E Using a spinnaker

Similar documents
Spinnaker pole kit, dip pole

Internal Sealing of Masts

E Manual Self tacking system 30

Sealing kit manual. For sealing of conventional mast sections C156-C304 and furling mast sections F176-F305. Comes with sealing kit

The 4th generation of an icon

E Seldén Sail hardware. OWS sliders and Batten receptacles

All the power you need. Reliable performance

All the power you need. Reliable performance

Unlimited performance. Proctor carbon spars

A useful guide for anyone interested in Inshore or Offshore yacht racing

Manual for installation and operation for

A Guide to Yacht Racing

Master your cruising chute

T 10 Tacking Ver

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat

Tacking (sailing on port, tacking to starboard)

Sonar Tuning Guide. Jud Smith Tomas Hornos Send order forms to:

CALLIOPE SEA SCOUT GROUP BASIC SAILING MANUAL

J/70 Tuning Guide. For any question you may have on tuning your J/70 for speed, contact our experts:

Tuning Guide January 2012

Seldén offer a full range of spinnaker equipment for keelboats. It consists of five aluminium pole sections, three carbon fibre sections, low weight

Melges 24 Sailing Guide

Rhodes 19 Tuning Guide

Setup &Tuning guide. Updated 1st February 07

ETCHELLS RIG SET UP FOR PC-M/PC+/BF MAIN, DC270/GM JIBS,.5oz VMG, FULL RADIAL and.5oz/.75oz BIRADIAL SPINNAKERS

Sailing Upwind. Section 14. Close-hauled. Starboard Tack. Port Tack Figure 14 1 Port Versus Starboard Tack. 14 Sailing Upwind 111

Taming the Kite! Wineglasses. Wineglasses occur when the top half of the kite fills before the bottom with a twist in the middle.

North Sails Seattle Thunderbird Tuning Guide

TUNE YOUR SAILS SPEED. J/70 Tuning Guide Rev. Q10a. Photo Chris Howell

Flow Control of the Kite

Most sail with 5 or 6 in the boat. Here are the names I will use for the various positons (from the back forward):

Wysiwig - Wayfarer Rigging Guide

THE INTERNATIONAL SOLING CLASS by STU WALKER Jan Linge designed and built the first Soling in Three years later in the second of two trials,

Your new Quantum asymmetrical. is designed and engineered to be. easy to set and trim. Fundamental. principals of asymmetrical trim are

Follow these easy steps to properly assemble your new Zim 420

#1 Genoa Sheeting Apparent Wind: 0-12

TUNE YOUR SAILS SPEED

Welcome to the. National Twelve Owners Association. Dear National 12 sailor

Martin 242 Tuning Guide

Ensign Tuning Guide. Before Your Boat Hits The Water

The M242 is a relatively easy boat to sail and the fleet has taken steps to make the boats as even as possible.

Heavy Weather Sailing

TUNE YOUR SAILS SPEED

J/70 Tuning Guide. onedesign.com Follow North Sails on... For any question you may have on tuning your J/70 for speed, contact our experts:

Tuning C420 Sails By Brian Doyle and Dave Kirkpatrick

Sailing Downwind. Presented by Forespar Presenter: Bruce Brown

Daysailer Tuning Guide

Topaz OMEGA Rigging Instructions

Set Up for Epsilon, Z Spar, Needlespar & Goldspar Masts

The ends. I x. Wall thickness mm B087 87/ B /

Installing a Track-Mounted Whisker Pole

HIGHLANDER TUNING GUIDE

BoatWorks. (An Illustrated Sailing Primer) Table of Contents: 1. Basic Sailing Terminology: Boat Related Wind Related Other key terms

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

Thanks to North Sails, who gave us these fast rigging tips.

Large books have been written on this subject, but we shall attempt to give you a concise set of basic guidelines. So here goes...

TUNE YOUR SAILS SPEED

TUNE YOUR SAILS SPEED. J/22 Tuning Guide. Rev Q01

Section V Sailing off the wind

420 Rigging Guide.

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

Wind Light Moderate Heavy Speed 0-8 mph 9-17 mph 18 + mph

CSC Learn to Sail Class

Optimist Tuning Guide

Whisker Poles Art Bandy 10/12/06

10 (Racing) TIPS FOR PATIN SAILORS

Tacking - Moderate airs

Setting up your FD to go sailing

Date: 18th December 2001

E Scow Racing and Rigging Manual

TUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength

National Maritime Center

SONATA YACHT ASSOCIATION OF VICTORIA INC. P.O. Box 6010, M.D.C. Doncaster, Victoria 3108

North Sails One Design Atlantic Tuning Guide

TUNE YOUR SAILS SPEED. J/80 Tuning Guide. Rev R12a

VEGA ONE DESIGN ASSOCIATION (VODA) Albin VEGA CLASS RULES 2006 INTRODUCTION

ASSEMBLY MANUAL HOBIE CATSY

Sailboat Rigging and Tuning

DOLPHIN ASSOCIATION TUNING FOR PERFORMANCE

Catalina 37 One Design

THE TRAMP Sailing Manual

Basic Keelboat Sailing Standard (ASA 101)

Sail Trimming Guide for the Beneteau 373

Solo TUNE YOUR SAILS FOR OUTRIGHT SPEED. Solo Tuning Guide Solutions for today s sailors

Fast Lane Crew Handbook

The Basics of Victory Sailing II

Introduction to Dinghy Sailing AYF - TL1 Course Notes

Reefing systems. S-Hooks for slab reef or Cunningham

OPERATIONAL CHECK LIST

TECHNICAL DESCRIPTION MASTHEAD SLOOP:

The Definite Guide to Optimist Trim

Thistle Tuning Guide

Tuning Trailer Yachts Part 1. by Tony Bouzaid

Viper 640 Tuning Guide

1 Tuning Platform Reseating Beam Pads Rudder alignment Noisy Foils Rig Tension...

J70 Tuning Guide. Jud Smith Seldon Mast

BOWMAN Pre-Race Setup: same tack, foil groove, and halyard telling YOU Starting: Spinnaker Sets:

F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL

TUNE YOUR SAILS SPEED. Etchells Tuning Guide. Rev Q04

SELDÉN CX AND GX. Furling systems for Code 0 and asymmetric spinnakers

Transcription:

1 595-560-E 2007-01-05 Using a spinnaker

2 Spinnaker sailing These instructions have been compiled with both the beginner and the experienced sailor in mind. Our aim has been to help the beginner to start using a spinnaker safely, and to give the experienced skipper assistance in teaching a novice crew. Three different systems have evolved over the years which we describe in detail on the following pages. Method 1 Method 2 Method 3 The End-for-End method where the topping lift and the down-haul are attached to the centre of the spinnaker pole. We consider this method suitable for boats of up to 25 feet LOA. End for-end again, but with the topping lift at the centre of the pole, and the down-haul attached to the outboard end. In our opinion this system is best suited to fractionally rigged boats to a maximum of 40 feet LOA, and for mast-head rigged boats of up to about 33 feet LOA. The Dip Pole method is normally used for larger boats. Whilst there are further varieties of methods and equipment available, we feel that these three methods, which are described in detail in the following pages, are the best foundation on which to start using a spinnaker. Stowing spinnakers 1. Simple Stowage (smaller spinnakers) Flake each spinnaker leech/luff separately but simultaneously, starting at the head of the sail, and allowing the bunt of the sail to hang loosely from your hands. With larger spinnakers of, say, 50m 2 (500 sq.ft) and upwards it can also be an advantage to flake the foot of the sail. Stow the bunt of the sail in the turtle with the leech/luff to each side and on top. Leave the head and the clews projecting slightly, and bind them together with a piece of light line. Stopping A number of elastic bands are placed around a plastic pipe of 9-12 inch diameter - a plastic bucket with its bottom removed does excellently! The spinnaker is then fed through the pipe head first, taking care to keep the leech/luff untwisted. The rubber bands are slid off the pipe and over the sail at about three foot intervals, thus holding the sail together along its length. The sail is hoisted in this stopped state, allowing the wind to break the elastic bands when its foot is spread open by sheet and guy. There are other stowage methods; among them being the Spee Squeezer or sock.

Contents 3 Method 1. For spinnakers up to 50 m 2 (550 sq.ft). Equipment 4 Hoisting/Sailing g 5 Gybing 6 Lowering 7 Method For spinnakers up to 80 m 2 (850 sq.ft.) Equipment 8 Hoisting/Sailing g 9 Gybing 10 Lowering 11 Method 3. For spinnakers over 80 m 2. (850 sq.ft.) Equipment, Dip Pole -method 12 Hoisting/Sailing g 13 Gybing 14 Lowering 15 Deviations from these recommendations are acceptable, providing they are agreed between Seldén Mast and its customer.

4 1 Equipment Method 1. Topping lift and down-haul to the centre of the spinnaker pole. For spinnakers under 50 m 2 (550 sq.ft). Recommended for helsman and two crew. 1.11 Equipment Topping lift Spinnaker pole with identical end-fittings. Down-haul attached to optional bridle on spinnaker-pole. Two spinnaker sheets. Spinnaker halyard. No stopper-knots.

Hoisting/Sailing Method 1. Spinnakers under 50 m 2 (550 sq.ft.). 5 1.2 Hoisting 1. A hooks up the spinnaker. The sheet must run freely through the spinnaker pole end-fitting. B rigs the spinnaker pole, topping lift, and down-haul. C hauls in the sheet. B goes to the leeward sheetwinch. 3. A hoists the spinnaker. 4. A calls out TOP when spinnaker is fully hoisted. B hauls in the guy. 5. A tidies up and hands the genoa. 1.3 Sailing Keep the pole horizontal and at right angles to the apparent wind. The height of the spinnaker pole should be such that the clews are at about the same level. The spinnaker sheet should be eased until the luff of the sail is just about to break ( curl ). To reduce rolling and the risk of broaching in heavy weather one can use Barber-hauls, see Spinnaker Instruction 2, page 8.

6 Gybing Method 1. Spinnakers under 50 m 2 (550 sq.ft.). 1.4 Gybe 1. 3. 4. B trims the sheet and guy so that the clews are equally eased off. (Mark the sheets!). A standing astride and facing forward takes the spinnaker pole out of the mast-fitting and attaches it on to the new guy. A takes the spinnaker pole off the sheet, and hooks that end on to the mast-fitting. (The new outboard end of the pole should be as near the clew as possible to facilitate hooking up to the mast.) A calls out READY as soon as the pole is hooked to the mast. B hauls in the new guy 5. C gybes the mainsail. NB. In ghosting conditions keep the mailsail amidships to help keep the spinnaker filled during the entire operation. The helsman s main duty is to keep the boat as dead before the wind as possible

Lowering Method 1. Spinnakers under 50 m 2 (550 sq.ft.). 7 1.5 Lowering 1. A sets the genoa. 3. B grabs the spinnaker sheet and collects the foot of the sail close under the lee of the mainsail while at the same time... C eases off the spinnaker guy. A lowers the halyard at the same rate as collects the sail. 4. B then sheets in the genoa. 5. B tidies up. The spinnaker should be properly stowed as quickly as possible.

8 2 Equipment Method Down-haul forward. Spinnakers under 80 m2 (850 sq.ft). Recommended for helsman and four crew - two crew minimum. 1 Equipment Topping lift. Spinnaker pole with identical end-fittings. Two down-hauls. Two spinnaker sheets. Two Barber-hauls Spinnaker halyard. No stopper-knots.

Hoisting/Sailing Method Spinnakers under 80 m 2 (850 sq.ft). 9 2 Hoisting 1. 3. A and B set up the spinnaker pole, topping lift, and down-haul, and hook up the spinnaker. The sheet must run freely through the spinnaker pole end-fitting. D adjusts the spinnaker pole for height and then hauls in the guy and down-haul. A and B hoist the spinnaker. C ensures that the sail runs free from the turtle and holds its leech/luff to prevent the sail from twisting. B calls out TOP when spinnaker fully hoisted. D hauls in the sheet. 4. C removes the empty turtle and takes over guy and down-haul trimming. 5. A and B genoa. tidy up and hand the 3 Sailing Keep the pole horizontal and at right angles to the apparent wind. The height of the spinnaker pole should be such that the clews are at approximately the same level. The spinnaker sheet should be eased until the luff of the sail is just about to break. ( curl ). In heavy weather use the leeward Barber-haul to reduce rolling and the risk of a broach.

10 Gybing Method Spinnakers under 80 m 2 (850 sq.ft). 4 Gybe 1. A lowers the inboard end of the spinnaker pole to a comfortable working height, and hooks the leeward down-haul to the inboard end of the pole. B adjusts the topping lift and ensures that the new down-haul is released. C and D adjust the sheet and guy so that the clews are equally freed (mark the sheets). The Barber-hauls are taken in. A, standing astride and facing the fore, unhooks the spinnaker pole from the mast and hooks that the end to the sheet. The spinnaker pole is then unhooked from the guy and on to the mast fitting. The new outboard end of the pole should be kept as near the clew as possible to facilitate this operation A calls READY as soon as the pole is hooked to the mast. 3. B gybes the mainsail. C and D trim the spinnaker sheet and guy and ease the Barber-haul on the new sheet B trims the new Barber-haul. NB. In ghosting conditions keep the mainsail amidships to help keep the spinnaker filled during the entire operation. The helsman s main duty is to keep the boat as dead before the wind as possible.

Lowering Method Spinnakers under 80 m 2 (850 sq.ft). 11 5 Lowering 1. A and B hoist the genoa, and lowers the end of the pole to A who is standing near the forestay. C grabs the sheet and draws in the clew using the Barber-haul to help. A unhooks the spinnaker windward clew. A should stand to leeward of the spinnaker pole so as not to be hit by the recoiling pole end. Alternatively C can pay out the guy. C and D collect the foot of the sail. 3. B lowers the halyard at the same rate as C and D draw the spinnaker in under the lee of the mainsail. 4. B sheets in the genoa. 5. A and B tidy up. The spinnaker should be properly stowed as quicklyas possible.

12 3 Equipment Method 3. Dip method for spinnakers over 80 m2 (850 sq.ft). Recommended crew: helmsman and six crew - three crew minimum. 3.1 Equipment 1 Topping lift. 2 Spinnaker pole. 3 Foreguy 4 Pole heel lift 5 Two spinnaker sheets. (L=boat length x 1,5) 6 Two spinnaker guys. (L=boat length x 1,5 7 Spinnaker halyard. Movable snatchblock. Topping lift. No stopper-knots.

Hoisting/Sailing Method 3. Spinnakers over 80 m 2 (850 sq.ft). 13 3.2 Hoisting 1. A and B set up the spinnaker pole, topping lift, and fore guy, and hook up the spinnaker. (The guys are rigged as shown in 3.1). F and B then adjust the pole to suitable sailing height. E B hauls in the windward guy. and C hoist the spinnaker. A ensures that the spinnaker runs free from the turtle, holding its leech/luff to prevent the sail from twisting. 3. C calls out TOP when spinnaker fully hoisted, whereupon sheets in. D 4. A and genoa. B tidy up and hand the 3.3 Sailing Keep the pole horizontal and at right angles to the apparent wind. Spinnaker pole height should be such that the clews are at approximately the same level. The spinnaker sheet should be eased until the luff of the sail is just about to break ( curl ).

14 Gybing Method 3. Spinnakers over 80 m 2 (850 sq.ft). 3.4 Gybe 1. E hauls in the spinnaker guy to take the strain off the pole guy. B releases the inner forestay. B triggers the outboard end-fitting of the spinnaker pole to free windward pole guy, and takes the slack leeward pole guy forward of the forestay, where the sits. The guy is held as shown. New tack As seen from forward 3. F lowers the pole by easing the topping lift and taking in on the fore guy so that the pole end can swing under and past the forestay. B opens the end-fitting as it passes him. (If the end-fitting is of the Trip Trigger type the fitting will remain open from the time it has been released from the old windward guy until A reactuates the mechanism by inserting the new guy) 4. F hauls on the topping lift while easing the fore guy D simultaneously hauls in the new windward guy to reposition the pole. 5. D takes up the slack in the new spinnaker guy. 6. G gybes the mainsail. NB. In ghosting conditions keep the mainsail amidships in order to keep the spinnaker filled during the entire operation. The helmsman s main duty is to keep the boat as dead before the wind as possible. NB. It can be very difficult to execute a gybe in heavy weather as the spinnaker is flying during the operation. It is ad- visable to use two poles under such conditions, and thus avoid having to dip and undo the inner forestay. Pole guys can be permanently reaved.

Lowering Method 3. Spinnakers over 80 m 2 (850 sq.ft). 15 3.5 Lowering 1. 3. 4. A and C set the genoa. F and D lower the pole-end and guide it to A who is standing by the forestay. E hauls in the leeward pole guy. A unhooks the windward clew. He must stand to leeward of the spinnaker pole in order to avoid possible injury when it recoils. B, F and D gather the foot of the sail. C eases the halyard at the same rate as B, F and D draw the spinnaker in under the lee of the mainsail. E and C sheet in the genoa. 5. A, B and C tidy up. The spinnaker should be properly stowed without undue delay.

DINGHIESKEELBOATSYACHTS Seldén Mast AB, Sweden Tel +46 (0)31 69 69 00 Fax +46 (0)31 29 71 37 e-mail info@seldenmast.com Seldén Mast Limited, UK Tel +44 (0) 1329 504000 Fax +44 (0) 1329 504049 e-mail info@seldenmast.co.uk Seldén Mast Inc., USA Tel +1 843-760-6278 Fax +1 843-760-1220 e-mail info@seldenus.com Seldén Mast A/S, DK Tel +45 39 18 44 00 Fax +45 39 27 17 00 e-mail info@seldenmast.dk Seldén Mid Europe B.V., NL Tel +31 (0) 111-698 120 Fax +31 (0) 111-698 130 e-mail info@seldenmast.nl The Seldén Group is the world s leading manufacturer of masts and rigging systems in carbon and aluminium for dinghies, keelboats and yachts. The Group consists of Seldén Mast AB in Sweden, Seldén Mast A/S in Denmark, Seldén Mast Ltd in the UK, Seldén Mid Europe B.V. in the Netherlands, Seldén Mast Inc in the USA and Seldén Mast SAS in France. Our well known brands are Seldén and Furlex. The worldwide success of Furlex has enabled us to build a network of over 750 authorised dealers covering the world s marine markets. So wherever you sail, you can be sure of fast access to our service, Seldén Mast SAS, FR Tel +33 (0) 251 362 110 Fax +33 (0) 251 362 185 e-mail info@seldenmast.fr www.seldenmast.com Dealer: spare parts and know-how. 595-560-E Printed in Sweden