SMART BIKE PARKING UPDATE. SMART Board of Directors, October 21 st, 2016

Similar documents
Facilitating Suburban Bike-to-Rail

Bicycle Pedestrian Commission

Bicycle Pedestrian Commission

Sonoma-Marin Area Rail Transit District

Bicycle Pedestrian Commission

Proposals in this Element that will help accomplish the above include the following:

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

TABLE OF CONTENTS. Executive Summary

APPENDIX B: FUNDING MATRIX

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1


Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

San Mateo County Comprehensive Bicycle and Pedestrian Plan

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Project Status Update

Metropolitan Council Transportation Committee

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Vision Zero San Jose. Moving toward zero traffic deaths and providing safe streets for all

The Big Picture. FY Bicycling Highlights

Transportation Development Act Grant Radar Check Speed Signs

FOR INFORMATION ONLY

Shifting Gears for a Healthier City.

Our Mission What We Stand For

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

BIKE PLAN CONTENTS GATEWAY

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

Key objectives of the survey were to gain a better understanding of:

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Rail Station Fact Sheet CentrePort/DFW Airport Station

4.11 Transportation and Traffic

1. Engineering: An Inviting Network of Bicycling Facilities for Cyclists of All Ages and Abilities and Destinations that Support Bicycling

Spring 2011 Community-Based Outreach Results

San Jose Transportation Policy

Findings and Lessons from Safe Routes to Transit (SR2T) David Weinzimmer, SafeTREC, UC Berkeley PedsCount!, May 2014

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #RegionalMobility

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

2017 Northwest Arkansas Trail Usage Monitoring Report

Bike Share Expansion P LANS A ND P ROGRAMS C OMMITTEE J UNE 1 6,

CITY OF SEBASTOPOL BICYCLE AND PEDESTRIAN MASTER PLAN AMENDED NOVEMBER, 2011

Berkeley Strategic Transportation Plan A-76

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm

TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018

TR A N S P O R TAT I O N READY TO GO

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

City of San Bernardino

The Pedestrian Safety Action Plan

Caltrain Bicycle Parking Management Plan

Changing the Climate of Mobility: Bellingham s Multimodal Transportation Networks

Honorable Mayor and Members of the City Council. Contract: AJW Construction for the 2013 Safe Routes to School Project

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

101 Corridor Managed Lanes

PRESS RELEASE San Joaquin Council of Governments

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Dumbarton Transportation Corridor Study. Board of Directors December 6, 2017

5. Pedestrian System. Accomplishments Over the Past Five Years

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

VI-7. TRAFFIC CALMING

COMMUNITY PARTICIPATION CHAPTER 8

support Complete Streets policy adoption/implementation talk to elected officials about importance of bicycling; and let

First and Last Mile Plan. April 2016

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

CITY OF HEALDSBURG TRANSPORTATION ADVISORY COMMISSION REGULAR MEETING AGENDA

UPDATES, SUCCESSES, AND WHAT S AHEAD ON THE ROAD TO ZERO

Rail Station Fact Sheet DFW Airport North Station* (*station under construction with anticipated start of service in late 2018)

There are traffic jams on Highway 1

2014 Review/2015 Business Plan

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Linking Transportation and Health in Nashville & Middle Tennessee

Getting Ready for the Active Transportation Program (ATP) Cycle 4

AUTHORIZE BID ADVERTISEMENT

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

ACTION TRANSMITTAL No

City of San Diego Vision Zero Draft Strategic Plan FY 2017

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

CHAPTER 3: Vision Statement and Goals

PARKMERCED. San Francisco Municipal Transportation Agency Board Meeting September 7, 2010

City of Bakersfield. Bicycle Transportation Plan. Prepared by: In Partnership with: Prepared for: Alta Planning and Design

Oakland Bicycle and Pedestrian Advisory Committee, September 19, 2013 Meeting

San Mateo County Bicycle and Pedestrian Advisory Committee

TOWN OF WINDSOR AGENDA REPORT

Safe Routes to School

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

North Shore Transportation Improvement Strategy

San Rafael School District. Task Force Meeting Notes. November 5, 2012

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Transcription:

SMART BIKE PARKING UPDATE SMART Board of Directors, October 21 st, 2016

THE SMART BIKE PARKING PLAN Comments» SMART received comments from 69 responders, either by email or Facebook. There were no written comments received.» Largely, the comments focused on one main area Adding bike parking spaces to SMART Stations at the levels recommended in the SMART Bicycle Parking Infrastructure Plan the before the train starts» Additional Comments Add more secure bike parking spaces at each station Questions regarding the methodology to determine the number of needed spaces at each station: comments included both more and less needs based on a variety of factors. 2

THE SMART BIKE PARKING PLAN Baseline Recommended Parking Spaces SMART Station (IOS) Tier Secure Short High Term Volume Total Sonoma County Airport Tier 1 4 10 14 Santa Rosa North Tier 1 4 10 14 Santa Rosa Downtown Tier 3 8 20 TBD 28, with option to expand Rohnert Park Tier 1 4 10 14 Cotati Tier 2 8 20 28 Petaluma Downtown Tier 3 8-12 36 TBD 44-48, with option to expand Novato San Marin Tier 2 8 20 28 Novato Hamilton Tier 1 4 10 14 San Rafael Marin Civic Center Tier 2 8 20 28 San Rafael Downtown Tier 3 20 60 80, high volume as possible TOTAL 56-60 176 292-296 Larkspur (2018) Tier 3 8 20 TBD 28, with option to expand 3

DAY 1 VS. BUILDING THE SMART BIKE PARKING INFRASTRUCTURE PLAN Due to funding constraints, the Station Finishes Contract, awarded in 2012, included 5 U-Racks per station, or, spaces for 10 bicycles to be parked. to Buildout the Bike Parking Plan, the remaining needs for» The 10 IOS Stations: Secure Bike Parking Spaces: 60 spaces, spread over 9 stations Short Term Spaces (U-Rack Spaces): 76 spaces High Volume Facilities: 3, for Santa Rosa Downtown, Petaluma Downtown, and San Rafael Downtown Stations» The Larkspur Station (2018): Secure Bike Parking Spaces: 8 spaces Short Term Spaces (U-Rack Spaces): 20 spaces High Volume Facilities: 1, for the Larkspur Station 4

COST TO ACHIEVE THE BASELINE RECOMMENDATION The 10 IOS Stations:» Secure Bike Parking Spaces: 60 spaces, spread over 9 stations $261,669 (including 5 years of O&M)» Short Term Spaces (U-Rack Spaces): 76 spaces $18,240» High Volume Facilities: 3, for Santa Rosa Downtown, Petaluma Downtown, and San Rafael Downtown Stations $334,800 TOTAL PROGRAM COST» $614,714 5

COST FOR THE LARKSPUR EXTENSION The Larkspur Station (2018):» Secure Bike Parking Spaces: 8 spaces $34,890» Short Term Spaces (U-Rack Spaces): 20 spaces $4,800» High Volume Facilities: 1, for the Larkspur Station $111,600 TOTAL PROGRAM COST» $151,290 6

FUNDING SOURCES? Transportation Fund for Clean Air (TFCA) Fund» Bay Area Air Quality Management District (BAAQMD or the Air District) accepts applications twice a year (last funding cycle was in June 2016) 100k max funding Requires a 10% match O&M costs are not eligible SMART can contact BAAQMD directly, to inquire about a special case for out of cycle regional funds to support the new rail corridor.» TFCA County Program Manager Fund (TAM and SCTA) SMART can submit an application for the TFCA County Program Manger Fund in either Sonoma or Marin depending on the station location. The call for projects vary based on the TAM and SCTA's schedule. TAM issues a Multi-Fund call for projects to program TFCA and TDA Article 3 funds together. In June of 2015, $661,000 was available for bicycle and pedestrian projects in Marin. SCTA programs these funds annually. Match amounts and minimums can vary based on the agency that is administering funds, Typically, the County Program Manager Funds are more heavily subscribed than the Regional Fund. 7

FUNDING SOURCES? Transportation Development Act (TDA) Article 3» In Marin County, TAM administers these funds» In Sonoma County, agencies apply directly to the Metropolitan Transportation Commission (MTC).» No matching requirements» Required to meet Caltrans safety design criteria and CEQA requirements,» Implementation must occur within three years,» Must be maintained,» Must be consistent with any local adopted bicycle plans, and be authorized by a governing council or board. SMART would need to adopt the SMART Bicycle Parking Infrastructure Plan 8

FUNDING SOURCES? Sonoma County Measure M (SCTA) Marin County Measure A (TAM) One Bay Area Grant 2 (OBAG 2) (MTC, TAM, SCTA)» The call for projects is occurred in summer of 2016 with the final projects due to MTC in January 2017. Partnerships» Partner with local Business Improvement Districts (BIDs) or other local merchant coalitions to sponsor bicycle parking as part of the local neighborhood benefits program.» Partner with local advocacy groups for special event and short-term weekday valet bicycle storage. Sponsorship Packages/Advertising» Invite local businesses and employers to purchase sponsorship packages for long-term bicycle parking.» Solicit in-kind donations of space and/or services from local businesses. 9