Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

Similar documents
Universal Charging and Testing Unit FPU-1

Code AWC20HP Air Compressor

MAINTENANCE PROCEDURE FOR X 650

Manual Actuated Boiler Blowdown Valves

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Unit 24: Applications of Pneumatics and Hydraulics

Installation, Operation and Maintenance Manual for Back Pressure Regulator

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

BLADDER CARE INSTRUCTIONS

4 ANGLE GRINDER MODEL NO: CAT 52 PART

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

2 in. 18 Gauge Brad Nailer. User manual

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

PV4 and PV6 Piston Valves

Pressure Dump Valve Service Kit for Series 2300 Units

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09

Johnston Invar Coupling Johnston Invar Coupling

Application and Sizing

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Instruction Manual. Standard Surge Eliminator. Standard X. Flushable X - X

Operating Instructions Model and Hydrostatic Test Pump

Operating Instructions UCA Charging & Gauging Kit. For use with Piston, Bladder & Diaphragm Accumulators. Hydraulics. Effective: 01 July 2001

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

ACCU-PULSE Installation and Operation Instructions

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

THE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.

Hydraulic Piston Accumulators

8-GAL PNEUMATIC OIL DISPENSER

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

30T A/Manual Hydraulic Shop Press

Air Mortar User Manual

Interface Devices, Inc. Hydraulic Mini Mule

OPERATION MANUAL NTF-15

35 TON HYDRAULIC PUNCH WARNING

Operating Procedure TITON SUBSEA BOLT TENSIONER

OPERATION MANUAL NTF-60 Plus

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

SEries 29 Hydrant valves installation, operation & maintenance manual

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

APT14, APT14HC and APT14SHC Spares 2

Installation and Service Manual

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

1.0 - OPENING AND CLOSING THE DOOR

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Installation and commissioning instructions 255 series and 256 series

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Index Table. Model 794. Installation, Operating and Maintenance Instructions

SC6H OIL-LESS AIR COMPRESSOR

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

SCUBAPRO Repair Guide. S600-S550 Second Stages

Product Sheet Spraymist Unit

Hydraulic Piston Accumulators

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Yoke Block Instruction Manual

Type CT88 Backpressure Regulator

Instructions for Use. Plug connection for medical gas and vacuum acc. to DIN / 2004 DIN EN ISO

Pressure Relief Valve Instruction Manual

LRS(H)4 Pressure-Reducing Regulator User Manual

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Modular valve block. Operating manual Series MVB 100/200. Version BA EN Print-No TR MA DE Rev001

DelVal Flow Controls Private limited

3:1 High Ratio Oil Pump W. Extn. Kit

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

CS150 CAP STAPLER OWNER S MANUAL

AIR STAPLER. MODEL: CSG3KC Part No OPERATING & MAINTENANCE INSTRUCTIONS

Engineering Data Sheet

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: CHAMP 3 PART NO: LS0115

PDY TON HYDRAULIC CRIMPING TOOL WARNING

AIR/OVER HYDRAULIC JACK 20 TON

WW-720. Pressure Reducing Control Valve

WHEATLEY Series 500 Swing Check Valve

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

100C Air Compressor Kit

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Latvin Luxury Shower Panel. Telephone Product Specification. ~ Minimum Working Pressure 1.0 bar ~ Maximum Working Pressure 3.

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

Operating and maintenance manual Filter and reducing station Series / 1.0

Hydraulic Punch Drivers

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

WW-720. Pressure Reducing Control Valve

Pressure Dump Valve Service Kit for Series 3000 Units

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Instruction Manual. Maximum Operating Pressure 1,500 bar

OXYWAY. Service and Repair Instructions

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Transcription:

Page 1 von 8 Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV 100-575, top reparable Content Seite 0 Legend 2 1 Overview 2 2 Accumulator assembly and installation 3 2.1 Check to be carried out on receipt of the accumulators 3 2.2 Pressurizing, pre-charge pressure and checking 3 2.2.1 Pre-charging the bladder 3 2.2.2 Checking the pre-charge pressure 3 2.3 Installation 4 2.3.1 Location 4 2.3.2 Recommendations 4 2.3.3 Putting into service 4 2.4 Operation 4 2.5 Instructions for maintenance and repair 4 2.5.1 Overview 4 2.5.2 Periodical check of pre-charge pressure 4 2.5.3 Checking the pre-charge pressure 5 2.5.4 Dismantling the accumulator 5 2.5.5 Cleaning, inspection and repair 5 2.5.6 Assemby 5/6 2.5.7 Restarting into service 6 3 Tester and pressurizer, type VGU 6 3.1 Description 6 3.2 Handling 6 3.2.1 Preparation 6 3.2.2 Checking the pre-charge pressure 6 3.2.3 Reducing the pre-charge pressure 6 3.2.4 Raising / filling the pre-charge pressure 6 3.2.5 Removal of the unit 6 3.3 Spare parts 7/8

Page 2 von 8 0 Legend Danger This symbol refers to a high injury risk for people. It must be considered! Warning This symbol refers to an important information. Non-observance can lead to extensive damages. Safety informations must be respected! Note This symbol refers to an important information concerning the application. Non-observance can lead to disturbances! 1 Overview * customer specification

Page 3 von 8 2 Accumulator assembly and installation 2.1 Check to be carried out on receipt of the acc. The hydropneumatic accumulators with bladders are carefully checked and tested in the factory before delivery. They are delivered assembled and pre-charged with nitrogen in two possible choices: Pre-charged to a pressure P 0 as requested by the user with sealed valve pre-charged to 3-5 bar, in the case where no special request has been made by the user When the accumulators are received by the user, it is necessary to make sure: that they have suffered no damage during the course of transportation that the indications of the name plate with the order and delivery documents that the working pressure given on the name plate is at least equal to the maximum pressure used in the system that the protective cap of the air valve is installed that the plug of the "liquid side" orifice has been removed before connexion 2.2 Pressurizing, pre-charge press. a. checking Before use, the hydropneumatic accumulators with bladders must undergo two absolutely necessary operations: - Pressurizing of the bladder with nitrogen - Checking the pre-charge pressure of the bladder These operations must necessary be carried out by the user when the equipment has been delivered not charged or when they have been totally depresssurized in the case of maintenance or checks on constituent parts. 2.2.1 Pre-charging the bladder The bladder can be pressurized before or after the installation of the accumulator in the system. Its purpose is to fill into the bladder the quantity of nitrogen which determines the working characteristics and lifetime of the equipment. The pre-charge pressure depends on the working pressure, working temperature and application of the accumulator. It is carried out by means of the tester and pressurizer VGU (see chapter 3). It is necessary to use dry nitrogen from a bottle. The use of an air compressor or oxygen is strictly forbidden! The pre-charge pressure is determined by reference to: 1. The characteristics of the system 2. Expansion resulting from working temperatures 3. Limits of working temperatures 4. The function required, that is: Energy reserve: Equal to or lower than 9/10 of the minimum working pressure of the system and in no case lower than 1/5 of the maximum pressure in that system. Anti pulsation: Equal to 60 % of the average working pressure Compensation for thermal expansion: 80 % of the static pressure at minimal temperature Special cases: Consult the Parker Olaer technical service which will determine the pre-charge pressure 2.2.2 Checking the pre-charge pressure This check must not be carried out unless the accumulator is isolated and dis-charged from the hydraulic fluid. Checking the pre-charge pressure is very important for the highest degree of safety and for the proper operation of the Parker Olaer accumulators. It is carried out by means of the VGU (see chapter 3), specially designed for that purpose. Before start-up it must be guaranteed that the pre-charge pressure is entirely correct for the tasks that the accumulator must carry out. 1 week after start-up (either after installation or maintenance) check the pre-charge pressure. If there is no nitrogen loss next check has to be done 6 month later. After that the accumulator has to be checked annually.

Page 4 von 8 2 Accumulator assembly and installation 2.3 Installation 2.3.1 Location For maximum efficiency the accumulator should be placed as close as possible to the components in the system to which it is related. Allow a free space of 200 mm over the air valve at the top to fit the tester and pressurizer VGU. Leave the gas valve accessible Leave the operating instructions visible The accumulator has to be fixed with supporting brackets or legs. Normally accumulators can be used between temperatures of -15 C to +80 C. The permissible operating temperatures of the accumulator shown on the name plate are evident. 2.5 Instructions for maintenance and repair 2.5.1 Overview In no case collars or supports may be welded to the body of the accumulator! The fluid port of the accumulator has to be flanged to the hydraulic system connection. 2.3.2 Recommendations For efficient operation, it is advisable to take the following observations into account: Interpose a non-return valve between the pump and the accumulator (prevents back flow to the pump) Make sure that there is a pressure relief valve in the system to protect the accumulator If a pressure switch is used, take the pressure indication as close as possible to the accumulator. 2.3.3 Putting into service Before putting the system under pressure, vent any air that the pipework may contain. Then put the system under maximum pressure to check whether the gaskets and connectors are leak proof. 2.4 Operation The accumulator works maintenance-free and needs no manual action except for periodical checks. When the machine will be stopped, we advise the isolation of the charged accumulator before decompressing the whole system, so as to ensure a rapid restart. Fig. 2: Pressurizing unit Pos. Qty. Description 1 1 Bladder 2 1 Gas plug 3 1 Anti-extrusion ring 4 1 Back-up ring 5 1 O-ring 6 1 O-ring 7 1 Plate gas end 8 1 Lock nut gas end 9 1 Gas valve 10 1 Valve guard 11 1 Hexagon head screw 12 1 Spring lock washer 2.5.2 Periodical check of pre-charge pressure Make sure that the pre-charge pressure is maintained Carry out the check at least once during the first week of use, by means of the tester and pressurizer VGU (see chapter 3) Repeat this check every six months. Afterwards check it once a year in ordinary operating cond. Never forget to retighten the valve guard at the top

Page 5 von 8 2 Accumulator assembly and installation 2.5.3 Checking the pre-charge pressure (see fig. 3-2 page 7) Isolate the accumulator from the hydraulic sys. Discharge the accumulator on the fluid side Remove the valve guard and sealing cap of the gas valve Attach the tester and pressurizer VGU on the gas valve tighten by hand (see chapter 3) Make sure that the star knob of the bleed valve (20) is properly closed Turn star knob (6) clockwise until the pressure can be read on the pressure gauge Turn star knob of the bleed valve (20) anti clockwise and reduce the pressure To increase the pressure connect the charging hose (38) between the tester and pressurizer VGU and a nitrogen bottle. Open the stop valve of the nitrogen bottle slowly (a pressure-reducing valve on the nitrogen bottle is recommanded). Allow nitrogen to flow slowly into the accumulator until the desired pre-charge pressure is reached Close the stop valve of the nitrogen bottle. Wait several minutes to stabilize the pressure and temperature and then adjust the pressure accurately Turn star knob (6) anti clockwise to seal gas valve. Open the bleed valve (20) to exhaust gas from charging hose. Remove the tester and pressurizer VGU Test the accumulator gas valve for leaks using a leak detection spray or soapy water solution Replace the valve guard and sealing cap of the gas valve Increase slowly the hydraulic pressure on the fluid side of the accumulator 2.5.4 Dismantling the accumulator (see fig. 2 page 4) Discharge the accumulator on the fluid side. Remove the valve guard (10). Remove the sealing cap of the gas valve (9). Vent the pre-charge pressure in the bladder using the tester and pressurizer VGU (s.ch 3). Remove the gas valve (9) Remove the lock nut gas end (8) Remove the plate gas end (7) and its O-ring (6) Push the bladder (1) with the gas plug (2) and the anti-extrusion ring (3) into the shell Loose the anti-extrusion ring (3) from the gas plug (2), fold and remove it Remove the gas plug (2) Remove the bladder (1) 2.5.5 Cleaning, inspection and repair Clean all the metallic parts of the accumulator carefully and dry with compressed air Inspect the inside of the shell on its cleanness and no internal damages Check that the O-rings show no signs of wear or rubbing Check that the bladder shows no signs of major rubbing or other damages Replace all worn or damaged parts Don t try to repair the bladder under no circumstances 2.5.6 Assembly (see fig. 2 page 4) Ensure that no foreign parts remain in the shell of the accumulator Lubricate the bladder and the inside of the shell with the hydraulic system fluid, so as to facilitate the replacement of the bladder Roll up the bladder (1) longitudinally with fitted anti extrusion ring (3) and O-Ring (5) insert bladder (1) trough hole into shell and fit the gas valve (9) Check that the bladder (1) is neither folded nor twisted Pressurize the bladder lightly with nitrogen and put the gas valve (9) in the center of the shell opening Insert the gas plug (2) and install it on the bladder (1) Fold the anti-extrusion ring (3), insert and install it on the gas plug (2) Install the plate gas end (7) with fitted O-Ring (6) Install the lock nut gas end (8) by hand Tighten the gas valve (9) with a torque of 1,5 Nm Prefill the bladder slowly with nitrogen to a pressure of 1 to 1.5 bar using the tester and pressurizer VGU (see chapter 3) Tighten the lock nut gas end (8) Prefill the accumulator with the requested precharged pressure Tighten the sealing cap of the gas valve (9) Tighten the valve guard (10)

Page 6 von 8 2 Accumulator assembly and installation 2.5.7 Restarting into service Before putting the system under pressure, vent any air that the pipework may contain. Then put the system under maximum pressure to check whether the gaskets and connectors are leak proof. No welding, soldering or mechanical operations of any kind must be undertaken on the accumulator! 3 Tester and pressurizer, type VGU 3.1 Description The VGU tester and pressurizer is used for the charging of bladder, piston and membrane accumulators with nitrogen and to test or change the pre-charge pressure. It is screwed onto the gas valve of the hydropneumatic accumulator and connected with a hose to a standard nitrogen bottle. If only the pre-charge pressure needs to be checked, the connection of the charging hose is not necessary. Each unit comprises of: Tester and pressurizer with manometer, return valve on the charging connection release valve, valve spindle to open the gas inlet valve on the accumulator Charging hose, length 2,5 m Connections for the accumulator 7 / 8-14 UNF; 5 / 8-18 UNF; 0,305-32 NFT; M 28 x 1,5 Plastic protective case 3.2 Handling (see fig. 3-2 page 7) 3.2.1 Preparation Discharge the fluid side of the accumulator before each test and before filling or refilling with nitrogen Remove the valve guard and sealing cap of the gas valve Attach the pressurizer with adapter (25, 30 or 36) onto the gas valve Check that the bleed valve is closed. Turn the star knob (20) clockwise 3.2.2 Checking the pre-charge pressure Turn the star knob (6) clockwise. This opens the gas valve and the pressure can be read on the manometer. 3.2.3 Reducing the pre-charge pressure Turn the star knob (20) of the bleed valve slowly anti clockwise. The nitrogen escapes to the open. 3.2.4 Raising / filling the pre-charge pressure Never prefill with oxygen: Risk of explosion! If the pressure of the nitrogen bottle is higher than the permitted accumulator working pressure, a pressure-reducing valve must be connected ahead. Connect one end of the charging hose to the return valve (7) and the other to a commercial nitrogen bottle Open the stop valve on the nitrogen bottle carefully. Allow the nitrogen to flow slowly into the accumulator, until the desired pre-charge pressure is reached Close the stop valve of the nitrogen bottle. After 5 to 10 minutes (temperature stabilisation) check the pre-charge pressure again and correct, if necessary (see 3.2.2-3.2.4) 3.2.5 Removal of the unit Turn the star knob (6) back Turn the star knob (20) anti clockwise to exhaust gas from the pressurizer Remove the pressurizer Fig. 3-1 Tester and pressurizer, type VGU

Page 7 von 8 3 Tester and pressurizer, type VGU 3.3 Spare parts Pos. Qty. Description 1 1 Valve body 2 1 Valve spindle 3 1 Bolts 4 1 Split ring 5 1 Spigot nut 6 1 Star knob 7 1 Return valve 8 1 O-ring 9 1 Flat seal 10 1 Hexagon nut 11 1 Retaining ring 12 1 Compression spring 13 1 O-ring 14 1 O-ring 15 1 Retaining ring 16 1 Centre-grooved dowel pin 17 1 Name plate 18 1 Connect. for manom. G 1 / 4 " 19 1 Copper seal 20 1 Star knob 21 1 Sealing gland 22 1 Valve spindle 23 1 Valve ball 24 1 Knurled cap 25 1 Adapter SAE 7 / 8 " - 14UNF compl. 26 1 Retainig ring 27 1 Adapter SAE 7 / 8 " - 14 UNF 28 1 Valve spindle 29 1 O-ring 30 1 Adapter SAE 5 / 8 " - 18 UNF compl. 31 1 Retaining ring 32 1 Adapter SAE 5 / 8 " - 18 UNF 33 1 Valve spindle 34 1 O-ring 35 1 Flat seal 36 1 Connect 0,305"-32 NFT 37 1 Gasket assembly (complete set) Fig. 3-2: Tester and pressurizer, type VGU

Page 8 von 8 3 Tester and pressurizer, type VGU Fig. 3-3: Tester and pressurizer, type VGU 38 Charging hose 40 Connections for foreign nitrogen flasks 40b GB / AUS R 5 / 8 external 40c USA 24,51 x 1 / 14 external 40d Italy 21,7 x 1 / 14 external 40e Japan 22 x 1 / 14 internal 40f Japan W 23 x 1 / 14 external 40g Brazil R 1 / 2 internal 40h F, B, E 21,7 x 1 / 4 internal 40i China M 22 x 1.5 internal 40k China 5 / 8 internal 40l Malaysia G 7 / 8 external 40m Trinidad 7 / 8-14 UNF external 40n Bulgaria 3 / 4 internal 40o Philippines W 23 x 1 / 14 left