QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

Similar documents
Q150T S/E/ES Sample Preparation System Instruction Manual

Q150T S/E/ES Sample Preparation System Instruction Manual

The SPI Sputter Coater Handbook

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Standard Operating Manual

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Revised: June 7, 2017

Operating Procedures for Metal Evaporator I

Standard Operating Manual

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

SPUTTER STATION STANDARD OPERATING PROCEDURE

Thermo K-Alpha XPS Standard Operating Procedure

OPERATION OF THE DIMPLER

Nordiko Metal Sputtering System Standard Operating Procedure

THERMAL EVAPORATION UNIT (for Al evaporation)

Angstrom Dielectric Sputterer Operation Manual

Usage Policies Notebook for Parylene Coating System

QUARTZ HOUSING COATING PROCEDURE

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Oerlikon Sputtering Evaporator SOP

Standard Operating Procedure. For. PVD E-Beam

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Standard Operating Manual

Unaxis PECVD. SiH4 (5% in He)

COMELEC C-30-S Parylene Coating System

Standard Operating Manual

EMITECH K1250 Cryogenic Preparation System Instruction Manual

STS PECVD Instructions

1)! DO NOT PROCEED BEYOND THIS MARK

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

University of MN, Minnesota Nano Center Standard Operating Procedure

[USING THE VITROBOT April 9, Using the Vitrobot

STS ICP-RIE. Scott Munro (2-4826,

Cryo-Evaporator Operation

Xactix XeF2 OPERATION MANUAL

Basic ICP Operating Procedures

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Apollo Safety Features

SC7680 Large Chamber Auto/Manual High Resolution Sputter Coater. Operating Manual

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

BUBBLER CONTROL SYSTEM

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Cambridge NanoTech: Savannah S100. Table of Contents

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

WATER CONTROL SYSTEM QUICK START

University of Minnesota, MN Nano Center Standard Operating Procedure

Karl Suss MA6 Mask Aligner SOP

Pfeiffer. Operating, assembly and maintenance instructions for discontinuous sampling valve Series 27i. 1. Design, operation and dimensions

March CS-1701F Reactive Ion Etcher

Xactix Xenon Difluoride Etcher

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

Multicam Oxy-Fuel, Plasma Operations Guide Series 2/05

Approved by Principal Investigator Date: Approved by Super User: Date:

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

SAFETY RULES WARNING: READ THESE SAFETY RULES & OPERATORS MANUAL BEFORE HANDLING YOUR FIREARM

OPERATION. Estimated kerf width compensation. HPR260 Manual Gas Instruction Manual 4-9

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

University of MN, Minnesota Nano Center Standard Operating Procedure

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Valve Station ICF 15, 20 and 25

Performa Cv Twin Alternating and High Flow Systems. Manual Supplement

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

COBILT CA-800 Mask Aligner Equipment Operation

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

LESKER #1 STANDARD OPERATION PROCEDURE

KEG PUMP. Range of Electric Keg Pumps

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

User Instruction Manual

Air Plus User Manual

RAM 4021-DPX Operation Manual

Powermax machine-side reference guide For mechanized applications with Powermax1000, Powermax1250 and Powermax1650

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS

Hydro-Control V User Guide

Notes-PECVD: Chamber 1

Karl Suss MJB4 Mask Aligner

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Standard Operating Manual

Arizona State University NanoFab XACTIX ETCHER. Rev A

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

CC7650 Carbon Coater. Operating Manual

Draeger Fabius GS Pre-Use Check

March Asher Operation

Sedan Range. Evaporative Loss System Check Clarified Procedure

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Kit Details Air Lift Performance HARDWARE LIST STOP!

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Farm Chlor Chlorinator Instruction Manual

AIR COMPRESSOR 12 V DIRECT DRIVE MULTI-FUNCTION INSTRUCTION MANUAL. Model no

Transcription:

QUORUM TECH 150RES This document is intended to describe the function and use of the QuorumTech Q150RES system. Formal training and qualification by staff is required before gaining access to the tool. The Q150RES system is a versatile sputter coater/carbon evaporator for preparing specimens for examination by electron microscopy. This tool is strictly for the use of coating thin films of material in order to minimizing charging effects during imaging. This system includes: NOTE: Sputter coating with gold and gold palladium Carbon coating with quick flash evaporation using a fiber insert (not carbon rods) Film thickness monitor which can measure coating thickness applied to the sample as well as terminate a coating cycle once a required thickness has been achieved THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING PLEASE CONTACT STAFF IN ORDER TO SWITCH BETWEEN CARBON EVAPORATION AND GOLD COATING SET UP

System overview The Quorum Tech Q150RES uses an Argon gas supply for the thin film coating of gold and carbon. The sputter coating assembly is designated for coating thin gold films (~10 nm) per run. This assembly can be interchanged with a carbon fiber evaporation set up for carbon films up to 20 nm of thickness per run. The thickness of the coating can be monitored with a crystal film thickness monitor, as long as the cap for the crystal is open before running the process. Figure 1 shows the hardware components for the sputter coating, the process is controlled by a touch-screen (Fig 2). Use the stylus to edit profile parameters (i.e thickness), as appropriate. Evaporation or target source (Shown: Carbon evaporation) Sample holder (6 samples) Profile operating screen Gas valve Stylus Film thickness monitor Figure 1. Overview of hardware components

Figure 2. Overview of touch screen controls.

STANDARD OPERATING PROCEDURE Initial checks Wear gloves when handling the machine or your samples Tweezers are available for handling your samples Make sure the system is enabled on Badger. Turn on machine (if necessary) ON/OFF switch (Shown: ON position) Make sure gas valve is open and flowing by reading a pressure on the gauge that is greater than 0 psi Make sure pressure is above 0 Open/close valve

Loading Open the chamber, and make sure evaporation source or sputtering target has been loaded. Move the shutter over the evaporation or the sputtering target if necessary. Moving the shutter will minimize the amount of excess material being deposited onto your sample. Shown: Carbon fiber evaporation source Pull up on the black handle to open the chamber Place sample into one of the holes of the sample stage. The sample stage can hold up to 6 samples and rotates during the deposition. The stub should rest at the same height as surface of the sample stage.

Make sure the film thickness monitor (FTM) is uncapped, especially if you are running controlled depositions. The system will NOT automatically open this cap for you. FTM is covered FTM is uncovered

Make sure O-ring is clear of debris. If necessary, spray a small amount of IPA into a tekwipe and wipe the O-ring. Close the lid and set up the profile for deposition using the touch screen system to the right of the chamber. Use the stylus, and tap on the down arrow button to open the drop down list of profiles (Table 1) and select the desired process. Press edit profiles and select either QT gold 5nm or QT controlled pulse cord for carbon evaporation

Table 1. List of general profiles available and description of each profile. QT Gold 5nm has preset values for gold deposition. QT Controlled pulse cord has the specific profile for depositing carbon to a defined thickness.

Gold Depositions For gold depositions make sure the terminate thickness is between 1 and 20 nm. ANY DEPOSITIONS ABOVE A 20nm THICKNESS WILL DAMAGE THE TARGET On this screen make sure the following values are in the profile Parameter Value Material Gold (fixed, read only parameter) Sputter Current 50 ma Terminate Thickness (nm) 1-20 nm (for QT Gold 5 nm) Tooling Factor 2.30 Maximum sputtering time 1 minute

For controlled pulse cord carbon evaporations, make sure the terminate thickness is between 1 and 20 nm The values on this screen should be the following: Parameter Value Material Carbon (fixed read only parameter) Terminate Thickness (nm) 1-20 nm Pulse Resolution (nm/pulse).5 Current Step Rate (A/Pulse) 1 Pulse Current (A) 50 A Pulse Length (Seconds) 3 seconds Max Pulses 25 Pulse Interval (s) 10 Out gas time (s) 30 Out gas current (A) 30 Max outgas recovery time (s) 60 (read only) Pump hold Yes (read only) Tooling Factor 2.25 (read only)

Tap on the Run Profile button. The Q150RES starts pumping the sample chamber. The progress of the run is shown through a series of on-screen messages. When you want to stop a run while it is in progress, tap on the cancel button

When it is coating the sample, make sure the plasma is ignited and the shutter is open. At the completion of the run, the Q150R begins to vent the chamber. If you want to record thickness control or current information, make a note of it now. When the chamber has been vented, the display reverts to the standby screen. Leave the chamber vented and make sure the tool is disabled from Badger