CONNECTING OUR CITY WITH TRANSIT

Similar documents
Pocatello Regional Transit Master Transit Plan Draft Recommendations

TRANSIT RIDERSHIP IMPROVEMENT PROGRAM CAPITAL PROJECTS OPERATING PLANS - NEXT NETWORK TRANSIT INFORMATION TECHNOLOGY

Overview of Pulse BRT and transit network redesign

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Arterial Transitway Corridors Study. Ave

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

Technical Working Group November 15, 2017

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Environment and Public Works Committee Presentation

Transit Workshop with MPO Board

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Central Oregon Intergovernmental Council

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

From Disarray to Complete Street:

GRTC PULSE. Arriving June 24, May 30, Overview by: Carrie Rose Pace Greater Richmond Transit Company Director of Communications

Appendix A-K Public Information Centre 2 Materials

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson

MORE CONNECTIONS. Redesigning routes for the future of transit in Milwaukee County.

Arterial Transitway Corridors Study. Sept. 26, 2011

Everett Transit Action Plan. Community Open House November 16, 2015

Philadelphia Bus Network Choices Report

PROJECT OVERVIEW. Auburn Station Access Improvements Project

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Geary Bus Rapid Transit Project

Ann Arbor Downtown Street Plan

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

Community Task Force November 15, 2017

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

North Shore Transportation Improvement Strategy

Item B1 November 19, 2009

Pop-up Workshop Series Compilation of Community Feedback

Project Introduction January 2017

Metropolitan Council Transportation Committee

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Bus Rapid Transit Plans

Dumbarton Transportation Corridor Study. Board of Directors December 6, 2017

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

Seattle Transit Master Plan

Where We Live and Work Today

BRT for Berkeley A Proposal for Consideration

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Calgary Transit Route 302 Southeast BRT Year One Review June

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Operational Comparison of Transit Signal Priority Strategies

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

PROJECT OVERVIEW. Auburn Station Access Improvements Project

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

Arterial Transitway Corridors Study

Community Task Force July 25, 2017

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

Caltrain Bicycle Parking Management Plan

Eliminate on-street parking where it will allow for a dedicated bus only lane %

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

METRO Now. Transit Leader. One of only four urban. gain bus ridership in Purple and Green Lines. Red Line is one

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Access BART: TOD and Improved Connections. October 29, 2008

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Engagement Summary: Round 1

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM

The Florida Bicycle and Pedestrian Partnership Council

EBOTS Phase 1 Outreach Summary

Dawson Creek Transit System Performance Check-In: Interim Report

Transit Planning at 3 Scales: the Network, Corridor, and Station Levels

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

Community Transportation Plan Acknowledgements

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Standing Committee on Policy and Strategic Priorities

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Rochester Area Bike Sharing Program Study

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Durham Region Long Term Transit Strategy

Caltrain Bike Parking Management Plan

TPA Committee Meetings May 2018

City of Davenport CitiBus Public Transportation Study. April 2015

Frequently Asked Questions (FAQ)

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Caltrain Bike Parking Management Plan

Interim Transit Ridership Forecast Results Technical Memorandum

Decision on North Waterloo Routing

122 Avenue: 107 Street to Fort Road

Community Task Force March 14, 2018

North Coast Corridor:

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

KING STREET TRANSIT PILOT

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

PROPOSED BYLAW UPDATES AND FEES FOR SIDEWALK CAFÉS & MARKETING DISPLAYS

EMU Procurement Seats/Standees/Bikes/Bathroom

Transportation Master Plan Advisory Task Force

Transcription:

CONNECTING OUR CITY WITH TRANSIT Draft Recommended Transit Network

Introduction Why a Transit Network Plan for Richmond? Create seamless connections to BRT and throughout the bus system. Ensure the city s transit system corresponds to the city s values and priorities. Support existing and future land use patterns and economic development strategies. Why are we here today? Review prior Phase 1 and Phase 2 public and stakeholder feedback Present the Draft Recommended Network 2

Transit Network Plan Timeline Phase 1 Phase 2 Phase 3 January May Choices Report Values Survey On-Board Survey Stakeholder Meeting 4 Public Meetings May October Concepts Development Concepts Release Concepts Survey Stakeholder Meeting 8 Public Meetings October February Draft & Final Recommendations Stakeholder Meeting 8 Public Meetings 3

Richmond Transit Network Plan Phase 1 Choices 4

Every transit agency has to choose a point on the spectrum... High Ridership Think like a business. High Coverage Access for all An ideal policy: Devote % of our budget to the Ridership Goal, and the rest to the Coverage Goal???? ~50% 5

Ridership vs Coverage = Waiting vs Waiting Minimize Waiting Minimize Walking 6

Summary of Feedback 2,000 Onboard Survey Responses Phase 1 Strong desire to move toward less waiting rather than less walking Implies a higher frequency network which implies less coverage. Stakeholder consensus was around 70% of budget pursuing high ridership and just 30% providing coverage in low-ridership places In contrast, today GRTC spends about 50% of the budget covering low-ridership places. 7

Transit Network Concepts for Richmond Phase 2 8

n=652

Recommended Policy Direction: 70% Ridership, 30% Coverage 3-Block Stop Spacing

Phase 3: Recommended Network 11

Existing Network

Recommended Network

Evenings and Weekends 7pm-1am Weeknights 7pm-Midnight Sat All Day Sun

Key Features and Benefits

Key Features and Benefits

Existing Network: Access to Downtown Isochrones to be added

Recommended Network: Access to Downtown Isochrones to be added

How many residents or jobs are near any service? Residents are calculated based on 2014 ACS 5-year estimates. Jobs are calculated based on LEHD LODES 2014 dataset. Only jobs or residents within the City of Richmond are counted.

How many residents or jobs are near Frequent service? Residents are calculated based on 2014 ACS 5-year estimates. Jobs are calculated based on LEHD LODES 2014 dataset. Only jobs or residents within the City of Richmond are counted.

Phase 3 Public Outreach Draft Report and Supporting Materials on Website: www.richmondtransitnetwork.com Online and paper survey for feedback from the public Public Meetings January 18, 12-2pm, Main Public Library Auditorium, 101 E Franklin St January 18, 6-8pm, DMV Central Office, 2300 W Broad St January 19, 6-8pm, VCU Sports Medicine Building, 1300 W Broad St January 21, 12-2pm, Peter Paul Development Center, 1708 N 22nd St January 24, 6-8pm, Calhoun Center (Gilpin Court), 436 Calhoun St January 26, 6-8pm, Partnership for Families Northside, 800 W Graham St January 30, 6-8pm, Hillside Court Community Center, 1500 Harwood St January 31, 6-8pm, Southside Community Services Center, 4100 Hull St Study team will be at transfer plaza for 4-5 days between Jan 17 and Feb 10.

Phase 3 Next Steps Summarize public input on Draft Plan Revise Plan and Publish Final Plan Handoff to GRTC for Implementation Round of informational and educational meetings by GRTC in March and April More educational meetings, outreach and marketing throughout implementation phases

Thank you!! Questions?? 25

Additional Slides for Q & A 26

Transit Network Concepts for Richmond Phase 2 27

Familiar 50% Coverage 50% Ridership 1 block spacing

High Coverage 50% Coverage 50% Ridership 3 block spacing

High Ridership 20% Coverage 80% Ridership 3 block spacing

Times Rated 160 Concept Rankings Phase 2 140 120 100 80 60 40 20 0 Familiar High Coverage High Ridership 1 Star 2 Star 3 Star 4 Star 5 Star 31n=773

Number of Responses 500 Context Sensitive Stop Spacing Responses Phase 2 450 432 400 350 300 250 200 212 150 100 50 56 0 Current spacing (every block) Wider stop spacing (every 2nd block) Even wider spacing (every 3rd block) 32 n=700

Design Principles Phase 3 Consistent Frequencies Directness Easier schedules for riders to understand. Simpler, well-timed connections. Faster, more reliable service.

Design Principles Phase 3 Consistent Route Spacing Through Routing Across Town

Through Routes Chamberlayne to Hull and Midlothian

Through Routes North Ave to Semmes/Forest Hill, Jahnke and Midlothian

Through Routes 4 th Ave to Jeff Davis and Hillside Court

Through Routes Mechanicsville Tpke to Main/Cary

BRT Connections Route 8a/b (Fulton) to Orleans Street Station

BRT Connections Route 5 (Church Hill and Oakwood) to 24 th Street Station

BRT Connections Route 65 (Randolph) and Route 9 (VUU and Hermitage) to VCU/VUU Station

Routes 61 and 62 connect West End to Robinson Station Orbital Route 10 connects Northside and Southside to Robinson and Cleveland Stations

Routes 61, 62 and 63 connect West End and U of R to Willow Lawn Station

Existing Network: Access to Southside Plaza Isochrones to be added

Recommended Network: Access to Southside Plaza Isochrones to be added

Existing Network: Access to Fairfield Court Isochrones to be added

Recommended Network: Access to Fairfield Court Isochrones to be added