APPENDIX D REAL ESTATE PLAN

Similar documents
Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

Juneau Douglas Harbor

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

HARBOR INFRASTRUCTURE INVENTORIES Lorain Harbor, Ohio

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Juneau Aurora Harbor

HARBOR INFRASTRUCTURE INVENTORIES West Harbor, OH

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Redondo Beach Boat Launch Ramp Facility

Ninilchik Harbor Page 2 of 11

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Water Resources Report RKLD Annual Meeting July 30, 2016

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

Information for File # SEW

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH

Nome Harbor Page 2 of 12

HARBOR INFRASTRUCTURE INVENTORIES Caseville Harbor, Michigan

Port Infrastructure to Support Floating Offshore Wind West Coast USA

Cordova Harbor Page 2 of 9

HARBOR INFRASTRUCTURE INVENTORIES Lexington Harbor, Michigan

North Shore of Long Island, Feasibility Study

Structure Failure Modes

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

Appendix A. FINDING OF NO SIGNIFICANT IMPACT and ENVIRONMENTAL ASSESSMENT

SITKA PORT AND HARBORS COMMISSION Regular Commission Meeting Minutes November 13th, 2008 Harrigan Centennial Hall

HARBOR INFRASTRUCTURE INVENTORIES Muskegon Harbor, Michigan

A New Strategy for Harbor Planning and Design

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

HARBOR INFRASTRUCTURE INVENTORIES Cheboygan Harbor, Michigan

Norwalk Harbor: The Jewel of Long Island Sound. A Presentation by the Norwalk Harbor Management Commission

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

HARBOR INFRASTRUCTURE INVENTORIES Black Rock Lock & Tonawanda Harbor, NY

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

HARBOR INFRASTRUCTURE INVENTORIES Harbor Beach Harbor, Michigan

Port Sections Guide Section 01

To: William Woods, Jenni Austin Job No: CentrePort Harbour Deepening Project - Comments on community queries

ort of Ilwaco & Port of Chinook Washington Public Ports Association Port Report November 17, 2016 Guy Glenn, Manager

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Grays Harbor O&M and Deepening Dredging

Grays Harbor Federal Project

Burrard Bridge Civic Marina. Class B Marina (No Liveaboard Facilities) A Prime Location in the Heart of Downtown Vancouver

New Orleans Municipal Yacht Harbor

Building Coastal Resiliency at Plymouth Long Beach

Hydrographic Surveying Methods, Applications and Uses

Implications of proposed Whanganui Port and lower Whanganui River dredging

UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

APPENDIX D-2. Sea Level Rise Technical Memo

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

HARBOR INFRASTRUCTURE INVENTORIES Kenosha Harbor, Wisconsin

CITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT

Fort Hancock Sailing Center

3.9 Marine Transportation

Chapter I: Marine Resources

2018 Beach Preservation Project Information

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

St. George Harbor Feasibility Study. Appendix A - Hydraulic Design. St. George, Alaska. Tentatively Selected Plan August 17, 2018

Ventura County. Open Pacific Coast Study. California Coastal Analysis and Mapping Project

Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Amalga Fish Cleaning Station Project Feasibility -Draft-

UMass Boston Waterfront at a glance

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

ADA TRANSITION PLAN 2013

Unit 11 Lesson 2 How Does Ocean Water Move? Copyright Houghton Mifflin Harcourt Publishing Company

Southeast Sustainable Salmon Fund Project Statement of Work

VESSEL TRANSIT SCHEDULING AT THE PANAMA CANAL NUMBER AND ORDER OF VESSELS IN THE SCHEDULE

APPENDIX F ECONOMIC CONSIDERATIONS

Alaska Deep-Draft Arctic Port System

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

Midwest Hobie Wave Championships at Mayors Cup Regatta

3.7 River Navigation Affected Environment

Somerville Community Path Feasibility Study

Expanding Anchoring Away

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

Dredging Keeping Our Underwater Highways Open

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

Shoalwater Bay Shorline Erosion Dredging

The Matrix: All Safety Related Signs found in USACE Sign Program

Discussion Paper: Consideration of a Registration for Self-Guided Halibut Rental Boats

North Diversion Channel Physical Modeling:

VENICE LOCAL COASTAL PROGRAM UPDATE: COASTAL HAZARDS WELCOME

NAVIGATION STUDY FOR LAKE WORTH INLET, FLORIDA DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT APPENDIX A ENGINEERING

Humboldt Bay s Harbor

Sitka Passenger Fee Fund Implementation Plan

CHAPTER 134 INTRODUCTION

Transcription:

NAVIGATION IMPROVEMENTS SITKA HARBOR, ALASKA CHANNEL ROCK BREAKWATERS DRAFT DEFICIENCY CORRECTION EVALUATION REPORT APPENDIX D REAL ESTATE PLAN JANUARY 2011

REAL ESTATE PLAN FOR SITKA HARBOR, ALASKA CHANNEL ROCK BREAKWATERS DEFICIENCY CORRECTION EVALUATION REPORT January 3, 2011 1. Purpose: The Alaska District, Corps of Engineers, along with the City and Borough of Sitka (CBS), its non-federal sponsor, completed construction of the Channel Rock Breakwaters feature of the Sitka Harbor project in 1995. The purpose of that project was to provide protection for Thomsen Harbor and to protect additional moorage that would be constructed in the natural anchorage and channel between Sitka and Japonski Island. During the feasibility study and after, this additional moorage was termed New Thomsen Harbor. The name of the expanded moorage area was later changed to its current name, Eliason Harbor. After the Channel Rock Breakwaters were constructed, Sitka Harbor users and the city reported excessive energy entering through the breakwater gaps adversely affecting harbor use and damaging boats and harbor facilities during high tide and swell conditions. Congress provided the Corps funding from 2001 through 2003 to study the potential for excessive swell in the harbor. In May 2002, the Corps completed a Section 905(b) Analysis for Eliason Harbor, which recommended further study. Additional Congressional legislation in 2005 and in 2007 stated that the damages being experienced resulted from breakwater design deficiencies and directed the Corps to modify the Channel Rock Breakwaters to correct those deficiencies to reduce wave and swell motion within the Sitka Harbor. 2. Project Description: Hydraulic analysis has shown that gaps in the Channel Rock breakwater at Sitka Harbor are allowing significant wave energy to enter the harbor. The effects of this energy are most obviously manifested in significant and undesirable movement in the floats of the (New Thomsen) harbor. The adverse movement has led to damages to vessels and increased float maintenance costs as users attempt to access their vessels at the floats. Hydraulic analysis has also shown that the majority of energy comes through the gaps to the north and south of the center breakwater in a fairly equal manner. According to locals, the majority of the energy comes from the southern gap. Their anecdotal evidence discusses when the southerly storm systems impact the area, the energy that most affects the floats comes from the southern gap. According to the locals, the northern gap, though quite wide, does not cause as significant a problem. Preliminary cost estimate for design and construction of the project modification is $8.1 million (1 October 2011 price level).

3. Real Estate Requirements for the Project: The following real estate requirements for the project are based on the layout of the recommended deficiency correction measure alternative no. 4: Therefore, no real estate acquisition will be required. No disposal areas will be utilized since dredging will not be required. No known uplands staging area will be used since all construction can take place from barges. However, should the assumptions stated within the body of this report stating the rock will be procured from the quarry on Kasiana Island come to fruition, there is a potential requirement for rights-of-entry, as well as for assumed use of a landbased crane. 4. Federally/Government Owned Land included: There are no known government lands for use in this project. 5. LER below MHW/OHW: All construction will be done below Mean High Water; the U.S. Government asserts right of Navigational Servitude for this project. 6. Map: Sitka Alaska is located on the West coast of Baranof Island fronting the Pacific Ocean, on Sitka Sound. An Extinct Volcano, Mount Edgecombe, rises 3,200 feet above the community. It is 95 air miles southwest of Juneau, and 185 miles southwest of Ketchikan Alaska. Seattle Washington lies 862 air miles to the South. Figure 1, map of Sitka Harbor Construction Site:

7. Potential flooding induced by construction, operation or maintenance of project: No known potential for flooding is anticipated during or after construction. 8. Real Estate and Administrative Cost Estimate: Table II Federal project portions (GNF) Item Federal Local Subtotal Total Administration $3000 $000 $000 $ 3000 Payments for Real Estate -0- -0- -0- -0- Non-Federal project portions Item Federal Local Subtotal Total Administration $000 $000 $000 $ 000 Payments for Real Estate -0- $000 $000 $ 000 9. Relocation: No relocation of people or structures is anticipated under the Relocation Assistance Act, (PL 91-646). No known utility relocations are anticipated also. 10. Mineral Activity: No know mineral activity is under way in the Sitka Area. 11. Non-Federal sponsor s acquisition experience: Sponsor does not need to be certified under this project. 12. Environmental / HTW: Environmental study has been done; refer to other sections of this report. 13. Known or Anticipated Opposition of Landowners in project area: No known opposition of landowners to this project. 14. Other RE issues relevant to planning, design, or implementation of the project: This project is to correct a problem detected since construction on the float system was completed. The Sponsor has requested a study to look at alternatives to the energy of wave distribution, which may be damaging boats and docks in the inner harbor. Thomsen Harbor was authorized as a Federal project in 1992 and was constructed in 1994. The harbor is protected from wave action by three rubble mound breakwaters 480 feet, 1,200 feet, and 320 feet in length. Additional facilities include a 1,800-foot floating breakwater, a vehicle and a pedestrian ramp both leading to a loading area dock, and restroom and shower facilities. The project accommodates recreational and commercial vessels and has 260 slips, which are filled to capacity. Upon completion of the Channel Rock Breakwaters deficiency correction measure, the Federal government will remain responsible for Operation and Maintenance of the breakwaters, as a project General Navigation feature, and the local sponsor will remain responsible for the Operation and Maintenance of the Local Service Facilities, such as the piles, floats, and docks.