REPORT ON ENVELOPE AIR TIGHTNESS TESTING SPORTS HALL HMP LITTLEHEY CROW SPINNEY LANE PERRY HUNTINGDON PE28 0SR CLIENT: WATES CONSTRUCTION

Similar documents
Overview ASTATT3. Carry out air tightness testing for single dwellings and other small buildings

Overview ASTATT2. Prepare building for air tightness. testing

Air Leakage Detailing & Awareness Services

NSAI Agrément Approval Scheme for. Certified Air Tightness Tester Scheme Master Document

Report on the Acceptance Air Leakage Testing of Rectory Cottage in Langattock, Powys, in compliance with ATTMA TSL1 (2010)

Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010)

Air Pressure Test to EN13829:2000

Report on the Preliminary Air Leakage Testing of 8 Benson Place in Oxford, in compliance with ATTMA TSL1 (2010)

Report on Air Leakage Testing, in compliance with ATTMA TSL1 (2010) Site address: Cropthorne Autonomous House, WL10 3LZ. Autonomous House, Evesham

ASTATT10 Carry out air tightness testing on large and complex, high rise and phased hand over zonal buildings

TECHNICAL STANDARD L1. MEASURING AIR PERMEABILITY OF BUILDING ENVELOPES (DWELLINGS) October 2010 Issue

Stirley Barn Pressurisation Test Fri 13-Dec-2013

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7

Building air tightness

Duration: 4 hours Type: self-learning 2h and class room lectures 2 hours. Dr.sc.ing. Anatolijs Borodiņecs

TEST REPORT TS EN : TS EN A1 Windows and doors - Product standard. Testing Reference. : BM 72 Gizli Kanat Pencere (Hidden Vent Window)

Domestic ventilation systems

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Guidance on room integrity testing and its interpretation

B. Diagnostic Equipment Information 01 Number of Manometers Used to Measure Home Pressurization Manometer Make. Manometer Serial Number

Enclosure Sealing Webinar: Overview

APPLICATION OF AIRTIGHTNESS TO HEALTHCARE BUILDINGS

Evaluation of n-situ easurement ethods for ir ermeability of indows

Smoke and gas tightness of Hilti Firestop products

List of Appendices. Stamford Brook Deliverable 6: APPENDICES Web version - July 2007

OS2 F R A M E S E R I E S

Method Statement: Testing Dry Riser System

01 18/11/2013 correction of the reference of the product 1 4 5

Technical Report. Title: Product weathertightness testing of a sample of W.G.Ltd 500 series Curtain Walling for The Window Glass Company Limited

Airtightness Testing in Large Buildings: NESEA 2016

Steeple Road Industrial Estate Antrim Northern Ireland BT41 1AB

Module 6. Tightness Testing

Draft. Equipment/Instrument

TESTING AT VERY LOW FLOWRATE

In Vessel Composter Installation & Commissioning Manual

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

Clean Agent Enclosure Design for ISO & AS4212

Intertek Testing Services Building Products. Enterdoor AB ubv

What is Pressure? Residential Pressure Measurement

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

Detecting points of unintentional ventilation

This test shall be carried out on all vehicles equipped with open type traction batteries.

Notes on equipment protection per EN/IEC and NEMA For Bourdon tube or diaphragm pressure gauges

Validation of a Neutral Pressure Isolation Room

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

AIRTIGHTNESS OF BUILDING PENETRATIONS: AIR SEALING SOLUTIONS, DURABILITY EFFECTS AND MEASUREMENT UNCERTAINTY

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification.

M.D. Lyberg and C-A Boman Swedish Insitute for Building Research Box 785, S Gavle, Sweden

CTG Certification Protocol -- Version 3.0 SUMMARY

ETEM S.A. LIGHT METALS COMPANY 1, IROON POLYTEHNIOU STR. GR MAGOULA ATTIKIS GREECE

Zonal Pressurization Diagnostics (ZPD)

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

Window and Door Measurement System

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

IC Sentinel Applications Guide for Healthcare Environmental Air Quality Monitoring

TEST CERTIFICATE THE RESULTS CONCERN ONLY THE SPECIMEN TESTED. THE PRESENT DOCUMENT DOES NOT CONSIST PRODUCT APPROVAL BY E.K.AN.AL.

4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants.

LEV Inspection & Test Report

GENERAL SAFETY INSTRUCTION GSI-M-2 STANDARD PRESSURE EQUIPMENT

PRODUCT CONFORMITY CERTIFICATE

Pacific Gas & Electric Model Energy Communities Program Air Flow & Duct Leakage Comparative Study

Guidance on the pressure relief and post discharge venting of enclosures protected by gaseous fire fighting systems

CR Series. Special doors for clean room application

CERTIFICATE OF APPROVAL No ME 5088

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

Thermo Probe, Inc. TP-5 TP-7 TP-8. Instruction Manual English. Switch. Display. Carry Strap. Probe. Ground Clip. Switch. Display.

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Smoke and heat Ventilator Testing

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Protocol for the Hydrogen Chloride and Water Vapour Proficiency Testing Scheme Round 17 (Version2)

Building Official's Guide to Duct Testing based on 2009 IECC

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

AVEMS & UNICLIMA joint Position paper on Regulation (EU) No.1253/2014 Paris, June 8 th

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

Expert Hydrostatic Level Transmitters

Table 6: Schedule of Operational Commitments

Intertek Testing Services Taiwan Ltd.

The routine maintenance and inspection of local exhaust ventilation (LEV)

Airborne Activity Sampling and Monitoring at Hinkley Point A Site. David Williams, Hinkley Point A Site

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

Report No. 371/ This report consists of 6 pages

RECOMMENDED PERMIT CONDITIONS

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS])

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

Summary of the MRA LPG Codes of Practice

TEST CERTIFICATE PARTIAL REPRODUCTION OF THE PRESENT CERTIFICATE IS PROHIBITED WITHOUT PRIOR WRITTEN PERMISSION BY EKANAL.

Application Notes. Aluminium Electrolytic Capacitors

Certified Reference Materials FOR REFRACTOMETERS AND POLARIMETERS

Chemical Safe Havens The MineARC ChemSAFE Standard Design Range

Home Oxygen Therapy in NHS Scotland. Level 1 Education for Patients & Carers

WBEA Standard Operating Procedure

Comparative Tests on Differential Pressure Control Valves

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

Getting the Most From Your Diagnostic Equipment

Notes on equipment protection to DIN EN and NEMA

MSC Guidelines for Review of Stability for Towing Vessels (M)

Definitions 13 FREE SURFACE EFFECT

SECTION 2 APPLICATION OF FUNDAMENTALS

Transcription:

REPORT ON ENVELOPE AIR TIGHTNESS TESTING AT SPORTS HALL HMP LITTLEHEY CROW SPINNEY LANE PERRY HUNTINGDON PE28 0SR CLIENT: WATES CONSTRUCTION 2587 Name Position Signature Date Paul Cousins Acoustic Office Manager 4/11/09 Page 1 of 6

1. INTRODUCTION This report details the results of the envelope air tightness test carried out by HRS Services Ltd at: Sports Hall HMP Littlehey Crow Spinney Lane Perry Huntingdon PE28 0SR The estimated year of construction was 2009. The test was commissioned by David Bucknall. 2. TEST CONDITIONS AND RESULTS The worst acceptable building air permeability performance criteria as defined in Section 2 of the Building Regulations 2000 (as amended), Part L2A Conservation of Fuel and Power in New Buildings Other Than Dwellings is 10m 3 /(h.m 2 ) @ 50Pa. The test was carried out on 30.10.09, between 12.45 and 13.15. The result is representative of the building as tested on this day. The type of HVAC was mechanical. The envelope area for air permeability is defined as the area of the external walls plus the area of the roof and the ground floor. The envelope area was calculated by the client. The whole area of the building was tested. The envelope area of the test area was 2485.5m 2. The following air permeability was determined at 50Pa. 2.01m 3 /(h.m 2 ) The test area therefore passed the specified air permeability performance criteria Summary of Temporary Sealing Temporary sealing was applied to unfinished elements, see table overleaf for full details. It should be noted that temporary seals may, in practice, be more airtight than the element they replace. The finished elements should therefore be of an equal standard of airtightness for the quoted test result to remain unchanged. Page 2 of 6

3. TEMPORARY SEALING The following tables provide a detailed breakdown of the temporary sealing applied to the building during the air test. Temporary sealing applied to intentional openings Element Temporarily sealed for air test? Comment/Extent of Sealing HVAC supplies No Not commissioned HVAC extracts No Not commissioned Ventilation louvres No Drainage traps Yes Unfilled traps sealed Other - Specify No Temporary sealing applied to un-intentional openings/incomplete works Element Lift shafts/smoke vents Plant room Service risers Doors Windows Access hatches Passive ventilation Other - Specify Comment/Extent of sealing/reason for Sealing 1 door seal unfinished so temporarily sealed Comments on Temporary Sealing All temporary sealing applied was in compliance with Building Regulations 2000 (as amended), Part L2A Conservation of Fuel and Power in New Buildings Other Than Dwellings. Page 3 of 6

4. TEST METHOD The envelope air tightness test was carried out in line with the following standards: ATTMA TS1 Issue 2 - Measuring Air Permeability of Building Envelopes BS EN 13829:2001 Thermal performance of buildings - Determination of air permeability of building - Fan pressurisation method. The purpose of the test was method B (building envelope) as stated in BS 13829:2001. This requires that all adjustable openings shall be closed and remaining intentional openings sealed. The building was pressurised using the BLOWERDOOR system. The BLOWERDOOR system comprises of a portable fan, designed to supply up to 2 m 3 /second at 70 Pascals static pressure. The BLOWERDOOR system was UKAS calibrated in accordance with BS 848 Part 1 1997. The BLOWERDOOR system was set up in the single door. Pressure differences across the BLOWERDOOR and the building were measured using digital micromanometers at the start, during and end of the test. All equipment used is calibrated to UKAS standards annually. Air temperatures were measured using Therma 1 digital thermometer with K Special penetration probes. Measurements were taken at the start and end of the test. The probes were located central and external to the building. Wind speeds at the start and end of the test were measured using a Kestrel K4000 meter. Barometric pressure was established by an absolute pressure meter. The test area was prepared for air testing by the client. During the test HRS are external to the test area and are therefore reliant on the client maintaining the test area as agreed. The agreed test state of the test area is with all external windows and doors closed, and all internal doors open, with any temporary seals employed to remain intact for the duration of the test. 5. DETAILS OF TEST RESULTS Please refer to the test results overleaf. The results have been interpolated from the readings taken between 28Pa and 59Pa with a correlation co-efficient of 0.9934. Zero-Flow Pressure Differences The mean fan off p at the start of the test, p 0,1, was 0 The mean fan off p at the end of the test, p 0,2, was 0 The zero flow pressure difference p 0,1+ at the start of the test was 0 The zero flow pressure difference p 0,1- at the start of the test was 0 The zero flow pressure difference p 0,2+ at the end of the test was 0 The zero flow pressure difference p 0,2- at the end of the test was 0 FOR THE FULL SET OF CALCULATIONS USED TO CALCULATE THE AIR PERMEABILITY RATE, PLEASE GO TO http://www.hrsservices.co.uk/downloads/air_permeability_calculations.pdf Page 4 of 6