 16-07 16-07-063-05W6 Condensate $24.34 0129900 Cioc Karr 09-03 09-03-068-04W6 Crude $39.50 0055459 CNRL Doe Creek 04-33 04-33-078-08W6 Crude $22.85 0111721 CNRL Puskwa 03-03 03-03-072-26W5 Crude $16.68 0106892 CNRL S. Sturgeon Lake 02-02 02-02-069-22W5 Crude $17.11 0079061 CNRL Smokey 07-36 07-36-058-03W6 Condensate $41.08 9200026 CNRL Valhalla 16-11 16-11-075-09W6 Crude $23.73 0124065 CNRL Clairmont 03-27 03-27-072-05W6 Crude $20.88 0000891 CNRL Gold Creek Terminal 09-09-069-22W5 Condensate $16.80 3590012 CNRL Grand Prairie 09-10 09-10-073-06W6 Crude $21.14 0001042 CNRL Karr Plant 10-10 10-10-065-02W6 Condensate $20.50 0105128 CNRL Lator 13-09 13-09-063-02W6 Crude $39.47 0045417 CNRL Manir 14-21 14-21-072-03W6 Crude $20.88 3
FACILITY 0001506 CNRL Progress 01-01 01-01-078-10W6 Condensate $22.85 0041054 CNRL Progress 08-32 08-32-078-09W6 Crude $30.64 7470005 CNRL Progress 14-17 14-17-077-09W6 Crude $29.41 0109505 CNRL S. Spirit 08-09 08-09-077-07W6 Crude $22.85 0089568 CNRL Tony Creek 04-31 04-31-062-24W5 Crude $20.93 0049737 Valhalla 10-14 10-14-076-10W6 Crude $21.98 9200131 CNRL Valhalla 14-13 14-13-076-08W6 Crude $22.85 0001351 CNRL Wapiti Plant 04-08 04-08-069-08W6 Condensate $20.98 9300018 CNRL Waskahigan 15-07 15-07-064-23W5 Crude $17.97 9480011 CNRL Wembley 11-36 11-36-072-08W6 Crude $21.22 9480016 CNRL Wembley 14-03 14-03-073-08W6 Crude $21.22 0001350 Conoco Elmworth Plant 04-08 04-08-070-11W6 Condensate $20.61 0084856 Conoco McKinley 01-34 01-34-058-12W5 Crude $28.67 0001777 Conoco Resthaven 01-36 01-36-060-03W6 Condensate $39.14 0001520 Conoco Wembley 06-19 06-19-073-08W6 Condensate $21.22 0133259 Eca Kaybob 15-31 Gas Plant 15-31-062-21W5 Condensate $19.93 0001892 Encana Sexsmith 04-08 04-08-075-07W6 Condensate $24.89 0000957 Fox Creek Terminal 01-36-062-20W5 Crude/Condensate $11.75 0123073 Gordondale 02-06 02-06-079-11W6 Crude $21.89 0000881 Gordondale Terminal 08-10-079-10W6 Crude/Condensate $22.83 0135716 Harvest Bilbo 04-25 04-25-065-07W6 Condensate $32.74 5190013 Husky Kakwa 10-07 10-07-063-05W6 Crude $20.96 9200089 Husky Valhalla 01-12 01-12-075-09W6 Crude $22.25 0044529 Husky Wapiti 10-14 10-14-067-08W6 Crude $21.16 0000879 Kakwa Truck Terminal 15-18-063-05W6 Crude/Condensate $20.95 0132407 Kaybob 05-31 Gas Plant 05-31-062-24W5 Condensate $16.82 7470008 Kelt 06-19 06-19-077-09W6 Condensate $24.77 0126572 Kelt Karr 10-21 10-21-065-03W5 Crude $39.50 4
FACILITY 0001113 Keyera Simonette 04-06 04-06-063-25W5 Condensate $24.13 0125332 Kleskun 02-30 02-30-071-26W5 Crude $18.93 0000873 Laglace Truck Terminal 09-07-073-08W6 Crude/Condensate $21.21 0086366 Lator Truck Terminal 12-09-063-02W6 Crude/Condensate $20.68 8560001 Longrun Snipe Lake 07-04 07-04-071-18W5 Crude $17.38 0140733 Mancal Karr 01-07 01-07-066-03W6 Crude $39.50 0050542 Mark Valhalla Halfway BT 16-29 16-29-076-10W6 Crude $22.41 0001623 Mosiac Jayar 06-08 06-08-062-03W6 Condensate $27.44 5480001 Mosiac Lator 02-06 02-06-063-02W6 Crude $27.72 0052106 NAL Sturgeon Lake 13-07 13-07-069-24W5 Crude $20.82 0082330 Newalta Gordondale 09-10-079-10W6 Crude $22.23 0000724 Newalta Greencourt 12-29-058-09W5 Crude/Condensate $11.45 8530047 Norcen Spirit Unit 08-34 08-34-077-06W6 Crude $26.83 0137512 NuVista Wapiti 08-10 08-10-068-08W6 Condensate $28.79 8440002 Omers Simonette 11-06 11-06-063-25W5 Condensate $22.60 0000062 Peace Plateau Delivery 11-05-083-18W6 Crude/Condensate $25.25 0001222 Pembina Cutbank Plant 07-16 07-16-062-08W6 Condensate $25.79 0001740 Pembina Musreau Gas Plant 04-25 04-25-062-06W6 Condensate $20.61 0134628 Pembina Musreau 09-26 09-26-062-06W6 Condensate $25.42 2130001 Penn West Cherhill 04-24 04-24-056-05W5 Crude $11.58 5140017 Penn West Kaybob 03-24 03-24-062-20W5 Crude $15.27 0131387 Petrogas Clair Truck Terminal 06-18-073-05W6 Crude/Condensate $19.50 0118855 Pgs Kakwa River 08-13 08-13-063-05W6 Condensate $27.62 0105083 Polar Clairmont 01-09 01-09-073-05W6 Crude $20.88 0137426 Progress Karr 01-34 01-34-065-03W6 Crude $39.50 0094954 Resthaven 08-11-060-3W6 08-11-060-03W6 Condensate $39.68 0117737 RMP Waskahigan 12-07 12-07-064-23W5 Crude $20.88 7290005 Rtf Pouce Coupe 07-20 07-20-078-12W6 Crude $26.66 5
FACILITY 0140342 Rycroft 08-25 08-25-077-06W6 Crude $26.83 0100093 Secure Fox Creek FST 11-36-062-20W5 Crude/ Condensate $11.45 0141624 Secure Kakwa 08-05 08-05-064-05W6 Condensate $23.80 0097433 Secure Laglace FST 16-07 16-07-073-08W6 Crude/Condensate $20.65 0001107 Semcams Kaybob Amalgamated 01-12-062-20W5 Condensate $16.12 0001144 Semcams Kaybob South #3 03-15-059-18W5 Condensate $14.45 0140439 Simonette10-29 Gas Plant 10-29-063-23W5 Condensate $24.11 8840001 Sunset 14-29 14-29-069-19W5 Crude $17.56 0001084 Talisman Edson 04-11 04-11-053-18W5 Condensate $19.74 7690013 TAQA Redrock 16-14 16-14-063-08W6 Crude $26.33 0001115 TAQA Whitecourt 12-26 12-26-059-11W5 Condensate $16.60 0000989 Tervita Fox Creek 03-29 03-29-062-20W5 Crude $11.45 0000875 Tervita High Prairie 01-14 01-14-073-17W5 Crude $17.34 0000968 Tervita LaGlace 12-08 12-08-073-08W6 Crude/Condensate $21.70 0085709 Tervita Spirit River 12-31 12-31-077-05W6 Crude $21.70 0000982 Tervita Valleyview 09-16 09-16-069-22W5 Crude $15.87 0119721 Tourmaline Kakwa 08-13 08-13-062-06W6 Condensate $22.66 0143950 Tourmaline Spirit River 03-08 03-08-079-09W6 Condensate $29.65 0143950 Tourmaline Spirit River 03-08 03-08-079-09W6 Crude $25.77 0078606 Trilogy Kaybob 12-10 12-10-064-19W5 Crude $11.76 0080423 Trilogy Kaybob 08-09 08-09-064-19W5 Condensate $11.76 5130017 Trilogy Kaybob BHL Unit #1 08-09-064-19W5 Crude $11.45 0049799 Trilogy Simonette 16-17 16-17-064-26W5 Crude $19.05 9200172 Valhalla 06-18 06-18-074-08W6 Crude $22.20 0000857 Valleyview Truck Terminal 12-10-069-22W5 Crude/Condensate $16.12 0122857 Wapiti 07-22 07-22-068-08W6 Condensate $30.11 0001292 Wapiti 16-36 16-36-067-09W6 Condensate $22.22 0051820 Whitecap Valhalla 03-27 03-27-075-09W6 Crude $21.89 6
FACILITY 0130964 XTO Kaybob 15-07 15-07-060-18W5 Condensate $25.00 0134351 7g Karr 01-21 01-21-063-02W6 Condensate $21.64 0139776 7g Karr 02-11 02-11-064-04W6 Condensate $25.08 Delivery Fee 0096816 KinderMorgan North 40 06-05-053-23W4 Multi Product $0.25 NOTES: All facilities delivering less than 30m3/d will be charged $6.00/m3 for the difference between 30m3/d and the actual delivery. 7. Intra-System Transfers. The charge payable by each of the Transferor and the Transferee in respect of an intra-system transfer shall be $200 for each transfer. 8. Minimum Tenders. The minimum total volume for all Receipt Points that a Shipper can Tender for transportation by Petroleum type on the Pipeline System is 500 m 3 per Month. The charge applicable to Tenders that are below 500 m 3 per Month shall be $10.00/m 3 multiplied by the positive difference between 500 m 3 and such Monthly Tender (expressed in m 3 ). 9. Non-Performance Charge. The Non-Performance Charge in respect of the Pipeline System shall be subject to a fee equal to Shipper s current posted toll plus 10%. 10. Loss Allowance. The loss allowance rate is 0.15%. 11. Minimum Intervals. Shipper shall not Tender Petroleum for transportation on the Pipeline System at intervals of less than 180 Days. 12. Overage or Shortage Fee. The Overage or Shortage Fee in respect of the Pipeline System shall be equal to the higher of : (a) (b) $14.00/m 3, or 10% of the arithmetic average of the settlement prices per m 3 at West Texas Intermediate Light Sweet Crude Oil, for each Nomination Month Business Day in the Nomination Month, on the NYMEX (New York Mercantile Exchange) of the future contract for the first nearby Month. 13. Tolerance Margin. Shipper Tolerance Margin is calculated by Petroleum type and is equal to the smaller of 500 m 3 or 5% of each Shipper Tender for each Petroleum type. 14. New Shipper Fee. New Shippers will provide Pembina Pipeline Corporation with a cheque in the amount of $20,000 as a deposit for Shipper Status. Pembina Pipeline Corporation may refund up to maximum of $15,000 which will be paid one year after the grant of Shipper Status by Pembina Pipeline Corporation. Pembina Pipeline Corporation will calculate the refund as a credit against sustained tariff revenue that was generated against the first year of service and Pembina Pipeline Corporation will pay by cheque after the anniversary date. 15. Demurrage Fee. Any volumes of Petroleum which Shipper fails to remove from the Pipeline System or custody of Carrier upon Delivery (other than Non-Specification Petroleum and Retention Stock, which are specifically addressed in Sections 5.5 and 7.9 of the Rules and Regulations, respectively) shall be subject to a fee equal to the higher of 7
(a) (b) $20.00/m 3, or 10% of the arithmetic average of the settlement prices per m 3 at West Texas Intermediate Light Sweet Crude Oil, for each Nomination Month Business Day in the Nomination Month, on the NYMEX (New York Mercantile Exchange) of the future contract for the first nearby Month. 16. EDI Charge. The Shipper shall pay $0.10 per m 3 on total receipts for each production Month. 17. Carbon Tax Levy. The rates listed in this tariff schedule are exclusive of carbon tax levy. 8