Community Task Force August 8, 2018

Similar documents
Technical Working Group November 15, 2017

Community Task Force March 14, 2018

Community Task Force November 15, 2017

Community Task Force July 25, 2017

Community Task Force October 5, 2017

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

COLFAX MULTIMODAL ACCESS STUDY

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 3 BUS IMPROVEMENT CONCEPTS

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

122 Avenue: 107 Street to Fort Road

A District Council of the Urban Land Institute

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Appendix A-2: Screen 1 Alternatives Report

Developing Bikeways in South Denver

42nd Ave N Reconstruction

2.0 LANE WIDTHS GUIDELINE

Complete Streets in Constrained Corridors: Chicago s Central Loop BRT

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

BID Workshop September 12, 2017

Lynchburg District Update

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Chapter 6 Transportation Plan

Meade Street Bridge Design Alternative Study

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Welcome to the Quebec Alternatives Analysis Public Meeting

Paoli Road Improvement Feasibility Study

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Broadway Complete Streets Project

2017 General Obligation Bond

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

2017 General Obligation Bond

VISIONZEROPHL.COM #VISIONZEROPHL

Columbia Pike Implementation Team (CPIT) Meeting

Polk Streetscape Project

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

6 Screen 3 Analysis and Results

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Transportation Planning Division

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Arterial Transitway Corridors Study. Ave

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Omaha s Complete Streets Policy

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Auraria Campus. Colfax Avenue. Downtown. Denver. State Capitol. Concept Plan (CACP) City Park. March Denver. Aurora

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Completing the Street: Denning Drive

Frequently Asked Questions (FAQ)

Pedestrian Project List and Prioritization

New York City School Safety Engineering Program. Jackson Wandres The RBA Group June 09, 2005

Lincoln Neighborhood Corridor Plan The LiNC

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

PRESS RELEASE San Joaquin Council of Governments

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017


MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

About the Wilmington Downtown Circulation Study

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

North Shore Transportation Improvement Strategy

Environment and Public Works Committee Presentation

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

DRAFT TENNYSON STREET ANGLED PARKING ANALYSIS

Click to edit Master title style Click to edit Master title style

Wood and Cortland Neighborhood Greenways

Getting the facts 8th Street Pedestrian Bridge Preferred Option

Public Information Meeting

Crystal City Citizen Review Council Meeting. July 10, 2013

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Arterial Transitway Corridors Study

Transcription:

Community Task Force August 8, 2018

Welcome and Introductions

Project Partners Regional Transportation District (RTD) City of Aurora Colorado Department of Transportation (CDOT) Denver Regional Council of Governments (DRCOG)

Meeting Purpose and Agenda

Meeting Purpose Update on progress, schedule and next steps Discuss design approach and funding assumptions Review and gather feedback on conceptual (10%) design

Agenda Project update Process and next steps Preliminary funding assumptions Design methodology Pedestrian Safety Project Open house: Discuss and review conceptual (10%) design

Project Update

Corridor Development Timeline Opportunity for Stakeholders and Public To Influence Project Design Broad Definition of Project Design Detail Alternatives Analysis Conceptual Design & Environmental Analysis 12-18 months Engineering & Design 18 months 18-24 months Construction Revenue Service Ongoing Federal Transit Administration Project Development We Are Here Locally Preferred Alternative Definition of mode & alignment Conceptual station locations Operating plan Local decision Concept Design & Environmental Clearances Design detail determined Environmental impacts identified Fully Designed and Funded Project Design complete Finance package

Coordination with Related Projects Intersection, pedestrian safety and streetscaping Neighborhood Planning Initiatives (east / east central) RTD 15L improvements Others

10% Designs (BRT+ Pedestrian Mobility) Conceptual layout and function - 2018

30% Design (BRT+ Streetscaping) Begins to evolve conceptual layout and functionality - 2019

Final Design + Construction Starting 2020 / 2021

Preliminary Funding Assumptions

Current and Potential Funding Sources Denver General Obligation Bond $55 million Other funding sources may include: Federal grant funding Statewide ballot initiatives Other local funding

Project Elements: What s included in funding assumptions? Station areas ~1 block in each direction (east/west) Pedestrian access and safety features ~4 mid-block crossings, sidewalks and curb extensions BRT and vehicle operations (between stations and new crossings) Curb-to-curb Buses Replacement of Rt 15 Fleet

Conceptual (10%) Design Methodology

Conceptual Station Area Design Design Methodology: How much space do we have? Maintains existing driveway access Left turn lanes at signalized intersections Varied median widths Prioritize curbside parking and loading Center running stations and bus lanes Expanded sidewalks and shorter/safer pedestrian crossings Preliminary design concept. Subject to change.

Conceptual Pedestrian Crossing Design Expanded sidewalks and shorter/safer pedestrian crossings Maintains existing driveway access Prioritize curbside parking and loading Stop light for pedestrian crossing Center running bus lanes Preliminary design concept. Subject to change.

Corridor-Wide Pedestrian Safety Project

Corridor-Wide Pedestrian Safety Project Prioritizing Intersections (Sheridan to Yosemite) Pedestrian crashes Conceptual Design (10% design) Coordinating with BRT design (East Colfax) Complete by October 2018 Integration with Next phase of BRT to begin in 2019 (including streetscape, etc.)

Design Example Preliminary design concept. Subject to change.

Pedestrian Safety Project: Potential Intersections Adams Clarkson Emerson Fairfax Gilpin Glencoe High Humboldt Ivy Jasmine Kalamath (Santa Fe) Kearney Knox Leyden Logan Lowell Marion Meade Milwaukee Ogden/Corona Osage (7th St) Park/Franklin Pearl Race Raleigh Sheridan Speer Stuart Tennyson Valentia Verbena Vine Vrain Wabash Washington Preliminary conceptual locations. Subject to change.

Open House Discussion

25 Open House Discussion Areas of emphasis for detailed design Local access Stop spacing and connectivity Traffic operations How are these areas addressed in the conceptual design? How does it all fit together? What s missing? Are there other areas that need special attention (e.g., walk experience, traffic operations, etc.)?

Conceptual BRT Stations and New Pedestrian Crossings 1. Mariposa 2. Delaware 3. Civic Center 4. Pennsylvania 5. Downing 6. Williams 7. York/Josephine 8. Steele 9. Colorado 10. Elm 11. Hudson 12. Krameria 13. Monaco 14. Quebec 15. Uinta 16. Yosemite Signalized Pedestrian Crossings 1. Madison 2. Bellaire 3. Tamarac 4. Willow Note: Certain project elements will continue to be refined as design progresses (e.g., station spacing/locations, pedestrian crossings, left-turns, etc.).

Corridor Map

Corridor-Wide Pedestrian Safety Project

29 Open House Discussion Conceptual BRT station areas New signalized/protected pedestrian crossings BRT corridor map (I-25 to Yosemite) Corridor-wide pedestrian safety project

Next Steps

Where Do We Go From Here? Completion of conceptual design Ongoing coordination with partners and related projects Planning for upcoming detailed (30%) design phase

www.colfaxcorridorconnections.com Info@ColfaxCorridorConnections.com